Marine geological exploration early warning device

By using the airbag inflation mechanism in the offshore surveillance equipment and using the combined structure of insertion nails and side nails to fix the equipment under the sea, the problem of easy breakage of the rope and position deviation caused by undercurrent during the salvage process of offshore surveillance equipment is solved, and the equipment is easily recovered and the accuracy of survey data is achieved.

CN119840809AActive Publication Date: 2025-04-18SHENZHEN ENERGY INNOVATION TECHNOLOGY CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411893627.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-20
Publication Date
2025-04-18
Estimated Expiration
2044-12-20

AI Technical Summary

Technical Problem

Existing offshore ground survey equipment is prone to breaking due to seawater corrosion during salvage, and undercurrents under the sea may cause equipment position to shift, which will affect the accuracy of survey data.

Method used

A marine ground survey early warning device was designed, using an airbag inflation mechanism to lift the sea vein ground survey from the seabed, and fix the equipment on the seabed through a combined structure of inserting nails and side nails to avoid positional deviation caused by undercurrents.

Benefits of technology

It realizes convenient salvage and recycling of offshore ground survey equipment, avoids data inaccuracy caused by rope corrosion and undercurrent, and improves the accuracy of survey data and the stability of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119840809A_ABST
    Figure CN119840809A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of geological exploration, in particular to a marine geological exploration early warning device. The invention provides a sea geological exploration early warning device which comprises a sea vein geological exploration device, iron rings, a fixing plate, fixing rods and an air bag, the iron rings are symmetrically arranged on one side of the sea vein geological exploration device, the fixing plate is arranged on the top of the sea vein geological exploration device, the fixing rods are symmetrically arranged on the two sides of the top of the fixing plate, and the symmetrical fixing rods are jointly and detachably connected with the air bag. Air inlet ports are symmetrically formed in the bottom of the air bag, and the symmetrical air inlet ports are detachably connected with the symmetrical fixing rods in a clamped mode. The air bag is inflated through the compressed air tank, the air bag expands continuously, and the sea vein geological prospecting device is pulled out under the action of buoyancy of air in the air bag and ascends continuously until going out of the sea surface, so that the sea vein geological prospecting device is lifted from the sea bottom, and the effect that workers can recycle the sea vein geological prospecting device conveniently is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological survey, and in particular to an offshore geological survey early warning device. Background Art

[0002] Geological exploration, also known as geological survey, is aimed at understanding underground structures, rock properties, hydrological conditions and possible mineral resources through systematic investigation and analysis. These technologies are not only crucial to the safety and feasibility of construction projects, but also play an indispensable role in finding and evaluating natural resources. The "Haimai" submarine seismic exploration and acquisition equipment is a node-based seismic exploration and acquisition equipment independently developed and manufactured by China. The main application scenario of "Haimai" is to conduct submarine seismic exploration in marine oil and gas exploration. Thousands of "Haimai" nodes are regularly deployed at designated locations on the seabed through professional retractable equipment to form a huge monitoring network. When the operation is completed, technicians will retrieve them, download and analyze the collected data information, and then process them into seismic profiles to achieve accurate "pulse" of the strata. This technology can significantly improve the accuracy of oil and gas exploration and development, and help discover oil and gas reservoir information in deeper strata and complex geological structures.

[0003] After existing surveying equipment sinks to the bottom of the sea and collects geological information, it needs to be salvaged. The existing salvage method is to use a rope to tie the front end of the surveying equipment and put it into the water, and then mark it for easy salvage. However, the rope will be corroded by the erosion of sea water, causing the rope to become fragile. When the surveying equipment is lifted again, there is a risk of the rope breaking easily. Secondly, the position of the surveying equipment may be offset by the undercurrent in the sea, resulting in errors in the survey information. Summary of the invention

[0004] In order to overcome the shortcomings of existing surveying and salvaging using ropes, in which the ropes may be corroded by seawater and thus easily break during salvaging, and the surveying equipment may be displaced by undercurrents in the sea, thus resulting in inaccurate surveying data, the present invention provides an offshore geological survey early warning device that is easy to salvage.

[0005] The technical solution of the present invention is: an offshore geological exploration early warning device, including a sea vein geological exploration device, an iron ring, a fixing plate, a fixing rod, an airbag, a connecting rope and an inflation mechanism, an iron ring is symmetrically arranged on one side of the sea vein geological exploration device, a fixing plate is arranged on the top of the sea vein geological exploration device, fixing rods are symmetrically arranged on both sides of the top of the fixing plate, the symmetrical fixing rods are detachably connected to the airbags, the bottom of the airbags are symmetrically arranged with air inlet ports, and the symmetrical air inlet ports are detachably connected to the symmetrical fixing rods respectively, a plurality of connecting ropes are equidistantly and symmetrically arranged on the airbag along its circumference, one end of the connecting rope is connected to the airbag, and the other end thereof is connected to the top of the sea vein geological exploration device, and an inflation mechanism for inflating the airbag is arranged on the top of the fixing plate.

[0006] In one embodiment, the inflation mechanism includes a compressed gas tank, a solenoid valve and a connecting pipe. The compressed gas tanks are symmetrically arranged on both sides of the top of the fixed plate. The exhaust ports of the symmetrical compressed gas tanks are each provided with a solenoid valve for controlling the exhaust. The exhaust ports of the symmetrical compressed gas tanks are each provided with a connecting pipe, and one end of the connecting pipe away from the solenoid valve is respectively connected to the symmetrical air inlet port at the bottom of the airbag.

[0007] In one of the embodiments, it also includes a first guide rod, a first spring and a buffer plate. The first guide rods are symmetrically arranged on both sides of the top of the sea vein geophysical surveyor, and a buffer plate is slidably arranged on the bottom of the sea vein geophysical surveyor. The two sides of the buffer plate extend to both sides of the sea vein geophysical surveyor and are slidably connected to the symmetrical first guide rod located on the top of the sea vein geophysical surveyor. A first spring is arranged between the first guide rod and the extended part of the buffer plate, and the first spring is mounted on the first guide rod.

[0008] In one of the embodiments, it also includes a pin, a side pin, a second guide rod and a second spring. A plurality of pins are symmetrically and equidistantly arranged at the bottom of the sea vein exploration device, and second guide rods are symmetrically arranged on both sides of the pins. Side pins are symmetrically and slidably arranged on both sides of the pins, and the side pins are slidably installed on the second guide rods. A second spring is arranged between the side pins and the pins, and the second spring is sleeved on the second guide rod.

[0009] In one of the embodiments, it also includes a protective frame, a rotating plate and a torsion spring. A protective frame is arranged on the top of the sea pulse geological exploration device, and the protective frame wraps the inflation mechanism. A rotating plate is symmetrically and rotatably arranged on the top of the protective frame, and a torsion spring is arranged at the rotating connection between the rotating plate and the protective frame.

[0010] In one of the embodiments, a protective cover is also included. The protective cover is symmetrically arranged on the top of the fixed plate, and the symmetrical protective cover protects the seal of the compressed gas tank.

[0011] In one of the embodiments, a counterweight block is further included, and a plurality of counterweight blocks are equidistantly arranged at the bottom of the buffer plate.

[0012] In one of the embodiments, a limit plate is further included. The protection frame is provided with a limit plate for limiting the rotation angle of the rotation plate.

[0013] Compared with the prior art, the beneficial effects of the present invention are: 1. The airbag is inflated by a compressed gas tank, and the airbag continues to expand. Under the action of the buoyancy of the gas in the airbag, the sea vein geophysical surveyor is pulled out and continues to rise until it reaches the sea surface, thereby achieving the effect of lifting the sea vein geophysical surveyor from the seabed, making it easy for the staff to recover it.

[0014] 2. By inserting nails into the seabed and then inserting side nails into the seabed, the stability of the sea vein geophysical surveyor is increased, and the sea vein geophysical surveyor is fixed on the seabed, so as to avoid the seabed undercurrent pushing and washing the sea vein geophysical surveyor and causing displacement, resulting in inaccurate survey data. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.

[0017] Figure 2 It is a schematic diagram of the three-dimensional structure of the sea vein exploration device, the first spring and the buffer plate of the present invention.

[0018] Figure 3 It is a three-dimensional structural cross-sectional view of the buffer plate of the present invention.

[0019] Figure 4 It is a three-dimensional structural cross-sectional view of the pin of the present invention.

[0020] Figure 5 It is a three-dimensional structural cross-sectional view of the protection frame of the present invention.

[0021] Figure 6 It is a three-dimensional structural schematic diagram of the airbag, connecting rope, compressed gas tank and other components of the present invention.

[0022] Figure 7 It is a schematic diagram of the three-dimensional structure of the sea vein exploration device, the counterweight block and the buffer plate of the present invention.

[0023] Figure 8 It is a schematic diagram of the three-dimensional structure of the protection frame, the rotating plate and the torsion spring of the present invention.

[0024] In the accompanying drawings: 1. Haimai geological survey device, 101. Iron ring, 2. First guide rod, 3. First spring, 4. Buffer plate, 5. Pin, 6. Side nail, 7. Second guide rod, 8. Second spring, 9. Fixed plate, 901. Protective cover, 10. Fixed rod, 11. Air bag, 12. Connecting rope, 13. Compressed gas tank, 14. Solenoid valve, 15. Connecting pipe, 16. Counterweight, 17. Protective frame, 1701. Limiting plate, 18. Rotating plate, 19. Torsion spring. DETAILED DESCRIPTION

[0025] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0026] Thus, a feature indicated in this specification will be used to illustrate one of the features of an embodiment of the present invention, rather than implying that each embodiment of the present invention must have the described feature. In addition, it should be noted that this specification describes many features. Although some features can be combined together to illustrate possible system designs, these features can also be used in other combinations that are not explicitly described. Thus, unless otherwise stated, the described combinations are not intended to be limiting.

[0027] In the description of the present application, the terms “first” and “second” are used for descriptive purposes only and should not be understood as indicating or implying relative importance.

[0028] In the description of the present application, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] Embodiment 1: An offshore geological survey early warning device, such as Figure 1 , Figure 2 , Figure 5 and Figure 6As shown, it includes a sea vein geophysical surveyor 1, an iron ring 101, a fixing plate 9, a protective cover 901, a fixing rod 10, an air bag 11, a connecting rope 12, a compressed gas tank 13, a solenoid valve 14 and a connecting pipe 15. The front side of the sea vein geophysical surveyor 1 is symmetrically provided with an iron ring 101 for lifting, and the top middle part of the sea vein geophysical surveyor 1 is fixed with a fixing plate 9 by bolts. The fixing rods 10 are symmetrically arranged on the front and rear sides of the top of the fixing plate 9. The shape of the fixing rod 10 in the front view is an inverted L shape, and the L-shaped fixing plate is a Y shape when viewed from the top view. The symmetrical fixing rods 10 are detachably connected to an airbag 11, and an air inlet port is symmetrically arranged at the bottom of the airbag 11, and the air inlet port is detachably connected to the Y-shaped port at the top of the symmetrical L-shaped fixing rod 10, and the airbag 11 is equidistant and symmetrically arranged with four connecting ropes 12 along its circumference, and the connecting ropes 12 are arranged at the four corners of the airbag 11, one end of the connecting rope 12 is connected to the airbag 11, and the other end thereof is connected to the top of the sea vein geophysical surveyor 1 at a 45 degree angle outward toward the direction of the sea vein geophysical surveyor 1, thereby forming a A flat-top trapezoid is formed to ensure that the tension of each connecting rope 12 is equal when the airbag 11 is inflated. Compressed gas tanks 13 are arranged in a central rotationally symmetrical manner on the left and right sides of the top of the fixing plate 9, wherein the exhaust end of the compressed gas tank 13 on the left faces forward, and the exhaust end of the other compressed gas tank 13 faces backward. The exhaust ports of the central rotationally symmetrical compressed gas tanks 13 are all provided with electromagnetic valves 14 for controlling exhaust, and the exhaust ports of the symmetrical compressed gas tanks 13 are all provided with connecting pipes 15, and the ends of the connecting pipes 15 away from the compressed gas tanks 13 are respectively connected to the airbags The connecting tube 15 disposed on the compressed gas tank 13 on the left side of the fixing plate 9 is connected to and communicated with the air inlet port on the rear side of the bottom of the airbag 11 at one end away from the compressed gas tank 13; the connecting tube 15 disposed on the compressed gas tank 13 on the right side of the fixing plate 9 is connected to and communicated with the air inlet port on the front side of the bottom of the airbag 11 at one end away from the compressed gas tank 13; a protective cover 901 is rotationally symmetrically provided at the center of the top of the fixing plate 9, and the symmetrical protective cover 901 protects the compressed gas tank 13 from sealing.

[0031] like Figure 1 , Figure 5 and Figure 8 As shown, it also includes a protective frame 17, a limiting plate 1701, a rotating plate 18 and a torsion spring 19. A protective frame 17 is arranged on the top of the sea vein exploration device 1. A rotating plate 18 is symmetrically and rotatably arranged on the top of the protective frame 17. A torsion spring 19 is arranged at the rotating connection between the rotating plate 18 and the protective frame 17. A limiting plate 1701 for limiting the rotation angle of the rotating plate 18 is arranged in the protective frame 17. The protective frame 17 encloses all the components arranged on the fixed plate 9 and is closed by the symmetrical rotating plate 18 to form a closure.

[0032] When the geological information survey of the designated sea area is completed and the sea vein geophysical survey device 1 needs to be salvaged, the solenoid valve 14 is opened through the program. At this time, the high-pressure gas in the compressor tank inflates the airbag 11 through the connecting pipe 15. At this time, the airbag 11 continues to expand, and under the action of the gas buoyancy, it squeezes the rotating plate 18 and separates from the fixed rod 10. The rotating plate 18 rotates and opens along both sides of the protective frame 17, and the sea vein geophysical survey device 1 is pulled out from the seabed through the connecting rope 12. At the same time, the buffer plate 4 is reset under the elastic force of the compressed state of the first spring 3, and the side nail 6 is pushed to slide and reset along the second guide rod 7 into the insertion nail 5, and the grip of the side nail 6 on the seabed is released. At this time, the airbag 11 is continuously inflated. When a certain buoyancy is reached, the airbag 11 pulls up the sea vein geophysical survey device 1 and floats to the surface, thereby facilitating the staff to carry out recovery operations.

[0033] Embodiment 2: Based on embodiment 1, Figure 2 , Figure 3 , Figure 4 and Figure 7 As shown, it also includes a first guide rod 2, a first spring 3, a buffer plate 4 and a weight 16. Two groups of first guide rods 2 are symmetrically arranged on both sides of the top of the sea vein geophysical surveyor 1, wherein two first guide rods 2 form a group, and the left and right sides of the top of the sea vein geophysical surveyor 1 are respectively a group, and each first guide rod 2 is symmetrically arranged front and back and left and right, and the shape of the first guide rod 2 is N-shaped, and the bottom of the N-shaped first guide rod 2 is downwardly connected to the top of the sea vein geophysical surveyor 1, and the bottom of the sea vein geophysical surveyor 1 is slidably provided with a buffer plate 4, and the two sides of the buffer plate 4 extend to the two sides of the sea vein geophysical surveyor 1, and a group of extensions are respectively extended on both sides. The extension plates are grouped into two each, and the buffer plate 4 is grouped on each side. The top of the extension plate is in an inverted L-shape and is slidably connected to the N-shaped first guide rod 2. The positions of the first guide rod 2 and the extension plate correspond to each other. A first spring 3 is arranged between the first guide rod 2 and the L-shaped portion of the extension plate extending from the buffer plate 4, and the first spring 3 is sleeved on the first guide rod 2. Two first springs 3 are sleeved on the N-shaped first guide rod 2. Five counterweights 16 are equidistantly arranged on the bottom of the buffer plate 4 at front and back, and the lengths of the counterweights 16 on the outermost sides of the front and back are greater than the counterweights 16 in the middle.

[0034] like Figure 3 , Figure 4 and Figure 7As shown, it also includes a pin 5, a side pin 6, a second guide rod 7 and a second spring 8. Four pins 5 are symmetrically and equidistantly arranged at the bottom of the sea vein exploration device 1. Second guide rods 7 are symmetrically arranged on the left and right sides of the pin 5. The two second guide rods 7 form a group, and there are two groups on each pin 5. Side pins 6 are symmetrically and slidably arranged on both sides of the pin 5, and the side pins 6 are slidably installed on the second guide rod 7. A second spring 8 is arranged between the side pin 6 and the pin 5, and the second spring 8 is sleeved on the second guide rod 7.

[0035] When it is necessary to survey the internal geological information in a designated sea area, the iron ring 101 at the front end of the sea vein geophysical surveyor 1 is marked, and then the sea vein geophysical surveyor 1 sinks to the seabed. At this time, the sea vein geophysical surveyor 1 will drop horizontally under the gravity of the counterweight block 16. When the sea vein geophysical surveyor 1 reaches the seabed, the pins 5 at its bottom will be inserted into the seabed, and then the seabed plane squeezes the buffer plate 4 to slide upward along the first guide rod 2. At this time, the first spring 3 is compressed, and at the same time, the side pins 6 are pushed out under the action of the elastic force of the second spring 8, and the side pins 6 slide outward along the second guide rod 7. The side pins 6 are inserted into the seabed to increase the fixing effect and prevent the position of the sea vein geophysical surveyor 1 from shifting.

[0036] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. An offshore geological exploration early warning device, comprising a marine geological exploration device (1) and an iron ring (101), wherein the marine geological exploration device (1) is symmetrically provided with the iron ring (101) on one side, characterized in that: The device also comprises a fixing plate (9), a fixing rod (10), an airbag (11), a connecting rope (12) and an inflation mechanism. The fixing plate (9) is arranged on the top of the sea vein geophysical survey device (1). The fixing rods (10) are symmetrically arranged on both sides of the top of the fixing plate (9). The symmetrical fixing rods (10) are detachably connected to the airbag (11). The bottom of the airbag (11) is symmetrically arranged with an air inlet port, and the symmetrical air inlet port is detachably connected to the symmetrical fixing rods (10). The airbag (11) is symmetrically arranged with a plurality of connecting ropes (12) equidistantly and symmetrically arranged along its circumference. One end of the connecting rope (12) is connected to the airbag (11), and the other end thereof is connected to the top of the sea vein geophysical survey device (1). The top of the fixing plate (9) is provided with an inflation mechanism for inflating the airbag (11).

2. The marine geological survey early warning device according to claim 1, characterized in that: The inflation mechanism comprises a compressed gas tank (13), a solenoid valve (14) and a connecting pipe (15); the compressed gas tanks (13) are symmetrically arranged on both sides of the top of the fixing plate (9); the exhaust ports of the symmetrical compressed gas tanks (13) are each provided with a solenoid valve (14) for controlling exhaust; the exhaust ports of the symmetrical compressed gas tanks (13) are each provided with a connecting pipe (15); the ends of the connecting pipes (15) away from the solenoid valve (14) are respectively connected to the symmetrical air inlet ports at the bottom of the airbag (11).

3. The marine geological survey early warning device according to claim 2, characterized in that: The device also comprises a first guide rod (2), a first spring (3) and a buffer plate (4). The first guide rods (2) are symmetrically arranged on both sides of the top of the sea vein geophysical survey device (1). The buffer plate (4) is slidably arranged on the bottom of the sea vein geophysical survey device (1). Both sides of the buffer plate (4) extend toward both sides of the sea vein geophysical survey device (1) and are slidably connected to the symmetrical first guide rod (2) located at the top of the sea vein geophysical survey device (1). A first spring (3) is arranged between the first guide rod (2) and the extended part of the buffer plate (4), and the first spring (3) is sleeved on the first guide rod (2).

4. The marine geological survey early warning device according to claim 3, characterized in that: The invention also comprises a pin (5), a side pin (6), a second guide rod (7) and a second spring (8). The bottom of the sea vein exploration device (1) is symmetrically and equidistantly provided with a plurality of pins (5), the second guide rods (7) are symmetrically provided on both sides of the pin (5), the side pins (6) are symmetrically slidably provided on both sides of the pin (5), and the side pins (6) are slidably installed on the second guide rod (7), a second spring (8) is provided between the side pin (6) and the pin (5), and the second spring (8) is sleeved on the second guide rod (7).

5. The marine geological survey early warning device according to claim 4, characterized in that: The device also comprises a protective frame (17), a rotating plate (18) and a torsion spring (19). The top of the sea vein geophysical survey device (1) is provided with a protective frame (17), and the protective frame (17) wraps the inflation mechanism. The top of the protective frame (17) is symmetrically and rotatably provided with a rotating plate (18), and a torsion spring (19) is provided at the rotation connection between the rotating plate (18) and the protective frame (17).

6. The marine geological survey early warning device according to claim 5, characterized in that: It also includes a protective cover (901), which is symmetrically arranged on the top of the fixed plate (9), and the symmetrical protective cover (901) protects the compressed gas tank (13) from sealing.

7. The marine geological survey early warning device according to claim 6, characterized in that: It also includes a counterweight block (16), and a plurality of counterweight blocks (16) are equidistantly arranged at the bottom of the buffer plate (4).

8. The marine geological survey early warning device according to claim 7, characterized in that: It also includes a limiting plate (1701), which is arranged in the protection frame (17) and is used to limit the rotation angle of the rotating plate (18).

Citation Information

Patent Citations

  • Seabed detecting and fishing device

    CN114030574A

  • Towing cable type ocean seabed exploration platform with towing cable self-tightening binding mechanism

    CN114954808A

  • Overwater operation safety communication equipment and early warning method thereof

    CN115133262A