Load prediction-based airport charging pile load management method and system, and medium
By improving the particle swarm algorithm and long-term memory neural network model to predict airport load, and combining the improved raccoon optimization algorithm to determine the charging pile management strategy, the problems of airport power grid load prediction and optimization are solved, and the efficient utilization of power resources is achieved.
Patent Information
- Application Number
- CN202411579341.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-03-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
How to predict the load changes of different power consumption systems in airports in advance, and optimize and adjust the load status of electric vehicle charging pile systems in substations to achieve reasonable allocation and efficient utilization of limited power resources.
The improved particle swarm algorithm-long and short-term memory neural network model is used to predict future load data, and the optimal charging pile load management strategy is determined through the improved raccoon optimization algorithm to perform load regulation.
Accurate prediction and optimized management of airport power grid loads are achieved, ensuring the reasonable allocation and efficient utilization of power resources, and avoiding energy waste.