Flexible Organization Method and System for Urban Rail Transit under Examination Signal Shielding Interference

By setting up examination interference area information and computing mobile authorization in the urban rail transit system, the non-planned parking problem that test signal shielding interferes with the following trains is solved, and the stability guarantee for urban rail transit operation is achieved.

CN119734741BActive Publication Date: 2025-06-17TRAFFIC CONTROL TECH CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411880271.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-06-17
Estimated Expiration
2044-12-19

AI Technical Summary

Technical Problem

The wireless communication of vehicle-to-ground communication of urban rail transit is affected by the interference of test signal shielding, resulting in unplanned parking of trains, affecting normal operations.

Method used

The train automatic monitoring system (ATS) sets up the examination interference area information and transmits it to the automatic protection system (ATP) of the ground train, calculates the mobile authorizations containing each interference area to ensure that the train automatically maintains the mobile authorization operation in the interference area and reduces unplanned parking.

Benefits of technology

It effectively avoids the impact of signal shielding interference on the normal operation of urban rail transit, reduces unplanned parking of trains, and ensures the stability of traffic operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119734741B_ABST
    Figure CN119734741B_ABST
Patent Text Reader

Abstract

The present application provides a flexible organization method and system for urban rail transit under the interference of exam signal shielding. The method includes: ATS sets one or more exam interference area information, and ATS transmits the exam interference area information to the ground ATP. The ground ATP calculates the movement authority according to the exam interference area information. Among them, any movement authority includes a single interference area, otherwise it retreats to the start end of the interference area. Only one train is allowed to run through any interference area, so as to avoid the situation that the movement authority is insufficient and the passing train makes an unscheduled stop in the interference area. The ground ATP sends the movement authority to the on-board ATP. When the train passes through the interference area, the on-board ATP on the train automatically maintains the movement authority to run. The on-board ATP and the ground ATP no longer monitor the vehicle-ground wireless communication status, so that the on-board ATP does not trigger the emergency braking of the train due to the loss of vehicle-ground communication, thereby avoiding the impact of signal shielding interference on the normal operation organization of urban rail transit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of rail transit, and particularly to a flexible organization method and system for urban rail transit under the interference of examination signal shielding. Background Art

[0002] Currently, urban rail transit mainly adopts a train operation control system based on vehicle-ground communication. Continuous communication between the vehicle and the ground is an important prerequisite for ensuring the normal operation of urban rail transit. When the signal system determines a vehicle-ground communication failure, the on-board ATP (Automatic Train Protection) will trigger the emergency braking of the train to ensure traffic safety. To ensure the traffic safety of the following trains, the ground ATP will control the section where the following train and the tracked train are idle intervals. When the trains are tracked closely, it will cause the emergency braking and unscheduled parking of the following train in the section, which will have a greater impact on the normal operation organization of urban rail transit.

[0003] The vehicle-ground wireless communication of urban rail transit basically adopts a closed network, and a strict access mechanism is set to prevent non-signal system equipment from invading the vehicle-ground network. However, the blocking interference method adopted by the examination shielding equipment will still cause interruption interference to the vehicle-ground wireless communication.

[0004] Currently, more and more urban rail transit lines are built on elevated lines. When the elevated line is close to urban schools, the examination shielding equipment enabled by the school during the examination will interfere with the normal communication of the vehicle-ground wireless of urban rail transit. Summary of the Invention

[0005] To solve one of the above technical defects, this application provides a flexible organization method and system for urban rail transit under the interference of examination signal shielding.

[0006] In the first aspect of this application, a flexible organization method for urban rail transit under the interference of examination signal shielding is provided. The method includes:

[0007] The Automatic Train Supervision (ATS) system sets one or more examination interference area information; wherein, any examination interference area information includes: the interference range and interference time of any interference area;

[0008] The ATS transmits the examination interference area information to the Automatic Train Protection (ATP) system of the ground train;

[0009] The ground ATP calculates the movement authorization including each interference area according to the examination interference area information; wherein, any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area; only one train is allowed to run through any interference area;

[0010] The ground ATP sends the movement authorization to the on-vehicle ATP;

[0011] When the train passes through the interference area, the on-vehicle ATP on the train automatically maintains the operation of the movement authorization, and the on-vehicle ATP and the ground ATP on the train no longer monitor the status of the vehicle-ground wireless communication.

[0012] Optionally, the ATS sets one or more examination interference area information, including:

[0013] The ATS obtains the examination interference plan; the examination interference plan includes the examination signal shielding interference time and the interference range; wherein, the examination interference plan is determined by testing based on the rail transit line and the locations of schools along the line, based on the examination time and the examination location;

[0014] The ATS sets one or more examination interference area information according to the examination interference plan.

[0015] Optionally, when the train passes through the interference area, the on-vehicle ATP on the train automatically maintains the operation of the movement authorization, including:

[0016] If there are multiple trains running in any interference area, before the on-vehicle ATP on the leading train clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP, the subsequent trains automatically stop in any interference area, and the in-station trains are automatically linked to trigger train detention.

[0017] Optionally, the method further includes:

[0018] After the leading train clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP, the ground ATP extends the movement authorization of any interference area, allowing the subsequent trains to enter any interference area according to the movement authorization of any interference area.

[0019] Optionally, the method further includes:

[0020] When there are no other trains between the platform where the in-station train is located and any interference area, the train detention at the platform where the in-station train is located is automatically linked to cancel, allowing the in-station train to enter any interference area.

[0021] In the second aspect of the present application, there is provided an urban rail transit flexible organization system under examination signal shielding interference, the system includes: the train automatic monitoring system ATS, the automatic protection system ATP of the ground train and the train; the on-vehicle ATP is installed on the train;

[0022] Wherein, the ATS is used to set one or more examination interference area information; and transmit the examination interference area information to the ground ATP; wherein, any examination interference area information includes: the interference range and interference time of any interference area;

[0023] Ground ATP is used to calculate the movement authorization including each interference area according to the examination interference area information, and send the movement authorization to on-vehicle ATP. Any movement authorization includes a single interference area, otherwise it retreats to the start of the interference area. Only one train is allowed to run through any interference area.

[0024] Train. When passing through the interference area, the on-vehicle ATP on the train automatically maintains the operation of the movement authorization, and the on-vehicle ATP and the ground ATP on the train no longer supervise the vehicle-ground wireless communication status.

[0025] Optionally, ATS is used to obtain the examination interference plan. The examination interference plan includes the examination signal shielding interference time and the interference range, and sets the information of one or more examination interference areas according to the examination interference plan.

[0026] Among them, the examination interference plan is determined by testing based on the rail transit line and the locations of schools along the line, the examination time and the examination location.

[0027] Optionally, for the train, if there are multiple trains running in any interference area, if the train is the leading train, the on-vehicle ATP on it clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP; if the train is a following train, it automatically stops in any interference area before the on-vehicle ATP on the leading train clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP; if the train is a train at the station, it automatically triggers the train detention linkage before the on-vehicle ATP on the leading train clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP.

[0028] Optionally, the ground ATP is also used to extend the movement authorization of any interference area after the leading train clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP, allowing the following trains to enter any interference area according to the movement authorization of any interference area.

[0029] Optionally, the ground ATP is also used to automatically cancel the train detention at the platform where the train at the station is located and allow the train at the station to enter any interference area when there is no other train between the platform where the train at the station is located and any interference area.

[0030] The present application provides a method and system for flexible organization of urban rail transit under examination signal shielding interference. The method includes: the ATS sets one or more examination interference area information; wherein, any examination interference area information includes: the interference range and interference time of any interference area; the ATS transmits the examination interference area information to the ground ATP; the ground ATP calculates the movement authorization including each interference area according to the examination interference area information; wherein, any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area; only one train is allowed to run through any interference area; the ground ATP sends the movement authorization to the on-vehicle ATP; when the train passes through the interference area, the on-vehicle ATP on the train automatically maintains the movement authorization to run, and the on-vehicle ATP and the ground ATP on the train no longer supervise the vehicle-ground wireless communication status. After the ATS sets the examination interference area information in the method provided by the present application, the ground ATP calculates the movement authorization according to the examination interference area information, and any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area, avoiding the unplanned stop of the passing train in the interference area due to insufficient movement authorization distance. When the train passes through the interference area, the on-vehicle ATP on the train automatically maintains the movement authorization to run, and the on-vehicle ATP and the ground ATP on the train no longer supervise the vehicle-ground wireless communication status, so that the on-vehicle ATP does not trigger the emergency braking of the train due to the loss of vehicle-ground communication, thereby avoiding the impact of signal shielding interference on the normal operation organization of urban rail transit. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The drawings described herein are used to provide a further understanding of the present application and form a part of the present application. The illustrative embodiments and descriptions thereof of the present application are used to explain the present application and do not constitute an improper limitation of the present application. In the drawings:

[0032] Figure 1 is a schematic flow chart of a method for flexible organization of urban rail transit under examination signal shielding interference provided by an embodiment of the present application;

[0033] Figure 2 is a schematic diagram of determining an examination interference plan provided by an embodiment of the present application;

[0034] Figure 3 is a schematic diagram of setting examination interference area information provided by an embodiment of the present application;

[0035] Figure 4 is a schematic diagram of only allowing one train to run through any interference area provided by an embodiment of the present application;

[0036] Figure 5 is a schematic diagram of the train where the on-vehicle ATP runs according to the movement authorization provided by an embodiment of the present application;

[0037] Figure 6A schematic diagram of multi-vehicle linkage provided by an embodiment of this application. Detailed implementation manners

[0038] In order to make the technical solutions and advantages in the embodiments of this application clearer, the following further describes the exemplary embodiments of this application in detail with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, rather than an exhaustive list of all embodiments. It should be noted that, without conflict, the embodiments in this application and the features in the embodiments can be combined with each other.

[0039] In the process of implementing this application, the inventor found that the vehicle-ground wireless communication in urban rail transit basically adopts a closed network, and a strict access mechanism is set to prevent non-signal system equipment from invading the vehicle-ground network. However, the blocking interference method adopted by the exam shielding device will still cause interruption interference to the vehicle-ground wireless communication. At present, more and more urban rail transit lines are built on elevated lines. When the elevated line is close to urban schools, the exam shielding devices enabled by schools during exams will interfere with the normal communication of the vehicle-ground wireless in urban rail transit.

[0040] In view of the above problems, this application provides a method and system for flexible organization of urban rail transit under exam signal shielding interference. The method includes: the ATS sets one or more exam interference area information; wherein, any exam interference area information includes: the interference range and interference time of any interference area; the ATS transmits the exam interference area information to the ground ATP; the ground ATP calculates the movement authorization including each interference area according to the exam interference area information; wherein, any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area; only one train is allowed to run through any interference area; the ground ATP sends the movement authorization to the on-board ATP; when the train passes through the interference area, the on-board ATP on the train automatically maintains the movement authorization to run, and the on-board ATP and the ground ATP on the train no longer monitor the vehicle-ground wireless communication status. After the method provided by this application sets the exam interference area information, the ground ATP calculates the movement authorization according to the exam interference area information, and any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area, avoiding the situation that the movement authorization distance is insufficient and causing the passing train to stop unexpectedly in the interference area. When the train passes through the interference area, the on-board ATP on the train automatically maintains the movement authorization to run, and the on-board ATP and the ground ATP on the train no longer monitor the vehicle-ground wireless communication status, so that the on-board ATP does not trigger the emergency braking of the train due to the loss of vehicle-ground communication, thereby avoiding the impact of signal shielding interference on the normal operation organization of urban rail transit.

[0041] See Figure 1 , this embodiment provides a method for flexible organization of urban rail transit under exam signal shielding interference. The implementation process of this method is as follows:

[0042] 101. The ATS (Automatic Train Supervision) sets one or more examination interference area information.

[0043] Among them, any examination interference area information includes: the interference range and interference time of any interference area.

[0044] The implementation process of step 101 is as follows:

[0045] 101-1. The ATS obtains an examination interference plan.

[0046] Among them, the examination interference plan includes the examination signal shielding interference time and interference range.

[0047] The examination interference plan is determined by testing based on the rail transit line and the locations of schools along the line, the examination time, and the examination location.

[0048] As Figure 2 shown, according to the rail transit line and the locations of schools along the line, the location and specific interference range when interference is turned on for each school are tested to obtain the examination interference plan.

[0049] 101-2. The ATS sets one or more examination interference area information according to the examination interference plan.

[0050] As Figure 3 shown, the ATS obtains the school examination plan in advance, combines the examination plan and location, and dynamically sets one or more examination interference areas at one time to obtain one or more examination interference area information. Figure 3 The action time in is the examination signal shielding interference time, and the examination interference area is the interference range.

[0051] 102. The ATS transmits the examination interference area information to the ground ATP (Automatic Train Protection).

[0052] In addition, the ATS also transmits the examination interference area information to the on-vehicle ATP.

[0053] For example, after the examination interference area information is successfully set, the examination interference area information will be transmitted to the ground ATP and the on-vehicle ATP.

[0054] 103. The ground ATP calculates the movement authorization including each interference area according to the examination interference area information.

[0055] Among them, any movement authorization includes a single interference area, otherwise it retreats to the start of the interference area. Only one train is allowed to run through any interference area.

[0056] As Figure 4 shown, only one train is allowed to run through a single interference area (i.e., any interference area). The movement authority calculated by the ground ATP includes the scope of a single interference area. Otherwise, it will retreat to the start of the interference area to avoid the situation that the movement authority distance is insufficient and the passing train makes an unscheduled stop in the interference area.

[0057] 104. The ground ATP sends the movement authority to the on-board ATP.

[0058] 105. When the train passes through the interference area, the on-board ATP on the train automatically maintains the operation of the movement authority, and the on-board ATP and the ground ATP on the train no longer monitor the status of the vehicle-ground wireless communication.

[0059] If there are multiple trains running in any interference area, before the on-board ATP on the leading train clears any interference area according to the movement authority of any interference area and re-establishes communication with the ground ATP, the subsequent trains will automatically stop in any interference area, and the in-station trains will automatically trigger the train detention in a linked manner.

[0060] After the leading train clears any interference area according to the movement authority of any interference area and re-establishes communication with the ground ATP, the ground ATP extends the movement authority of any interference area to allow the subsequent trains to enter any interference area according to the movement authority of any interference area.

[0061] When there are no other trains between the platform where the in-station train is located and any interference area, the train detention at the platform where the in-station train is located is automatically cancelled in a linked manner, and the in-station train is allowed to enter any interference area.

[0062] As Figure 5 shown, for the train running through the interference area, the on-board ATP on it automatically maintains the operation of the previously received movement authority. The on-board ATP / ground ATP no longer monitors the status of the vehicle-ground wireless communication, and the on-board ATP does not trigger the emergency braking of the train due to the loss of vehicle-ground communication.

[0063] If there are multiple trains running in any interference area, as Figure 6 shown, before the on-board ATP on the leading train T3 clears that any interference area according to the movement authority of any interference area and re-establishes communication with the ground ATP, the subsequent train T2 automatically stops in that any interference area, and the in-station train T1 automatically triggers the train detention in a linked manner to reduce the occurrence of in-section stops.

[0064] After the previous train (i.e., the leading train T3) runs through that any interference area and its on-board ATP re-establishes communication with the ground ATP, the ground ATP extends the movement authority to allow the subsequent train T2 to enter that any interference area.

[0065] When there are no other trains on the platform where the in-station train T1 is located and the any interference area, the train detention at the platform is automatically cancelled in a linked manner, and train T1 is allowed to enter the any interference area.

[0066] In addition, after the examination ends, the setting of the interference area can be cancelled manually or automatically based on the input examination end time.

[0067] The flexible organization method of urban rail transit under the interference of examination signal shielding provided by this embodiment flexibly sets / cancels the interference operation area of urban rail transit according to the time and area range of the examination plan, and solves the interference problem of the examination jammer to urban rail transit through the automatic linked processing of the train operation control system. It avoids the emergency braking caused by the vehicle-ground wireless communication failure, avoids the impact on the operation organization caused thereby, and ensures the normal operation of urban rail transit.

[0068] This embodiment provides a flexible organization method of urban rail transit under the interference of examination signal shielding. After the ATS sets the examination interference area information, the ground ATP calculates the movement authorization according to the examination interference area information, and any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area to avoid the unplanned stop of the passing train in the interference area due to insufficient movement authorization distance. When the train passes through the interference area, the on-board ATP on the train automatically maintains the movement authorization operation, and the on-board ATP and the ground ATP on the train no longer monitor the vehicle-ground wireless communication status, so that the on-board ATP does not trigger the emergency braking of the train due to the loss of vehicle-ground communication, thereby avoiding the impact of signal shielding interference on the normal operation organization of urban rail transit.

[0069] Based on the same inventive concept of the flexible organization method of urban rail transit under the interference of examination signal shielding, this embodiment provides a flexible organization system of urban rail transit under the interference of examination signal shielding. The system includes: ATS, ground ATP and trains. The trains are equipped with on-board ATP.

[0070] Among them, the ATS is used for one or more examination interference area information. Transmit the examination interference area information to the automatic train protection system ATP of the ground train. Among them, any examination interference area information includes: the interference range and interference time of any interference area.

[0071] The ground ATP is used for calculating the movement authorization including each interference area according to the examination interference area information. Send the movement authorization to the on-board ATP. Among them, any movement authorization includes a single interference area, otherwise it retreats to the start end of the interference area; only one train is allowed to run through any interference area.

[0072] The train is used for when passing through the interference area, the on-board ATP on the train automatically maintains the movement authorization operation, and the on-board ATP and the ground ATP on the train no longer monitor the vehicle-ground wireless communication status.

[0073] Among them, the ATS is used to obtain the exam interference plan. The exam interference plan includes the exam signal shielding interference time and the interference range. One or more exam interference area information is set according to the exam interference plan.

[0074] Among them, the exam interference plan is determined by testing based on the rail transit line and the locations of schools along the line, as well as the exam time and exam location.

[0075] Among them, for the train, if there are multiple trains running in any interference area, if the train is the leading train, the on-vehicle ATP on it clears any interference area according to the movement authorization of any interference area and re - establishes communication with the ground ATP. If the train is a following train, it automatically stops in any interference area before the on-vehicle ATP on the leading train clears any interference area according to the movement authorization of any interference area and re - establishes communication with the ground ATP. If the train is a train at a station, before the on-vehicle ATP on the leading train clears any interference area according to the movement authorization of any interference area and re - establishes communication with the ground ATP, it automatically triggers the train detention in a linked manner.

[0076] Among them, the ground ATP is also used to, after the leading train clears any interference area according to the movement authorization of any interference area and re - establishes communication with the ground ATP, extend the movement authorization of any interference area to allow the following trains to enter any interference area according to the movement authorization of any interference area.

[0077] Among them, the ground ATP is also used to, when there are no other trains between the platform where the train at the station is located and any interference area, automatically cancel the train detention at the platform where the train at the station is located in a linked manner and allow the train at the station to enter any interference area.

[0078] This application provides an urban rail transit flexible organization system under exam signal shielding interference, including: ATS, ground ATP and trains, and on-vehicle ATP is installed on the trains. After the ATS sets the exam interference area information, the ground ATP calculates the movement authorization according to the exam interference area information, and any movement authorization includes a single interference area, otherwise it retreats to the start of the interference area to avoid unplanned stops of passing trains in the interference area due to insufficient movement authorization distance. When the train passes through the interference area, the on-vehicle ATP on the train automatically maintains the movement authorization to run, and the on-vehicle ATP on the train and the ground ATP no longer supervise the vehicle - to - ground wireless communication status, so that the on-vehicle ATP does not trigger the emergency braking of the train due to the loss of vehicle - to - ground communication, thereby avoiding the impact of signal shielding interference on the normal operation organization of urban rail transit.

[0079] Those skilled in the art should understand that the embodiments of the present application can be provided as a method, a system, or a computer program product. Therefore, the present application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present application can take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code. The solutions in the embodiments of the present application can be implemented in various computer languages. For example, object-oriented programming languages such as Java and interpreted scripting languages such as JavaScript, etc.

[0080] The present application is described with reference to the flowcharts and / or block diagrams of methods, apparatuses (systems), and computer program products according to the embodiments of the present application. It should be understood that each flow and / or block in the flowchart and / or block diagram, as well as the combination of flows and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing devices to generate a machine, such that the instructions executed by the processor of the computer or other programmable data processing devices generate means for implementing the functions specified in Figure 1 one flow or multiple flows and / or blocks Figure 1 one block or multiple blocks.

[0081] These computer program instructions can also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, such that the instructions stored in the computer-readable memory generate a manufactured article including instruction means that implement the functions specified in Figure 1 one flow or multiple flows and / or blocks Figure 1 one block or multiple blocks.

[0082] These computer program instructions can also be loaded onto a computer or other programmable data processing device, such that a series of operation steps are performed on the computer or other programmable device to generate a computer-implemented process, so that the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in Figure 1 one flow or multiple flows and / or blocks Figure 1 one block or multiple blocks.

[0083] Although the preferred embodiments of the present application have been described, those skilled in the art can make additional changes and modifications to these embodiments once they learn the basic creative concepts. Therefore, the appended claims are intended to be construed as including the preferred embodiments as well as all changes and modifications falling within the scope of the present application.

[0084] Obviously, those skilled in the art can make various changes and modifications to this application without departing from the spirit and scope of this application. Thus, if these modifications and variations of this application fall within the scope of the claims of this application and their equivalent technologies, this application is also intended to cover these modifications and variations.

Claims

1. A flexible organization method for urban rail transit under test signal shielding interference, characterized in that: The method comprises: The automatic train monitoring system ATS sets one or more test interference area information; wherein any test interference area information includes: the interference range and interference time of any interference area; The ATS transmits the test interference area information to the automatic protection system ATP of the ground train; The ground ATP calculates the movement authorization including each interference area according to the test interference area information; wherein any movement authorization includes a single interference area, otherwise it retreats to the beginning of the interference area; only one train is allowed to run through any interference area; The ground ATP sends the movement authorization to the vehicle ATP; When the train passes through the interference area, the onboard ATP on the train automatically maintains the mobile authorization operation, and the onboard ATP on the train and the ground ATP no longer monitor the train-ground wireless communication status; When the train passes through the interference area, the onboard ATP on the train automatically maintains the mobile authorization operation, including: If there are multiple trains running in any interference area, the onboard ATP on the first train will automatically stop in any interference area before re-establishing communication with the ground ATP according to the movement authorization of any interference area, and the trains at the station will automatically trigger the train detention; After the first train clears any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP, the ground ATP extends the movement authorization of any interference area and allows subsequent trains to enter any interference area according to the movement authorization of any interference area; When there is no other train between the platform where the train is located and any interference area, the train detention on the platform where the train is located is automatically cancelled, allowing the train to enter any interference area.

2. The method according to claim 1, characterized in that ATS sets one or more test interference area information, including: ATS obtains the test interference plan; the test interference plan includes the test signal shielding interference time and interference range; wherein the test interference plan is determined based on the rail transit line and the location of the schools along the line, based on the test time and the test location test; The ATS sets one or more examination interference area information according to the examination interference plan.

3. A flexible organization system for urban rail transit under test signal shielding interference, characterized in that: The system comprises: an automatic train monitoring system ATS, an automatic protection system ATP for ground trains and a train; the train is equipped with an on-board ATP; The ATS is used to set one or more test interference area information; transmit the test interference area information to the ground ATP; wherein any test interference area information includes: the interference range and interference time of any interference area; The ground ATP is used to calculate the movement authorization including each interference area according to the test interference area information; send the movement authorization to the vehicle ATP; wherein any movement authorization includes a single interference area, otherwise it will be withdrawn to the beginning of the interference area; only one train is allowed to run through any interference area; The train is used for passing through the interference area, the on-board ATP on the train automatically maintains the mobile authorization operation, and the on-board ATP on the train and the ground ATP no longer monitor the train-ground wireless communication status; The train is used for when there are multiple trains running in any interference area. If the train is the first train, the on-board ATP on it clears the any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP; if the train is the subsequent train, the on-board ATP on the first train automatically stops in any interference area before clearing the any interference area according to the movement authorization of any interference area and re-establishing communication with the ground ATP; if the train is an in-station train, the on-board ATP on the first train automatically links and triggers the vehicle seizure before clearing the any interference area according to the movement authorization of any interference area and re-establishing communication with the ground ATP; The ground ATP is also used to extend the movement authorization of any interference area after the first train clears the any interference area according to the movement authorization of any interference area and re-establishes communication with the ground ATP, so as to allow subsequent trains to enter any interference area according to the movement authorization of any interference area; The ground ATP is also used to automatically cancel the train detention at the platform where the train is located when there is no other train between the platform where the train is located and any interference area, and allow the train to enter any interference area.

4. The system according to claim 3, characterized in that ATS is used to obtain an examination interference plan; the examination interference plan includes the examination signal shielding interference time and interference range; one or more examination interference area information is set according to the examination interference plan; Among them, the examination interference plan is determined based on the rail transit lines and the locations of schools along the lines, and is tested based on the examination time and location.