Fastener material circulation supervision method and system based on cloud platform

Through the cloud-based fastener material flow supervision method and system, the problem of intangible inventory data and slow information transmission caused by traditional manual entry is solved, real-time monitoring of materials, precise inventory management and quality monitoring are realized, and the operational efficiency and cost control of enterprises are improved.

CN119850088APending Publication Date: 2025-04-18BEARBIT TECH (NANJING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411931503.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-04-18

AI Technical Summary

Technical Problem

In the warehousing management of fastener materials, traditional data entry relies on manual labor, resulting in inaccurate inventory data, prone to out-of-stock or oversold, and the information transmission speed is slow, affecting the efficiency and cost of production management.

Method used

The fastener material flow supervision method and system based on cloud platform is adopted to obtain the quantity of materials in real time through weighing sensors, realize automatic updates of material inlet and out of the warehouse, and ensure that the inventory meets production needs through consumption forecasts and replenishment reminders.

Benefits of technology

Real-time data monitoring and sharing of fastener materials, precise inventory management, quality monitoring and cost control, improve the operational efficiency of the enterprise, reduce manual inventory and monitoring work, and reduce production risks and labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119850088A_ABST
    Figure CN119850088A_ABST
Patent Text Reader

Abstract

The invention discloses a fastener material circulation supervision method and system based on a cloud platform, and relates to the technical field of fastener material production management, and the method comprises the following steps: a purchasing end obtains the number of currently purchased materials through a weighing sensor, completes the warehousing of the materials, and updates the stock Wc of the materials in real time; the project side generates a consumption list according to the production demand, and sends the consumption list to the purchasing side to request material delivery; and the purchasing end examines and approves the consumption list, completes material warehouse-out after the examination and approval are passed, and detects whether the remaining amount Wy of the material warehouse after warehouse-out conforms to the next production cycle or not. According to the invention, the circulation process of the fastener material can be tracked in real time, the overall operation efficiency of an enterprise is improved, meanwhile, the situation of material overstock and the like possibly occurring in the production process is solved, the enterprise is helped to realize basic material numeralization construction, and the production efficiency is improved. And automatic management and control of the production process of an enterprise and high-inventory material management of stiff materials are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of fastener material production management, and in particular to a fastener material flow supervision method and system based on a cloud platform. Background Art

[0002] Inventory management includes the storage, inventory and recording of inventory information. Generally, the storage of goods must follow certain rules, and inventory is to regularly check the goods in the warehouse to determine whether the actual inventory quantity is consistent with the book inventory quantity. In addition, the recording of inventory information is crucial. It is the basis of the entire warehouse management. By recording the time, quantity, storage location and other information of the goods entering and leaving the warehouse, dynamic monitoring of inventory can be achieved; fastener materials are a type of mechanical parts used to connect and fasten two or more components.

[0003] At present, traditional fasteners in the industrial field are standard auxiliary materials, which are characterized by concentrated categories and frequent repeated use. In daily use, problems such as material shortage, waste, and stagnant materials often occur, which poses specific problems and risks for the collection, use, and storage of materials by enterprises. In the storage management of fastener materials, data entry mainly relies on manual work. For example, after receiving or shipping goods, warehouse managers may not be able to enter data into the system in time due to busyness and other reasons. This results in inventory data not being able to reflect the actual inventory situation in real time. If there is an urgent order that needs to be shipped, there may be a shortage or oversold situation due to inaccurate inventory data.

[0004] At the same time, when the warehouse communicates with other departments such as the production department, the information transmission speed is slow because the management is mainly through paper documents or telephone. For example, it may not be possible to understand the minimum safety stock of inventory in time, resulting in failure to replenish stocks in time. The production department may also promise customers an unachievable delivery date because it cannot obtain inventory information in time, which brings cost and efficiency obstacles to the company's production management.

[0005] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention

[0006] In response to the problems in the related technology, the present invention proposes a fastener material flow supervision method and system based on a cloud platform to overcome the above-mentioned technical problems existing in the existing related technology.

[0007] The technical solution of the present invention is achieved in this way:

[0008] In one aspect, the present invention:

[0009] A fastener material flow supervision method based on a cloud platform includes the following steps:

[0010] The purchasing end obtains the current number of purchased materials through the weighing sensor, completes the material storage and updates the material inventory in real time. c ;

[0011] The project side generates a consumption list based on production requirements and sends the consumption list to the purchasing side to request material shipment.

[0012] The purchasing end approves the consumption list and completes the material delivery after approval, and checks the material inventory balance W after delivery. y Whether it meets the requirements of the next production cycle, including: predicting the production output of the next cycle X according to the production cycle c , get the material consumption forecast value Y c , including the following steps:

[0013] If the material consumption forecast value Y c ≤Material inventory balance W y , then it means the material inventory balance W y Comply with the next production cycle;

[0014] If the material consumption forecast value Y c >Material inventory balance W y , then it means the material inventory balance W y If it does not meet the next production cycle, the purchasing side obtains the purchase value and sends a replenishment list to the supply side, and completes the material warehousing and updates the material inventory W according to the replenishment list. c .

[0015] Among them, obtaining the quantity of currently purchased materials includes the following steps:

[0016] The weighing sensor collects the weight of a single material as m and the total weight of the material as M;

[0017] Get the material quantity N, expressed as: N = M / m.

[0018] The process of completing the material storage includes the following steps:

[0019] The defective rate test of the currently purchased materials includes the following steps:

[0020] Get the number of samples n in advance, expressed as: n = N × Z 2 ×p×(1-p) / E 2 ;

[0021] Where N is the number of materials, Z is the value corresponding to the confidence level, p is the estimated defective rate, and E is the allowable error;

[0022] According to the sampling quantity n, the sampled materials are weighed by the weighing sensor respectively to determine whether the weight of the sampled materials meets the preset weight range threshold. If the weight of the sampled materials does not meet the preset weight range threshold, it means that the current sampled materials are defective, and the sampled defective quantity nc is obtained;

[0023] Get the defective rate p of the purchased materials, expressed as: P = (nc / n) × 100%, and if the defective rate p < the preset defective threshold, it means that the currently purchased materials meet the production requirements, complete the material warehousing and update the material inventory W c .

[0024] Wherein, the material consumption forecast value Y is obtained c , including the following steps:

[0025] The linear function of the calibrated material consumption y and production output x is expressed as: y = a + bx;

[0026] Among them, a is the intercept and b is the slope.

[0027] Calculate the value of a, expressed as:

[0028] Calculate the value of b, expressed as:

[0029] Among them, (x i ,y i ) are multiple sets of material consumption data under different production outputs, and are the average values ​​of production output x and material consumption y respectively;

[0030] Preset the next cycle production output X c , according to the values ​​of a and b, obtain the material consumption forecast value Y c , expressed as: Yc = a + bX c .

[0031] Another aspect of the present invention is:

[0032] A fastener material flow supervision system based on a cloud platform, comprising: a cloud platform constructed by an enterprise end and a service end, the enterprise end comprising: a procurement management module and a project management module, the service end comprising: a supply management module, wherein;

[0033] The purchasing management module is used to review and approve the consumption list of the project management module, complete the delivery of materials after approval, and detect the remaining amount of materials after delivery. y Whether it meets the requirements for the next production cycle and is there a balance in the material warehouse W yIf it does not meet the requirements of the next production cycle, a replenishment list is sent to the supply management module, the quantity of purchased materials is obtained through the weighing sensor, and the materials are put into storage and the material inventory is updated in real time. c ;

[0034] The project management module generates a consumption list according to production requirements and sends the consumption list to the procurement management module to request material shipment;

[0035] The supply management module is used to receive the replenishment list in real time and complete the delivery according to the replenishment list.

[0036] Furthermore, the procurement management module includes: a warehouse entry detection module and an inventory warning module, wherein;

[0037] The warehousing detection module is used to detect the defective rate of the currently purchased materials. If the defective rate p is less than the preset defective threshold, it means that the currently purchased materials meet the production requirements, the materials are put into the warehouse and the material inventory W is updated. c ;

[0038] The inventory warning module is used to detect the remaining amount of material in the warehouse after delivery. y Whether it meets the requirements of the next production cycle, including: predicting the production output of the next cycle X according to the production cycle c , get the material consumption forecast value Y c , and if the material consumption forecast value Y c >Material inventory balance W y , then it means the material inventory balance W y If it does not meet the next production cycle, a replenishment list is sent to the supply management module, and the material is put into storage and the material inventory is updated according to the replenishment list. c .

[0039] Furthermore, the inventory warning module includes: an information push unit for detecting the remaining quantity W of the material warehouse after the outbound delivery. y The test result of whether it meets the requirements of the next production cycle is pushed to the mobile terminal, and an approval instruction is sent to the procurement management module according to the mobile terminal.

[0040] Beneficial effects of the present invention:

[0041] 1. The present invention has real-time data monitoring and sharing: it can track the circulation process of fastener materials in real time, and the status changes from material storage to the outbound transportation of materials in each production link in the workshop can be recorded and updated in time. Managers can obtain the latest material flow data through mobile phones or computers and other terminal devices at any time, find problems in time and make decisions. It breaks the information barriers between departments. The purchasing end can upload the detailed information of the purchased fastener materials to the cloud platform. The project end can directly send a consumption list to the purchasing end to request the outbound transportation of materials according to production needs, which improves the overall operational efficiency of the enterprise. At the same time, it solves the problems such as material backlog that may occur in the production process, which is helpful for the automation control of the enterprise's production process and the high inventory material management of stagnant materials.

[0042] 2. The present invention has precise inventory management: it can accurately monitor the inventory quantity of fastener materials, and can obtain the specific number of fasteners in each cargo position in real time, avoiding the errors that may occur in manual inventory. At the same time, it detects whether the remaining amount of materials in the warehouse after delivery meets the requirements of the next production cycle, and automatically generates replenishment reminders to ensure that production will not be interrupted due to material shortages.

[0043] 3. The present invention realizes quality monitoring: the defective rate of purchased fastener materials is detected, and the sampled materials are weighed by weighing sensors respectively to determine whether the weight of the sampled materials meets the preset weight range threshold. If the weight of the sampled materials does not meet the preset weight range threshold, it means that the current sampled materials are defective, and the sampled defective quantity and defective rate are obtained to reduce the production risks caused by fastener material supply problems, thereby improving product quality.

[0044] 4. Cost control and efficiency improvement of the present invention: It realizes the automated material data collection and processing from the procurement end to the project end and the supply end, reduces a lot of manual inventory, recording and monitoring work, and automatically updates inventory data, which greatly saves labor costs. At the same time, the automated processing of data also reduces the workload of manual statistical analysis and improves work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0046] Figure 1 It is a flow chart of a fastener material flow supervision method based on a cloud platform according to an embodiment of the present invention;

[0047] Figure 2It is a principle block diagram of a fastener material flow supervision system based on a cloud platform according to an embodiment of the present invention. DETAILED DESCRIPTION

[0048] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0049] According to a first embodiment of the present invention, a fastener material flow supervision method based on a cloud platform is provided.

[0050] like Figure 1 As shown, the fastener material flow supervision method based on the cloud platform according to an embodiment of the present invention includes the following steps:

[0051] Step S1: The purchasing end obtains the quantity of the currently purchased materials through the weighing sensor, completes the material storage and updates the material inventory W in real time. c ;

[0052] This technical solution, for obtaining the quantity of currently purchased materials, includes the following steps:

[0053] The weighing sensor collects the weight of a single material as m and the total weight of the material as M;

[0054] Get the material quantity N, expressed as: N = M / m;

[0055] Specifically, in application, the total weight of a batch of fasteners is 500 grams as measured by a weighing sensor, and the weight of a single fastener is 5 grams, so the number of fasteners n=500 / 5=100.

[0056] In addition, the following steps are included:

[0057] The defective rate test of the currently purchased materials includes the following steps:

[0058] Get the number of samples n in advance, expressed as: n = N × Z 2 ×p×(1-p) / E 2 ;

[0059] Where N is the number of materials, Z is the value corresponding to the confidence level, which is 95%, p is the estimated defective rate, which is 5%, and E is the allowable error, which is 2%;

[0060] According to the sampling quantity n, the sampled materials are weighed by the weighing sensor respectively to determine whether the weight of the sampled materials meets the preset weight range threshold. If the weight of the sampled materials does not meet the preset weight range threshold, it means that the current sampled materials are defective, and the sampled defective quantity nc is obtained;

[0061] Specifically, in application, the preset weight range threshold of the fastener may adopt the standard range of 4.9 to 5.1 grams, and when the weight of the sampled fastener does not meet the standard range of 4.9 to 5.1 grams, it indicates that the current fastener is defective.

[0062] Get the defective rate p of the purchased materials, expressed as: P = (nc / n) × 100%, and if the defective rate p < the preset defective threshold, it means that the currently purchased materials meet the production requirements, complete the material warehousing and update the material inventory W c .

[0063] In addition, if the defective rate p ≥ the preset defective threshold, it means that the currently purchased materials do not meet the production requirements, and the purchasing end sends material non-conformity information to the supply end.

[0064] Step S2: The project side generates a consumption list according to production requirements and sends the consumption list to the purchasing side to request material shipment;

[0065] Step S3: The purchasing end approves the consumption list, completes the material delivery after approval, and detects the material inventory balance W after delivery. y Whether it is in compliance with the next production cycle, which includes the following steps:

[0066] According to the production cycle, the next cycle production output X is predicted c , get the material consumption forecast value Y c , which includes the following steps:

[0067] If the material consumption forecast value Y c ≤Material inventory balance W y , then it means the material inventory balance W y Comply with the next production cycle;

[0068] If the material consumption forecast value Y c >Material inventory balance W y , then it means the material inventory balance W y If it does not meet the next production cycle, the purchasing side obtains the purchase value and sends a replenishment list to the supply side, and completes the material warehousing and updates the material inventory W according to the replenishment list. c .

[0069] Specifically, for the above purchase value, the material consumption forecast value Y c and material inventory balance W yThe difference is used as the purchase value to send a replenishment list to the supplier, expressed as: Purchase value = Y c —W y .

[0070] In addition, obtain the material consumption forecast value Y c , including the following steps:

[0071] The linear function of the calibrated material consumption y and production output x is expressed as: y = a + bx;

[0072] Among them, a is the intercept and b is the slope.

[0073] Calculate the value of a, expressed as: a = y-bx;

[0074] Calculate the value of b, expressed as:

[0075] Among them, (x i ,y i ) are multiple sets of material consumption data under different production outputs, and are the average values ​​of production output x and material consumption y respectively;

[0076] Preset the next cycle production output X c , according to the values ​​of a and b, obtain the material consumption forecast value Y c , expressed as: Yc = a + bX c .

[0077] According to a second embodiment of the present invention, a fastener material flow supervision system based on a cloud platform is provided.

[0078] like Figure 2 As shown, the fastener material flow supervision system based on the cloud platform according to an embodiment of the present invention includes: a cloud platform constructed by an enterprise end and a service end, the enterprise end includes: a procurement management module 1 and a project management module 2, and the service end includes: a supply management module 3, wherein;

[0079] The purchasing management module 1 is used to review and approve the consumption list of the project management module 2, complete the delivery of materials after approval, and detect the remaining quantity W of the materials after delivery. y Whether it meets the requirements for the next production cycle and is there a balance in the material warehouse W y If it does not meet the requirements of the next production cycle, the replenishment list is sent to the supply management module 3, the quantity of purchased materials is obtained through the weighing sensor, and the materials are put into storage and the material inventory is updated in real time. c ;

[0080] Project management module 2 generates a consumption list according to production requirements and sends the consumption list to procurement management module 1 to request material shipment;

[0081] The supply management module 3 is used to receive the replenishment list in real time and complete the delivery according to the replenishment list.

[0082] In addition, the procurement management module 1 includes: a warehouse inspection module 11 and a stock early warning module 12, wherein;

[0083] The warehousing detection module 11 is used to detect the defective rate of the currently purchased materials. If the defective rate p is less than the preset defective threshold, it means that the currently purchased materials meet the production requirements, the materials are put into the warehouse and the material inventory W is updated. c ;

[0084] Inventory warning module 12, used to detect the remaining amount of material in the warehouse after delivery y Whether it meets the requirements of the next production cycle, including: predicting the production output of the next cycle X according to the production cycle c , get the material consumption forecast value Y c , and if the material consumption forecast value Y c >Material inventory balance W y , then it means the material inventory balance W y If it does not meet the next production cycle, the replenishment list is sent to the supply management module 3, and the material is put into storage and the material inventory W is updated according to the replenishment list. c .

[0085] In addition, the inventory warning module 12 includes: an information push unit 13, which is used to detect the remaining quantity W of the material warehouse after the warehouse is out. y The test result of whether it meets the requirements of the next production cycle is pushed to the mobile terminal, and an approval instruction is sent to the procurement management module 1 based on the mobile terminal.

[0086] In summary, with the help of the above technical solution of the present invention, the following effects can be achieved:

[0087] 1. The present invention has real-time data monitoring and sharing: it can track the circulation process of fastener materials in real time, and the status changes from material storage to the outbound transportation of materials in each production link in the workshop can be recorded and updated in time. Managers can obtain the latest material flow data through mobile phones or computers and other terminal devices at any time, find problems in time and make decisions. It breaks the information barriers between departments. The purchasing end can upload the detailed information of the purchased fastener materials to the cloud platform. The project end can directly send a consumption list to the purchasing end to request the outbound transportation of materials according to production needs, which improves the overall operational efficiency of the enterprise. At the same time, it solves the problems such as material backlog that may occur in the production process, which is helpful for the automation control of the enterprise's production process and the high inventory material management of stagnant materials.

[0088] 2. The present invention has precise inventory management: it can accurately monitor the inventory quantity of fastener materials, and can obtain the specific number of fasteners in each cargo position in real time, avoiding the errors that may occur in manual inventory. At the same time, it detects whether the remaining amount of materials in the warehouse after delivery meets the requirements of the next production cycle, and automatically generates replenishment reminders to ensure that production will not be interrupted due to material shortages.

[0089] 3. The present invention realizes quality monitoring: the defective rate of purchased fastener materials is detected, and the sampled materials are weighed by weighing sensors respectively to determine whether the weight of the sampled materials meets the preset weight range threshold. If the weight of the sampled materials does not meet the preset weight range threshold, it means that the current sampled materials are defective, and the sampled defective quantity and defective rate are obtained to reduce the production risks caused by fastener material supply problems, thereby improving product quality.

[0090] 4. Cost control and efficiency improvement of the present invention: It realizes the automated material data collection and processing from the procurement end to the project end and the supply end, reduces a lot of manual inventory, recording and monitoring work, and automatically updates inventory data, which greatly saves labor costs. At the same time, the automated processing of data also reduces the workload of manual statistical analysis and improves work efficiency.

[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. After considering the disclosure of the specification and the examples, those skilled in the art will easily think of other embodiments of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art that are not disclosed in the present disclosure. The specification and the examples are only regarded as exemplary, and the true scope and spirit of the present disclosure are indicated by the claims.

[0092] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. A fastener material flow supervision method based on a cloud platform, characterized in that: The following steps are involved: The purchasing end obtains the current number of purchased materials through the weighing sensor, completes the material storage and updates the material inventory in real time. c ; The project side generates a consumption list based on production requirements and sends the consumption list to the purchasing side to request material shipment. The purchasing end approves the consumption list and completes the material delivery after approval, and checks the material inventory balance W after delivery. y Whether it meets the requirements of the next production cycle, including: predicting the production output of the next cycle X according to the production cycle c , get the material consumption forecast value Y c , including the following steps: If the material consumption forecast value Y c ≤Material inventory balance W y , then it means the material inventory balance W y Comply with the next production cycle; If the material consumption forecast value Y c >Material inventory balance W y , then it means the material inventory balance W y If it does not meet the next production cycle, the purchasing side obtains the purchase value and sends a replenishment list to the supply side, and completes the material warehousing and updates the material inventory W according to the replenishment list. c .

2. The fastener material flow supervision method based on cloud platform according to claim 1 is characterized in that: Get the quantity of the currently purchased materials, including the following steps: The weighing sensor collects the weight of a single material as m and the total weight of the material as M; Get the material quantity N, expressed as: N = M / m.

3. The fastener material flow supervision method based on cloud platform according to claim 2 is characterized in that: The process of completing material warehousing includes the following steps: The defective rate test of the currently purchased materials includes the following steps: Get the number of samples n in advance, expressed as: n = N × Z 2 ×p×(1-p) / E 2 ; Where N is the number of materials, Z is the value corresponding to the confidence level, p is the estimated defective rate, and E is the allowable error; According to the sampling quantity n, the sampled materials are weighed by the weighing sensor respectively to determine whether the weight of the sampled materials meets the preset weight range threshold. If the weight of the sampled materials does not meet the preset weight range threshold, it means that the current sampled materials are defective, and the sampled defective quantity nc is obtained; Get the defective rate p of the purchased materials, expressed as: P = (nc / n) × 100%, and if the defective rate p < the preset defective threshold, it means that the currently purchased materials meet the production requirements, complete the material warehousing and update the material inventory W c .

4. The method for supervising the flow of fastener materials based on a cloud platform according to claim 1 is characterized in that: The material consumption forecast value Y is obtained c , including the following steps: The linear function of the calibrated material consumption y and production output x is expressed as: y = a + bx; Among them, a is the intercept and b is the slope. Calculate the value of a, expressed as: Calculate the value of b, expressed as: Among them, (x i ,y i ) are material consumption data under multiple groups of different production outputs, and are the average values ​​of production output x and material consumption y respectively; Preset the next cycle production output X c , according to the values ​​of a and b, obtain the material consumption forecast value Y c , expressed as: Yc = a + bX c .

5. A fastener material flow supervision system based on a cloud platform, used in the fastener material flow supervision method based on a cloud platform as claimed in any one of claims 1 to 4, characterized in that: include: A cloud platform constructed by an enterprise side and a service side, wherein the enterprise side includes: a procurement management module (1) and a project management module (2), and the service side includes: a supply management module (3), wherein; The purchasing management module (1) is used to review and approve the consumption list of the project management module (2), complete the delivery of materials after approval, and detect the remaining quantity W of the materials after delivery. y Whether it meets the requirements for the next production cycle and is there a balance in the material warehouse W y If it does not meet the requirements of the next production cycle, a replenishment list is sent to the supply management module (3), the quantity of purchased materials is obtained through the weighing sensor, and the materials are put into storage and the material inventory is updated in real time. c ; The project management module (2) generates a consumption list according to production requirements, and sends the consumption list to the procurement management module (1) to request the delivery of materials; The supply management module (3) is used to receive the replenishment list in real time and complete the delivery according to the replenishment list.

6. The fastener material flow supervision system based on cloud platform according to claim 5 is characterized in that: The purchasing management module (1) comprises: a warehouse entry detection module (11) and an inventory warning module (12), wherein; The warehousing detection module (11) is used to detect the defective rate of the currently purchased materials. If the defective rate p is less than the preset defective threshold, it means that the currently purchased materials meet the production requirements, the materials are put into the warehouse and the material inventory W is updated. c ; The inventory warning module (12) is used to detect the remaining amount W of the material warehouse after the warehouse is shipped out. y Whether it meets the requirements of the next production cycle, including: predicting the production output of the next cycle X according to the production cycle c , get the material consumption forecast value Y c , and if the material consumption forecast value Y c >Material inventory balance W y , then it means the material inventory balance W y If it does not meet the requirements of the next production cycle, a replenishment list is sent to the supply management module (3), and the material is put into storage and the material inventory W is updated according to the replenishment list. c .

7. The cloud platform-based fastener material flow supervision system according to claim 6 is characterized in that: The inventory warning module (12) comprises: an information push unit (13) for detecting the remaining quantity W of the material warehouse after the warehouse is shipped out. y The test result of whether it meets the requirements of the next production cycle is pushed to the mobile terminal, and an approval instruction is sent to the procurement management module (1) based on the mobile terminal.