Integrated management method and device serving enterprise development planning
By analyzing the order cost-effectiveness impact data and basic priority value data in the enterprise management system, calculating the order processing priority and determining the processing order, the problem of difficult service efficiency and service quality when the order quantity surges, and efficient optimization of enterprise resource management is achieved.
Patent Information
- Application Number
- CN202411786273.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-06
- Publication Date
- 2025-03-21
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the enterprise management system, when the number of orders surges, it is difficult to ensure service efficiency and service quality, and it is difficult to effectively integrate resource management to optimize order processing in the existing technology.
Through an integrated management method, enterprise order data is obtained, order cost-effectiveness impact data is analyzed, order processing priority is calculated based on basic priority data, and order processing order is determined to optimize enterprise resource management.
It realizes efficient priority analysis and processing order determination of enterprise orders, and improves the service efficiency and service quality of enterprises.
Smart Images

Figure CN119671323A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of enterprise management, and in particular to an integrated management method and device serving enterprise development planning. Background Art
[0002] Enterprise management is an objective requirement and inevitable product of the development of large-scale socialized production. It is caused by the joint labor of people in the process of exchange. When social production develops to a certain stage, all large-scale joint labor needs to be directed to a greater or lesser extent to coordinate individual activities. In the enterprise management system, it contains multiple functional modules, each of which is responsible for one or more aspects of orders. In certain specific periods, the number of orders surges. In order to ensure the service efficiency and service quality of the enterprise, it is very important to integrate the management of the enterprise so that the enterprise can reasonably solve these orders. Summary of the invention
[0003] The present application provides an integrated management method and device serving the enterprise development planning, which can enable the enterprise to integrate resource management orders and ensure the service efficiency and service quality of the enterprise.
[0004] In a first aspect, the present application provides an integrated management method for serving enterprise development planning. The method is applied to an enterprise management system and specifically includes: Obtaining enterprise order data; the enterprise order data includes order source data and order demand data; the order source data refers to the enterprise management module data to which the order belongs; the order demand data includes order demand time, order demand resources and order value; Determine the basic priority value data according to the preset enterprise management module basic impact table and the order source data; the preset enterprise management module basic impact table includes the corresponding relationship between the enterprise management module data to which the order belongs and the basic priority value data; Analyze order cost performance impact data according to the order demand time, the order demand resources and the order value; the order cost performance impact data is associated with the order demand time, the order demand resources and the order value; Order processing priority data is calculated according to the basic priority value data and the order cost performance impact data, and the order processing sequence is determined based on the order processing priority data.
[0005] Further, the analyzing the order cost performance impact data according to the order demand time, the order demand resources and the order value; the order cost performance impact data associating the order demand time, the order demand resources and the order value includes: Determine first order evaluation data according to the order demand time; the first order evaluation data is negatively correlated with the order demand time; Determine second order evaluation data according to the preset module resource data and the order requirement resource; the second order evaluation data is associated with the preset module resource data and the order requirement data; Determine third order evaluation data according to preset order-associated customer data, the order demand resources and the order value; The order cost performance impact data is analyzed based on the first order evaluation data, the second order evaluation data and the third order evaluation data.
[0006] Further, the second order evaluation data is determined according to the preset module resource data and the order requirement resource; the second order evaluation data is associated with the preset module resource data and the order requirement data and includes: Determining the preset resource quantity data owned by the enterprise management module according to the preset module resource data; Determine the quantity of resources required for the order according to the order demand resources; The second order evaluation data is determined according to the preset unit resource quantity data and the resource quantity data required for the order.
[0007] Furthermore, the calculation method of the order cost performance impact data includes: ; In the formula, Influence data for order cost performance, Evaluate data for the first order, Evaluate the data for the second order, Evaluate data for third orders; The first order evaluation weight, the second order evaluation weight and the third order evaluation weight are preset respectively; and, ; in, ; ; Determine data for resources; The resource difference data is the difference between the resource quantity data required for the order and the preset unit resource quantity data.
[0008] Furthermore, the method for calculating the order processing priority data includes: ; In the formula, Processing priority data for orders, As the basic priority value data, Influence data for order cost performance; are respectively a preset first weight and a preset second weight; and, .
[0009] In a second aspect, the present application provides an integrated management device serving enterprise development planning, the device comprising: An acquisition module is used to acquire enterprise order data; the enterprise order data includes order source data and order demand data; the order source data refers to the enterprise management module data to which the order belongs; the order demand data includes order demand time, order demand resources and order value; A determination module, used to determine basic priority value data according to a preset enterprise management module basic impact table and the order source data; the preset enterprise management module basic impact table includes a corresponding relationship between the enterprise management module data to which the order belongs and the basic priority value data; An analysis module, configured to analyze order cost performance impact data according to the order demand time, the order demand resources and the order value; the order cost performance impact data is associated with the order demand time, the order demand resources and the order value; A calculation module is used to calculate order processing priority data according to the basic priority value data and the order cost performance impact data, and determine the order processing sequence based on the order processing priority data.
[0010] Furthermore, the analysis module is further configured to analyze the order cost performance impact data according to the order demand time, the order demand resources and the order value; the order cost performance impact data is associated with the order demand time, the order demand resources and the order value, including: Determine first order evaluation data according to the order demand time; the first order evaluation data is negatively correlated with the order demand time; Determine second order evaluation data according to the preset module resource data and the order requirement resource; the second order evaluation data is associated with the preset module resource data and the order requirement data; Determine third order evaluation data according to preset order-associated customer data, the order demand resources and the order value; The order cost performance impact data is analyzed based on the first order evaluation data, the second order evaluation data and the third order evaluation data.
[0011] Furthermore, the analysis module is further configured to determine second order evaluation data according to the preset module resource data and the order demand resource; the second order evaluation data is associated with the preset module resource data and the order demand data and includes: Determining the preset resource quantity data owned by the enterprise management module according to the preset module resource data; Determine the quantity of resources required for the order according to the order demand resources; The second order evaluation data is determined according to the preset unit resource quantity data and the resource quantity data required for the order.
[0012] Furthermore, the analysis module (230) is further configured such that the calculation method of the order cost performance impact data includes: ; In the formula, Influence data for order cost performance, Evaluate data for the first order, Evaluate the data for the second order, Evaluate data for third orders; The first order evaluation weight, the second order evaluation weight and the third order evaluation weight are preset respectively; and, ; in, ; ; Determine data for resources; The resource difference data is the difference between the resource quantity data required for the order and the preset unit resource quantity data.
[0013] Furthermore, the calculation module is further configured such that the calculation method of the order processing priority data includes: ; In the formula, Processing priority data for orders, As the basic priority value data, Influence data for order cost performance; are respectively a preset first weight and a preset second weight; and, .
[0014] It should be understood that the contents described in the Summary of the Invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The above and other features, advantages and aspects of the embodiments of the present application will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, wherein: Figure 1 A flowchart of an integrated management method serving enterprise development planning in an embodiment of the present application is shown; Figure 2 A block diagram of an integrated management device serving enterprise development planning in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0016] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0017] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0018] The present application provides an integrated management method and device serving the enterprise development planning, which can perform priority analysis on each order received by the enterprise management system, determine the order in which the enterprise management system processes the orders, and ensure the service quality and service efficiency of the enterprise.
[0019] In a first aspect, the present application provides an integrated management method for serving enterprise development planning, the method being applied to an enterprise management system. Figure 1 The specific steps included in the method are as follows.
[0020] Step S110: Acquire enterprise order data; the enterprise order data includes order source data and order demand data; the order source data refers to the enterprise management module data to which the order belongs; the order demand data includes order demand time, order demand resources and order value.
[0021] In an embodiment of the present application, the enterprise management system includes multiple enterprise management modules, each of which is responsible for a different number of customers and projects and accepts orders signed by customers. The enterprise management system conducts an overall analysis of all orders and ultimately determines the order processing priority; in this way, the order processing efficiency is improved, and the service efficiency and service quality of the enterprise are improved.
[0022] It can be understood that the enterprise management module data to which the order belongs here includes the enterprise management module that provides the order; the order demand time here is the time length data between the order deadline and the order receipt time; the order demand resources refer to the enterprise products required by the customer when placing an order and the corresponding demands raised by the customer; the order value is the company's revenue data that the order can bring, and the company's revenue data is unified as the value data represented by the order amount.
[0023] Step S120: determining basic priority value data according to a preset enterprise management module basic impact table and the order source data; the preset enterprise management module basic impact table includes a correspondence between the enterprise management module data to which the order belongs and the basic priority value data.
[0024] In an embodiment of the present application, the preset enterprise management module basic impact table includes the enterprise management module data to which the order belongs, the basic priority value data, and the correspondence between the enterprise management module data to which the order belongs and the basic priority value data; therefore, when any two of the above three items are obtained, the third item can be determined based on the preset enterprise management module basic impact table.
[0025] Step S130: analyzing order cost performance impact data according to the order demand time, the order demand resources and the order value; the order cost performance impact data is associated with the order demand time, the order demand resources and the order value.
[0026] In an embodiment of the present application, analyzing order cost-effectiveness impact data based on the order demand time, the order demand resources and the order value specifically includes: determining first order evaluation data based on the order demand time; the first order evaluation data is negatively correlated with the order demand time; determining second order evaluation data based on preset module resource data and the order demand resources; the second order evaluation data is associated with the preset module resource data and the order demand data; determining third order evaluation data based on preset order-associated customer data, the order demand resources and the order value; analyzing order cost-effectiveness impact data based on the first order evaluation data, the second order evaluation data and the third order evaluation data.
[0027] Among them, the first order evaluation data is determined based on the order demand time; it can be understood that the order demand time here is mentioned in step S110, and the order demand time is the time length data between the order deadline and the order reception time; and for a specific order, the longer the order demand time, the lower the urgency of the order, and conversely, the shorter the order demand time, the higher the urgency of the order; therefore, in an embodiment of the present application, the longer the order demand time, the larger the first order evaluation data, and the smaller the order demand time, the smaller the first order evaluation data; there is a positive correlation between the first order evaluation data and the order demand time; specifically, the first order evaluation data = order demand time * preset time impact evaluation coefficient.
[0028] Among them, determining the second order evaluation data based on the preset module resource data and the order requirement resources specifically includes: determining the preset resource quantity data owned by the enterprise management module based on the preset module resource data; determining the order required resource quantity data based on the order requirement resources; and determining the second order evaluation data based on the preset unit resource quantity data and the order required resource quantity data.
[0029] It can be understood that in the embodiment of the present application, the second order evaluation data is used to assess whether the enterprise management module corresponding to the order can complete the requirements of the corresponding order; specifically, each enterprise management module will have the dominant power over some enterprise resources, that is, each enterprise management module contains a preset number of enterprise resources, where the enterprise resources include human resources and material resources; human resources refer to the employees of the enterprise, and each employee represents a unit number of enterprise resources; the material resources here refer to the remaining resources except human resources, such as enterprise data resources, etc.; based on the preset enterprise resource table, the unit resource quantity data corresponding to different types of material resources can be determined; and after receiving the order, the enterprise management system will evaluate the order and determine the unit resource quantity data required to complete the order in combination with the preset enterprise resource table, that is, the above-mentioned order required resource quantity data; it should be noted that the unit quantity conversion settings for different types of material resources or human resources in the preset enterprise resource table are determined by the enterprise itself and can be freely changed. In the embodiment of the present application, only this method is used to represent the digital conversion of resources required for the order and the resources paid by the company. The specific conversion process, that is, the preset enterprise resource table is not within the scope of this solution, and can be achieved by adopting a general conventional technical solution.
[0030] In the embodiment of the present application, what this scheme wants to emphasize is that for any order, if the resources owned by the corresponding enterprise management module are unable to process the order, it means that the resources required for the order are high and exceed the capacity of the corresponding enterprise management module. At this time, the enterprise management system needs to be integrated and managed, and the resources of other enterprise management modules are deployed for auxiliary processing. Once the resources of other enterprise management modules are deployed, it means that the processing priority of the order is greatly improved. In order to ensure that the enterprise can process orders in a timely, efficient and high-quality manner, and improve the service efficiency and service quality of the enterprise, the priority corresponding to the order in this case will also be greatly improved. Correspondingly, when the resource quantity data required for the order is greater than the preset unit resource quantity data by 1 unit, the second order evaluation data surges, but as the part of the resource quantity data required for the order exceeds the preset unit resource quantity data, the efficiency of the second order evaluation data decreases before the intersection, and the corresponding image curve slope growth rate decreases, which means that in the actual order processing situation, when additional resources are needed, the priority of the order will surge, but the more the number of additional resources increases, the rate of increase in priority will decrease.
[0031] Specifically, the preset order-associated customer data here includes preset customer level data, and the customer level here indicates the importance of the customer. The higher the customer importance, the higher the order processing priority; the third order evaluation data here is calculated as follows: third order evaluation data = order value * preset value weight + preset customer level data + preset customer level weight - order required resource quantity data * preset order required resource quantity weight.
[0032] Furthermore, the calculation method of the order cost performance impact data includes: ; In the formula, Influence data for order cost performance, Evaluate data for the first order, Evaluate the data for the second order, Evaluate data for third orders; The first order evaluation weight, the second order evaluation weight and the third order evaluation weight are preset respectively; and, ; in, ; ; Determine data for resources; The resource difference data is the difference between the resource quantity data required for the order and the preset unit resource quantity data.
[0033] Step S140: Calculate order processing priority data according to the basic priority value data and the order cost performance impact data, and determine the order processing sequence based on the order processing priority data.
[0034] In the embodiment of the present application, after the basic priority value data and the order cost performance impact data are obtained, the order processing priority data can be calculated based on the preset calculation formula; specifically, the calculation method of the order processing priority data includes: ; In the formula, Processing priority data for orders, As the basic priority value data, Influence data for order cost performance; are respectively a preset first weight and a preset second weight; and, .
[0035] After obtaining the processing priority data of each order, the processing order of the orders can be determined by sorting the orders from high to low according to the order processing priority data.
[0036] In an embodiment of the present application, the above method is essentially a machine learning model applied to order processing in an enterprise management system; in the process of continuous analysis and calculation of the order processing priority, training of some parameters can be achieved; among them, the parameters that can be trained include preset enterprise management module basic impact table, preset time impact evaluation coefficient, preset resource quantity data, preset value weight, preset customer level weight, preset order required resource quantity weight, preset first order evaluation weight, preset second order evaluation weight, preset third order evaluation weight, preset first weight, preset second weight, etc.; through continuous training of the above parameters, the order processing priority data finally calculated is more accurate and more in line with reality, thereby ensuring the efficiency and security of the enterprise in processing orders and improving the service efficiency and service quality of the enterprise.
[0037] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the embodiments of the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.
[0038] In the second aspect, the present application provides an integrated management device serving enterprise development planning. Figure 2As shown, the device includes, an acquisition module 210, used to acquire enterprise order data; the enterprise order data includes order source data and order demand data; the order source data refers to the enterprise management module data to which the order belongs; the order demand data includes order demand time, order demand resources and order value; a determination module 220, used to determine the basic priority value data according to the preset enterprise management module basic impact table and the order source data; the preset enterprise management module basic impact table includes the corresponding relationship between the enterprise management module data to which the order belongs and the basic priority value data; an analysis module 230, used to analyze the order cost-effectiveness impact data according to the order demand time, the order demand resources and the order value; the order cost-effectiveness impact data is associated with the order demand time, the order demand resources and the order value; a calculation module 240, used to calculate the order processing priority data according to the basic priority value data and the order cost-effectiveness impact data, and determine the order processing order based on the order processing priority data.
[0039] Further, the analysis module 230 is further configured to analyze the order cost-effectiveness impact data according to the order demand time, the order demand resources and the order value; the order cost-effectiveness impact data is associated with the order demand time, the order demand resources and the order value, including: determining the first order evaluation data according to the order demand time; the first order evaluation data is negatively correlated with the order demand time; determining the second order evaluation data according to the preset module resource data and the order demand resources; the second order evaluation data is associated with the preset module resource data and the order demand data; determining the third order evaluation data according to the preset order-associated customer data, the order demand resources and the order value; analyzing the order cost-effectiveness impact data according to the first order evaluation data, the second order evaluation data and the third order evaluation data; wherein, determining the second order evaluation data according to the preset module resource data and the order demand resources; the second order evaluation data is associated with the preset module resource data and the order demand data, including: determining the preset resource quantity data owned by the enterprise management module according to the preset module resource data; determining the order required resource quantity data according to the order demand resources; determining the second order evaluation data according to the preset unit resource quantity data and the order required resource quantity data.
[0040] The calculation methods for the order cost performance impact data include: ; In the formula, Influence data for order cost performance, Evaluate data for the first order, Evaluate the data for the second order, Evaluate data for third orders; The first order evaluation weight, the second order evaluation weight and the third order evaluation weight are preset respectively; and, ; in, ; ; Determine data for resources; The resource difference data is the difference between the resource quantity data required for the order and the preset unit resource quantity data.
[0041] The calculation module 240 is further configured to calculate the order processing priority data in a method including: ; In the formula, Processing priority data for orders, As the basic priority value data, Influence data for order cost performance; are respectively a preset first weight and a preset second weight; and, .
[0042] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described device can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0043] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.
Claims
1. An integrated management method serving enterprise development planning, applied to enterprise management system, characterized in that: include: Obtain enterprise order data; The enterprise order data includes order source data and order demand data; The order source data refers to the enterprise management module data to which the order belongs; The order demand data includes order demand time, order demand resources and order value; Determine basic priority value data according to the preset enterprise management module basic impact table and the order source data; The preset enterprise management module basic impact table includes the corresponding relationship between the enterprise management module data to which the order belongs and the basic priority value data; Analyze order cost performance impact data according to the order demand time, the order demand resources and the order value; The order cost performance impact data is associated with the order demand time, the order demand resources and the order value; Order processing priority data is calculated according to the basic priority value data and the order cost performance impact data, and the order processing sequence is determined based on the order processing priority data.
2. The method according to claim 1, characterized in that analyzing the order cost performance impact data according to the order demand time, the order demand resources and the order value; The order cost performance impact data associated with the order demand time, the order demand resources and the order value includes: Determine first order evaluation data according to the order demand time; the first order evaluation data is negatively correlated with the order demand time; Determine second order evaluation data according to the preset module resource data and the order requirement resource; the second order evaluation data is associated with the preset module resource data and the order requirement data; Determine third order evaluation data according to preset order-associated customer data, the order demand resources and the order value; The order cost performance impact data is analyzed based on the first order evaluation data, the second order evaluation data and the third order evaluation data.
3. The method according to claim 2, characterized in that The second order evaluation data is determined according to the preset module resource data and the order requirement resource; the second order evaluation data is associated with the preset module resource data and the order requirement data and includes: Determining the preset resource quantity data owned by the enterprise management module according to the preset module resource data; Determine the quantity of resources required for the order according to the order demand resources; The second order evaluation data is determined according to the preset unit resource quantity data and the resource quantity data required for the order.
4. The method according to claim 3, characterized in that: The calculation method of the order cost performance impact data includes: ; In the formula, Influence data for order cost performance, Evaluate data for the first order, Evaluate the data for the second order, Evaluate data for third orders; The first order evaluation weight, the second order evaluation weight and the third order evaluation weight are preset respectively; and, ; in, ; ; Determine data for resources; The resource difference data is the difference between the resource quantity data required for the order and the preset unit resource quantity data.
5. The method according to claim 4, characterized in that The calculation method of the order processing priority data includes: ; In the formula, Processing priority data for orders, As the basic priority value data, Influence data for order cost performance; are respectively a preset first weight and a preset second weight; and, .
6. An integrated management device serving enterprise development planning, characterized in that: An acquisition module (210) is used to acquire enterprise order data; the enterprise order data includes order source data and order demand data; The order source data refers to the data of the enterprise management module to which the order belongs; the order demand data includes the order demand time, order demand resources and order value; A determination module (220), configured to determine basic priority value data according to a preset enterprise management module basic impact table and the order source data; The preset enterprise management module basic impact table includes the corresponding relationship between the enterprise management module data to which the order belongs and the basic priority value data; An analysis module (230) is used to analyze order cost performance impact data according to the order demand time, the order demand resources and the order value; the order cost performance impact data is associated with the order demand time, the order demand resources and the order value; A calculation module (240) is used to calculate order processing priority data according to the basic priority value data and the order cost performance impact data, and determine the order processing sequence based on the order processing priority data.
7. The integrated management device serving enterprise development planning according to claim 6, characterized in that: The analysis module (230) is further configured to analyze the order cost performance impact data according to the order demand time, the order demand resources and the order value; The order cost performance impact data associated with the order demand time, the order demand resources and the order value includes: Determine first order evaluation data according to the order demand time; the first order evaluation data is negatively correlated with the order demand time; Determine second order evaluation data according to the preset module resource data and the order requirement resource; the second order evaluation data is associated with the preset module resource data and the order requirement data; Determine third order evaluation data according to preset order-associated customer data, the order demand resources and the order value; The order cost performance impact data is analyzed based on the first order evaluation data, the second order evaluation data and the third order evaluation data.
8. The integrated management device serving enterprise development planning according to claim 7, characterized in that: The analysis module (230) is further configured to determine second order evaluation data according to the preset module resource data and the order demand resources; the second order evaluation data is associated with the preset module resource data and the order demand data and includes: Determining the preset resource quantity data owned by the enterprise management module according to the preset module resource data; Determine the quantity of resources required for the order according to the order demand resources; The second order evaluation data is determined according to the preset unit resource quantity data and the resource quantity data required for the order.
9. The integrated management device serving enterprise development planning according to claim 8, characterized in that: The analysis module (230) is further configured such that the calculation method of the order cost performance impact data includes: ; In the formula, Influence data for order cost performance, Evaluate data for the first order, Evaluate the data for the second order, Evaluate data for third orders; The first order evaluation weight, the second order evaluation weight and the third order evaluation weight are preset respectively; and, ; in, ; ; Determine data for resources; The resource difference data is the difference between the resource quantity data required for the order and the preset unit resource quantity data.
10. The integrated management device serving enterprise development planning according to claim 9, characterized in that: The calculation module (240) is further configured such that the calculation method of the order processing priority data includes: ; In the formula, Processing priority data for orders, As the basic priority value data, Influence data for order cost performance; are respectively a preset first weight and a preset second weight; and, .
Citation Information
Patent Citations
Production scheduling method and device and storage medium
CN113469499A
Production plan intelligent planning method and system based on big data, and medium
CN116523262A
Intelligent production plan management method and system based on time nodes
CN117557078A
System and method for realizing order dispatch based on priority level
CN1975771A