High-altitude assembling and mounting method for roof steel structure of large gymnasium

Through the simplified four-step construction method and computer synchronous measurement and control and wireless remote control system technology, the existing large-scale gymnasium roof steel structures have been solved, and efficient and safe construction and installation have been achieved.

CN119737058APending Publication Date: 2025-04-01CHINA MCC17 GRP CO LTD
8 Cites 0 Cited by

Patent Information

Application Number
CN202510132813.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-06
Publication Date
2025-04-01

AI Technical Summary

Technical Problem

The installation method for high-altitude steel structures in the existing large stadium roof is complicated and complicated, the construction is cumbersome and the safety is not good.

Method used

The simplified four-step construction method is adopted, including the outer frame, inner frame installation, the setting of track and track flat car, as well as computer synchronization measurement and control and wireless remote control system technology to dynamically monitor and control the hoisting machine status.

Benefits of technology

The construction steps are simplified, construction efficiency and safety are improved, and the efficient and safe installation of steel structures in the roof of large gymnasiums is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119737058A_ABST
    Figure CN119737058A_ABST
Patent Text Reader

Abstract

The invention discloses a large-scale gymnasium roof steel structure high-altitude assembling and installing method, and relates to the technical field of constructions.The large-scale gymnasium roof steel structure high-altitude assembling and installing method comprises the steps that hoisting machines are fixedly installed on all rail flatcars, and the rail flatcars flexibly run on rails; then the hoisting machine is operated to hoist the large gymnasium roof steel structural parts to proper positions and heights one by one, installation is completed, positions are designed, small units or parts are assembled, computer synchronous measurement and control and wireless remote control system technologies are adopted, the working state of the hoisting machine is dynamically monitored and controlled at any time, construction safety is ensured, and the construction efficiency is improved. And after high-altitude assembly and installation of the large gymnasium roof steel structure are completed, all the devices are dismantled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction, and in particular to a high-altitude loose assembly and installation method for a large gymnasium roof steel structure. Background Art

[0002] A gymnasium is a large building used for sports competitions, physical exercises, concerts and other activities. The top or periphery of the gymnasium is generally supported by a steel grid structure. With the rapid development of the economy, large-span grid structures are increasingly used in construction projects. The steel structure of a large gymnasium roof is a new type of steel structure with reasonable force, light weight, low cost, lively and novel appearance, good stability and safety. The existing high-altitude scattered assembly method of the steel structure of a large gymnasium roof is relatively traditional, which is not only cumbersome and complicated, but also troublesome to construct and has poor safety. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a method for high-altitude loose assembly and installation of a large gymnasium roof steel structure, which simplifies the construction steps, is easier to implement, and has better safety.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A method for high-altitude assembly and installation of a large gymnasium roof steel structure comprises the following steps:

[0006] A. Install the outer frame of the gymnasium steel structure. First install the crossbeams and longitudinal beams to ensure the correct installation position and angle. Then install the columns and vertical supports to ensure the appropriate installation height and distance. When installing the outer frame, you need to use tools such as cranes to lift the steel structure to the correct position.

[0007] B. After the installation of the outer frame is completed, the inner frame of the gymnasium steel structure is installed. The purpose of this step is to strengthen the outer frame and support the weight of the roof. When installing the inner frame, attention should be paid to the distance and position around the pipes and cables to ensure that the inner frame will not affect the pipes and cables.

[0008] C. A safety circle of tracks is fixed on the top of the outer frame and the inner frame, and a number of track flat cars that can circulate freely are installed on the tracks;

[0009] D. Install the hoisting machine on all rail flat cars, move the rail flat cars flexibly on the tracks, and then operate the hoisting machine to hoist the steel structure parts of the large gymnasium roof one by one to the appropriate position and height and complete the installation. Assemble small units or components at the designed position, use computer synchronous measurement and control and wireless remote control system technology to dynamically monitor the working status of the hoisting machine and control it at any time to ensure construction safety. After completing the high-altitude loose assembly installation of the large gymnasium roof steel structure, all equipment will be removed.

[0010] Preferably, a plurality of fixing points are provided on the track to prevent the track flat car from deviating during use.

[0011] Preferably, a GPS positioning system is installed on the rail flat car so that the rail flat car can be found quickly when needed, thereby improving work efficiency.

[0012] Preferably, a braking force device is installed on the rail flat car, and when the flat car deviates, the flat car can be braked immediately to keep it on the predetermined track line.

[0013] Preferably, the rail flat car is provided with a track guide system so that the rail flat car can only travel within a predetermined track range, thereby avoiding deviation.

[0014] Preferably, a limit switch is provided on the track. When the rail flat car exceeds a certain deviation range, the limit switch will send a signal to cut off the power of the rail flat car, so that the rail flat car stops moving, thereby avoiding deviation.

[0015] Preferably, the outer frames are all made of stainless steel rods installed by means of screws, nuts and mounting brackets.

[0016] Preferably, the inner frames are all made of stainless steel rods installed by means of screws, nuts and mounting brackets.

[0017] Preferably, the rail is made of stainless steel.

[0018] Preferably, the rail flat car is a diesel internal combustion vehicle.

[0019] Compared with the prior art, the present invention provides a method for high-altitude loose assembly and installation of a large gymnasium roof steel structure, which has the following beneficial effects:

[0020] The high-altitude scattered installation method of the steel structure roof of the large gymnasium adopts a simplified 4-step construction method. It is not only simple and convenient to operate and improves construction efficiency, but also uses computer synchronous measurement and control and wireless remote control system technology to dynamically monitor the working status of the hoisting machine and control it at any time. At the same time, through optimized design, it can timely detect whether the rail flat car is offset and take countermeasures to ensure construction safety.

[0021] The high-altitude scattered installation method of the large gymnasium roof steel structure simplifies the construction steps, is easier to implement, and is safer. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings.

[0023] Figure 1 It is a schematic diagram of the high-altitude scattered assembly and installation method of the steel structure of the roof of a large gymnasium according to the present invention.

[0024] Among them, 1. outer frame, 2. inner frame, 3. track, 4. track flat car, 5. hoisting machine. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0026] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0027] Reference Figure 1 A method for high-altitude assembly and installation of a large gymnasium roof steel structure comprises the following steps:

[0028] A. Install the outer frame 1 of the gymnasium steel structure. First install the crossbeams and longitudinal beams to ensure the correct installation position and angle. Then install the columns and vertical supports to ensure the appropriate installation height and distance. When installing the outer frame 1, you need to use a crane or other tools to lift the steel structure to the correct position.

[0029] B. After the installation of the outer frame 1 is completed, the inner frame 2 of the gymnasium steel structure is installed. The purpose of this step is to strengthen the outer frame 1 and support the weight of the roof. When installing the inner frame 2, attention should be paid to the distance and position around the pipes and cables to ensure that the inner frame 2 will not affect the pipes and cables;

[0030] C. A safety track 3 is fixed on the top of the outer frame 1 and the inner frame 2, and a number of track flat cars 4 that can circulate freely are installed on the track 3;

[0031] D. Install the hoisting machine 5 on all the rail flat cars 4, move the rail flat cars 4 flexibly on the tracks 3, and then operate the hoisting machine 5 to hoist the steel structure parts of the large gymnasium roof one by one to the appropriate position and height and complete the installation. Assemble small units or components at the designed position, use computer synchronous measurement and control and wireless remote control system technology to dynamically monitor the working status of the hoisting machine 5 and control it at any time to ensure construction safety. After completing the high-altitude loose assembly installation of the large gymnasium roof steel structure, all equipment will be removed.

[0032] Embodiment 2

[0033] On the basis of the first embodiment, a braking force device is installed on the track flat car 4. When the flat car deviates, the flat car can be braked immediately to keep it on the predetermined track line.

[0034] The rail flat car 4 is provided with a track guide system so that the rail flat car can only travel within a predetermined track range. A limit switch is provided on the track 3. When the rail flat car exceeds a certain deviation range, the limit switch will send a signal to cut off the power of the rail flat car 4, causing the rail flat car 4 to stop moving, thereby avoiding deviation.

[0035] The rail flat car 4 is equipped with a GPS positioning system so that the rail flat car 4 can be found quickly when needed, thereby improving work efficiency.

[0036] The outer frame 1 is made of stainless steel rods assembled by screws, nuts and mounting brackets; the inner frame 2 is made of stainless steel rods assembled by screws, nuts and mounting brackets.

[0037] The track 3 is made of stainless steel, and the track flat car 4 is a diesel internal combustion vehicle.

[0038] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. The high-altitude scattered installation method of the steel structure of the roof of a large gymnasium is characterized by: The steps include: A. Install the outer frame (1) of the gymnasium steel structure. First, install the horizontal beams and longitudinal beams to ensure that the installation position and angle are correct. Then install the columns and vertical supports to ensure that the installation height and distance are appropriate. When installing the outer frame (1), it is necessary to use a crane or other tools to lift the steel structure to the correct position. B. After the installation of the outer frame (1) is completed, the inner frame (2) of the gymnasium steel structure is installed. The purpose of this step is to strengthen the outer frame (1) and support the weight of the roof. When installing the inner frame (2), attention should be paid to the distance and position around the pipes and cables to ensure that the inner frame (2) will not affect the pipes and cables. C. A safety track (3) is fixed on the top of the outer frame (1) and the inner frame (2), and a plurality of track flat cars (4) that can circulate freely are installed on the track (3); D. Install the hoisting machine (5) on all the rail flat cars (4), flexibly drive the rail flat cars (4) on the tracks (3), and then operate the hoisting machine (5) to hoist the steel structure parts of the large gymnasium roof one by one to the appropriate position and height and complete the installation. Assemble small units or components at the designed position, use computer synchronous measurement and control and wireless remote control system technology to dynamically monitor the working status of the hoisting machine (5) and control it at any time to ensure construction safety. After completing the high-altitude loose assembly installation of the large gymnasium roof steel structure, all equipment will be removed.

2. According to the method for high-altitude assembly of steel structure of large gymnasium roof according to claim 1, it is characterized by: A plurality of fixing points are arranged on the track (3) to prevent the track flat car (4) from deviating during use.

3. According to claim 1, the method for high-altitude assembly and installation of the steel structure of a large gymnasium roof is characterized by: The rail flat car (4) is equipped with a GPS positioning system so as to quickly find the rail flat car (4) when needed, thereby improving work efficiency.

4. According to claim 1, the method for high-altitude assembly and installation of the steel structure of a large gymnasium roof is characterized by: The track flat car (4) is equipped with a braking force device, which can immediately brake the flat car when it deviates to keep it on the predetermined track line.

5. According to claim 1, the method for high-altitude assembly and installation of the steel structure of a large gymnasium roof is characterized by: The track flat car (4) is provided with a track guide system so that the track flat car can only travel within a predetermined track range, thereby avoiding deviation.

6. According to claim 1, the method for high-altitude assembly and installation of the steel structure of a large gymnasium roof is characterized by: A limit switch is arranged on the track (3). When the track flat car exceeds a certain deflection range, the limit switch will send a signal to cut off the power of the track flat car (4), so that the track flat car (4) stops moving, thereby avoiding deflection.

7. According to claim 1, the method for high-altitude assembly and installation of a large gymnasium roof steel structure is characterized by: The outer frames (1) are all made of stainless steel rods and are assembled by means of screws, nuts and mounting frames.

8. According to claim 1, the method for high-altitude assembly and installation of a large gymnasium roof steel structure is characterized by: The inner frames (2) are all made of stainless steel rods and are assembled by means of screws, nuts and mounting frames.

9. According to claim 1, the method for high-altitude assembly and installation of a large gymnasium roof steel structure is characterized by: The track (3) is made of stainless steel.

10. According to claim 1, the method for high-altitude assembly and installation of a large gymnasium roof steel structure is characterized by: The rail flat car (4) is a diesel internal combustion vehicle.

Citation Information

Patent Citations

  • High-altitude steel member mounting device and method thereof

    CN116241084A

  • Circular venue steel structure sliding construction method

    CN119102377A

  • Positioning and mounting method for multi-layer annular track curtain wall of tower

    CN119163246A

  • Dual annular rail hoisting device for curtain wall

    CN202379601U

  • Curtain wall annular track for roof framework beam part

    CN210316599U