Power distribution network operator safety risk monitoring and early warning system

By collecting rainfall, terrain and soil load-bearing data in the distribution network construction area and comparing operation characteristics, the problem of difficulty in safely monitoring construction workers in complex environments in the existing technology is solved, and multi-dimensional safety monitoring and early warning is realized, which improves safety reliability and risk control.

CN119832712APending Publication Date: 2025-04-15WUHAN UNIV +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411904946.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-04-15

AI Technical Summary

Technical Problem

The prior art is difficult to monitor the distribution network construction workers in the complex terrain of the plum rainy season, and it is difficult to predict potential safety risks by monitoring the operational actions of the construction workers.

Method used

By collecting rainfall, terrain and soil load-bearing data in the construction area of ​​the distribution network, and combining the operation actions of different operating methods of preset different operating methods, the operation actions of construction workers and the characteristics of preset operating actions are performed to achieve multi-dimensional three-dimensional safety monitoring.

Benefits of technology

It improves the reliability of safety monitoring, can promptly warn before safety accidents occur, ensure the safety of construction workers, and enhances the control of safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119832712A_ABST
    Figure CN119832712A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network operator safety risk monitoring and early warning system, which belongs to the technical field of construction monitoring and comprises an information acquisition unit, and the information acquisition unit comprises a CCD camera, an image data compression module and an image interception module; the CCD camera is used for acquiring image data; the image data compression module is used for compressing the image data; the image interception module is used for intercepting image data of a pre-selected area in the image data compression module; the rainfall, terrain and soil bearing data of a power distribution network construction operation area are collected, operation actions of different operation modes are preset, feature comparison is carried out on the operation actions of construction operation personnel and preset operation actions, multi-dimensional three-dimensional safety monitoring can be carried out on the construction operation personnel, and the safety of the construction operation personnel is improved. The reliability of safety monitoring is improved, and the control over safety risks is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction monitoring, and in particular to a safety risk monitoring and early warning system for distribution network operators. Background Art

[0002] The construction of distribution network is an important project to ensure the normal operation of the national economy. The environment of the distribution network construction site is complex and diverse. During the construction process, construction workers are required to professionally and strictly follow the operation guidelines to perform standardized operations. Usually, in order to ensure that construction workers can work safely, they will be filmed and monitored in a standardized manner during the operation of the workers to avoid accidents caused by their illegal operations. Under the existing technology, the safety monitoring of workers is mostly focused on whether the workers comply with the operation guidelines and whether they wear and / or wear safety equipment as required. However, when the distribution network is operated under the complex terrain conditions in the rainy season, mountain and / or soil landslides will also pose a safety threat to the workers and cause damage to the distribution network equipment. Such incidents are not uncommon. However, it is difficult for the existing technology to conduct safety monitoring of distribution network construction workers under the complex terrain conditions in the rainy season. At the same time, it is also difficult to predict potential risks by monitoring the operating actions of construction workers. If the construction workers cannot be monitored in a multi-dimensional and three-dimensional manner, it will be difficult to control safety risks. Summary of the invention

[0003] In view of the above-mentioned problems existing in the existing safety monitoring and early warning system for distribution network operators, the present invention is proposed.

[0004] Therefore, one of the objects of the present invention is to provide a distribution network worker safety risk monitoring and early warning system, which utilizes the collected rainfall, topography and soil bearing data in the distribution network construction area, and through pre-setting operating actions of different operating modes, the operating actions of the construction workers are compared with the preset operating actions. It can perform multi-dimensional and three-dimensional safety monitoring of the construction workers, improve the reliability of safety monitoring, ensure the safety of construction workers to a higher degree, and enhance the control of safety risks.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] On the one hand, the present invention provides a distribution network operator safety risk monitoring and early warning system, comprising:

[0007] An information acquisition unit, the information acquisition unit comprising a CCD camera, an image data compression module and an image capture module;

[0008] The CCD camera is used to obtain image data of the operator's working process;

[0009] The image data compression module is used for compressing the image data;

[0010] The image capture module is used to capture the image data of the pre-selected area in the image data compression module;

[0011] The action data acquisition module is used to collect the historical process actions of the operator from the beginning to the end of the operation, and to summarize and divide the historical process actions according to the operation purpose. At the same time, the action prediction model is constructed based on the historical process actions of different operation purposes;

[0012] A fusion analysis unit, the fusion analysis unit comprising a motion feature interception module and a time feature acquisition module;

[0013] The action feature interception module is used to obtain historical feature operation actions in different operation purposes;

[0014] The time feature acquisition module is used to acquire the processes corresponding to the feature operation actions in different operation purposes.

[0015] As a preferred solution of the present invention, the information acquisition unit also includes obtaining soil moisture value data of the preset distribution network construction area at the time of the historical maximum monthly rainfall, and presetting a safety threshold based on the soil moisture value data when a landslide occurred in the preset distribution network construction area in the past. When the soil moisture value data of the preset distribution network construction area in the future period is higher than the safety threshold, the system determines that the preset distribution network construction area is in a landslide risk state, otherwise, it does not determine, and calculates the change law of the soil moisture value data based on the hourly rainfall data in the historical maximum monthly rainfall in the preset distribution network construction area, and calculates it according to the following formula:

[0016] Among them, w i represents the maximum hourly rainfall data collected for the ith time in the maximum monthly rainfall;

[0017] In the formula, ξ represents the average change value of soil moisture in the preset distribution network construction area during the maximum monthly rainfall, and x i It represents the maximum average change value data of soil moisture when the soil landslide occurs during the i-th time of the maximum monthly rainfall, and a critical threshold is preset based on the maximum average change value data. When the maximum average change value data of soil moisture collected in the future period is higher than the critical threshold, the system issues a safety warning, otherwise, no warning is issued;

[0018] At the same time, if the maximum average change value data of soil moisture collected in the future period is higher than the critical threshold and no soil landslide occurs, the critical threshold is reassigned;

[0019] b represents the historical number of soil landslides that occurred in the preset distribution network construction area, and n represents the soil bearing capacity data when historical soil landslides occurred.

[0020] As a preferred solution of the present invention, the operation process required for different construction work purposes is preset, and the operation action image matching the operation process is obtained, and the key frame image of the characteristic action is obtained in the operation action image, and the key frame image is divided into θ1, θ2, ..., θ n , where n represents the nth key frame image. When the system does not detect the characteristic action that is consistent with the operation process, the system will issue an early warning, otherwise, no early warning will be issued.

[0021] As a preferred solution of the present invention, the operating procedures of operators in historical construction operations in which illegal operations and / or safety accidents occurred are obtained, and the operating procedures in which illegal operations and / or safety accidents occurred are sorted from the highest to the lowest number of times, and the previous operating actions in which illegal operations and / or safety accidents occurred in different operating procedures are collected, and the corresponding action features are obtained based on the previous operating actions. When the system monitors that an operation procedure has an action feature corresponding to the previous operation action during construction operations in a future period, the system determines it as an erroneous operation and issues a warning. Otherwise, no warning is issued.

[0022] As a preferred solution of the present invention, the corresponding operation processes are monitored at different levels in order of most to least when a safety accident occurs, and the different levels of monitoring are divided into high, medium and low levels in a step-by-step manner, wherein high-level monitoring and medium-level monitoring are both full-process monitoring, and low-level monitoring is non-full-process monitoring.

[0023] As a preferred solution of the present invention, the soil bearing data includes the weight of the distribution network equipment and the weight increased due to rainfall, and collects the minimum weight portion increased due to rainfall when a landslide occurred in history, and presets a weight threshold based on the minimum increased weight portion. When the weight increased due to rainfall in the distribution network construction area preset in the future time period exceeds the weight threshold, the system issues an early warning, otherwise, no early warning is issued.

[0024] As a preferred solution of the present invention, it also includes a monitoring terminal for recording the communication base station and / or the communication base station operator matching the preset construction operation area, receiving the field data uploaded by the collection monitoring point, and updating the background data at the same time;

[0025] When a system warning signal is issued in the monitoring area, a request for obtaining information on the warning status of the power transmission line is initiated to the corresponding communication base station and / or the communication base station operator in the preset monitoring area.

[0026] As a preferred solution of the present invention, an image set is generated according to the acquired key frame images, and the key frame images in the image set are preprocessed.

[0027] On the other hand, the present invention provides a method for a distribution network operator safety risk monitoring and early warning system, comprising the following steps:

[0028] Acquire image data of the operator's working process, compress and process the image data, and intercept image data of a preselected area;

[0029] Collect the historical process actions of the operator from the beginning to the end of the operation, and summarize and divide the historical process actions according to the operation purpose. At the same time, build an action prediction model based on the historical process actions of different operation purposes;

[0030] Acquire historical characteristic operation actions in different operation purposes, and collect the processes corresponding to the characteristic operation actions in different operation purposes;

[0031] Preset the operation process required for different construction work purposes, and obtain the operation action image matching the operation process, and at the same time obtain the key frame image of the characteristic action in the operation action image;

[0032] Generating an image set according to the acquired key frame images, and preprocessing the key frame images in the image set;

[0033] The operating procedures of operators in historical construction operations that resulted in illegal operations and / or safety accidents are obtained, and the operating procedures in which illegal operations and / or safety accidents occurred are sorted from the most to the least frequent. When the system detects that an operating procedure has action features corresponding to the previous operation during construction operations in future time periods, the system determines it as an erroneous operation and issues a warning. Otherwise, no warning is issued.

[0034] Beneficial effects of the present invention: By collecting rainfall, topography and soil bearing data in the distribution network construction area, the present invention can effectively analyze and predict the occurrence of soil landslides, and issue timely warnings, thereby warning workers to evacuate before a safety accident occurs. At the same time, by presetting operating actions for different operating modes, the operating actions of the construction workers are feature-matched with the preset operating actions, and it can be predicted whether the operating actions of the workers will cause safety risks. Furthermore, multi-dimensional and three-dimensional safety monitoring of the construction workers can be performed, thereby improving the reliability of safety monitoring, ensuring the safety of construction workers to a higher degree, and enhancing the control of safety risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0036] Figure 1 It is a schematic diagram of the modular structure of the distribution network operator safety monitoring and early warning system according to an embodiment of the present invention;

[0037] Figure 2 It is a schematic diagram of the modular structure of the information acquisition unit according to an embodiment of the present invention;

[0038] Figure 3 A schematic diagram of a method flow of an embodiment of the present invention;

[0039] Numbers in the figure: 110 - information acquisition unit; 1101 - CCD camera; 1102 - image data compression module; 1103 - image capture module; 120 - motion data acquisition module; 130 - fusion analysis unit; 1301 - motion feature capture module; 1302 - time feature acquisition module; 140 - monitoring terminal. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0041] It is difficult to conduct safety monitoring of distribution network construction workers in the complex terrain during the rainy season using existing technologies. It is also difficult to predict potential risks by monitoring the operating actions of construction workers. If multi-dimensional and three-dimensional safety monitoring of construction workers cannot be carried out, it will be difficult to control safety risks.

[0042] Based on this, the present invention proposes a distribution network operator safety risk monitoring and early warning system, which collects rainfall, topography and soil bearing data in the distribution network construction area, and through pre-setting operating actions of different operating modes, compares the operating actions of the construction workers with the preset operating actions. It can perform multi-dimensional and three-dimensional safety monitoring of the construction workers, improve the reliability of safety monitoring, ensure the safety of construction workers to a higher degree, and enhance the control of safety risks.

[0043] The present invention is further described in detail below through embodiments and in conjunction with the accompanying drawings.

[0044] Reference Figures 1 to 3 , is an embodiment of the present invention, which provides a distribution network operator safety risk monitoring and early warning system, including:

[0045] The information acquisition unit 110 includes a CCD camera 1101, an image data compression module 1102 and an image capture module 1103;

[0046] The CCD camera 1101 is used to obtain image data of the operator's working process;

[0047] The image data compression module 1102 is used for compressing image data;

[0048] The image capture module 1103 is used to capture the image data of the pre-selected area in the image data compression module 1102;

[0049] In the information acquisition unit 110, it also includes obtaining the soil moisture value data of the preset distribution network construction area at the time of the historical maximum monthly rainfall, and setting a safety threshold based on the soil moisture value data when the preset distribution network construction area has a landslide in history. When the soil moisture value data of the preset distribution network construction area in the future period is higher than the safety threshold, the system determines that the preset distribution network construction area is in a landslide risk state, otherwise, it does not determine, and calculates the change law of the soil moisture value data based on the hourly rainfall data in the historical maximum monthly rainfall in the preset distribution network construction area, and calculates it according to the following formula:

[0050] Among them, w i represents the maximum hourly rainfall data collected for the i-th time in the maximum monthly rainfall;

[0051] In the formula, ξ represents the average change value of soil moisture in the preset distribution network construction area during the maximum monthly rainfall, and x i It represents the maximum average change value data of soil moisture when the soil landslide occurs during the maximum monthly rainfall, and the critical threshold is preset based on the maximum average change value data. When the maximum average change value data of soil moisture collected in the future period is higher than the critical threshold, the system will issue a safety warning, otherwise, no warning will be issued;

[0052] At the same time, if the maximum average change value data of soil moisture collected in the future period is higher than the critical threshold and no soil landslide occurs, the critical threshold is reassigned;

[0053] b represents the historical number of soil landslides in the preset distribution network construction area, and n represents the soil bearing data when historical soil landslides occurred;

[0054] In this embodiment, the soil bearing data includes the weight of the distribution network equipment and the weight increased due to rainfall, and collects the minimum weight portion increased due to rainfall when a landslide occurs in history, and presets a weight threshold based on the minimum weight portion increased. When the weight increased due to rainfall in the distribution network construction area preset in the future period exceeds the weight threshold, the system issues an early warning, otherwise, no early warning is issued;

[0055] The action data acquisition module 120 is used to collect the historical process actions of the operator from the beginning to the end of the operation, and to summarize and divide the historical process actions according to the operation purpose. At the same time, the action prediction model is constructed based on the historical process actions of different operation purposes;

[0056] A fusion analysis unit 130, which includes a motion feature interception module 1301 and a time feature acquisition module 1302;

[0057] The action feature interception module 1301 is used to obtain historical feature operation actions in different operation purposes;

[0058] The time feature collection module 1302 is used to collect processes corresponding to feature operation actions in different work purposes.

[0059] The operation process required for different construction work purposes is preset, and the operation action image matching the operation process is obtained. At the same time, the key frame image of the characteristic action is obtained in the operation action image, and the key frame image is divided into θ1, θ2, ..., θ n , where n represents the nth key frame image. When the system does not detect the characteristic action that matches the operation process, the system will issue an early warning, otherwise, no early warning will be issued;

[0060] Further, an image set is generated according to the acquired key frame images, and the key frame images in the image set are preprocessed;

[0061] The operating procedures of operators in historical construction operations that resulted in illegal operations and / or safety accidents are obtained, and the operating procedures in which illegal operations and / or safety accidents occurred are sorted from the most to the least frequent. At the same time, the previous operating actions in which illegal operations and / or safety accidents occurred in different operating procedures are collected, and the corresponding action features are obtained based on the previous operating actions. When the system detects that an operating procedure has an action feature corresponding to the previous operating action during construction operations in the future period, the system determines it as an erroneous operation and issues a warning. Otherwise, no warning is issued.

[0062] The corresponding operating processes will be monitored at different levels in order of the most to least safety incidents, and the different levels of monitoring will be divided into high, medium and low levels. Among them, high-level monitoring and medium-level monitoring are full-process monitoring, and low-level monitoring is non-full-process monitoring.

[0063] It also includes a monitoring terminal 140, which is used to record the communication base stations and / or communication base station operators that match the preset construction work area, receive the field data uploaded by the collection monitoring points, and update the background data at the same time;

[0064] When a system warning signal is issued in the monitoring area, a request for obtaining information on the warning status of the power transmission line is initiated to the corresponding communication base station and / or the communication base station operator in the preset monitoring area.

[0065] According to the above-mentioned distribution network operator safety risk monitoring and early warning system, the present invention also provides a working method applied to the system, as follows:

[0066] Acquire image data of the operator's working process, compress and process the image data, and intercept image data of a preselected area;

[0067] Collect the historical process actions of the operator from the beginning to the end of the operation, and summarize and divide the historical process actions according to the operation purpose. At the same time, build an action prediction model based on the historical process actions of different operation purposes;

[0068] Acquire historical characteristic operation actions in different operation purposes, and collect the processes corresponding to the characteristic operation actions in different operation purposes;

[0069] Preset the operation process required for different construction work purposes, and obtain the operation action image matching the operation process, and at the same time obtain the key frame image of the characteristic action in the operation action image;

[0070] Generating an image set according to the acquired key frame images, and preprocessing the key frame images in the image set;

[0071] The operating procedures of operators in historical construction operations that resulted in illegal operations and / or safety accidents are obtained, and the operating procedures in which illegal operations and / or safety accidents occurred are sorted from the most to the least frequent. When the system detects that an operating procedure has action features corresponding to the previous operation during construction operations in future time periods, the system determines it as an erroneous operation and issues a warning. Otherwise, no warning is issued.

[0072] To sum up, the present invention can effectively analyze and predict the occurrence of soil landslides, and give timely warnings by collecting rainfall, topography and soil bearing data in the distribution network construction area, thereby warning workers to evacuate before a safety accident occurs. At the same time, by presetting operating actions for different operating modes and comparing the operating actions of the construction workers with the preset operating actions, it can be predicted whether the operating actions of the workers will cause safety risks, thereby providing multi-dimensional and three-dimensional safety monitoring for the construction workers, thereby improving the reliability of safety monitoring, ensuring the safety of construction workers to a higher degree, and enhancing the control of safety risks.

[0073] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A distribution network operator safety risk monitoring and early warning system, characterized in that: include: An information acquisition unit, the information acquisition unit comprising a CCD camera, an image data compression module and an image capture module; The CCD camera is used to obtain image data of the operator's working process; The image data compression module is used for compressing and processing the image data; The image capture module is used to capture the image data of the pre-selected area in the image data compression module; The action data acquisition module is used to collect the historical process actions of the operator from the beginning to the end of the operation, and to summarize and divide the historical process actions according to the operation purpose. At the same time, the action prediction model is constructed based on the historical process actions of different operation purposes; A fusion analysis unit, the fusion analysis unit comprising a motion feature interception module and a time feature acquisition module; The action feature interception module is used to obtain historical feature operation actions in different operation purposes; The time feature acquisition module is used to acquire the processes corresponding to the feature operation actions in different operation purposes.

2. A distribution network operator safety risk monitoring and early warning system as claimed in claim 1, characterized in that: The information acquisition unit also includes obtaining soil moisture value data of the preset distribution network construction area at the time of the historical maximum monthly rainfall, and presetting a safety threshold based on the soil moisture value data when a landslide occurred in the preset distribution network construction area in the past. When the soil moisture value data of the preset distribution network construction area in the future period is higher than the safety threshold, the system determines that the preset distribution network construction area is in a landslide risk state, otherwise, it does not determine, and calculates the change law of the soil moisture value data based on the hourly rainfall data in the historical maximum monthly rainfall in the preset distribution network construction area, and calculates it according to the following formula: Among them, w i represents the maximum hourly rainfall data collected for the ith time in the maximum monthly rainfall; In the formula, ξ represents the average change value of soil moisture in the preset distribution network construction area during the maximum monthly rainfall, and x i It represents the maximum average change value data of soil moisture when the soil landslide occurs during the i-th time of the maximum monthly rainfall, and a critical threshold is preset based on the maximum average change value data. When the maximum average change value data of soil moisture collected in the future period is higher than the critical threshold, the system issues a safety warning, otherwise, no warning is issued; At the same time, if the maximum average change value data of soil moisture collected in the future period is higher than the critical threshold and no soil landslide occurs, the critical threshold is reassigned; b represents the historical number of soil landslides that occurred in the preset distribution network construction area, and n represents the soil bearing capacity data when historical soil landslides occurred.

3. A distribution network operator safety risk monitoring and early warning system as claimed in claim 1, characterized in that: The operation process required for different construction work purposes is preset, and the operation action image matching the operation process is obtained. At the same time, the key frame image of the characteristic action is obtained in the operation action image, and the key frame image is divided into θ1, θ2, ..., θ n , where n represents the nth key frame image. When the system does not detect a characteristic action that is consistent with the operation process, the system issues an early warning. Otherwise, no early warning is issued.

4. A distribution network operator safety risk monitoring and early warning system as claimed in claim 1, characterized in that: The operating procedures in which operators have violated regulations and / or safety accidents during historical construction operations are obtained, and the operating procedures in which violations and / or safety accidents have occurred are sorted from the most to the least frequent. At the same time, the previous operating actions in which violations and / or safety accidents have occurred in different operating procedures are collected, and the corresponding action features are obtained based on the previous operating actions. When the system detects that an operation procedure has an action feature corresponding to the previous operation action during construction operations in the future period, the system determines it as an erroneous operation and issues a warning. Otherwise, no warning is issued.

5. A distribution network operator safety risk monitoring and early warning system as claimed in claim 4, characterized in that: The corresponding operating processes will be monitored at different levels in order of most to least safety accidents, and the different levels of monitoring will be divided into high, medium and low levels in a ladder-like manner, among which high-level monitoring and medium-level monitoring are full-process monitoring, and low-level monitoring is non-full-process monitoring.

6. A distribution network operator safety risk monitoring and early warning system as claimed in claim 2, characterized in that: The soil bearing data includes the weight of the distribution network equipment and the weight increased due to rainfall, and collects the minimum weight portion increased due to rainfall when landslides occurred in the past. At the same time, a weight threshold is preset based on the minimum increased weight portion. When the weight increased due to rainfall in the preset distribution network construction area in the future period exceeds the weight threshold, the system issues an early warning, otherwise, no early warning is issued.

7. A distribution network operator safety risk monitoring and early warning system as claimed in claim 1, characterized in that: It also includes a monitoring terminal for recording the communication base stations and / or communication base station operators that match the preset construction work area, receiving the field data uploaded by the collection monitoring points, and updating the background data at the same time; When a system warning signal is issued in the monitoring area, a request for obtaining information on the warning status of the power transmission line is initiated to the corresponding communication base station and / or the communication base station operator in the preset monitoring area.

8. A distribution network operator safety risk monitoring and early warning system as claimed in claim 3, characterized in that: An image set is generated according to the acquired key frame images, and the key frame images in the image set are preprocessed.

9. A method for monitoring and early warning system for safety risks of distribution network operators as claimed in claim 1, characterized in that: The steps include: Acquire image data of the operator's working process, compress and process the image data, and intercept image data of a preselected area; Collect the historical process actions of the operator from the beginning to the end of the operation, and summarize and divide the historical process actions according to the operation purpose. At the same time, build an action prediction model based on the historical process actions of different operation purposes; Acquire historical characteristic operation actions in different operation purposes, and collect the processes corresponding to the characteristic operation actions in different operation purposes; Preset the operation process required for different construction work purposes, and obtain the operation action image matching the operation process, and at the same time obtain the key frame image of the characteristic action in the operation action image; Generating an image set according to the acquired key frame images, and preprocessing the key frame images in the image set; The operating procedures of operators in historical construction operations that resulted in illegal operations and / or safety accidents are obtained, and the operating procedures in which illegal operations and / or safety accidents occurred are sorted from the most to the least frequent. When the system detects that an operating procedure has action features corresponding to the previous operation during construction operations in future time periods, the system determines it as an erroneous operation and issues a warning. Otherwise, no warning is issued.

Citation Information

Patent Citations

  • Computer-implemented method and system for monitoring information technology systems

    CN104657255A

  • Safety management and control device for electric power field operation

    CN113450535A

  • Data acquisition method and device

    CN113672447A

  • Construction site safety operation detection method and device, computer equipment and storage medium

    CN117612090A