Drainage pipe network operation and maintenance data digital management system

By building a three-dimensional spatial model of the pipeline network and a real-time pipeline network model, optimizing operation and maintenance decisions, the problem of insufficient coordination scope and coordination of the existing drainage pipeline network operation and maintenance management system has been solved, and more efficient and scientific drainage pipeline operation and maintenance management has been achieved.

CN119762284AActive Publication Date: 2025-04-04中核第七研究设计院有限公司
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411836124.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-13
Publication Date
2025-04-04
Estimated Expiration
2044-12-13

AI Technical Summary

Technical Problem

The existing drainage pipeline operation and maintenance management system has shortcomings in the scope and coordination of the coordination, resulting in poor coordination results and affecting the scientificity and efficiency of the drainage process.

Method used

A digital management system for operation and maintenance of drainage pipeline network is adopted. By building a three-dimensional spatial model of the pipeline network and a real-time pipeline network model, the operation and maintenance management nodes are set up, the pipeline drainage data is collected and analyzed, the load data is mapped and the drainage pipeline link is constructed, and the operation and maintenance decisions are optimized to regulate pipeline flow.

Benefits of technology

The visualization degree of operation and maintenance management of drainage pipeline network has been improved, the scope of coordination has been expanded, the coordination, scientificity and coordination scope in the processing process of pipeline network has been improved, and the efficiency and safety of drainage process has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119762284A_ABST
    Figure CN119762284A_ABST
Patent Text Reader

Abstract

The invention discloses a digital management system for drainage pipe network operation and maintenance data, which relates to the field of digital management and comprises an operation and maintenance management center which is provided with a pipe network management module, a data acquisition module, a data analysis module, a data collaboration module and an operation and maintenance management module. The pipe network management module is used for constructing a pipe network three-dimensional space model and setting operation and maintenance management nodes; the data acquisition module is used for acquiring pipeline drainage data; the data analysis module is used for acquiring pipeline load data at each position and setting a drainage pipeline link; the data collaboration module is used for setting collaborative drainage information at the operation and maintenance management node according to the pipeline load data and the drainage pipeline link; the operation and maintenance management module is used for optimizing the collaborative drainage information, obtaining operation and maintenance decision information and adjusting the pipeline flow according to the operation and maintenance decision information; according to the invention, the collaboration and rationality in the operation and maintenance process of the drainage pipe network are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of digital management technology, and in particular to a digital management system for drainage network operation and maintenance data. Background Art

[0002] With the continuous acceleration of urbanization, the number and scale of drainage networks are also growing. In order to ensure the normal operation of urban drainage, the maintenance and management of drainage networks have become increasingly important. However, there are many problems with the traditional maintenance and management methods of drainage networks, such as inaccurate information records and low work efficiency of managers. These problems seriously affect the safe operation of drainage networks and the sustainable development of cities. Therefore, it is necessary to develop a system that can realize digital management of drainage network operation and maintenance data, thereby improving the management efficiency and safety of drainage networks.

[0003] After searching, the invention patent with the publication number CN116050037A in China discloses an indirect monitoring and analysis method of the liquid level of an urban drainage system based on a directed topological network, including the following steps: constructing a directed topological model of the drainage network and a drainage network database; extracting the upstream and downstream inspection wells and pipeline numbers corresponding to the monitoring points; preliminarily estimating the liquid level; dividing the network into upstream, mid-upstream and downstream areas; calculating the new liquid level for each node and pipeline in the mid-upstream and downstream areas of the monitoring point; and adjusting the places where the liquid level difference of the pipelines at both ends is too large. The present invention is based on an urban drainage system with a directed topological network, combined with the monitoring values ​​obtained by the actual monitoring equipment, and indirectly monitors the liquid level of other pipe networks through pipe network initialization interpolation and subsequent smoothing processing, assisting the pipe network operation and maintenance unit to grasp the real-time liquid level changes of the entire drainage system from a global perspective with limited monitoring costs, and providing effective data support for the operation and maintenance management of the urban drainage network and scientific scheduling decisions.

[0004] Compared with the prior art, the invention patent with the Chinese publication number CN116050037A divides the drainage network into regions and analyzes and processes the pipelines in different areas according to the regional division results, thereby achieving the effect of indirect monitoring;

[0005] However, in the actual use of the above system, the drainage network is not clearly divided and has a wide span during the drainage process, which makes it impossible to accurately coordinate, resulting in a small range of coordination, thus affecting the coordination result. Therefore, how to set the corresponding scientific drainage network flow, effectively coordinate the drainage flow direction in different areas within the maximum range, and improve the coordination in the drainage process is a problem we need to consider. To this end, a digital management system for drainage network operation and maintenance data is proposed. Summary of the invention

[0006] The purpose of the present invention is to solve the shortcomings of the prior art, such as small coordination range and low coordination, and to propose a digital management system for drainage network operation and maintenance data.

[0007] In order to achieve the above object, the present invention adopts the following technical solutions:

[0008] A drainage pipe network operation and maintenance data digital management system, a drainage pipe network operation and maintenance data digital management system, including an operation and maintenance management center, wherein the operation and maintenance management center is provided with a pipe network management module, a data acquisition module, a data analysis module, a data collaboration module and an operation and maintenance management module;

[0009] The pipe network management module is used to obtain GIS geographic information, basic pipeline information and pipeline connection information in the corresponding city, build a three-dimensional spatial model of the pipe network according to the obtained information, and set corresponding operation and maintenance management nodes in the three-dimensional spatial model of the pipe network;

[0010] The data acquisition module is used to collect pipeline drainage data at corresponding pipeline locations according to the operation and maintenance management nodes set in the three-dimensional spatial model of the pipeline network;

[0011] The data analysis module is used to analyze and process the obtained pipeline drainage data, obtain pipeline load data and pipeline operation data at corresponding pipeline locations, and set corresponding drainage pipeline links according to the three-dimensional spatial model of the pipeline network;

[0012] The data coordination module is used to map the pipeline load data and pipeline operation data at each pipeline location to the corresponding operation and maintenance management node, build a real-time pipeline network model, obtain the drainage pipeline link, and set the coordinated drainage information for the corresponding operation and maintenance management node according to the drainage pipeline link and pipeline load data;

[0013] The operation and maintenance management module is used to optimize the obtained collaborative drainage information according to the location of the operation and maintenance management node, obtain corresponding operation and maintenance decision information, and adjust the corresponding pipeline flow of each operation and maintenance management node according to the operation decision information.

[0014] The above technical solution further includes: the process of the pipe network management module constructing the three-dimensional spatial model of the pipe network and the corresponding operation and maintenance management nodes includes:

[0015] Enter GIS geographic information, basic pipeline information and pipeline connection information, and mark the obtained information according to the collection time;

[0016] Acquire the latest information according to the acquisition time, acquire GIS geographic information, build a geographic coordinate reference system according to the GIS geographic information, and generate corresponding digital elevation information; acquire basic pipeline information and pipeline connection information, and set corresponding pipe network data information according to the basic pipeline information and pipeline connection information; integrate the obtained pipe network data information and digital elevation information according to the corresponding geographic coordinate reference system, and generate a corresponding pipe network three-dimensional space model according to the integration result;

[0017] Obtain the corresponding pipeline network data information in the three-dimensional space of the pipeline network, set the pipeline drainage process sequence points according to the pipeline network data information, preset evaluation dimension indicators, judge the importance data of each pipeline drainage process sequence point according to the evaluation dimension indicators, and set the pipeline drainage process sequence points whose importance data meet the preset limit as operation and maintenance management nodes.

[0018] Furthermore, the process of the data acquisition module acquiring pipeline drainage data includes:

[0019] Acquire each operation and maintenance management node in the three-dimensional spatial model of the pipeline network, and set corresponding pipeline monitoring sensors according to the pipeline location information of the operation and maintenance management node, wherein the pipeline monitoring sensors include a water level sensor, a flow velocity sensor, and a flow direction sensor;

[0020] Corresponding pipeline drainage data is acquired according to the pipeline monitoring sensor, and the pipeline drainage data includes drainage water level data and drainage flow rate data.

[0021] Furthermore, the process of the data analysis module obtaining pipeline load data according to pipeline drainage data includes:

[0022] Acquire the pipeline drainage data obtained in each operation and maintenance management node, and the operation and maintenance management node analyzes and processes the pipeline drainage data obtained at the corresponding position respectively;

[0023] According to the pipeline data information corresponding to the operation and maintenance management node, the corresponding load mapping coordinate system is set, and the obtained drainage water level data and drainage flow rate data are respectively input into the corresponding load mapping coordinate system. According to the coordinate results, the water level load data and flow rate load data are obtained, and the water level load data and flow rate load data are respectively comprehensively processed to obtain the pipeline load data corresponding to the operation and maintenance management node.

[0024] Furthermore, the process of setting the drainage pipeline link by the data analysis module includes:

[0025] Obtain the digital elevation information of each operation and maintenance management node in the three-dimensional spatial model of the pipe network, perform layout design division on each operation and maintenance management node according to the digital elevation information, perform gradient division according to the digital elevation information corresponding to the operation and maintenance management node, obtain each gradient subset according to the pipeline connection information between each operation and maintenance management node within the same gradient range, mark the obtained gradient subset as a ring sub-pipeline network, and mark and store each ring sub-pipeline network;

[0026] The corresponding drainage pipeline link is generated according to the connection results of each annular sub-pipe network within the adjacent gradient range. The drainage pipeline link is the operation management nodes connected to each other in the adjacent annular sub-pipe networks and the connection relationship between the operation management nodes.

[0027] Furthermore, the process of constructing a real-time pipe network model by the data collaboration module includes:

[0028] The pipeline load data obtained by each operation and maintenance management node in the three-dimensional spatial model of the pipeline network is obtained, and the obtained pipeline load data is mapped to the pipeline position corresponding to the corresponding operation and maintenance management node in the three-dimensional spatial model of the pipeline network. The operation status of each operation and maintenance management node is obtained according to the pipeline load data, and the operation status includes a low load state, a normal load state and a high load state. Each operation and maintenance management node is visualized according to the operation status, and a corresponding real-time pipeline network model is generated according to the visualization processing result.

[0029] Furthermore, the process of setting collaborative drainage information in the data collaboration module includes:

[0030] Obtain the real-time pipe network model and the drainage pipe links in each ring sub-pipe network, and obtain the operating status of the operation and maintenance management nodes in each ring sub-pipe network in the real-time pipe network model;

[0031] Integrate the load status of the operation and maintenance management nodes within each operation and maintenance management node, obtain the balanced load data of the corresponding ring sub-pipe network, and obtain the elastic coordination data or overload flow rate data of each operation and maintenance management node based on the balanced load data;

[0032] Sorting the operation and maintenance management nodes corresponding to the elastic coordination data or overload flow rate data in the ring sub-pipeline network to obtain the pipe network coordination queue and the pipe network overload queue;

[0033] Obtain the elastic coordination data or overload flow rate data of the operation management node at the other end of the drainage pipeline link corresponding to each ring sub-pipe network, sort the operation and maintenance management nodes corresponding to the elastic coordination data or overload flow rate data corresponding to each interconnection according to the drainage pipeline link, and obtain the link coordination queue and link overload queue;

[0034] A collaborative radius is preset, and each operation and maintenance management node in the pipeline collaborative queue, pipeline overload queue, link collaborative queue and link overload queue within the collaborative range is matched according to the collaborative radius. The collaborative matching results of each operation and maintenance management node between different queues are obtained based on the big data algorithm, and the obtained collaborative matching results are marked as the collaborative drainage information of the corresponding operation and maintenance management node.

[0035] Furthermore, the operation and maintenance management module generates operation and maintenance decision information, and the process of adjusting according to the operation and maintenance decision information includes:

[0036] Obtain the coordinated drainage information of each operation and maintenance management node in the real-time pipe network model;

[0037] According to the digital elevation data, the coordinated drainage information of the operation and maintenance management nodes in each ring sub-pipe network is analyzed and processed in order from low to high;

[0038] Respectively obtain the proportion data of the network overload queue and the link overload queue corresponding to the ring sub-pipeline network and the drainage pipeline link to which the operation and maintenance management node belongs, and preset the coordination coefficient of each coordination matching result in the coordinated drainage information according to the proportion data;

[0039] The collaborative matching results in the collaborative drainage information are reordered according to the collaborative coefficient, the operation and maintenance decision information of the corresponding operation and maintenance management node is obtained according to the sorting result, and the flow regulation processing is performed on the drainage process at the corresponding pipeline equipment according to the operation and maintenance decision information.

[0040] The present invention has the following beneficial effects:

[0041] 1. In the present invention, a three-dimensional spatial model of the pipeline and a real-time pipe network model are set up to perform visualization analysis and processing on the pipeline drainage process, and the drainage process of the pipeline equipment corresponding to each operation and maintenance management node is monitored through the digital elevation data in the three-dimensional spatial model of the pipeline, thereby improving the visualization of the drainage pipe network operation and maintenance management process to a certain extent.

[0042] 2. In the present invention, a ring-shaped sub-pipe network is set up according to pipeline equipment and pipeline connection information, a drainage pipeline link is set for the connection relationship of each ring-shaped sub-pipe network in the pipeline three-dimensional space model, and the load data of each pipeline in the ring-shaped sub-pipe network and the drainage pipeline link are analyzed and processed in the coordination process of each operation and maintenance management node, thereby increasing the coordination dimension in the coordination processing process of the ring-shaped sub-pipe network, thereby improving the synergy, scientificity and coordination scope in the pipeline network processing process. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 This is a structural schematic diagram of a digital management system for drainage network operation and maintenance data proposed by the present invention. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Embodiment 1

[0046] like Figure 1 As shown, the present invention proposes a digital management system for drainage network operation and maintenance data, which sets up an operation and maintenance management center, in which a network management module, a data acquisition module, a data analysis module, a data collaboration module and an operation and maintenance management module are set.

[0047] The pipe network management module is used to obtain GIS geographic information, basic pipeline information and pipeline connection information in the corresponding city, build a three-dimensional spatial model of the pipe network based on the obtained information, and set corresponding operation and maintenance management nodes in the three-dimensional spatial model of the pipe network. The specific implementation process includes:

[0048] Setting up an information entry unit and an information management unit;

[0049] The information input unit is used to input GIS geographic information, basic pipeline information and pipeline connection information in the corresponding city, wherein:

[0050] GIS geographic information includes geographic location information and topographic information, among which: geographic location information includes the longitude and latitude information of the corresponding drainage network, and topographic information includes the elevation data, slope information and surface cover type of the corresponding drainage network;

[0051] The basic information of the pipeline includes the pipeline physical property information, pipeline construction information and pipeline function information, among which: the pipeline physical property information includes the pipe diameter information, pipe type and pipe wall thickness information, the pipeline construction information includes the construction location, construction year, construction unit and design standard, and the pipeline function information includes the pipeline use information and drainage area information;

[0052] The pipeline connection information includes the pipeline connection node coordinate information, pipeline connection node mode information and ancillary facility connection information, among which: the pipeline connection node coordinate information includes the intersection point coordinate information of the corresponding pipeline, the pipeline connection mode information includes fixed connection, socket connection, upstream and downstream relationship and connection angle information, etc.; the ancillary facility connection information includes the pump station connection information and valve connection information of each pipeline;

[0053] Mark the obtained GIS geographic information, pipeline basic information and pipeline connection information according to the acquisition time, generate a pipeline data packet according to the marking result, and send the obtained pipeline data packet to the information management unit;

[0054] It should be further explained that, in the specific implementation process, the pipeline data packet is updated according to the pipeline management result, and the three-dimensional spatial model of the pipeline network is updated by the information management unit according to the update result;

[0055] The information management unit is used to obtain the entered or updated pipeline data package, analyze and process the data information in the pipeline data package, and construct a corresponding three-dimensional spatial model of the pipeline network. The specific implementation process includes:

[0056] Obtain GIS geographic information, present it in DEM mode according to the GIS geographic information, and obtain digital elevation data (DEM) corresponding to the GIS geographic information;

[0057] Obtain basic pipeline information, sort out the coordinates based on the physical property information, construction location information and function information of the pipeline in the basic pipeline information, and obtain the coordinate location data of each pipeline;

[0058] Obtain pipeline connection information, compare the pipeline connection information with the coordinate position data of each pipeline, and mark each coordinate position data according to the comparison result. The marking result includes auxiliary marks, connection marks, etc., wherein the auxiliary marks include pump station marks, valve marks, inspection well marks, water inlet marks, and water outlet marks;

[0059] The coordinate position data and coordinate position information marking results of each pipeline are set as pipeline network data information, wherein the pipeline network data information includes basic pipeline information, auxiliary marking information and cross marking information;

[0060] The obtained digital elevation model is input into Bentley OpenCities Planner software, which analyzes and processes the obtained information, establishes a geographic coordinate reference system, and maps the digital elevation model into the corresponding geographic coordinate reference system;

[0061] Obtain the corresponding pipe network data information, use Bentley OpenCities Planner software to convert the pipe network data information into a unified format, input the converted pipe network data information into the corresponding geographic coordinate reference system, and construct the corresponding pipe network three-dimensional spatial model according to the location of the digital elevation information of the pipe network data information;

[0062] The three-dimensional spatial model of the pipe network includes the location marks and connection results of the pipe equipment and auxiliary equipment, the drainage flow direction information of the pipe network, etc.

[0063] Obtain the location information of each pipeline equipment and auxiliary equipment in the three-dimensional spatial model of the pipeline network and the drainage flow direction information of the pipeline network;

[0064] Obtain each pipeline device according to the drainage flow direction information of the pipeline network, and mark each pipeline device as a sequence point of the pipeline drainage process;

[0065] Obtain the historical drainage information of each pipeline drainage process sequence point, and extract the pipeline drainage characteristic information based on the historical drainage information;

[0066] According to the pipeline drainage characteristic information of each pipeline drainage process sequence point in the three-dimensional spatial model of the pipeline network, the evaluation dimension index is selected, and the indicator dimension weight corresponding to the evaluation dimension index is set. The membership matrix of each pipeline drainage process sequence point to the preset importance level is judged through fuzzy comprehensive evaluation;

[0067] Obtain the importance data of each pipeline drainage process sequence point based on the membership matrix and indicator dimension weights;

[0068] Preset importance data limits, compare and analyze the obtained importance data with the importance data limits, and set the pipeline drainage process sequence points that meet the importance data limits as operation and maintenance management nodes;

[0069] If the importance data is greater than or equal to the importance data limit, the pipeline drainage process sequence point is set as an operation and maintenance management node;

[0070] It should be further explained that, in the specific implementation process, the operation and maintenance management node is marked according to the pipeline equipment type, connection result and pipeline network drainage flow direction information corresponding to the corresponding pipeline drainage process sequence point.

[0071] The data acquisition module is used to collect pipeline drainage data at corresponding pipeline locations according to the operation and maintenance management nodes set in the three-dimensional spatial model of the pipeline network. The specific implementation process includes:

[0072] Obtain each operation and maintenance management node in the three-dimensional spatial model of the pipeline network, and set the corresponding pipeline monitoring sensor according to the pipeline location information of the operation and maintenance management node, where:

[0073] Pipeline monitoring sensors include water level sensors, flow velocity sensors, and flow direction sensors;

[0074] The water level sensor is used to obtain drainage water level data at the pipeline position corresponding to each operation and maintenance management node;

[0075] The flow rate sensor is used to obtain drainage flow rate data at the pipeline position corresponding to each operation and maintenance management node;

[0076] The flow direction sensor is used to obtain drainage flow direction data at the pipeline position corresponding to each operation and maintenance management node;

[0077] The obtained drainage water level data, drainage flow rate data and drainage flow direction data are collectively referred to as pipeline drainage data, and the pipeline drainage data are marked according to the operation and maintenance management node and the corresponding collection time;

[0078] The drainage data of each pipeline is sent to the data analysis module according to the marking results.

[0079] The data analysis module is used to analyze and process the pipeline drainage data at each pipeline position to determine the pipeline load data and pipeline operation data at the corresponding pipeline position. The specific implementation process includes:

[0080] Setting up data analysis unit and data management unit;

[0081] The data analysis unit is used to obtain the pipeline drainage data obtained in each operation and maintenance management node, and analyze and process the obtained pipeline drainage data to obtain corresponding pipeline load data and drainage operation data:

[0082] Obtain valve information of the corresponding pipeline at the operation and maintenance management node, and set the load mapping coordinate system at the corresponding position of the operation and maintenance management node according to the valve information;

[0083] The horizontal axis in the load mapping coordinate system is the corresponding collection time of the drainage water level data and the drainage flow rate data, and the vertical axis is the corresponding values ​​of the drainage water level data and the drainage flow rate data, and the vertical axis is set with the water level load assignment function and the flow rate load assignment function corresponding to the valve information of the corresponding operation and maintenance management node, and the total water level load data and the total flow rate load data corresponding to the corresponding valve information are obtained;

[0084] The water level load assignment function and the flow rate load assignment function correspond to comparing and analyzing the water level total load data and the flow rate total load data respectively occupied by the obtained drainage water level data and drainage flow rate data, obtaining the proportion relationship between the two, and obtaining the corresponding water level load data and flow rate load data according to the proportion relationship;

[0085] Obtain the pipeline load data and pipeline operation data obtained by each operation and maintenance management node in the three-dimensional spatial model of the pipeline network, and analyze and process the pipeline load data and pipeline network operation data;

[0086] Obtain water level load data and flow rate load data in the pipeline load data; analyze and process the water level load data and flow rate load data in combination with the pipeline operation data;

[0087] According to the location information corresponding to each operation and maintenance management node, the water level load level interval and flow rate load level interval are preset, where:

[0088] The water level load level range includes three levels: no load, full load and overload;

[0089] The flow rate load level range includes three levels: slow, average and fast;

[0090] When the network operation data is negative, the operation and maintenance management node is marked as abnormal;

[0091] When the pipe network operation data is positive or 0, the levels of water level load data and flow rate load data are obtained;

[0092] When the level corresponding to the water level load data is overload, the overload level coefficient is set according to the flow rate load level, wherein the overload level coefficient corresponding to the slow speed is greater than the overload level coefficient corresponding to the average speed; and the overload level coefficient corresponding to the average speed is greater than the overload level coefficient corresponding to the fast speed;

[0093] When the level corresponding to the water level load data is full load, the full load level coefficient is set according to the flow rate load level, wherein the full load level coefficient corresponding to the slow speed is greater than the full load level coefficient corresponding to the average speed; the full load level coefficient corresponding to the average speed is greater than the full load level coefficient corresponding to the fast speed;

[0094] When the level corresponding to the water level load data is no-load, the no-load level coefficient is set according to the flow rate load level, wherein the no-load level coefficient corresponding to the slow speed is greater than the no-load level coefficient corresponding to the average speed; the no-load level coefficient corresponding to the average speed is greater than the no-load level coefficient corresponding to the fast speed;

[0095] The pipeline load data of the corresponding operation and maintenance management node is obtained by multiplying the water level load data and the obtained grade coefficient;

[0096] Set corresponding coordinated pipeline load threshold data according to valve information of the operation and maintenance management node;

[0097] Compare and analyze the pipeline load data with the coordinated pipeline load threshold data, and obtain the load operation status of the corresponding operation and maintenance management node based on the comparison and analysis results:

[0098] If the pipeline load data is greater than or equal to the coordinated pipeline load threshold data, the operation and maintenance management node is marked as load abnormal, and the corresponding abnormal type is obtained according to the data source corresponding to the comprehensive pipeline load;

[0099] Obtaining the location information of the three-dimensional spatial model of the pipe network to which the operation and maintenance management node belongs, and setting corresponding normal flow direction data according to the location information, wherein the normal flow direction data includes the normal range angle of the corresponding operation and maintenance management node in the normal drainage process;

[0100] Compare and analyze the obtained normal flow direction data with the drainage flow direction data;

[0101] If the drainage flow direction data is consistent with the normal flow direction data, the pipeline operation data of the operation and maintenance management node is marked as normal;

[0102] If the drainage flow direction data does not conform to the normal flow direction data, the deviation angle data of the drainage flow direction data in the operation and maintenance management node is obtained, and an abnormal warning message is generated and sent to the operation and maintenance management center.

[0103] The data management unit is used to set a corresponding drainage pipeline link according to the three-dimensional spatial model of the pipe network, wherein the drainage pipeline link includes drainage connection information of each pipeline equipment in the three-dimensional spatial model of the pipe network and water flow information during drainage.

[0104] Obtain the digital elevation information of each operation and maintenance management node in the three-dimensional spatial model of the pipe network, perform layout design and division of each operation and maintenance management node according to the digital elevation information, preset the digital elevation radius, mark the operation and maintenance management nodes within the data elevation radius, and perform gradient division of the operation and maintenance management nodes in the three-dimensional spatial model of the pipe network according to the marking results;

[0105] Obtain the spatial distribution of the three-dimensional spatial model of the pipe network to which each operation and maintenance management node belongs;

[0106] According to the spatial distribution, the operation and maintenance management nodes with a connection relationship are set to a gradient subset in the corresponding gradient, and the gradient subset includes each operation and maintenance management node with a connection relationship within the same data elevation radius;

[0107] Mark each operation and maintenance management node in the gradient subset to obtain the corresponding ring sub-network;

[0108] According to the connection relationship of each operation and maintenance management node in the obtained ring sub-pipe network, the ring sub-pipe networks within the adjacent elevation radius are connected, and the corresponding drainage pipe links are generated according to the connection relationship of the corresponding ring sub-pipe networks within the adjacent elevation radius, and the corresponding drainage pipe links are marked and stored.

[0109] The data coordination module is used to map the pipeline load data and pipeline operation data of each pipeline location to the corresponding operation and maintenance management node, build a real-time pipeline network model, obtain the drainage pipeline link, and set the coordinated drainage information for the operation and maintenance management node according to the drainage pipeline link and pipeline load data. The specific implementation process includes:

[0110] Set up real-time management units and collaborative management units;

[0111] The real-time management unit is used to obtain pipeline load data obtained by each operation and maintenance management node in the three-dimensional spatial model of the pipeline network, map the obtained pipeline load data to the pipeline position corresponding to the corresponding operation and maintenance management node in the three-dimensional spatial model of the pipeline network, and obtain the operating status of each operation and maintenance management node according to the pipeline load data;

[0112] Get the maximum load data of each operation and maintenance management node and mark it as Q design , label the pipeline load data as Q actual ;

[0113] Get the load rate F of the operation and maintenance management node,

[0114] Preset a load level interval, compare and analyze the obtained load rate with the load level interval, and obtain the operating status of the operation and maintenance management node based on the comparison and analysis results;

[0115] The operating status includes a low load state, a normal load state and a high load state. Visual processing is performed on each operation and maintenance management node according to the operating status, and a corresponding real-time pipe network model is generated according to the visualization processing result.

[0116] The collaborative management unit is used to set collaborative drainage information for the operation and maintenance management node according to the drainage pipeline link and pipeline load data;

[0117] Obtain the real-time pipe network model and the drainage pipe links in each ring sub-pipe network, and obtain the operating status of the operation and maintenance management nodes in each ring sub-pipe network in the real-time pipe network model;

[0118] Integrate the load status of the operation and maintenance management nodes in each operation and maintenance management node, obtain the balanced load data of the corresponding ring sub-pipeline network, and compare and analyze the network load data of the operation and maintenance management node with the balanced load data;

[0119] If the pipe network load data is equal to or greater than the balanced load data, the difference is marked as overload flow rate data, and the elastic coordination data is the drainage load data that can be accommodated by the corresponding operation and maintenance management node;

[0120] If the pipe network load data is less than the balanced load data, the difference is marked as elastic coordination data, and the overload flow rate data is the drainage load data currently overloaded by the corresponding operation and maintenance management node;

[0121] It should be further explained that, in the specific implementation process, the load balancing data statistically analyzes the operating status of each operation and maintenance management node, obtains the average load data of each operation and maintenance management node inside the ring sub-pipe network, and sets the corresponding superposition coefficient according to the digital elevation data of the ring sub-pipe network to ensure the normal drainage of the ring sub-pipe network;

[0122] Sorting the operation and maintenance management nodes corresponding to the elastic coordination data or overload flow rate data in the ring sub-pipeline network to obtain the pipe network coordination queue and the pipe network overload queue;

[0123] Obtain the elastic coordination data or overload flow rate data of the operation management node at the other end of the drainage pipeline link corresponding to each ring sub-pipe network, sort the operation and maintenance management nodes corresponding to the elastic coordination data or overload flow rate data corresponding to each interconnection according to the drainage pipeline link, and obtain the link coordination queue and link overload queue;

[0124] Preset the collaborative radius, match the operation and maintenance management nodes in the pipe network collaborative queue, pipe network overload queue, link collaborative queue and link overload queue within the collaborative range according to the collaborative radius, obtain the collaborative matching results of the operation and maintenance management nodes between different queues based on the big data algorithm, and mark the obtained collaborative matching results as the collaborative drainage information of the corresponding operation and maintenance management node;

[0125] It should be further explained that, in the specific implementation process, the collaborative drainage information obtains the drainage flow direction relationship between the operation and maintenance management node and the corresponding operation and maintenance management node, and selects the drainage flow adjustment for the corresponding operation and maintenance management node according to the drainage flow direction relationship, and determines whether the flow adjustment for the corresponding operation and maintenance management node is to be enlarged or reduced.

[0126] The operation and maintenance management module is used to optimize the obtained collaborative drainage information according to the location of the operation and maintenance management node, obtain the corresponding operation and maintenance decision information, and adjust the corresponding pipeline flow of each operation and maintenance management node according to the operation decision information. The specific implementation process includes:

[0127] Obtain the coordinated drainage information of each operation and maintenance management node in the real-time pipe network model;

[0128] According to the digital elevation data, the coordinated drainage information of the operation and maintenance management nodes in each ring sub-pipe network is analyzed and processed in order from low to high;

[0129] It should be further explained that, in the specific implementation process, by analyzing and processing the coordinated drainage information of the operation and maintenance management nodes in each ring sub-pipeline network from low to high according to the digital elevation data, it is avoided that the pipeline drainage at the operation and maintenance management nodes corresponding to the low altitude is not smooth, which leads to the occurrence of disasters such as waterlogging;

[0130] Respectively obtain the proportion data of the network overload queue and the link overload queue corresponding to the ring sub-pipeline network and the drainage pipeline link to which the operation and maintenance management node belongs, and preset the coordination coefficient of each coordination matching result in the coordinated drainage information according to the proportion data;

[0131] The proportion of the pipe network overload queue and the link overload queue is marked as x respectively. 管 and x 链 , respectively marked as α according to the elastic load data corresponding to the corresponding ring sub-network operation and maintenance management node and the elastic load data corresponding to the drainage pipeline link operation and maintenance management node 管 and α 链 ; Label the synergy coefficient as y, where:

[0132] y=∑x 管 α 管 =∑x 链 α 链 ;

[0133] According to the coordination coefficient, the various coordinated matching results in the coordinated drainage information are reordered to obtain the most suitable operation and maintenance management node after reordering, and the operation and maintenance decision information of the corresponding operation and maintenance management node is obtained according to the sorting result. According to the operation and maintenance decision information, the drainage process at the corresponding pipeline equipment is subjected to flow regulation processing.

[0134] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A digital management system for drainage network operation and maintenance data, including an operation and maintenance management center, characterized in that: The operation and maintenance management center is provided with a pipe network management module, a data acquisition module, a data analysis module, a data collaboration module and an operation and maintenance management module; The pipe network management module is used to obtain GIS geographic information, basic pipeline information and pipeline connection information in the corresponding city, build a three-dimensional spatial model of the pipe network according to the obtained information, and set corresponding operation and maintenance management nodes in the three-dimensional spatial model of the pipe network; The data acquisition module is used to collect pipeline drainage data at corresponding pipeline locations according to the operation and maintenance management nodes set in the three-dimensional spatial model of the pipeline network; The data analysis module is used to analyze and process the obtained pipeline drainage data, obtain the pipeline load data at the corresponding pipeline position, and set the corresponding drainage pipeline link according to the three-dimensional spatial model of the pipeline network; The data coordination module is used to map the pipeline load data and pipeline operation data at each pipeline location to the corresponding operation and maintenance management node, build a real-time pipeline network model, obtain the drainage pipeline link, and set the coordinated drainage information for the corresponding operation and maintenance management node according to the drainage pipeline link and pipeline load data; The operation and maintenance management module is used to optimize the obtained collaborative drainage information according to the location of the operation and maintenance management node, obtain corresponding operation and maintenance decision information, and adjust the corresponding pipeline flow of each operation and maintenance management node according to the operation decision information.

2. A digital management system for drainage network operation and maintenance data according to claim 1, characterized in that: The process of constructing the three-dimensional spatial model of the pipeline network and the corresponding operation and maintenance management nodes in the pipeline network management module includes: Enter GIS geographic information, basic pipeline information and pipeline connection information, and mark the obtained information according to the collection time; Acquire the latest information according to the acquisition time, acquire GIS geographic information, build a geographic coordinate reference system according to the GIS geographic information, and generate corresponding digital elevation information; acquire basic pipeline information and pipeline connection information, and set corresponding pipe network data information according to the basic pipeline information and pipeline connection information; integrate the obtained pipe network data information and digital elevation information according to the corresponding geographic coordinate reference system, and generate a corresponding pipe network three-dimensional space model according to the integration result; Obtain the corresponding pipeline network data information in the three-dimensional space of the pipeline network, set the pipeline drainage process sequence points according to the pipeline network data information, preset evaluation dimension indicators, judge the importance data of each pipeline drainage process sequence point according to the evaluation dimension indicators, and set the pipeline drainage process sequence points whose importance data meet the preset limit as operation and maintenance management nodes.

3. A digital management system for drainage network operation and maintenance data according to claim 2, characterized in that: The process of the data acquisition module obtaining pipeline drainage data includes: Acquire each operation and maintenance management node in the three-dimensional spatial model of the pipeline network, and set corresponding pipeline monitoring sensors according to the pipeline location information of the operation and maintenance management node, wherein the pipeline monitoring sensors include a water level sensor and a flow rate sensor; Corresponding pipeline drainage data is acquired according to the pipeline monitoring sensor, and the pipeline drainage data includes drainage water level data and drainage flow rate data.

4. A digital management system for drainage network operation and maintenance data according to claim 3, characterized in that: The process of the data analysis module obtaining pipeline load data based on pipeline drainage data includes: Acquire the pipeline drainage data obtained in each operation and maintenance management node, and the operation and maintenance management node analyzes and processes the pipeline drainage data obtained at the corresponding position respectively; According to the pipeline data information corresponding to the operation and maintenance management node, the corresponding load mapping coordinate system is set, and the obtained drainage water level data and drainage flow rate data are respectively input into the corresponding load mapping coordinate system. According to the coordinate results, the water level load data and flow rate load data are obtained, and the water level load data and flow rate load data are respectively comprehensively processed to obtain the pipeline load data corresponding to the operation and maintenance management node.

5. A digital management system for drainage network operation and maintenance data according to claim 4, characterized in that: The process of setting up the drainage pipeline link in the data analysis module includes: Obtain the digital elevation information of each operation and maintenance management node in the three-dimensional spatial model of the pipe network, perform layout design division on each operation and maintenance management node according to the digital elevation information, perform gradient division according to the digital elevation information corresponding to the operation and maintenance management node, obtain each gradient subset according to the pipeline connection information between each operation and maintenance management node within the same gradient range, mark the obtained gradient subset as a ring sub-pipeline network, and mark and store each ring sub-pipeline network; The corresponding drainage pipeline link is generated according to the connection results of each annular sub-pipe network within the adjacent gradient range. The drainage pipeline link is the operation management nodes connected to each other in the adjacent annular sub-pipe networks and the connection relationship between the operation management nodes.

6. A digital management system for drainage network operation and maintenance data according to claim 5, characterized in that: The process of building a real-time pipe network model in the data collaboration module includes: The pipeline load data obtained by each operation and maintenance management node in the three-dimensional spatial model of the pipeline network is obtained, and the obtained pipeline load data is mapped to the pipeline position corresponding to the corresponding operation and maintenance management node in the three-dimensional spatial model of the pipeline network. The operation status of each operation and maintenance management node is obtained according to the pipeline load data, and the operation status includes a low load state, a normal load state and a high load state. Each operation and maintenance management node is visualized according to the operation status, and a corresponding real-time pipeline network model is generated according to the visualization processing result.

7. A digital management system for drainage network operation and maintenance data according to claim 6, characterized in that: The process of setting collaborative drainage information in the data collaboration module includes: Obtain the real-time pipe network model and the drainage pipe links in each ring sub-pipe network, and obtain the operating status of the operation and maintenance management nodes in each ring sub-pipe network in the real-time pipe network model; Integrate the load status of the operation and maintenance management nodes within each operation and maintenance management node, obtain the balanced load data of the corresponding ring sub-pipe network, and obtain the elastic coordination data or overload flow rate data of each operation and maintenance management node based on the balanced load data; Sorting the operation and maintenance management nodes corresponding to the elastic coordination data or overload flow rate data in the ring sub-pipeline network to obtain the pipe network coordination queue and the pipe network overload queue; Obtain the elastic coordination data or overload flow rate data of the operation management node at the other end of the drainage pipeline link corresponding to each ring sub-pipe network, sort the operation and maintenance management nodes corresponding to the elastic coordination data or overload flow rate data corresponding to each interconnection according to the drainage pipeline link, and obtain the link coordination queue and link overload queue; A collaborative radius is preset, and each operation and maintenance management node in the pipeline collaborative queue, pipeline overload queue, link collaborative queue and link overload queue within the collaborative range is matched according to the collaborative radius. The collaborative matching results of each operation and maintenance management node between different queues are obtained based on the big data algorithm, and the obtained collaborative matching results are marked as the collaborative drainage information of the corresponding operation and maintenance management node.

8. A digital management system for drainage network operation and maintenance data according to claim 7, characterized in that: The operation and maintenance management module generates operation and maintenance decision information, and the process of adjusting according to the operation and maintenance decision information includes: Obtain the coordinated drainage information of each operation and maintenance management node in the real-time pipe network model; According to the digital elevation data, the coordinated drainage information of the operation and maintenance management nodes in each ring sub-pipe network is analyzed and processed in order from low to high; Respectively obtain the proportion data of the network overload queue and the link overload queue corresponding to the ring sub-pipeline network and the drainage pipeline link to which the operation and maintenance management node belongs, and preset the coordination coefficient of each coordination matching result in the coordinated drainage information according to the proportion data; The collaborative matching results in the collaborative drainage information are reordered according to the collaborative coefficient, the operation and maintenance decision information of the corresponding operation and maintenance management node is obtained according to the sorting result, and the flow regulation processing is performed on the drainage process at the corresponding pipeline equipment according to the operation and maintenance decision information.

Citation Information

Patent Citations

  • Urban drainage system liquid level indirect monitoring analysis method based on directed topology network

    CN116050037A

  • Emergency control method for preventing interlocking overloading of power transmission section

    CN105305389A

  • Urban drainage pipe network water flow numerical simulation method based on Godunov format

    CN111046567A

  • Intelligent water affair Internet-of-things integrated management system and method

    CN114021296A

  • Traffic scheduling method and device, storage medium and electronic equipment

    CN118200236A