Method and system for generating main wiring diagram of transformer substation
Through machine learning algorithms, multi-level features of substation equipment are extracted, and equipment topology models are built on the site, and equipment is automatically laid out and connected to the equipment, and the main wiring diagram of the substation is generated. This solves the problems of low efficiency and error-prone substation drawing design in the existing technology, and improves the efficiency of substation operation and management.
Patent Information
- Application Number
- CN202411537118.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-02-28
AI Technical Summary
In the prior art, the design and management methods of substation drawings have problems such as time-consuming, low efficiency, error-prone, poor flexibility, and difficulty in real-time updates, which makes it difficult to comprehensively, quickly and accurately reflect the complexity, diversity and real-time nature of the substation's internal maps, and it is difficult to meet the needs of rapid response and precise management of substations.
Machine learning algorithms are used to extract the basic data of multiple devices in the substation, and obtain multi-level pro-features, which are used to build multiple on-site equipment topology models, and automatically layout and connect devices based on these models to generate the main wiring diagram of the substation.
Through automation, the rapid, accurate and multi-style automatic generation of the main wiring diagram of the substation is achieved, which improves the efficiency of the substation's operation and management and can better meet the needs of the substation's rapid response and precise management.
Smart Images

Figure CN119538462A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of substation automation, and in particular to a method and system for generating a main wiring diagram of a substation. Background Art
[0002] With the continuous deepening of smart grid construction, substations, as the core components of the power system, have a direct impact on the stability and reliability of the power grid with their operating efficiency and intelligence level. In related technologies, the traditional substation drawing design and management methods have problems such as long manual drawing time, low efficiency, easy errors, poor flexibility, and difficulty in real-time updating. It is difficult to fully, quickly and accurately reflect the complexity, diversity, and real-time nature of substation internal drawings, and it is difficult to meet the needs of rapid response and precise management of substations. Summary of the invention
[0003] In order to solve the problems of the prior art, the present invention proposes a method and system for generating a main wiring diagram of a substation, aiming to realize fast, accurate and multi-style automatic generation of the main wiring diagram of the substation through automation means, thereby improving the operation and management efficiency of the substation.
[0004] The purpose of the present invention is achieved by adopting the following technical solutions:
[0005] In one aspect, the present invention provides a method for generating a main wiring diagram of a substation, the method comprising:
[0006] Using a machine learning algorithm, feature extraction is performed on basic data of multiple devices in the substation to obtain multi-level affinity features; wherein the multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between the multiple devices;
[0007] Constructing multiple in-station equipment topology models matching the multi-level affinity features;
[0008] Based on the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the substation main wiring diagram.
[0009] Optionally, the machine learning algorithm is used to extract features from basic data of multiple devices in the substation to obtain multi-level features, including:
[0010] Preprocessing the basic data to obtain intermediate data;
[0011] The machine learning algorithm is used to extract features from the intermediate data to obtain the multi-level affinity features.
[0012] Optionally, the constructing of multiple in-station device topology models matching the multi-level affinity features includes:
[0013] Analyze the multi-level affinity features to obtain key nodes, connection paths and connection densities corresponding to the multiple devices;
[0014] Based on the key nodes, the connection paths and the connection density, the multiple in-station equipment topology models are constructed.
[0015] Optionally, before laying out and connecting the multiple devices based on the multiple in-station device topology models to generate the substation main wiring diagram, the method further includes:
[0016] Acquire the spatial constraint relationship between the multiple devices;
[0017] The step of arranging and connecting the plurality of devices based on the plurality of in-station device topology models to generate the substation main wiring diagram includes:
[0018] Based on the spatial constraint relationship and the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the substation main connection diagram.
[0019] Optionally, after laying out and connecting the multiple devices based on the multiple in-station device topology models to generate the substation main wiring diagram, the method further includes:
[0020] In response to receiving a control operation directed to a user interaction interface, adjusting the substation main wiring diagram based on a control instruction carried by the control operation to obtain an adjusted substation main wiring diagram;
[0021] Wherein, the user interaction interface at least includes a display area for displaying the main wiring diagram of the substation.
[0022] On the other hand, the present invention also provides a system for generating a main wiring diagram of a substation, the system comprising:
[0023] A feature extraction module is used to extract features from basic data of multiple devices in the substation using a machine learning algorithm to obtain multi-level affinity features; wherein the multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between the multiple devices;
[0024] A topology building module, used to build multiple in-station equipment topology models matching the multi-level affinity features;
[0025] The layout module is used to layout and connect the multiple devices based on the multiple in-station device topology models to generate the main wiring diagram of the substation.
[0026] Optionally, the feature extraction module includes:
[0027] A data preprocessing subunit, used to preprocess the basic data to obtain intermediate data;
[0028] The feature extraction subunit is used to use the machine learning algorithm to extract features from the intermediate data to obtain the multi-level affinity features.
[0029] Optionally, the topology building module includes:
[0030] A feature analysis subunit, configured to analyze the multi-level affinity features to obtain key nodes, connection paths, and connection densities corresponding to the multiple devices;
[0031] The topology construction subunit is used to construct the multiple in-station equipment topology models based on the key nodes, the connection paths and the connection density.
[0032] Optionally, the layout module is specifically used to obtain the spatial constraint relationship between the multiple devices; based on the spatial constraint relationship and the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the substation main connection diagram.
[0033] Optionally, the system further includes:
[0034] A display control module, configured to, in response to receiving a control operation directed to a user interaction interface, adjust the substation main wiring diagram based on a control instruction carried by the control operation to obtain an adjusted substation main wiring diagram;
[0035] Wherein, the user interaction interface at least includes a display area for displaying the main wiring diagram of the substation.
[0036] In another aspect, the present invention further provides a computing device, comprising: at least one processor and a memory; the memory and the processor are connected via a bus;
[0037] The memory is used to store one or more programs;
[0038] When the one or more programs are executed by the at least one processor, the method for generating a main wiring diagram of a substation as described in any one of the above items is implemented.
[0039] On the other hand, the present invention further provides a readable storage medium having an execution program stored thereon, and when the execution program is executed, the method for generating a main wiring diagram of a substation as described in any one of the above items is implemented.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] The machine learning algorithm is used to extract multi-level features from the basic data of multiple devices in the substation, and the extracted multi-level features are analyzed and modeled to obtain multiple in-station equipment topology models, thereby automatically laying out and drawing the substation main wiring diagram based on multiple in-station equipment topology models. In this way, the main wiring diagram of the substation can be automatically generated quickly, accurately, and in multiple styles through automation to improve the operation and management efficiency of the substation.
[0042] It should be understood that the above general description and the following detailed description are merely exemplary and explanatory, and are not intended to limit the technical solutions provided by the embodiments of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work, among which:
[0044] Figure 1 A schematic diagram of a flow chart of a method for generating a main wiring diagram of a substation provided by the present invention;
[0045] Figure 2 A schematic diagram of the components of a device corresponding to the method for generating a main wiring diagram of a substation provided by the present invention;
[0046] Figure 3 A schematic diagram of the composition of a system for generating a main wiring diagram of a substation provided by an embodiment of the present invention;
[0047] Figure 4 A schematic diagram of the composition of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0048] The following will describe the embodiments of the present invention with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention, not for limiting the scope of protection of the present invention.
[0049] In the following description, reference is made to “some embodiments”, which describe a subset of all possible embodiments, but it will be understood that “some embodiments” may be the same subset or different subsets of all possible embodiments and may be combined with each other without conflict.
[0050] In the following description, the terms "first\second\third" involved are merely used to distinguish similar objects and do not represent a specific ordering of the objects. It can be understood that "first\second\third" can be interchanged with a specific order or sequence where permitted, so that the embodiments of the present invention described herein can be implemented in an order other than that illustrated or described herein.
[0051] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the technical field of the embodiments of the present invention. The terms used herein are only for the purpose of describing the embodiments of the present invention and are not intended to limit the embodiments of the present invention.
[0052] With the continuous deepening of smart grid construction, substations, as the core components of the power system, have a direct impact on the stability and reliability of the power grid with their operating efficiency and intelligence level. In related technologies, the traditional substation drawing design and management methods have problems such as long manual drawing time, low efficiency, easy errors, poor flexibility, and difficulty in real-time updating. It is difficult to fully, quickly and accurately reflect the complexity, diversity, and real-time nature of substation internal drawings, and it is difficult to meet the needs of rapid response and precise management of substations.
[0053] Based on the above problems, the present invention provides a method and system for generating a main wiring diagram of a substation, aiming to realize fast, accurate and multi-style automatic generation of the main wiring diagram of the substation through automation means, thereby improving the operation and management efficiency of the substation.
[0054] Example 1
[0055] See also Figure 1 As shown, it is a schematic diagram of a flow chart of a method for generating a main wiring diagram of a substation provided by the present invention, wherein the method for generating a main wiring diagram of a substation can be combined with Figure 1 The steps shown are explained below:
[0056] Step 101: Use a machine learning algorithm to extract features from basic data of multiple devices in the substation to obtain multi-level features.
[0057] The multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between the multiple devices.
[0058] In some embodiments of the present invention, a machine learning algorithm may be used to perform data analysis and feature mining on basic data of multiple devices in a substation, thereby obtaining multi-level features. Here, feature extraction refers to data analysis and feature mining.
[0059] The multiple devices in the substation may refer to the main devices of the substation, including but not limited to: transformers, switches, circuit breakers, busbars, bay unit devices, etc. Correspondingly, the basic data of the multiple devices include but are not limited to: device locations, connection relationships, attribute information, etc.
[0060] Here, the substation is an electric power facility in the power system that transforms voltage, receives and distributes electric energy, controls the flow of electricity and adjusts voltage. It connects power grids of various voltage levels through its transformers.
[0061] It should be noted that machine learning algorithms are data- and experience-based algorithms that automatically discover patterns, rules, and associations in data by learning and analyzing large amounts of data, and use these patterns and rules to perform tasks such as prediction, classification, or optimization. The goal of machine learning algorithms is to extract useful information and knowledge from data and apply it to new unknown data.
[0062] In some embodiments of the present invention, the machine learning algorithm may be an algorithm based on statistical principles or an algorithm based on neural networks, and the present invention does not impose any limitation on this. Here, a machine learning algorithm may be used to extract features based on basic data between multiple devices in a substation, such as actual device data, electrical information of topological data, connection information, etc., to obtain multi-level affinity features; wherein, the voltage level may be used as a feature of the layout position and graphic rendering of high, medium and low voltages for feature extraction; the device type may be used as an electrical characteristic and a feature of graphic rendering for feature extraction; the topological structure between devices and connected devices, and between devices may be used as a relationship feature for feature extraction, thereby obtaining multi-level affinity features.
[0063] In some embodiments of the present invention, multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between multiple devices, that is, multi-level affinity features are used to describe the closeness between multiple devices in a substation, and this closeness can be reflected in terms of the physical connection level, logical level and functional level.
[0064] In some embodiments of the present invention, the physical connection relationship between multiple devices in a substation may refer to the actual connection characteristics between multiple devices, for example: the equipment connection structure relationship between busbars determines the wiring mode of the busbar, such as bus coupling, bridging, single bus, double bus, segmentation, bypass and other wiring modes; the equipment connection structure relationship between transformers and busbars may determine line transformer groups, internal bridges, external bridges, etc. The logical hierarchical relationship between multiple devices in a substation refers to stratifying the logical relationship of multiple devices in a substation according to the order of structural complexity, for example, transformers and busbars are regarded as first-layer devices, the connecting lines connected thereto are regarded as second-layer devices, branches and convergence devices are regarded as third-layer devices, and so on. The functional dependency relationship between multiple devices in a substation can be used to express, for example: the incoming and outgoing lines are connected to circuit breakers, and the dependency relationship of device connections is clarified according to the main functional characteristics of the equipment.
[0065] In some embodiments of the present invention, the above step 101 may be implemented by the following steps 1011 and 1012 (not shown in the figure):
[0066] Step 1011: pre-process the basic data to obtain intermediate data.
[0067] In some embodiments of the present invention, preprocessing includes, but is not limited to, data cleaning, data error correction, data format conversion and other preprocessing operations.
[0068] Step 1012: Use the machine learning algorithm to extract features from the intermediate data to obtain the multi-level affinity features.
[0069] In this way, the basic data of multiple devices in the substation, such as device location, connection relationship, attribute information, etc., are preprocessed, and then the preprocessed data is subjected to feature extraction using a machine learning algorithm to obtain multi-level affinity features. In this way, the efficiency and accuracy of obtaining multi-level affinity features can be improved.
[0070] Step 102: construct multiple in-station equipment topology models that match the multi-level affinity features.
[0071] In some embodiments of the present invention, the extracted multi-level affinity features can be comprehensively analyzed to identify key nodes, connection paths, connection density and other information corresponding to multiple devices, so as to construct multiple in-station equipment topology models corresponding to the substation with the help of this information.
[0072] In some embodiments of the present invention, various in-station equipment topology models include but are not limited to: single mother model, single mother segmented model, single mother with bypass model, single mother segmented with bypass model, dual mother model, dual mother segmented model, dual mother segmented with bypass model, line transformer group model, 3 / 2 wiring model, and bridge wiring model.
[0073] Here, each of the multiple in-station device topology models can be customized with different graphic display styles and layout designs according to the wiring method between devices.
[0074] In some embodiments of the present invention, the above step 102 may be implemented by the following steps 1021 and 1022 (not shown in the figure):
[0075] Step 1021: Analyze the multi-level affinity features to obtain key nodes, connection paths, and connection densities corresponding to the multiple devices.
[0076] In some embodiments of the present invention, the connection paths corresponding to multiple devices may refer to the main connection paths between device 1 and device 2 in multiple devices, for example: the main path from transformer to inlet and outlet as the line transformer group connection method; the path from transformer to device connection between buses; the path from bus to device connection between buses; the path from bus to inlet and outlet, etc. At the same time, the connection density corresponding to the multiple devices can determine the dense area corresponding to the multiple devices based on the connection density, and the dense devices in the dense area need to be adjusted or processed in layout.
[0077] Step 1022: construct the multiple in-station equipment topology models based on the key nodes, the connection paths, and the connection density.
[0078] In some embodiments of the present invention, a variety of different in-station equipment topology models are established based on the acquired information: key nodes, the connection paths and the connection density, so that the main wiring diagram of the substation corresponding to the subsequent output based on the variety of different in-station equipment topology models can be realized.
[0079] In this way, feature analysis and modeling are performed through multi-level affinity features. That is, based on the key nodes, connection paths and connection densities corresponding to multiple devices obtained based on feature analysis, various in-station equipment topology models are efficiently constructed, thereby providing a parameter basis for the subsequent generation of the substation main wiring diagram.
[0080] Step 103: Based on the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate a main wiring diagram of the substation.
[0081] In some embodiments of the present invention, suitable layout algorithms (such as hierarchical layout, grid layout, etc.) can be used for automatic layout. At the same time, in the layout process, the mutual relationship between multiple devices in the substation (multiple in-station equipment topology models are already available) and spatial constraints can also be considered to further ensure that the generated substation main wiring diagram has a clear structure and distinct levels. In addition, according to the attributes and connection relationships of multiple devices in the substation, graphic elements such as connection lines and annotation information can be automatically drawn to form the final substation main wiring diagram.
[0082] In some embodiments of the present invention, before executing the above step 103, the following step A1 may be executed first:
[0083] Step A1: Acquire the spatial constraint relationship between the multiple devices.
[0084] In some embodiments of the present invention, the spatial constraint relationship between multiple devices includes but is not limited to: spatial distance constraints, spatial partition constraints, spatial shape constraints, and spatial pattern constraints, for example: the distance between device 1 and device 2 must be greater than a preset distance, etc.
[0085] Correspondingly, the above step 103 can be implemented by following the following step A2:
[0086] Step A2: Based on the spatial constraint relationship and the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the main wiring diagram of the substation.
[0087] In some embodiments of the present invention, the attributes and connection relationships between multiple devices can be obtained based on the spatial constraint relationships and the mutual relationships between multiple devices corresponding to multiple in-station equipment topology models, thereby realizing automatic drawing of connection lines, marking information, etc. to obtain the main connection diagram of the substation.
[0088] In this way, by making use of the spatial constraint relationship between multiple devices and various in-station equipment topology models, corresponding layout and connection can be carried out to generate a substation main wiring diagram with a clear structure and distinct levels.
[0089] In some embodiments of the present invention, after executing step 103 of "laying out and connecting the multiple devices based on the multiple in-station device topology models to generate the substation main wiring diagram", the following step B may also be executed:
[0090] In response to receiving a control operation directed to a user interaction interface, adjusting the substation main wiring diagram based on a control instruction carried by the control operation to obtain an adjusted substation main wiring diagram;
[0091] Wherein, the user interaction interface at least includes a display area for displaying the main wiring diagram of the substation.
[0092] In some embodiments of the present invention, the user interaction interface can be displayed on the relevant display module, and the user interaction interface can include not only: a display area for displaying the main wiring diagram of the substation, but also: a control menu area, etc. The user display interface can allow relevant operating users in the substation to partially modify and adjust the generated main wiring diagram of the substation to carry out expansion, monitoring and other services.
[0093] Here, the control operation for the user interaction interface includes, but is not limited to: control operations generated by related touch, control operations generated by operating an external input device (such as a mouse) of the system where the user interaction interface is located, etc.
[0094] In some embodiments of the present invention, the control operation on the user interaction interface includes, but is not limited to: local adjustment operation on the substation main wiring diagram, display brightness adjustment operation on the substation main wiring diagram, control operation of scaling the substation main wiring diagram, etc.
[0095] In this way, by combining the control operation of the user interaction interface and adjusting the main wiring diagram of the substation, the user can make partial modifications and adjustments to the automatically generated in-station diagram, thereby updating the in-station diagram in a timely manner, thereby improving the operation and management efficiency of the substation.
[0096] Refer to the above description, such as Figure 2As shown, it is a schematic diagram of the components of the device corresponding to the method for generating the main wiring diagram of a substation provided by the present invention. The device can be composed of: a data input module 201, a data preprocessing module 202, a feature extraction module 203, a feature analysis module 204, a topology modeling module 205, an automatic layout module 206, a graphics drawing module 207 and a user interaction module 208. Here, firstly, the data input module 201 can be used to collect basic data of multiple devices in the substation, so that the data preprocessing module 202 can perform preprocessing operations such as data cleaning, error correction, and format conversion on the collected basic data of multiple devices; secondly, the basic data after the preprocessing operation can be The multi-level affinity features are input into the feature extraction module 203 for extraction, so that the extracted multi-level affinity features are input into the feature analysis module 204 for feature analysis to obtain analysis results; then, the analysis results are input into the topology modeling module 205 for model construction to obtain various in-station equipment topology models, and the various in-station equipment topology models obtained are successively laid out and connected by the automatic layout module 206 and the graphics drawing module 207 to obtain the substation main wiring diagram; here, the obtained substation main wiring diagram can be further input into the user interaction module 208 to enable the relevant operation user to make relevant adjustments and modifications to the obtained substation main wiring diagram.
[0097] The method for generating a substation main wiring diagram provided by the present invention uses a machine learning algorithm to extract multi-level affinity features from the basic data of multiple devices in the substation, and analyzes and models the extracted multi-level affinity features to obtain multiple in-station equipment topology models, thereby automatically laying out and drawing the substation main wiring diagram based on the multiple in-station equipment topology models. In this way, the main wiring diagram of the substation can be automatically generated quickly, accurately, and in multiple styles through automated means, so as to improve the operation and management efficiency of the substation.
[0098] Embodiment 2:
[0099] The present invention based on the same inventive concept also provides a system for generating a main wiring diagram of a substation, referring to Figure 3 FIG. 3 is a schematic diagram of a system for generating a main wiring diagram of a substation provided by an embodiment of the present invention. The system 300 includes:
[0100] The feature extraction module 301 is used to extract features from the basic data of multiple devices in the substation using a machine learning algorithm to obtain multi-level affinity features; wherein the multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between the multiple devices;
[0101] A topology construction module 302, used to construct multiple in-station equipment topology models matching the multi-level affinity features;
[0102] The layout module 303 is used to layout and connect the multiple devices based on the multiple in-station device topology models to generate the substation main wiring diagram.
[0103] In some embodiments of the present invention, the feature extraction module 301 includes: a data preprocessing subunit, used to preprocess the basic data to obtain intermediate data; a feature extraction subunit, used to use the machine learning algorithm to extract features from the intermediate data to obtain the multi-level affinity features.
[0104] In some embodiments of the present invention, the topology construction module 302 includes: a feature analysis subunit, used to analyze the multi-level affinity features to obtain key nodes, connection paths and connection densities corresponding to the multiple devices; a topology construction subunit, used to construct topology models of the multiple in-station devices based on the key nodes, the connection paths and the connection densities.
[0105] In some embodiments of the present invention, the layout module 303 is specifically used to obtain the spatial constraint relationship between the multiple devices; based on the spatial constraint relationship and the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the substation main connection diagram.
[0106] In some embodiments of the present invention, the system 300 also includes: a display control module, which is used to adjust the substation main connection diagram in response to receiving a control operation for a user interaction interface, based on the control instructions carried by the control operation, to obtain the adjusted substation main connection diagram; wherein the user interaction interface includes at least a display area for displaying the substation main connection diagram.
[0107] It should be noted that the description of the system is similar to the description of the above method embodiment, and has similar beneficial effects as the method embodiment. For technical details not disclosed in the system embodiment of the present invention, please refer to the description of the method embodiment of the present invention for understanding.
[0108] Embodiment 3:
[0109] Based on the same inventive concept, Figure 4As shown, the present invention also provides an electronic device, which may be a computer device, a single-chip device, an intelligent mobile device, etc. The electronic device in this embodiment may include a processor 410, a memory 420, a transceiver component 430, etc. The processor 410, the memory 420 and the transceiver component 430 are connected via a bus 440; the memory 420 can be used to store an execution program, and an exemplary execution program may include instructions; the processor 410 is used to execute the instructions stored in the memory. The memory 420 can also be used to store data, which can be called and / or modified when executing instructions.
[0110] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, specifically suitable for loading and executing one or more instructions in a storage medium to implement the corresponding method flow or corresponding functions, so as to realize the steps of the method for generating the main wiring diagram of the substation in the above embodiment.
[0111] Embodiment 4:
[0112] Based on the same inventive concept, the present invention also provides a readable storage medium, specifically an electronic device readable storage medium (Memory), which is a memory device in an electronic device for storing programs and data. It can be understood that the storage medium here can include both built-in storage media in electronic devices and, of course, extended storage media supported by electronic devices. The storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more execution programs (including program codes). It should be noted that the storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor loads and executes one or more instructions stored in the storage medium to implement the steps of the method for generating the main wiring diagram of the substation in the above embodiment.
[0113] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0114] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0115] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0116] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0117] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for generating a main wiring diagram of a substation, characterized in that: The method comprises: Using a machine learning algorithm, feature extraction is performed on basic data of multiple devices in the substation to obtain multi-level affinity features; wherein the multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between the multiple devices; Constructing multiple in-station equipment topology models matching the multi-level affinity features; Based on the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the substation main wiring diagram.
2. The method according to claim 1, characterized in that The machine learning algorithm is used to extract features from the basic data of multiple devices in the substation to obtain multi-level features, including: Preprocessing the basic data to obtain intermediate data; The machine learning algorithm is used to extract features from the intermediate data to obtain the multi-level affinity features.
3. The method according to claim 1 or 2, characterized in that: The constructing of multiple in-station equipment topology models matching the multi-level affinity features includes: Analyze the multi-level affinity features to obtain key nodes, connection paths and connection densities corresponding to the multiple devices; Based on the key nodes, the connection paths and the connection density, the multiple in-station equipment topology models are constructed.
4. The method according to claim 1, characterized in that Before laying out and connecting the multiple devices based on the multiple in-station device topology models to generate the substation main wiring diagram, the method further includes: Acquire the spatial constraint relationship between the multiple devices; The step of arranging and connecting the plurality of devices based on the plurality of in-station device topology models to generate the substation main wiring diagram includes: Based on the spatial constraint relationship and the multiple in-station equipment topology models, the multiple devices are laid out and connected to generate the substation main connection diagram.
5. The method according to any one of claims 1 to 4, characterized in that: After laying out and connecting the multiple devices based on the multiple in-station device topology models to generate the substation main wiring diagram, the method further includes: In response to receiving a control operation directed to a user interaction interface, adjusting the substation main wiring diagram based on a control instruction carried by the control operation to obtain an adjusted substation main wiring diagram; Wherein, the user interaction interface at least includes a display area for displaying the main wiring diagram of the substation.
6. A system for generating a main wiring diagram of a substation, characterized in that: The system comprises: A feature extraction module is used to extract features from basic data of multiple devices in the substation using a machine learning algorithm to obtain multi-level affinity features; wherein the multi-level affinity features are used to characterize the physical connection relationship, logical hierarchical relationship and functional dependency relationship between the multiple devices; A topology building module, used to build multiple in-station equipment topology models matching the multi-level affinity features; The layout module is used to layout and connect the multiple devices based on the multiple in-station device topology models to generate the main wiring diagram of the substation.
7. The system according to claim 6, characterized in that The feature extraction module comprises: A data preprocessing subunit, used to preprocess the basic data to obtain intermediate data; The feature extraction subunit is used to use the machine learning algorithm to extract features from the intermediate data to obtain the multi-level affinity features.
8. The system according to claim 6 or 7, characterized in that: The topology building module comprises: A feature analysis subunit, configured to analyze the multi-level affinity features to obtain key nodes, connection paths, and connection densities corresponding to the multiple devices; The topology construction subunit is used to construct the multiple in-station equipment topology models based on the key nodes, the connection paths and the connection density.
9. The system according to claim 6, characterized in that The layout module is specifically used to obtain the spatial constraint relationship between the multiple devices; based on the spatial constraint relationship and the multiple in-station device topology models, the multiple devices are laid out and connected to generate the substation main wiring diagram.
10. The system according to any one of claims 6 to 9, characterized in that: The system further comprises: A display control module, configured to, in response to receiving a control operation directed to a user interaction interface, adjust the substation main wiring diagram based on a control instruction carried by the control operation to obtain an adjusted substation main wiring diagram; Wherein, the user interaction interface at least includes a display area for displaying the main wiring diagram of the substation.