Construction site layout planning optimization method integrating BIM (Building Information Modeling) and GIS (Geographic Information System) advantages
By importing the BIM model into GIS and combining the project planning timetable, a dynamic layout planning diagram is created and optimized using the whale optimization algorithm, the existing BIM technology is solved to solve the problem that efficient management and exquisite planning needs in the optimization of construction site layout, and the efficient optimization of construction site is achieved.
Patent Information
- Application Number
- CN202411847759.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-12-16
AI Technical Summary
When solving the optimization of the construction site layout of pumped storage power stations, existing BIM technology is difficult to meet the needs of high spatial management requirements, exquisite planning and comprehensive decision-making basis.
By importing the BIM model into GIS, a two-dimensional construction site layout diagram is generated, and a dynamic layout planning diagram is created in combination with the project planning timetable. Using the whale optimization algorithm based on population guidance, dual-objective optimization of the total travel distance and safety level between facilities is carried out to optimize the layout of the construction site.
It has achieved efficient meeting of construction site management needs, optimized the total travel distance and safety level between facilities, and ensured the safety of the construction process and improved production efficiency.