Emergency power resource optimization scheduling method and system based on data model
Through the data model-based emergency power resource optimization scheduling method, the existing technology is solved, and the problem of rapid response and real-time adjustment of emergency power resource scheduling is difficult to meet, efficient and intelligent power resource management is achieved, and system stability and reliability are improved.
Patent Information
- Application Number
- CN202510329905.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-20
- Publication Date
- 2025-04-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art is difficult to meet the needs of rapid response, accurate calculation and real-time adjustment of emergency power resource scheduling in emergencies, especially when power system complexity and dependence increase.
The emergency power resource optimization scheduling method based on the data model is adopted, and by receiving the target device opening and closing instructions, confirming environmental parameters, obtaining standard electrical data, starting the target opening and closing motor device, judging the power state, using the solid-state battery module to provide backup power, perform charging and emergency power scheduling, including power reversing and current monitoring, until the optimal current data set is reached.
It improves the efficiency and intelligence of the optimization scheduling of emergency power resources, reduces the excessive consumption of time and unnecessary resources, and ensures the stability and reliability of the power system.
Smart Images

Figure CN119853024A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of emergency power resource dispatching, and in particular to a data model-based emergency power resource optimization dispatching method, system, electronic equipment and computer-readable storage medium. Background Art
[0002] The data model is a comprehensive tool that uses the collected data to optimize and automate the dispatch process of emergency power resources to ensure the stability and safe operation of the system under various circumstances. Emergency power resource optimization dispatch refers to the efficient and reasonable allocation and dispatch of power resources in emergency situations to ensure the stability and reliability of the power system.
[0003] As the demand for electricity in modern society continues to grow, the complexity and dependence of the power system are also increasing. In emergency situations, the dispatch of power resources requires rapid response, precise calculation and real-time adjustment. Traditional dispatch methods often fail to meet the needs of emergency dispatch due to the lack of comprehensive analysis and dynamic optimization capabilities of complex data. Therefore, how to improve the efficiency and intelligence of emergency power resource optimization dispatch is a technical problem that needs to be solved urgently. Summary of the invention
[0004] The present invention provides an emergency power resource optimization scheduling method based on a data model and a computer-readable storage medium, the main purpose of which is to improve the efficiency and intelligence of emergency power resource optimization scheduling, thereby reducing time and unnecessary excessive consumption of resources.
[0005] To achieve the above object, the present invention provides an emergency power resource optimization scheduling method based on a data model, comprising: Receive the target device start-up and closing instructions, confirm the environmental parameters, obtain the standard electrical data based on the environmental parameters, obtain the target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instructions and the standard electrical data, and obtain the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data; Determine whether the power indicator light is off; If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is in a pre-constructed no-power state, the motor type of the initial power device is obtained, a three-phase sinusoidal power supply is obtained using the pre-constructed solid-state battery module and the motor type, and a charging operation is performed on the initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay; According to the preset emergency standard, it is judged whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, it is judged whether it is necessary to perform power supply reversing operation on the charging power device based on the reversing module, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch; If the emergency power dispatch is a commutation power dispatch, it is confirmed that a power commutation operation needs to be performed on the charging power device, and a power commutation operation is performed on the charging power device using a pre-built fast plug-in and a preset time threshold to obtain a commutation power device, and a power power adaptation is performed on the commutation power device using a preset monitoring frequency and a pre-built commutation emergency power supply, and a current monitoring operation is performed on the commutation power device to obtain commutation current data; If the emergency power dispatch is power dispatch, it is confirmed that there is no need to perform power switching operation on the charging power device, and the charging power device is adapted to power by using a preset monitoring frequency and a pre-built emergency power supply, and a current monitoring operation is performed on the charging power device to obtain current data; Determine whether there is data greater than a preset current threshold in the current data or the commutation current data; If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, thereby obtaining an optimal current data set; Complete the optimal dispatch of emergency power resources based on the data model based on the optimal current data set.
[0006] Optionally, the determining of environmental parameters and obtaining standard electrical data based on the environmental parameters includes: Get multiple detection periods; A detection period is sequentially extracted from the multiple detection periods, and the following operations are performed on each of the extracted detection periods: Using a pre-built multi-parameter sensor and a detection period to detect temperature data, humidity data and electromagnetic data of pre-built initial environmental parameters, wherein the multi-parameter sensor includes: a temperature sensor, a humidity sensor and an electromagnetic sensor; Obtaining curve graphs based on temperature data, humidity data and electromagnetic data respectively, and obtaining a plurality of curve graphs; Obtaining a difference group set according to the plurality of curve graphs, and extracting difference groups from the difference group set in sequence, wherein the difference group set includes a plurality of difference groups, and the difference group includes a plurality of differences; If there is a difference greater than a preset difference threshold in the difference group, the detection period is eliminated, and the detection periods that are not eliminated in the multiple detection periods are summarized to obtain multiple updated detection periods. The multiple updated detection periods are used as the multiple detection periods, and the step of extracting one detection period from the multiple detection periods is returned to in sequence until there is no difference greater than the preset difference threshold in the difference group; If there is no difference greater than the preset difference threshold in the difference group, the data in the curve graph corresponding to the detection period is confirmed as qualified data; Summarize qualified data to obtain qualified data sets corresponding to multiple detection periods, and confirm environmental parameters based on the qualified data sets; The rated parameters of the pre-built opening and closing motor are obtained according to the environmental parameters, wherein the rated parameters include: rated power and rated electricity, and the standard electrical data are confirmed based on the rated parameters.
[0007] Optionally, obtaining a difference value set according to a plurality of curve graphs includes: Extract a target curve graph from multiple curve graphs in sequence, and perform the following operations on the extracted target curve graphs: Obtaining a plurality of standard curve graphs, wherein the horizontal axis of the standard curve graph is time and the vertical axis of the standard curve graph is the measurement value; Extract a standard curve graph from the multiple standard curve graphs in sequence, and perform the following operations on the extracted standard curve graphs: The difference between each pre-constructed data point in the standard curve and the target curve is calculated using a pre-constructed non-linear difference formula to obtain multiple differences, wherein the non-linear difference formula is as follows: ; in, Indicates The difference of data points, Indicates the target curve The value of the data point, Indicates the standard curve The value of the data point, Indicates The timestamp corresponding to each data point, represents the hyperbolic tangent function, represents the logarithmic function with base 10, Represents the index of the data point; Obtain a difference value group according to multiple difference values; The difference groups are aggregated to obtain a difference group set.
[0008] Optionally, the step of acquiring the target start / stop motor device comprises: Get the initial start and stop motor set; Extract an initial start-stop motor from the initial start-stop motor set in turn, and perform the following operations on the extracted initial start-stop motors: Start the initial opening and closing motor, and use the initial opening and closing motor after starting to obtain the working current, use frequency, motor temperature and vibration frequency; Calculate the initial start-stop motor health index using the pre-built motor health index formula, operating current, usage frequency, motor temperature, and vibration frequency; If the health index is greater than or equal to 0.8, the initial start-stop motor is confirmed as the target start-stop motor device; Otherwise, return to the step of extracting an initial starter and shutter motor from the initial starter and shutter motor set in sequence until the health index is greater than or equal to 0.8, and obtain the target starter and shutter motor device.
[0009] Optionally, the motor health index formula is as follows: ; in, Represents the health index, Represents the weight of healthy working current, Indicates the working current, represents the weight of the healthy motor temperature, Indicates the motor temperature, represents the weight of the frequency of healthy use, Indicates the frequency of use, Indicates the weight of the healthy vibration frequency, Indicates the vibration frequency.
[0010] Optionally, the method of obtaining a three-phase sinusoidal power supply using a pre-built solid-state battery module and a motor type includes: Obtain the maximum power, duration and maximum voltage of the initial power device according to the motor type, and calculate the required battery capacity of the initial power device according to the maximum power, maximum voltage and duration; Acquire multiple battery cells according to the required battery capacity, and acquire multiple module units, wherein the module unit includes: a battery cell, a protection circuit, a heat sink, and a connection port; respectively introducing the plurality of battery cells into the plurality of module units to obtain a plurality of filling units, wherein the battery cells in the module units correspond one to one to the battery cells in the plurality of battery cells; A plurality of filling units are connected by using a pre-built connection plate to obtain a solid-state battery pack, wherein the connection includes: series connection and parallel connection; Use solid-state battery packs to obtain direct current, design a three-phase inverter circuit, and use the three-phase inverter circuit to convert direct current into three-phase alternating current; A three-phase alternating current waveform is obtained according to the three-phase alternating current and a pre-constructed filter, and a standard three-phase sine wave is obtained using a pre-constructed oscilloscope and the three-phase alternating current waveform, and a power supply corresponding to the standard three-phase sine wave is confirmed as a three-phase sine wave power supply.
[0011] Optionally, the step of calculating the required battery capacity of the initial power device according to the maximum power, the maximum voltage and the duration includes: Get battery conversion efficiency; Calculate the required battery capacity of the initial power device using pre-built battery capacity formulas, maximum power, battery conversion efficiency, maximum voltage and duration; Among them, the battery capacity formula is as follows: ; in, Indicates the required battery capacity. Indicates the maximum power, Indicates duration, represents the safety factor, Indicates the maximum voltage, Indicates the battery conversion efficiency.
[0012] Optionally, the method of obtaining a standard three-phase sine wave by using a pre-built oscilloscope and a three-phase alternating current waveform includes: The three-phase AC waveform is detected using an oscilloscope, a pre-built comprehensive detection index formula, and a preset waveform monitoring period to obtain a comprehensive detection index value, wherein the comprehensive detection index formula is as follows: ; in, Indicates the comprehensive detection index value, Both represent weight coefficients, Indicates the waveform monitoring period, represents the total harmonic energy, represents the phase error, Represents the waveform symmetry index, Indicates The voltage waveform function of the phase, Represents the three-phase voltage waveform; If the comprehensive detection index value is less than 0.1, the three-phase alternating current waveform is confirmed as a standard three-phase sine wave; If the comprehensive detection index value is greater than or equal to 0.1, the three-phase AC waveform is adjusted until the comprehensive detection index value is greater than or equal to 0.1, and a standard three-phase sine wave is obtained.
[0013] Optionally, performing a charging operation on the initial power device according to the three-phase sinusoidal wave power supply to obtain a charging power device includes: Using a high-voltage time delay relay to delay the initial power device to obtain a power device to be charged, using a pre-charge capacitor, a pre-charge resistor and a three-phase sine wave power supply to perform a pre-charge operation on the power device to be charged to obtain an initial charging power device, and monitoring the current of the initial charging power device in real time to obtain an initial current; Determine the magnitude of the initial current and a preset current threshold; If it is confirmed that the initial current is less than the preset current threshold, the pre-charging resistance is adjusted until the initial current is equal to the preset current threshold, thereby obtaining a charging power device.
[0014] To achieve the above object, the present invention also provides an emergency power resource optimization dispatching system based on a data model, comprising: A device status confirmation module is used to receive a target device start-up and closing instruction, confirm environmental parameters, obtain standard electrical data based on the environmental parameters, obtain a target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instruction and the standard electrical data, and obtain an initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data, determine whether the power indicator light is off, if it is confirmed that the power indicator light is off, then confirm that the initial power device is in a pre-constructed no-power state, obtain the motor type of the initial power device, and monitor the pre-constructed power indicator light of the initial power device in real time; An emergency power dispatching module is used to obtain a three-phase sinusoidal power supply by using a pre-built solid-state battery module and a motor type, and to perform a charging operation on an initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay, and to determine whether the charging power device needs to perform emergency power dispatching according to a preset emergency standard, and if it is confirmed that emergency power dispatching needs to be performed, then it is determined whether a power supply reversing operation needs to be performed on the charging power device based on the reversing module, wherein the emergency power dispatching includes: reversing power dispatching and power supply power dispatching; A power supply current monitoring module, which is used for, if the emergency power dispatch is a commutation power dispatch, confirming that a power commutation operation needs to be performed on the charging power device, then using a pre-built fast plug-in and a preset time threshold to perform a power commutation operation on the charging power device to obtain a commutation power device, then using a preset monitoring frequency and a pre-built commutation emergency power supply to perform power supply power adaptation on the commutation power device, and performing a current monitoring operation on the commutation power device to obtain commutation current data; if the emergency power dispatch is a power supply power dispatch, then confirming that a power commutation operation does not need to be performed on the charging power device, then using a preset monitoring frequency and a pre-built emergency power supply to perform power supply power adaptation on the charging power device, and performing a current monitoring operation on the charging power device to obtain current data; The optimization scheduling completion module is used to determine whether there is data greater than a preset current threshold in the current data or the commutation current data. If it is confirmed that there is data greater than the preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, so as to obtain an optimal current data set, and complete the data model-based optimal scheduling of emergency power resources based on the optimal current data set.
[0015] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising: A memory storing at least one instruction; The processor executes the instructions stored in the memory to implement the above-mentioned emergency power resource optimization scheduling method based on the data model.
[0016] In order to solve the above problems, the present invention also provides a computer-readable storage medium, in which at least one instruction is stored, and the at least one instruction is executed by a processor in an electronic device to implement the above-mentioned data model-based emergency power resource optimization scheduling method.
[0017] The present invention is to solve the problem described in the background technology. The present invention receives the start-up and closing instructions of the target device, confirms the environmental parameters, obtains the standard electrical data based on the environmental parameters, obtains the target start-up and closing motor device, starts the target start-up and closing motor device according to the start-up and closing instructions of the target device and the standard electrical data, and obtains the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data. The present invention realizes the automatic start-up of the device by receiving instructions and confirming the environmental parameters, reduces manual intervention, and determines whether the power indicator light is off. The present invention monitors the power status in real time and promptly discovers abnormal situations, provides a basis for subsequent emergency treatment, and avoids system paralysis due to power problems. If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is pre- The invention relates to a method for constructing a no-power state, obtaining a motor type of an initial power device, obtaining a three-phase sinusoidal power supply by using a pre-constructed solid-state battery module and a motor type, performing a charging operation on the initial power device according to the three-phase sinusoidal power supply, and obtaining a charging power device, wherein the solid-state battery module comprises: a solid-state battery pack and an electronic control pack, wherein the electronic control pack comprises: a braking resistor, a pre-charge resistor, a pre-charge capacitor, and a high-voltage delay relay. In the case of a power outage, the present invention provides a backup power supply through a solid-state battery module to ensure the normal operation of the device, and uses a three-phase sinusoidal power supply for charging to improve the charging efficiency and stability. According to a preset emergency standard, it is determined whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, the switching module is used to determine whether the emergency power dispatch needs to be performed. Whether it is necessary to perform power reversing operation on the charging power device, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch. The present invention dynamically adjusts the power dispatch strategy according to the actual situation to confirm that the backup power supply needs to be dispatched for emergency power, and then accurately performs the power reversing operation according to the judgment of the reversing module to ensure the accuracy of power dispatch. If the emergency power dispatch is reversing power dispatch, it is confirmed that the charging power device needs to be reversing, and the pre-built fast plug-in and the preset time threshold are used to perform power reversing operation on the charging power device to obtain the reversing power device. The preset monitoring frequency and the pre-built reversing emergency power supply are used to adapt the power supply to the reversing power device, and the current monitoring operation is performed on the reversing power device. The present invention realizes rapid response of power commutation through fast plug-in and time threshold, improves system efficiency, and at the same time, grasps the working status of the power device in real time through current monitoring to ensure safe operation. If the emergency power dispatch is power dispatch, it is confirmed that there is no need to perform power commutation operation on the charging power device, and then the power supply power adaptation of the charging power device is performed using the preset monitoring frequency and the pre-built emergency power supply, and the current monitoring operation is performed on the charging power device to obtain current data. If there is no need to perform power commutation operation, the present invention simplifies the dispatching process and improves efficiency. Through emergency power adaptation, the stable operation of the power device is ensured, and it is determined whether there is data greater than the preset current threshold in the current data or the commutation current data.The present invention promptly detects current overload conditions to avoid equipment damage or safety accidents. If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the brake resistor is used to adjust the solid-state battery module until there is no data greater than the preset current threshold in the current data and the commutation current data, and the optimal current data set is obtained. The present invention adjusts the current through the brake resistor, which can quickly adjust the current to a safe range to ensure that the system operates within a safe range. The optimal current data set data completes the optimal scheduling of emergency power resources based on the data model. The present invention optimizes scheduling, reasonably allocates power resources, improves system efficiency, reduces unnecessary power consumption, and reduces operating costs. Therefore, the present invention can improve the efficiency and intelligence of the optimal scheduling of emergency power resources, thereby reducing time and unnecessary excessive consumption of resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of a flow chart of an emergency power resource optimization and dispatching method based on a data model provided in one embodiment of the present invention; Figure 2 A functional module diagram of an emergency power resource optimization and dispatching system based on a data model provided by an embodiment of the present invention; Figure 3 A schematic diagram of the structure of an electronic device for implementing the data model-based emergency power resource optimization scheduling method provided in one embodiment of the present invention.
[0019] Description of reference numerals: 1. Electronic device; 10. Processor; 11. Memory; 12. Bus.
[0020] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0021] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0022] The embodiment of the present application provides an emergency power resource optimization and scheduling method based on a data model. The execution subject of the emergency power resource optimization and scheduling method based on the data model includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the emergency power resource optimization and scheduling method based on the data model can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.
[0023] Reference Figure 1FIG. 1 is a flow chart of an emergency power resource optimization scheduling method based on a data model provided by an embodiment of the present invention. In this embodiment, the emergency power resource optimization scheduling method based on a data model includes: S1. Receive the start and stop instructions of the target device, confirm the environmental parameters, and obtain standard electrical data based on the environmental parameters.
[0024] It should be explained that the target device start-up and shutdown command refers to a command issued by a computer control system to control the start or shutdown of a specific device. Standard electrical data refers to the data of electrical parameters related to the normal operation of the target start-up and shutdown motor device.
[0025] In detail, the identifying of environmental parameters and obtaining standard electrical data based on the environmental parameters include: Get multiple detection periods; A detection period is sequentially extracted from the multiple detection periods, and the following operations are performed on each of the extracted detection periods: Using a pre-built multi-parameter sensor and a detection period to detect temperature data, humidity data and electromagnetic data of pre-built initial environmental parameters, wherein the multi-parameter sensor includes: a temperature sensor, a humidity sensor and an electromagnetic sensor; Obtaining curve graphs based on temperature data, humidity data and electromagnetic data respectively, and obtaining a plurality of curve graphs; Obtaining a difference group set according to the plurality of curve graphs, and extracting difference groups from the difference group set in sequence, wherein the difference group set includes a plurality of difference groups, and the difference group includes a plurality of differences; If there is a difference greater than a preset difference threshold in the difference group, the detection period is eliminated, and the detection periods that are not eliminated in the multiple detection periods are summarized to obtain multiple updated detection periods. The multiple updated detection periods are used as the multiple detection periods, and the step of extracting one detection period from the multiple detection periods is returned to in sequence until there is no difference greater than the preset difference threshold in the difference group; If there is no difference greater than the preset difference threshold in the difference group, the data in the curve graph corresponding to the detection period is confirmed as qualified data; Summarize qualified data to obtain qualified data sets corresponding to multiple detection periods, and confirm environmental parameters based on the qualified data sets; The rated parameters of the pre-built opening and closing motor are obtained according to the environmental parameters, wherein the rated parameters include: rated power and rated electricity, and the standard electrical data are confirmed based on the rated parameters.
[0026] It should be explained that multiple detection periods refer to periods of data detection performed in different time periods. The difference threshold refers to a pre-set value used to determine whether the data is within an acceptable range. A temperature sensor refers to a device used to measure ambient temperature and can convert temperature signals into electrical signals. Humidity sensors and electromagnetic sensors refer to devices used to measure the water vapor content in ambient air and devices used to measure electromagnetic fields in the environment, respectively.
[0027] Importantly, the step of obtaining multiple curve graphs by respectively obtaining curve graphs based on temperature data, humidity data and electromagnetic data is as follows: importing temperature data, humidity data and electromagnetic data into a visualization tool according to the order of each time point to generate multiple curve graphs. Multiple updated detection periods refer to the detection periods remaining after eliminating abnormal detection periods. The step of aggregating qualified data to obtain qualified data sets corresponding to multiple detection periods is as follows: one detection period corresponds to one difference group set, the difference group set includes multiple difference groups, one difference group corresponds to one curve graph, and if there is a difference in the difference group that is greater than a preset difference threshold, the detection period corresponding to the difference needs to be eliminated until one or more difference groups corresponding to the detection period are found, and all differences in the one or more difference groups are less than or equal to the difference threshold, then the data in all curve graphs corresponding to all difference groups corresponding to the one or more detection periods are confirmed as qualified data sets.
[0028] In detail, obtaining a difference value set according to a plurality of curve graphs includes: Extract a target curve graph from multiple curve graphs in sequence, and perform the following operations on the extracted target curve graphs: Obtaining a plurality of standard curve graphs, wherein the horizontal axis of the standard curve graph is time and the vertical axis of the standard curve graph is the measurement value; Extract a standard curve graph from the multiple standard curve graphs in sequence, and perform the following operations on the extracted standard curve graphs: The difference between each pre-constructed data point in the standard curve and the target curve is calculated using a pre-constructed non-linear difference formula to obtain multiple differences, wherein the non-linear difference formula is as follows: ; in, Indicates The difference of data points, Indicates the target curve The value of the data point, Indicates the standard curve The value of the data point, Indicates The timestamp corresponding to each data point, represents the hyperbolic tangent function, represents the logarithmic function with base 10, Represents the index of the data point; Obtain a difference value group according to multiple difference values; The difference groups are aggregated to obtain a difference group set.
[0029] It should be explained that the target curve graph refers to a specific curve graph extracted from multiple curve graphs. The step of obtaining multiple standard curves is: multiple standard curves are preset based on historical data obtained from previous tests. Timestamp refers to the specific time corresponding to each data point, usually expressed in the form of date and time. A difference group refers to a set of differences calculated for each data point between a certain standard curve and the target curve graph. A difference group set refers to a set of difference groups obtained by comparing all standard curves with the target curve graph.
[0030] S2. Obtain a target start and close motor device, start the target start and close motor device according to the start and close instruction of the target device and standard electrical data, and obtain an initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data.
[0031] It should be explained that the initial power device refers to the device formed after starting the target starting and closing motor device, which is composed of key components such as power indicator light, commutation module and current data.
[0032] In detail, the step of obtaining the target start and stop motor device includes: Get the initial start and stop motor set; Extract an initial start-stop motor from the initial start-stop motor set in turn, and perform the following operations on the extracted initial start-stop motors: Start the initial opening and closing motor, and use the initial opening and closing motor after starting to obtain the working current, use frequency, motor temperature and vibration frequency; Calculate the initial start-stop motor health index using the pre-built motor health index formula, operating current, usage frequency, motor temperature, and vibration frequency; If the health index is greater than or equal to 0.8, the initial start-stop motor is confirmed as the target start-stop motor device; Otherwise, return to the step of extracting an initial starter and shutter motor from the initial starter and shutter motor set in sequence until the health index is greater than or equal to 0.8, and obtain the target starter and shutter motor device.
[0033] It should be explained that the initial power device refers to the start-and-stop motor of the target device after startup. The initial start-and-stop motor set refers to the set of all available start-and-stop motors. The vibration frequency refers to the frequency of the vibration generated by the initial start-and-stop motor during operation. The step of using the initial start-and-stop motor after startup to obtain the working current, usage frequency, motor temperature and vibration frequency is as follows: using a current sensor, a counter, an infrared thermometer and a vibration sensor to measure the initial start-and-stop motor after startup to obtain the working current, usage frequency, motor temperature and vibration frequency. The target start-and-stop motor in the step of confirming the initial start-and-stop motor as the target start-and-stop motor device refers to the first motor extracted whose health index is greater than 0.8.
[0034] In detail, the motor health index formula is as follows: ; in, Represents the health index, Represents the weight of healthy working current, Indicates the working current, represents the weight of the healthy motor temperature, Indicates the motor temperature, represents the weight of the frequency of healthy use, Indicates the frequency of use, Indicates the weight of the healthy vibration frequency, Indicates the vibration frequency.
[0035] It should be explained that the steps of weighting the healthy working current, the healthy motor temperature, the healthy usage frequency and the healthy vibration frequency are as follows: collect the opinions of experts in the field, score the importance of each parameter based on their experience in motor operation and maintenance, take the average of each expert's scores for each parameter, and confirm the average as the weight.
[0036] S3. Determine whether the power indicator light is off. If it is confirmed that the power indicator light is off, confirm that the initial power device is in a pre-built no-power state, obtain the motor type of the initial power device, and use the pre-built solid-state battery module and motor type to obtain a three-phase sinusoidal wave power supply.
[0037] It should be explained that the initial power device in the step of obtaining the motor type of the initial power device refers to the initial power device that becomes an disconnected initial power device after the power indicator light is off. At the same time, the motor type of the initial power device before the power indicator light is off is the same as the motor type of the initial power device after the power indicator light is off.
[0038] In detail, the method of obtaining a three-phase sinusoidal power supply using a pre-built solid-state battery module and a motor type includes: Obtain the maximum power, duration and maximum voltage of the initial power device according to the motor type, and calculate the required battery capacity of the initial power device according to the maximum power, maximum voltage and duration; Acquire multiple battery cells according to the required battery capacity, and acquire multiple module units, wherein the module unit includes: a battery cell, a protection circuit, a heat sink, and a connection port; respectively introducing the plurality of battery cells into the plurality of module units to obtain a plurality of filling units, wherein the battery cells in the module units correspond one to one to the battery cells in the plurality of battery cells; A plurality of filling units are connected by using a pre-built connection plate to obtain a solid-state battery pack, wherein the connection includes: series connection and parallel connection; Use solid-state battery packs to obtain direct current, design a three-phase inverter circuit, and use the three-phase inverter circuit to convert direct current into three-phase alternating current; A three-phase alternating current waveform is obtained according to the three-phase alternating current and a pre-constructed filter, and a standard three-phase sine wave is obtained using a pre-constructed oscilloscope and the three-phase alternating current waveform, and a power supply corresponding to the standard three-phase sine wave is confirmed as a three-phase sine wave power supply.
[0039] It should be explained that the battery cell refers to the basic unit that constitutes the solid-state battery pack, and the capacity and voltage meet the designed battery capacity requirements. The filling unit refers to the unit obtained by importing the battery cell into the module unit. The solid-state battery pack refers to the overall battery pack obtained by connecting multiple filling units in series and parallel using a pre-built connection plate. A three-phase inverter circuit refers to a circuit that converts direct current into three-phase alternating current. The steps of designing a three-phase inverter circuit are: adopting a three-phase full-bridge topology, consisting of six switching devices, divided into an upper bridge arm and a lower bridge arm, and then by controlling the on-off sequence of the switching devices, three-phase alternating current can be generated. The steps of designing a three-phase inverter circuit described in the embodiment of the present invention are prior art and will not be repeated here.
[0040] It is understandable that the step of obtaining direct current by using a solid-state battery pack is: constructing an efficient and safe solid-state battery pack by reasonably designing and connecting solid-state battery cells, and ensuring that the solid-state battery pack outputs direct current stably through a battery management system. The step of obtaining the maximum power, duration and maximum voltage of the initial power device according to the motor type is: obtaining the specifications of the motor, and obtaining the maximum power, duration and maximum voltage according to the specifications.
[0041] In detail, the step of calculating the required battery capacity of the initial power device according to the maximum power, the maximum voltage and the duration includes: Get battery conversion efficiency; Calculate the required battery capacity of the initial power device using pre-built battery capacity formulas, maximum power, battery conversion efficiency, maximum voltage and duration; Among them, the battery capacity formula is as follows: ; in, Indicates the required battery capacity. Indicates the maximum power, Indicates duration, represents the safety factor, Indicates the maximum voltage, Indicates the battery conversion efficiency.
[0042] It should be explained that duration refers to the length of time the battery needs to continuously supply power at maximum power. Battery conversion efficiency refers to the efficiency of the battery in converting input chemical energy into output electrical energy. The steps of obtaining the battery conversion efficiency are: by charging the battery, measuring the input current and voltage, by discharging the battery, measuring the output current and voltage through the load, and calculating the percentage of the input current and voltage to the output current and voltage to obtain the battery conversion efficiency.
[0043] Furthermore, the method of obtaining a standard three-phase sine wave using a pre-built oscilloscope and a three-phase alternating current waveform includes: The three-phase AC waveform is detected using an oscilloscope, a pre-built comprehensive detection index formula, and a preset waveform monitoring period to obtain a comprehensive detection index value, wherein the comprehensive detection index formula is as follows: ; in, Indicates the comprehensive detection index value, Both represent weight coefficients, Indicates the waveform monitoring period, represents the total harmonic energy, represents the phase error, Represents the waveform symmetry index, Indicates The voltage waveform function of the phase, Represents the three-phase voltage waveform; If the comprehensive detection index value is less than 0.1, the three-phase alternating current waveform is confirmed as a standard three-phase sine wave; If the comprehensive detection index value is greater than or equal to 0.1, the three-phase AC waveform is adjusted until the comprehensive detection index value is greater than or equal to 0.1, and a standard three-phase sine wave is obtained.
[0044] It should be explained that an oscilloscope refers to an electronic measuring instrument, a device for displaying the waveform of voltage changing over time. The oscilloscope described in the embodiment of the present invention is used to capture and display the waveform of three-phase voltage in real time. The waveform detection period refers to the time period used to detect and analyze the signal. The comprehensive detection index value is a comprehensive indicator used to evaluate the quality of the three-phase alternating current waveform. The total harmonic energy refers to the total energy of all harmonic components in the three-phase alternating current waveform, which is obtained by decomposing the voltage waveform into the fundamental wave and each harmonic through Fourier transform, and then calculating the total energy of each harmonic.
[0045] Importantly, phase error refers to the deviation of the phase difference between the three-phase voltage waveforms from the ideal value, which is obtained by measuring the phase angle of the three-phase voltage waveform, calculating the deviation of each phase angle from 120 degrees, taking the absolute value of the deviation and summing them. The waveform symmetry index is an index used to evaluate the symmetry of the three-phase AC waveform. The voltage waveform function refers to the function of the waveform of the voltage of each phase changing with time in a three-phase AC system. The step of adjusting the three-phase AC waveform is: by reducing harmonics, adjusting the phase relationship or improving the waveform symmetry.
[0046] S4. Perform a charging operation on the initial power device according to the three-phase sinusoidal wave power supply to obtain a charged power device.
[0047] Specifically, the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay.
[0048] In detail, the charging operation is performed on the initial power device according to the three-phase sine wave power supply to obtain the charging power device, including: Using a high-voltage time delay relay to delay the initial power device to obtain a power device to be charged, using a pre-charge capacitor, a pre-charge resistor and a three-phase sine wave power supply to perform a pre-charge operation on the power device to be charged to obtain an initial charging power device, and monitoring the current of the initial charging power device in real time to obtain an initial current; Determine the magnitude of the initial current and a preset current threshold; If it is confirmed that the initial current is less than the preset current threshold, the pre-charging resistance is adjusted until the initial current is equal to the preset current threshold, thereby obtaining a charging power device.
[0049] It should be explained that the charging power device refers to the initial power device after the charging operation. The high-voltage delay relay refers to an electrical control device, which is used to provide a delay function in a high-voltage environment. The high-voltage delay relay described in the embodiment of the present invention is a device used to delay the initial power device during the charging operation to ensure that the charging operation starts after a specific time to avoid instantaneous current shocks. The power device to be charged refers to the initial power device after the high-voltage delay relay delays, which is in a state to be charged.
[0050] It is understood that the pre-charge capacitor refers to a capacitor used to provide a smooth current in the initial stage to avoid the impact of instantaneous high current on the initial power device. The pre-charge resistor refers to a resistor used to limit the current in the initial stage and adjust it when necessary to reach a preset current threshold. The initial charging power device refers to the initial power device after the pre-charging operation, and the current value of the initial power device must be greater than or equal to 95% of the current threshold.
[0051] For example, the current threshold is 10, when the current value of a certain initial power device is greater than or equal to , taking a certain initial power device as the initial charging power device.
[0052] Specifically, the initial current refers to the current value actually measured in the initial power device after the pre-charging operation. The current threshold refers to a preset current value used to determine whether the charging state of the initial power device meets the requirements.
[0053] S5. According to the preset emergency standard, determine whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, determine whether it is necessary to perform power reversing operation on the charging power device based on the reversing module.
[0054] Specifically, emergency power dispatch includes: switching power dispatch and power supply power dispatch.
[0055] It should be explained that the emergency standard is equivalent to judging whether the power of the solid-state battery module can meet the power consumption of the charging power device. If it is confirmed that emergency power dispatch needs to be performed, the step of judging whether it is necessary to perform power reversing operation on the charging power device based on the reversing module is: if it is confirmed that the solid-state battery module needs emergency power dispatch, then judge whether the charging power device needs to change the power wiring sequence to control the opening or closing of the charging power device. Power reversing operation refers to the operation by switching the phase sequence of the power supply. Power supply power dispatch refers to power dispatch consistent with the initial power direction. Reversing power dispatch refers to power dispatch opposite to the initial power direction.
[0056] S6. If the emergency power dispatch is a commutation power dispatch, it is confirmed that a power commutation operation needs to be performed on the charging power device, and a pre-built quick plug-in and a preset time threshold are used to perform a power commutation operation on the charging power device to obtain a commutation power device. The commutation power device is adapted to power supply power using a preset monitoring frequency and a pre-built commutation emergency power supply, and a current monitoring operation is performed on the commutation power device to obtain commutation current data.
[0057] It should be explained that a quick plug-in refers to a component that quickly connects and disconnects electrical equipment, and is usually used in situations where wiring needs to be frequently replaced or adjusted. The quick plug-in described in the embodiment of the present invention is a device for quickly switching the polarity of the power supply. The time threshold refers to a pre-set time limit used to control the duration of the commutation module. The commutation power device refers to a charging power device after the commutation module, in which the power phase sequence has been changed and the expected commutation state has been achieved.
[0058] Importantly, the commutation current data refers to the specific current value obtained by monitoring the current of the commutation power device after the power commutation operation is completed. The commutation emergency power supply refers to the backup power supply used to perform the power commutation operation in emergency power dispatch. Power supply power adaptation refers to the operation of adjusting the power supply system according to actual needs to ensure that the output of the commutation power device can meet the voltage, current or frequency of the load.
[0059] S7. If the emergency power dispatch is power supply dispatch, it is confirmed that there is no need to perform power switching operation on the charging power device, then the power supply power of the charging power device is adapted using the preset monitoring frequency and the pre-built emergency power supply, and the current monitoring operation is performed on the charging power device to obtain current data.
[0060] It should be explained that the monitoring frequency refers to the preset time interval for monitoring the current of the charging power device, for example, once every minute. The current data refers to the current value set obtained through current monitoring, including the current value at each time point.
[0061] S8. Determine whether there is data greater than a preset current threshold in the current data or the commutation current data. If it is confirmed that there is data greater than the preset current threshold in the current data or the commutation current data, use the braking resistor to adjust the solid-state battery module until there is no data greater than the preset current threshold in the current data and the commutation current data, so as to obtain the optimal current data set.
[0062] It should be explained that the braking resistor is a resistor used to convert the regenerative energy of the charging power device into heat energy, thereby limiting the magnitude of the current. If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the step of adjusting the solid-state battery module using the braking resistor is: when the current data or the commutation current data exceeds the preset threshold, the resistance value of the braking resistor is adjusted to consume excess current, thereby reducing the current output.
[0063] S9. Complete the optimal dispatch of emergency power resources based on the data model based on the optimal current data set.
[0064] It should be explained that the optimal current data set refers to a collection of current data that is within a safe and efficient range after adjustment and does not exceed a preset current threshold. The safety means that the current data is in a state that complies with electrical standards and will not cause equipment failure, electrical fire or other safety accidents. The high efficiency means that the power supply is highly efficient, that is, when emergency power dispatching converts and transmits electric energy, the power utilization rate is greater than the preset utilization rate threshold, for example, the utilization rate threshold is 90%, which improves energy utilization efficiency. The data model refers to a mathematical model or algorithm used to describe the operating laws of the power system or the emergency dispatch strategy.
[0065] The present invention is to solve the problem described in the background technology. The present invention receives the start-up and closing instructions of the target device, confirms the environmental parameters, obtains the standard electrical data based on the environmental parameters, obtains the target start-up and closing motor device, starts the target start-up and closing motor device according to the start-up and closing instructions of the target device and the standard electrical data, and obtains the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data. The present invention realizes the automatic start-up of the device by receiving instructions and confirming the environmental parameters, reduces manual intervention, and determines whether the power indicator light is off. The present invention monitors the power status in real time and promptly discovers abnormal situations, provides a basis for subsequent emergency treatment, and avoids system paralysis due to power problems. If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is pre- The invention relates to a method for constructing a no-power state, obtaining a motor type of an initial power device, obtaining a three-phase sinusoidal power supply by using a pre-constructed solid-state battery module and a motor type, performing a charging operation on the initial power device according to the three-phase sinusoidal power supply, and obtaining a charging power device, wherein the solid-state battery module comprises: a solid-state battery pack and an electronic control pack, wherein the electronic control pack comprises: a braking resistor, a pre-charge resistor, a pre-charge capacitor, and a high-voltage delay relay. In the case of a power outage, the present invention provides a backup power supply through a solid-state battery module to ensure the normal operation of the device, and uses a three-phase sinusoidal power supply for charging to improve the charging efficiency and stability. According to a preset emergency standard, it is determined whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, the switching module is used to determine whether the emergency power dispatch needs to be performed. Whether it is necessary to perform power reversing operation on the charging power device, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch. The present invention dynamically adjusts the power dispatch strategy according to the actual situation to confirm that the backup power supply needs to be dispatched for emergency power, and then accurately performs the power reversing operation according to the judgment of the reversing module to ensure the accuracy of power dispatch. If the emergency power dispatch is reversing power dispatch, it is confirmed that the charging power device needs to be reversing, and the pre-built fast plug-in and the preset time threshold are used to perform power reversing operation on the charging power device to obtain the reversing power device. The preset monitoring frequency and the pre-built reversing emergency power supply are used to adapt the power supply to the reversing power device, and the current monitoring operation is performed on the reversing power device. The present invention realizes rapid response of power commutation through fast plug-in and time threshold, improves system efficiency, and at the same time, grasps the working status of the power device in real time through current monitoring to ensure safe operation. If the emergency power dispatch is power dispatch, it is confirmed that there is no need to perform power commutation operation on the charging power device, and then the power supply power adaptation of the charging power device is performed using the preset monitoring frequency and the pre-built emergency power supply, and the current monitoring operation is performed on the charging power device to obtain current data. If there is no need to perform power commutation operation, the present invention simplifies the dispatching process and improves efficiency. Through emergency power adaptation, the stable operation of the power device is ensured, and it is determined whether there is data greater than the preset current threshold in the current data or the commutation current data.The present invention promptly detects current overload conditions to avoid equipment damage or safety accidents. If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the brake resistor is used to adjust the solid-state battery module until there is no data greater than the preset current threshold in the current data and the commutation current data, and the optimal current data set is obtained. The present invention adjusts the current by the brake resistor, and can quickly adjust the current to a safe range to ensure that the system operates within a safe range. The optimal current data set completes the optimal scheduling of emergency power resources based on the data model. The present invention optimizes scheduling, reasonably allocates power resources, improves system efficiency, reduces unnecessary power consumption, and reduces operating costs. Therefore, the present invention can improve the efficiency and intelligence of the optimal scheduling of emergency power resources, thereby reducing time and unnecessary excessive consumption of resources. . ,
[0066] like Figure 2 , which is a functional module diagram of an emergency power resource optimization and dispatching system based on a data model provided in one embodiment of the present invention.
[0067] The data model-based emergency power resource optimization and dispatching system 100 of the present invention can be installed in an electronic device. According to the functions to be implemented, the data model-based emergency power resource optimization and dispatching system 100 can include a device status confirmation module 101, an emergency power dispatching module 102, a power supply current monitoring module 103 and an optimization and dispatching completion module 104. The module of the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device; The device state confirmation module 101 is used to receive the target device start-up and closing instructions, confirm the environmental parameters, obtain the standard electrical data based on the environmental parameters, obtain the target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instructions and the standard electrical data, and obtain the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data, and judge whether the power indicator light is off. If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is in a pre-constructed no-power state, obtain the motor type of the initial power device, and monitor the pre-constructed power indicator light of the initial power device in real time; The emergency power dispatch module 102 is used to obtain a three-phase sinusoidal power supply using a pre-built solid-state battery module and a motor type, and to perform a charging operation on an initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay, and to determine whether the charging power device needs to perform emergency power dispatch according to a preset emergency standard, and if it is confirmed that emergency power dispatch needs to be performed, then determine whether it is necessary to perform a power supply reversing operation on the charging power device based on the reversing module, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch; The power supply current monitoring module 103 is used for, if the emergency power dispatch is the commutation power dispatch, confirming that the power supply commutation operation needs to be performed on the charging power device, then using the pre-built fast plug-in and the preset time threshold to perform the power supply commutation operation on the charging power device to obtain the commutation power device, then using the preset monitoring frequency and the pre-built commutation emergency power supply to perform power supply power adaptation on the commutation power device, and performing the current monitoring operation on the commutation power device to obtain the commutation current data; if the emergency power dispatch is the power supply power dispatch, then confirming that the power supply commutation operation does not need to be performed on the charging power device, then using the preset monitoring frequency and the pre-built emergency power supply to perform power supply power adaptation on the charging power device, and performing the current monitoring operation on the charging power device to obtain the current data; The optimization scheduling completion module 104 is used to determine whether there is data greater than a preset current threshold in the current data or the commutation current data. If it is confirmed that there is data greater than the preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, so as to obtain an optimal current data set, and complete the data model-based optimal scheduling of emergency power resources based on the optimal current data set.
[0068] In detail, each module in the data model-based emergency power resource optimization dispatching system 100 in the embodiment of the present invention is used in the same manner as above. Figure 1 The technical means are the same as the emergency power resource optimization dispatching method based on data model described in, and can produce the same technical effects, so they will not be repeated here.
[0069] like Figure 3 , is a schematic diagram of the structure of an electronic device for implementing an emergency power resource optimization scheduling method based on a data model provided by an embodiment of the present invention.
[0070] The electronic device 1 may include a processor 10, a memory 11 and a bus 12, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as an emergency power resource optimization scheduling method program based on a data model.
[0071] The memory 11 includes at least one type of readable storage medium, and the readable storage medium includes a flash memory, a mobile hard disk, a multimedia card, a card-type memory (e.g., SD or DX memory, etc.), a magnetic memory, a disk, an optical disk, etc. In some embodiments, the memory 11 may be an internal storage unit of the electronic device 1, such as a mobile hard disk of the electronic device 1. In other embodiments, the memory 11 may also be an external storage device of the electronic device 1, such as a plug-in mobile hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 1. Further, the memory 11 also includes an internal storage unit of the electronic device 1 and an external storage device. The memory 11 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code of the emergency power resource optimization scheduling method program based on the data model, but also can be used to temporarily store data that has been output or is to be output.
[0072] The processor 10 may be composed of an integrated circuit in some embodiments, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and a combination of various control chips, etc. The processor 10 is the control core (Control Unit) of the electronic device, and uses various interfaces and lines to connect various components of the entire electronic device, and executes or executes programs or modules stored in the memory 11 (such as emergency power resource optimization scheduling method programs based on data models, etc.), and calls data stored in the memory 11 to execute various functions of the electronic device 1 and process data.
[0073] The bus 12 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus 12 may be divided into an address bus, a data bus, a control bus, etc. The bus 12 is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.
[0074] Figure 3 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 3 The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.
[0075] For example, although not shown, the electronic device 1 may also include a power source (such as a battery) for supplying power to various components. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, and other arbitrary components. The electronic device 1 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.
[0076] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device 1 and other electronic devices.
[0077] Optionally, the electronic device 1 may further include a user interface, which may be a display, an input unit (such as a keyboard), or a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode) touch device. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visual user interface.
[0078] The emergency power resource optimization scheduling method program based on the data model stored in the memory 11 in the electronic device 1 is a combination of multiple instructions. When running in the processor 10, it can achieve: Receive the target device start-up and closing instructions, confirm the environmental parameters, obtain the standard electrical data based on the environmental parameters, obtain the target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instructions and the standard electrical data, and obtain the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data; Determine whether the power indicator light is off; If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is in a pre-constructed no-power state, the motor type of the initial power device is obtained, a three-phase sinusoidal power supply is obtained using the pre-constructed solid-state battery module and the motor type, and a charging operation is performed on the initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay; According to the preset emergency standard, it is judged whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, it is judged whether it is necessary to perform power supply reversing operation on the charging power device based on the reversing module, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch; If the emergency power dispatch is a commutation power dispatch, it is confirmed that a power commutation operation needs to be performed on the charging power device, and a power commutation operation is performed on the charging power device using a pre-built fast plug-in and a preset time threshold to obtain a commutation power device, and a power power adaptation is performed on the commutation power device using a preset monitoring frequency and a pre-built commutation emergency power supply, and a current monitoring operation is performed on the commutation power device to obtain commutation current data; If the emergency power dispatch is power dispatch, it is confirmed that there is no need to perform power switching operation on the charging power device, and the charging power device is adapted to power by using a preset monitoring frequency and a pre-built emergency power supply, and a current monitoring operation is performed on the charging power device to obtain current data; Determine whether there is data greater than a preset current threshold in the current data or the commutation current data; If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, thereby obtaining an optimal current data set; Complete the optimal dispatch of emergency power resources based on the data model based on the optimal current data set.
[0079] Specifically, the specific implementation method of the processor 10 for the above instructions can refer to Figures 1 to 3 The description of the relevant steps in the corresponding embodiments will not be repeated here.
[0080] Furthermore, if the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).
[0081] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement: Receive the target device start-up and closing instructions, confirm the environmental parameters, obtain the standard electrical data based on the environmental parameters, obtain the target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instructions and the standard electrical data, and obtain the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data; Determine whether the power indicator light is off; If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is in a pre-constructed no-power state, the motor type of the initial power device is obtained, a three-phase sinusoidal power supply is obtained using the pre-constructed solid-state battery module and the motor type, and a charging operation is performed on the initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay; According to the preset emergency standard, it is judged whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, it is judged whether it is necessary to perform power supply reversing operation on the charging power device based on the reversing module, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch; If the emergency power dispatch is a commutation power dispatch, it is confirmed that a power commutation operation needs to be performed on the charging power device, and a power commutation operation is performed on the charging power device using a pre-built fast plug-in and a preset time threshold to obtain a commutation power device, and a power power adaptation is performed on the commutation power device using a preset monitoring frequency and a pre-built commutation emergency power supply, and a current monitoring operation is performed on the commutation power device to obtain commutation current data; If the emergency power dispatch is power dispatch, it is confirmed that there is no need to perform power switching operation on the charging power device, and the charging power device is adapted to power by using a preset monitoring frequency and a pre-built emergency power supply, and a current monitoring operation is performed on the charging power device to obtain current data; Determine whether there is data greater than a preset current threshold in the current data or the commutation current data; If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, thereby obtaining an optimal current data set; Complete the optimal dispatch of emergency power resources based on the data model based on the optimal current data set.
[0082] In the several embodiments provided by the present invention, it should be understood that the disclosed devices, systems and methods can be implemented in other ways. For example, the system embodiments described above are only illustrative, and actual implementation may have other division methods.
[0083] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0084] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.
[0085] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.
[0086] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for optimizing and dispatching emergency power resources based on a data model, characterized in that: The method comprises: Receive the target device start-up and closing instructions, confirm the environmental parameters, obtain the standard electrical data based on the environmental parameters, obtain the target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instructions and the standard electrical data, and obtain the initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data; Determine whether the power indicator light is off; If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is in a pre-constructed no-power state, the motor type of the initial power device is obtained, a three-phase sinusoidal power supply is obtained using the pre-constructed solid-state battery module and the motor type, and a charging operation is performed on the initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay; According to the preset emergency standard, it is judged whether the charging power device needs to perform emergency power dispatch. If it is confirmed that emergency power dispatch needs to be performed, it is judged whether it is necessary to perform power supply reversing operation on the charging power device based on the reversing module, wherein the emergency power dispatch includes: reversing power dispatch and power supply power dispatch; If the emergency power dispatch is a commutation power dispatch, it is confirmed that a power commutation operation needs to be performed on the charging power device, and a power commutation operation is performed on the charging power device using a pre-built fast plug-in and a preset time threshold to obtain a commutation power device, and a power power adaptation is performed on the commutation power device using a preset monitoring frequency and a pre-built commutation emergency power supply, and a current monitoring operation is performed on the commutation power device to obtain commutation current data; If the emergency power dispatch is power dispatch, it is confirmed that there is no need to perform power switching operation on the charging power device, and the charging power device is adapted to power by using a preset monitoring frequency and a pre-built emergency power supply, and a current monitoring operation is performed on the charging power device to obtain current data; Determine whether there is data greater than a preset current threshold in the current data or the commutation current data; If it is confirmed that there is data greater than a preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, thereby obtaining an optimal current data set; Complete the optimal dispatch of emergency power resources based on the data model based on the optimal current data set.
2. The method for optimizing and dispatching emergency power resources based on a data model according to claim 1, characterized in that: The step of determining the environmental parameters and obtaining standard electrical data based on the environmental parameters includes: Get multiple detection periods; A detection period is sequentially extracted from the multiple detection periods, and the following operations are performed on each of the extracted detection periods: Using a pre-built multi-parameter sensor and a detection period to detect temperature data, humidity data and electromagnetic data of pre-built initial environmental parameters, wherein the multi-parameter sensor includes: a temperature sensor, a humidity sensor and an electromagnetic sensor; Obtaining curve graphs based on temperature data, humidity data and electromagnetic data respectively, and obtaining a plurality of curve graphs; Obtaining a difference group set according to the plurality of curve graphs, and extracting difference groups from the difference group set in sequence, wherein the difference group set includes a plurality of difference groups, and the difference group includes a plurality of differences; If there is a difference greater than a preset difference threshold in the difference group, the detection period is eliminated, and the detection periods that are not eliminated in the multiple detection periods are summarized to obtain multiple updated detection periods. The multiple updated detection periods are used as the multiple detection periods, and the step of extracting one detection period from the multiple detection periods is returned to in sequence until there is no difference greater than the preset difference threshold in the difference group; If there is no difference greater than the preset difference threshold in the difference group, the data in the curve graph corresponding to the detection period is confirmed as qualified data; Summarize qualified data to obtain qualified data sets corresponding to multiple detection periods, and confirm environmental parameters based on the qualified data sets; The rated parameters of the pre-built opening and closing motor are obtained according to the environmental parameters, wherein the rated parameters include: rated power and rated electricity, and the standard electrical data are confirmed based on the rated parameters.
3. The method for optimizing and dispatching emergency power resources based on a data model according to claim 2, characterized in that: The step of obtaining a difference value set according to a plurality of curve graphs includes: Extract a target curve graph from multiple curve graphs in sequence, and perform the following operations on the extracted target curve graphs: Obtaining a plurality of standard curve graphs, wherein the horizontal axis of the standard curve graph is time and the vertical axis of the standard curve graph is the measurement value; Extract a standard curve graph from the multiple standard curve graphs in sequence, and perform the following operations on the extracted standard curve graphs: The difference between each pre-constructed data point in the standard curve and the target curve is calculated using a pre-constructed non-linear difference formula to obtain multiple differences, wherein the non-linear difference formula is as follows: ; in, Indicates The difference of data points, Indicates the target curve The value of the data point, Indicates the standard curve The value of the data point, Indicates The timestamp corresponding to each data point, represents the hyperbolic tangent function, represents the logarithmic function with base 10, Represents the index of the data point; Obtain a difference value group according to multiple difference values; The difference groups are aggregated to obtain a difference group set.
4. The method for optimizing and dispatching emergency power resources based on a data model according to claim 3, characterized in that: The method of obtaining a target start and stop motor device comprises: Get the initial start and stop motor set; Extract an initial start-stop motor from the initial start-stop motor set in turn, and perform the following operations on the extracted initial start-stop motors: Start the initial opening and closing motor, and use the initial opening and closing motor after starting to obtain the working current, use frequency, motor temperature and vibration frequency; Calculate the initial start-stop motor health index using the pre-built motor health index formula, operating current, usage frequency, motor temperature, and vibration frequency; If the health index is greater than or equal to 0.8, the initial start-stop motor is confirmed as the target start-stop motor device; Otherwise, return to the step of extracting an initial starter and shutter motor from the initial starter and shutter motor set in sequence until the health index is greater than or equal to 0.8, and obtain the target starter and shutter motor device.
5. The method for optimizing and dispatching emergency power resources based on a data model according to claim 4, characterized in that: The motor health index formula is as follows: ; in, Represents the health index, Represents the weight of healthy working current, Indicates the working current, represents the weight of the healthy motor temperature, Indicates the motor temperature, represents the weight of the frequency of healthy use, Indicates the frequency of use, Indicates the weight of the healthy vibration frequency, Indicates the vibration frequency.
6. The method for optimizing and dispatching emergency power resources based on a data model according to claim 5, characterized in that: The method of obtaining a three-phase sinusoidal power supply using a pre-built solid-state battery module and a motor type includes: Obtain the maximum power, duration and maximum voltage of the initial power device according to the motor type, and calculate the required battery capacity of the initial power device according to the maximum power, maximum voltage and duration; Acquire multiple battery cells according to the required battery capacity, and acquire multiple module units, wherein the module unit includes: a battery cell, a protection circuit, a heat sink, and a connection port; respectively introducing the plurality of battery cells into the plurality of module units to obtain a plurality of filling units, wherein the battery cells in the module units correspond one to one to the battery cells in the plurality of battery cells; A plurality of filling units are connected by using a pre-built connection plate to obtain a solid-state battery pack, wherein the connection includes: series connection and parallel connection; Use solid-state battery packs to obtain direct current, design a three-phase inverter circuit, and use the three-phase inverter circuit to convert direct current into three-phase alternating current; A three-phase alternating current waveform is obtained according to the three-phase alternating current and a pre-constructed filter, and a standard three-phase sine wave is obtained using a pre-constructed oscilloscope and the three-phase alternating current waveform, and a power supply corresponding to the standard three-phase sine wave is confirmed as a three-phase sine wave power supply.
7. The method for optimizing and dispatching emergency power resources based on a data model according to claim 6, characterized in that: The step of calculating the required battery capacity of the initial power device according to the maximum power, the maximum voltage and the duration includes: Get battery conversion efficiency; Calculate the required battery capacity of the initial power device using pre-built battery capacity formulas, maximum power, battery conversion efficiency, maximum voltage and duration; Among them, the battery capacity formula is as follows: ; in, Indicates the required battery capacity. Indicates the maximum power, Indicates duration, represents the safety factor, Indicates the maximum voltage, Indicates the battery conversion efficiency.
8. The method for optimizing and dispatching emergency power resources based on a data model according to claim 7, characterized in that: The method of obtaining a standard three-phase sine wave by using a pre-built oscilloscope and a three-phase alternating current waveform includes: The three-phase AC waveform is detected using an oscilloscope, a pre-built comprehensive detection index formula, and a preset waveform monitoring period to obtain a comprehensive detection index value, wherein the comprehensive detection index formula is as follows: ; in, Indicates the comprehensive detection index value, Both represent weight coefficients, Indicates the waveform monitoring period, represents the total harmonic energy, represents the phase error, Represents the waveform symmetry index, Indicates The voltage waveform function of the phase, Represents the three-phase voltage waveform; If the comprehensive detection index value is less than 0.1, the three-phase alternating current waveform is confirmed as a standard three-phase sine wave; If the comprehensive detection index value is greater than or equal to 0.1, the three-phase AC waveform is adjusted until the comprehensive detection index value is greater than or equal to 0.1, and a standard three-phase sine wave is obtained.
9. The method for optimizing and dispatching emergency power resources based on a data model according to claim 8, characterized in that: The method of performing a charging operation on the initial power device according to the three-phase sinusoidal wave power supply to obtain a charging power device comprises: Using a high-voltage time delay relay to delay the initial power device to obtain a power device to be charged, using a pre-charge capacitor, a pre-charge resistor and a three-phase sine wave power supply to perform a pre-charge operation on the power device to be charged to obtain an initial charging power device, and monitoring the current of the initial charging power device in real time to obtain an initial current; Determine the magnitude of the initial current and a preset current threshold; If it is confirmed that the initial current is less than the preset current threshold, the pre-charging resistance is adjusted until the initial current is equal to the preset current threshold, thereby obtaining a charging power device.
10. An emergency power resource optimization dispatching system based on a data model, characterized in that: The system comprises: A device state confirmation module is used to receive a target device start-up and closing instruction, confirm environmental parameters, obtain standard electrical data based on the environmental parameters, obtain a target start-up and closing motor device, start the target start-up and closing motor device according to the target device start-up and closing instruction and the standard electrical data, and obtain an initial power device, wherein the initial power device includes: a power indicator light, a commutation module and current data, and judge whether the power indicator light is off. If it is confirmed that the power indicator light is off, it is confirmed that the initial power device is in a pre-constructed no-power state, and the motor type of the initial power device is obtained; An emergency power dispatching module is used to obtain a three-phase sinusoidal power supply by using a pre-built solid-state battery module and a motor type, and to perform a charging operation on an initial power device according to the three-phase sinusoidal power supply to obtain a charging power device, wherein the solid-state battery module includes: a solid-state battery pack and an electronic control pack, wherein the electronic control pack includes: a braking resistor, a pre-charge resistor, a pre-charge capacitor and a high-voltage delay relay, and to determine whether the charging power device needs to perform emergency power dispatching according to a preset emergency standard, and if it is confirmed that emergency power dispatching needs to be performed, then it is determined whether a power supply reversing operation needs to be performed on the charging power device based on the reversing module, wherein the emergency power dispatching includes: reversing power dispatching and power supply power dispatching; A power supply current monitoring module, which is used for, if the emergency power dispatch is a commutation power dispatch, confirming that a power commutation operation needs to be performed on the charging power device, then using a pre-built fast plug-in and a preset time threshold to perform a power commutation operation on the charging power device to obtain a commutation power device, then using a preset monitoring frequency and a pre-built commutation emergency power supply to perform power supply power adaptation on the commutation power device, and performing a current monitoring operation on the commutation power device to obtain commutation current data; if the emergency power dispatch is a power supply power dispatch, then confirming that a power commutation operation does not need to be performed on the charging power device, then using a preset monitoring frequency and a pre-built emergency power supply to perform power supply power adaptation on the charging power device, and performing a current monitoring operation on the charging power device to obtain current data; The optimization scheduling completion module is used to determine whether there is data greater than a preset current threshold in the current data or the commutation current data. If it is confirmed that there is data greater than the preset current threshold in the current data or the commutation current data, the solid-state battery module is adjusted using the braking resistor until there is no data greater than the preset current threshold in the current data and the commutation current data, so as to obtain an optimal current data set, and complete the data model-based optimal scheduling of emergency power resources based on the optimal current data set.
Citation Information
Patent Citations
Rail transit emergency power supply system and control method
CN108832611A
Method and system for opening and closing emergency power supply based on intelligent control water gate
CN119582423A
Cited By
IGBT (Insulated Gate Bipolar Translator)-based sine wave digital micro-circuit breaker intelligent dimming method and system
CN121194369A