Factory construction management system and method

By implementing the factory construction management system on the construction site and using data collection, integration and analysis modules, the problems of data lag and human error in traditional construction site management methods are solved, and the safety and efficiency of the construction process are improved.

CN119886873APending Publication Date: 2025-04-25BAOTOU ALUMINUM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411951212.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

Traditional construction site management methods rely on manual inspections and manual recording, resulting in data lag, management blind spots and human errors, and cannot meet the requirements of modern factories for efficient management and security.

Method used

It provides a factory construction management system, including a data acquisition and acquisition module, a data integration processing module and an analysis and management module. It integrates information processing data through Kettle data integration tool, and the analysis and management module performs data analysis to generate safety analysis, quality inspection and progress management information.

Benefits of technology

It improves the safety and efficiency of the construction process, and through real-time data processing and automated management, human errors and data lag are reduced, and the accuracy of construction quality and progress management is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119886873A_ABST
    Figure CN119886873A_ABST
Patent Text Reader

Abstract

The invention discloses a factory construction management system and method, and relates to the field of factory construction management. The data acquisition module is used for acquiring information data in a target factory area; the information data comprises environment information data, access control information data, monitoring video data and report service data; the data integration processing module is used for carrying out integration processing on the information data by adopting a Kettle data integration tool to obtain processed information data; the analysis management module is used for performing analysis processing according to the processing information data to obtain analysis data; the analysis data comprises personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data. The safety and efficiency of the construction process can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of plant construction management, and in particular to a plant construction management system and method. Background Art

[0002] With the advent of the industrial information age, production and construction are gradually developing in the direction of intelligence and digitalization. Traditional construction site management methods mainly rely on manual inspections, manual records and experience judgments. This method is not only time-consuming and labor-intensive, but also prone to data lags, management blind spots and human errors. It cannot meet the requirements of modern factories for efficient management and safety assurance. Although the existing smart construction site management system can integrate some monitoring and management functions, it usually lacks the ability to efficiently process real-time data, automate management and comprehensively visualize display. Summary of the invention

[0003] The purpose of this application is to provide a plant construction management system and method that can improve the safety and efficiency of the construction process.

[0004] To achieve the above objectives, this application provides the following solutions:

[0005] In a first aspect, the present application provides a plant construction management system, including: a data collection and acquisition module, a data integration and processing module, and an analysis and management module;

[0006] The data acquisition module is connected to the data integration processing module; the data integration processing module is connected to the analysis and management module;

[0007] The data acquisition module is used to acquire information data within the target factory area; the information data includes: environmental information data, access control information data, monitoring video data and report service data;

[0008] The data integration processing module is used to use the Kettle data integration tool to integrate the information data to obtain processed information data;

[0009] The analysis management module is used to perform analysis and processing based on the processed information data to obtain analysis data; the analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data.

[0010] Optionally, the analysis and management module includes: a personnel and vehicle management submodule, a safety management and behavior analysis submodule, an environment monitoring and judgment submodule, a regional monitoring submodule and a quality and progress management submodule;

[0011] The personnel and vehicle management submodule, the safety management and behavior analysis submodule, the environment monitoring and judgment submodule, the area monitoring submodule and the quality and progress management submodule are all connected to the data integration processing module; the quality and progress management submodule and the personnel and vehicle management submodule are also connected to the safety management and behavior analysis submodule; the safety management and behavior analysis submodule is also connected to the area monitoring submodule;

[0012] The personnel and vehicle management submodule is used to count the attendance information of the staff in the target factory area and determine the attendance information data of the staff according to the access control information data in the processed information data;

[0013] The personnel and vehicle management submodule is also used to determine the vehicle flow and the total number of vehicles passing per day according to the vehicle entry and exit data information in the access control information data;

[0014] The environmental monitoring and judgment submodule is used to judge whether the conditions for carrying out construction work are met based on the environmental information data in the processed information data and combined with the weather forecast information to ensure construction safety;

[0015] The regional monitoring submodule is used to analyze and process the monitoring video data in the processing information data to obtain monitoring information to monitor the operation status of the construction site of the target factory area;

[0016] The quality and progress management submodule is used to determine the inspection and rectification information data according to the hidden danger information in the monitoring information, and to inspect and analyze the construction quality to obtain the quality inspection information data to ensure that the construction quality meets the set standards;

[0017] The quality and progress management submodule is also used to determine progress management information data according to the report service data in the processing information data; the progress management information data includes: construction progress and equipment installation progress;

[0018] The safety management and behavior analysis submodule is used to calculate the responsibility implementation rate based on the report service data, the personnel attendance information data and the progress management information data in the processing information data;

[0019] The security management and behavior analysis submodule is also used to determine security analysis information data based on the monitoring information.

[0020] Optionally, the plant construction management system further comprises: a data storage and report generation module;

[0021] The data storage and report generation module is connected to the analysis management module;

[0022] The data storage and report generation module is used to store the analysis data and determine management report information based on the analysis data; the management report information includes: personnel attendance report, safety analysis report, quality inspection report and progress management report.

[0023] Optionally, the plant construction management system further includes: a data visualization display module;

[0024] The data visualization display module is connected to the data collection and acquisition module and the data storage and report generation module respectively;

[0025] The data visualization display module is used to display the information data and the management report information.

[0026] Optionally, the data integration processing module includes: a data cleaning submodule, a conversion submodule and an integration submodule;

[0027] The data cleaning submodule is connected to the data acquisition module; the conversion submodule is connected to the data cleaning submodule; the integration submodule is connected to the conversion submodule;

[0028] The data cleaning submodule is used to clean the information data to obtain cleaned information data;

[0029] The conversion submodule is used to convert the cleaning information data according to a set format to obtain converted information data;

[0030] The integration submodule is used to integrate the conversion information data according to a predetermined format and structure to obtain processing information data.

[0031] Optionally, the data acquisition module includes: an environmental information acquisition submodule, a door access data acquisition submodule, a surveillance video data acquisition submodule and a report service data acquisition submodule;

[0032] The environmental information acquisition submodule is used to collect and acquire environmental information data based on the environmental monitoring server;

[0033] The access control data acquisition submodule is used to obtain the entry and exit record information of personnel based on the access control server to obtain access control information data;

[0034] The monitoring video data acquisition submodule is used to acquire the real-time monitoring video stream of each area in the target factory area based on the monitoring server to obtain the monitoring video data;

[0035] The report service data acquisition submodule is used to acquire report service data based on the report server.

[0036] Optionally, the environmental information data includes temperature, wind direction and humidity.

[0037] In a second aspect, the present application provides a factory construction management method, which is implemented by using the factory construction management system described above; the factory construction management method includes:

[0038] Acquire information data within the target factory area; the information data includes: environmental information data, access control information data, surveillance video data, and report service data;

[0039] Using Kettle data integration tool to integrate the information data to obtain processed information data;

[0040] Analyze and process the processed information data to obtain analysis data; the analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data.

[0041] Optionally, performing analysis and processing according to the processed information data to obtain analysis data specifically includes:

[0042] According to the access control information data in the processed information data, the attendance information of the staff in the target factory area is counted to determine the attendance information data of the staff;

[0043] Determine the vehicle flow and the total number of vehicles passing through per day based on the vehicle entry and exit data information in the access control information data;

[0044] Based on the environmental information data in the processed information data and combined with the weather forecast information, determine whether the conditions for carrying out construction work are met to ensure construction safety;

[0045] Analyze and process the monitoring video data in the processed information data to obtain monitoring information to monitor the operation status of the construction site of the target factory area;

[0046] Determine inspection and rectification information data according to the hidden danger information in the monitoring information, and inspect and analyze the construction quality to obtain the quality inspection information data to ensure that the construction quality meets the set standards;

[0047] Determine the progress management information data according to the report service data in the processing information data; the progress management information data includes: construction progress and equipment installation progress;

[0048] Calculate the responsibility implementation rate based on the report service data, the personnel attendance information data and the progress management information data in the processing information data;

[0049] Determine security analysis information data based on the monitoring information.

[0050] Optionally, the plant construction management method further includes:

[0051] The analysis data is stored, and management report information is determined based on the analysis data; the management report information includes: personnel attendance report, safety analysis report, quality inspection report and progress management report.

[0052] According to the specific embodiments provided in this application, this application has the following technical effects:

[0053] The present application provides a plant construction management system and method, which obtains information data in the target plant through a data acquisition module; the data integration processing module uses the Kettle data integration tool to integrate and process the information data to obtain processed information data; the analysis management module is used to analyze and process the processed information data to obtain analysis data; the analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data. Since the analysis management module can determine the safety analysis information data and the quality inspection information data, the safety and quality of the construction process in the target plant can be monitored and analyzed, so that the safety of the construction process can be improved. In addition, since the analysis management module can determine the progress management information data based on the processed information data, the construction progress can be controlled, thereby improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0055] Figure 1 This is the structural diagram of the plant construction management system;

[0056] Figure 2 The figure is a flow chart of the factory construction management method. DETAILED DESCRIPTION

[0057] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0058] In this context, the development of smart construction site systems has emerged. The system aims to provide an integrated, automated and visual management platform for smart factories, and comprehensively improve the safety, management efficiency and intelligence level of construction sites. Through the integration and processing of multiple data sources, combined with intelligent analysis and real-time monitoring technology, the smart construction site system can grasp the personnel, vehicles, environment and safety status of the construction site in real time, automatically manage construction progress and quality inspections, and display key data on a large screen to provide decision support for managers.

[0059] The smart construction site system of this application, that is, the factory construction management system, not only solves the problems of data dispersion, processing lag, and large manual errors in traditional construction site management, but also realizes the comprehensive upgrade of construction site management through automation and intelligent means, and improves the safety, efficiency and transparency of the factory construction process. This new management method effectively makes up for the shortcomings of existing technologies and promotes the intelligent process of site construction.

[0060] By integrating modules such as data acquisition, personnel and vehicle management, safety monitoring, environmental monitoring, quality and progress management, the safety, management efficiency and intelligence level of the construction site can be improved, and comprehensive digitalization and intelligent management of the factory construction process can be achieved.

[0061] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0062] In an exemplary embodiment, Figure 1 As shown, a plant construction management system is provided. The plant construction management system includes: a data collection and acquisition module, a data integration and processing module, and an analysis and management module.

[0063] The data collection and acquisition module is connected to the data integration processing module; the data integration processing module is connected to the analysis and management module.

[0064] The data acquisition module is used to acquire information data within the target factory area; the information data includes: environmental information data, access control information data, surveillance video data and report service data. Environmental information data includes temperature, wind direction and humidity.

[0065] The data integration processing module is used to integrate and process information data using the Kettle data integration tool to obtain processed information data.

[0066] The analysis management module is used to perform analysis and processing based on the processed information data to obtain analysis data; the analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data.

[0067] In one embodiment, the analysis and management module includes: a personnel and vehicle management submodule, a safety management and behavior analysis submodule, an environment monitoring and judgment submodule, a regional monitoring submodule and a quality and progress management submodule.

[0068] The personnel and vehicle management submodule, the safety management and behavior analysis submodule, the environmental monitoring and judgment submodule, the regional monitoring submodule and the quality and progress management submodule are all connected to the data integration processing module; the quality and progress management submodule and the personnel and vehicle management submodule are also connected to the safety management and behavior analysis submodule; the safety management and behavior analysis submodule is also connected to the regional monitoring submodule.

[0069] The personnel and vehicle management submodule is used to count the attendance information of the staff in the target factory area and determine the personnel attendance information data according to the access control information data in the processing information data.

[0070] The personnel and vehicle management submodule is also used to determine the vehicle flow and the total number of vehicles passing through per day based on the vehicle entry and exit data information in the access control information data.

[0071] The environmental monitoring and judgment submodule is used to determine whether the conditions for carrying out construction work are met based on the environmental information data in the processed information data and combined with weather forecast information to ensure construction safety.

[0072] The regional monitoring submodule is used to analyze and process the monitoring video data in the processing information data to obtain monitoring information to monitor the operation status of the construction site of the target factory area.

[0073] The quality and progress management submodule is used to determine the inspection and rectification information data based on the hidden danger information in the monitoring information, and to inspect and analyze the construction quality to obtain quality inspection information data to ensure that the construction quality meets the set standards.

[0074] The quality and progress management submodule is also used to determine progress management information data according to the report service data in the processing information data; the progress management information data includes: construction progress and equipment installation progress.

[0075] The safety management and behavior analysis submodule is used to calculate the responsibility implementation rate based on the report service data, personnel attendance information data and progress management information data in the processing information data.

[0076] The security management and behavior analysis submodule is also used to determine security analysis information data based on monitoring information.

[0077] In one embodiment, the plant construction management system further includes: a data storage and report generation module.

[0078] The data storage and report generation module is connected to the analysis management module; the data storage and report generation module is used to store the analysis data and determine the management report information based on the analysis data; the management report information includes: personnel attendance report, safety analysis report, quality inspection report and progress management report.

[0079] The plant construction management system also includes: a data visualization display module; the data visualization display module is connected to the data collection and acquisition module and the data storage and report generation module respectively; the data visualization display module is used to display information data and manage report information.

[0080] As an optional implementation, the data integration processing module includes: a data cleaning submodule, a conversion submodule and an integration submodule.

[0081] The data cleaning submodule is connected to the data collection and acquisition module; the conversion submodule is connected to the data cleaning submodule; and the integration submodule is connected to the conversion submodule.

[0082] The data cleaning submodule is used to clean the information data to obtain cleaned information data; the conversion submodule is used to convert the cleaned information data according to the set format to obtain converted information data; the integration submodule is used to integrate the converted information data according to the predetermined format and structure to obtain processed information data.

[0083] The data acquisition module includes: an environmental information acquisition submodule, a door access data acquisition submodule, a surveillance video data acquisition submodule and a report service data acquisition submodule.

[0084] The environmental information acquisition submodule is used to collect and acquire environmental information data based on the environmental monitoring server; the access control data acquisition submodule is used to acquire personnel entry and exit record information based on the access control server to obtain access control information data; the monitoring video data acquisition submodule is used to acquire real-time monitoring video streams of various areas in the target factory area based on the monitoring server to obtain monitoring video data; the report service data acquisition submodule is used to acquire report service data based on the report server.

[0085] In actual applications, the data collection and acquisition module is executed through a computer server, regularly accessing different server interfaces to collect various required data.

[0086] Environmental information acquisition submodule: access the environmental monitoring server, collect real-time environmental parameter data such as temperature, wind direction, humidity, etc., and obtain environmental information data.

[0087] Access control data acquisition submodule: access the access control server, obtain the entry and exit record information of personnel, count the attendance rate of each construction unit and the number of people in the factory in real time, and obtain access control information data.

[0088] Monitoring video data acquisition submodule: access the monitoring server, obtain the real-time monitoring video stream of each area in the factory, and obtain the monitoring video data.

[0089] Report service data acquisition submodule: access the report server to obtain report service data, namely, safety inspection, quality inspection, progress management and other related report data.

[0090] The data integration processing module performs data integration and processing through the Windows system on the virtual machine. The Kettle data integration tool is used to clean, convert and integrate the various types of data obtained. Specific operations include:

[0091] Perform data cleaning in the data cleaning submodule: remove invalid or duplicate data to ensure data accuracy.

[0092] Data conversion is performed in the conversion submodule: data in different formats are uniformly converted into a standard format that the system can recognize and process.

[0093] Data integration is performed in the integration submodule: all processed data are stored in the system database in a predetermined format and structure for subsequent analysis and application.

[0094] The personnel and vehicle management submodule realizes real-time management of personnel and vehicles through analysis of integrated data.

[0095] Regarding personnel management: Analyze the data collected by the access control system (access control information data), and conduct real-time statistics on the attendance rate of personnel in each construction unit, the number of people in the factory, and the attendance of key personnel.

[0096] Regarding vehicle management: Analyze vehicle entry and exit data, record detailed vehicle information, calculate vehicle flow during peak hours and the total number of vehicles passing per day, and provide support for traffic and logistics optimization.

[0097] The safety management and behavior analysis submodule calculates the responsibility implementation rate based on the report service data, personnel attendance information data and progress management information data in the processed information data; and determines the safety analysis information data based on the monitoring information. That is, it monitors and analyzes the behavior of on-site personnel to ensure the safety of the construction site.

[0098] Attendance summary of key personnel: real-time monitoring of the attendance rate and work responsibilities of key personnel such as safety officers, safety directors and project managers. For attendance data, combined with the report submission of responsible persons for progress, quality and safety, the responsibility implementation rate can be calculated.

[0099] Behavior analysis: Automatically detect and capture safety violations on site through surveillance video, such as high-altitude operations, use of safety belts, wearing of safety helmets, fireworks and smoking, wearing of work clothes, etc., and record and issue safety alerts in a timely manner.

[0100] Specifically, obtain monitoring information and perform video preprocessing on the monitoring information: image enhancement and object detection.

[0101] Among them, image enhancement: improve video quality. Object detection: use deep learning models to identify objects such as helmets, safety belts, and work clothes.

[0102] Use motion detection models to analyze people's actions, such as whether they are wearing a safety belt correctly or performing high-altitude operations. Combined with predefined rules or models, identify violations such as smoking.

[0103] Compare the recognition results with the standard behavior database. If there is any abnormality, an alarm is triggered and recorded.

[0104] The applied model algorithms include: CV industry large model, NLP industry large model, and multimodal industry large model. For model training, the labeled data set is used for supervised learning.

[0105] The environmental monitoring and judgment submodule monitors and analyzes the environmental parameters in the factory to assist in judging specific construction conditions. That is, based on the environmental information data in the processed information data and combined with the weather forecast information, it is judged whether the conditions for carrying out construction work are met to ensure construction safety.

[0106] Based on the real-time environmental data such as temperature, wind direction, humidity, etc., combined with weather forecast information, it is determined whether specific construction operations such as welding and lifting meet the conditions for implementation to ensure construction safety.

[0107] Specifically, welding operations shall not be carried out when the ambient temperature is below 5 degrees Celsius; outdoor lifting operations shall not be carried out when the ambient wind force level reaches Level 6 or above; outdoor high-altitude operations shall not be carried out when the ambient wind force level reaches Level 5 or above; outdoor high-altitude operations shall not be carried out when it is snowing; outdoor high-altitude operations, lifting operations, and welding operations shall not be carried out when it is raining.

[0108] The regional monitoring submodule monitors the important areas in the factory in real time to ensure the safety and transparency of the construction process. That is, the regional monitoring submodule analyzes and processes the monitoring video data in the processing information data to obtain monitoring information to monitor the operation of the construction site of the target factory.

[0109] Real-time analysis of surveillance video: Analyze real-time video of important areas such as electrolysis, purification, assembly, and rectification to monitor construction progress and on-site conditions, and promptly identify and address potential safety hazards.

[0110] The camera collects videos of key areas and transmits them to the data center. The machine learning model is used to detect unsafe phenomena such as not wearing a helmet and smoking. The data analysis results are matched according to the set safety hazard standards. Alarms are triggered and abnormal events are recorded.

[0111] Personnel behavior detection: whether there are dangerous behaviors (such as climbing, not wearing a safety belt, not wearing work clothes, etc.).

[0112] Environmental change detection: whether there are obvious fire hazards (such as smoke concentration exceeding the standard).

[0113] Abnormal analysis based on behavior detection (OpenPose). Combined with data from IoT sensors, video + environment linkage analysis is performed.

[0114] The quality and progress management submodule ensures comprehensive control of construction quality and progress. That is, the inspection and rectification information data is determined based on the hidden danger information in the monitoring information, and the construction quality is inspected and analyzed to obtain quality inspection information data to ensure that the construction quality meets the set standards; the progress management information data is determined based on the report service data in the processing information data; the progress management information data includes: construction progress and equipment installation progress.

[0115] Among them, safety inspection: allow on-site supervisors to upload pictures of hidden dangers, generate inspection and rectification orders and make corrections in real time, forming a closed-loop management to ensure construction safety.

[0116] Quality inspection: Conduct real-time inspections on construction quality, promptly identify unqualified items and notify rectification to ensure that construction quality meets standards.

[0117] Progress management: supports online uploading, querying and statistics of construction progress and equipment installation progress, realizing visual management and efficient control of project progress.

[0118] 1. Hidden danger image recognition:

[0119] After the on-site supervisor uploads the pictures, the on-site supervisor will determine whether there are known safety hazards in the report (such as exposed steel bars and irregular welding). The on-site supervisor will classify the hazards and mark the problem areas.

[0120] 2. Tracking of rectification process:

[0121] The pictures after hidden danger rectification are uploaded again, and the system compares them with the original problem area to determine whether the rectification is completed.

[0122] The data storage and report generation module is used to store analytical data and determine management report information based on the analytical data to provide decision support for management.

[0123] The data visualization display module is executed by the large screen display module, which displays important information such as the overall status of the system, real-time monitoring video, attendance rate, vehicle flow, safety inspection results, etc. in real time through the large screen, so that managers can understand the dynamics and safety conditions of the construction site at a glance. That is, the data visualization display module is used to display information data and management report information.

[0124] As a result, all-round and intelligent management of the construction site is achieved, management efficiency and safety level are improved, and the transparency and standardization of the factory construction process are ensured.

[0125] In an exemplary embodiment, a factory construction management method is provided, which is implemented using a factory construction management system. Figure 2 As shown, the plant construction management methods include:

[0126] Step 100: Acquire information data in the target factory area. The information data includes: environmental information data, access control information data, surveillance video data, and report service data.

[0127] Step 200: Use the Kettle data integration tool to integrate the information data to obtain processed information data.

[0128] Step 300: Analyze and process the processed information data to obtain analysis data. The analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data, and progress management information data.

[0129] In one embodiment, analyzing and processing the processed information data to obtain the analysis data specifically includes:

[0130] According to the access control information data in the processed information data, the attendance information of the staff in the target factory area is counted to determine the personnel attendance information data; the vehicle flow and the total daily number of vehicles passing through are determined according to the vehicle entry and exit data information in the access control information data; according to the environmental information data in the processed information data and combined with the weather forecast information, it is judged whether the conditions for carrying out construction work are met to ensure construction safety.

[0131] The monitoring video data in the processed information data is analyzed and processed to obtain monitoring information to monitor the operation status of the target factory construction site; the inspection and rectification information data is determined based on the hidden danger information in the monitoring information, and the construction quality is inspected and analyzed to obtain quality inspection information data to ensure that the construction quality meets the set standards.

[0132] According to the report service data in the processing information data, the progress management information data is determined; the progress management information data includes: construction progress and equipment installation progress.

[0133] The responsibility fulfillment rate is calculated based on the report service data, personnel attendance information data and progress management information data in the processing information data.

[0134] Determine security analysis information data based on monitoring information.

[0135] In one embodiment, the plant construction management method further includes:

[0136] Store analysis data and determine management report information based on the analysis data; management report information includes: personnel attendance report, safety analysis report, quality inspection report and progress management report.

[0137] Benefits of this application:

[0138] 1. High management efficiency: Through data acquisition, integration, processing and multi-module linkage, the comprehensive digital and intelligent management of the construction site is realized, which effectively improves the management efficiency. Specifically, the personnel and vehicle management submodule and the safety management and behavior analysis submodule automatically count attendance rates and monitor on-site behaviors through real-time data analysis, which significantly reduces the workload of manual statistics and inspections. The environmental monitoring and judgment submodule combines real-time environmental data with weather forecasts to realize automatic judgment of operating conditions and reduce errors and delays in human decision-making.

[0139] 2. High safety: The safety management and behavior analysis submodule uses video surveillance and intelligent algorithms to automatically detect and capture various safety violations in real time, such as not wearing a helmet, smoking in violation of regulations, etc., and promptly issues safety alarms to ensure the safety of the construction site. This safety management method based on intelligent analysis greatly improves the accuracy and real-time nature of safety inspections and reduces safety hazards.

[0140] 3. High accuracy: The quality and progress management submodule automatically generates inspection reports and rectification suggestions through real-time data upload and analysis, and realizes visual management of construction progress. Compared with traditional manual recording and statistics, this automated management method ensures the accuracy of data and the precision of construction quality.

[0141] 4. Strong visualization capability: Through the data visualization display module, data visualization and large-screen display functions enable managers to intuitively grasp the dynamics and safety conditions of the construction site, improving the efficiency of information communication and the accuracy of management decisions. Through real-time monitoring of different areas and visualization of environmental data, managers can make timely adjustments and decisions to ensure smooth construction progress.

[0142] In this application, all actions to obtain signals, information or data are carried out in compliance with the relevant data protection laws and policies of the country where they are located and with the authorization of the corresponding device owner. It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0143] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0144] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.

Claims

1. A plant construction management system, characterized in that: The plant construction management system includes: a data collection and acquisition module, a data integration and processing module, and an analysis and management module; The data acquisition module is connected to the data integration processing module; the data integration processing module is connected to the analysis and management module; The data acquisition module is used to acquire information data within the target factory area; the information data includes: environmental information data, access control information data, monitoring video data and report service data; The data integration processing module is used to use the Kettle data integration tool to integrate the information data to obtain processed information data; The analysis management module is used to perform analysis and processing based on the processed information data to obtain analysis data; the analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data.

2. The plant construction management system according to claim 1, characterized in that: The analysis and management module includes: a personnel and vehicle management submodule, a safety management and behavior analysis submodule, an environment monitoring and judgment submodule, a regional monitoring submodule and a quality and progress management submodule; The personnel and vehicle management submodule, the safety management and behavior analysis submodule, the environment monitoring and judgment submodule, the area monitoring submodule and the quality and progress management submodule are all connected to the data integration processing module; the quality and progress management submodule and the personnel and vehicle management submodule are also connected to the safety management and behavior analysis submodule; the safety management and behavior analysis submodule is also connected to the area monitoring submodule; The personnel and vehicle management submodule is used to count the attendance information of the staff in the target factory area and determine the attendance information data of the staff according to the access control information data in the processed information data; The personnel and vehicle management submodule is also used to determine the vehicle flow and the total number of vehicles passing per day according to the vehicle entry and exit data information in the access control information data; The environmental monitoring and judgment submodule is used to judge whether the conditions for carrying out construction work are met based on the environmental information data in the processed information data and combined with the weather forecast information to ensure construction safety; The regional monitoring submodule is used to analyze and process the monitoring video data in the processing information data to obtain monitoring information to monitor the operation status of the construction site of the target factory area; The quality and progress management submodule is used to determine the inspection and rectification information data according to the hidden danger information in the monitoring information, and to inspect and analyze the construction quality to obtain the quality inspection information data to ensure that the construction quality meets the set standards; The quality and progress management submodule is also used to determine progress management information data according to the report service data in the processing information data; the progress management information data includes: construction progress and equipment installation progress; The safety management and behavior analysis submodule is used to calculate the responsibility implementation rate based on the report service data, the personnel attendance information data and the progress management information data in the processing information data; The security management and behavior analysis submodule is also used to determine security analysis information data based on the monitoring information.

3. The plant construction management system according to claim 1, characterized in that: The plant construction management system also includes: a data storage and report generation module; The data storage and report generation module is connected to the analysis management module; The data storage and report generation module is used to store the analysis data and determine management report information based on the analysis data; the management report information includes: personnel attendance report, safety analysis report, quality inspection report and progress management report.

4. The plant construction management system according to claim 1, characterized in that: The plant construction management system also includes: a data visualization display module; The data visualization display module is connected to the data collection and acquisition module and the data storage and report generation module respectively; The data visualization display module is used to display the information data and the management report information.

5. The plant construction management system according to claim 1, characterized in that: The data integration processing module includes: a data cleaning submodule, a conversion submodule and an integration submodule; The data cleaning submodule is connected to the data acquisition module; the conversion submodule is connected to the data cleaning submodule; the integration submodule is connected to the conversion submodule; The data cleaning submodule is used to clean the information data to obtain cleaned information data; The conversion submodule is used to convert the cleaning information data according to a set format to obtain converted information data; The integration submodule is used to integrate the conversion information data according to a predetermined format and structure to obtain processing information data.

6. The plant construction management system according to claim 1, characterized in that: The data acquisition module includes: an environmental information acquisition submodule, a door access data acquisition submodule, a surveillance video data acquisition submodule and a report service data acquisition submodule; The environmental information acquisition submodule is used to collect and acquire environmental information data based on the environmental monitoring server; The access control data acquisition submodule is used to obtain the entry and exit record information of personnel based on the access control server to obtain access control information data; The monitoring video data acquisition submodule is used to acquire the real-time monitoring video stream of each area in the target factory area based on the monitoring server to obtain the monitoring video data; The report service data acquisition submodule is used to acquire report service data based on the report server.

7. The plant construction management system according to claim 6, characterized in that: The environmental information data includes temperature, wind direction and humidity.

8. A factory construction management method, characterized in that: The plant construction management method is implemented by using the plant construction management system described in any one of claims 1 to 7; the plant construction management method comprises: Acquire information data within the target factory area; the information data includes: environmental information data, access control information data, surveillance video data, and report service data; Using Kettle data integration tool to integrate the information data to obtain processed information data; Analyze and process the processed information data to obtain analysis data; the analysis data includes: personnel attendance information data, safety analysis information data, quality inspection information data and progress management information data.

9. The factory construction management method according to claim 8, characterized in that: Analyzing and processing the processed information data to obtain analysis data specifically includes: According to the access control information data in the processed information data, the attendance information of the staff in the target factory area is counted to determine the attendance information data of the staff; Determine the vehicle flow and the total number of vehicles passing through per day based on the vehicle entry and exit data information in the access control information data; Based on the environmental information data in the processed information data and combined with the weather forecast information, determine whether the conditions for carrying out construction work are met to ensure construction safety; Analyze and process the monitoring video data in the processed information data to obtain monitoring information to monitor the operation status of the construction site of the target factory area; Determine inspection and rectification information data according to the hidden danger information in the monitoring information, and inspect and analyze the construction quality to obtain the quality inspection information data to ensure that the construction quality meets the set standards; Determine the progress management information data according to the report service data in the processing information data; the progress management information data includes: construction progress and equipment installation progress; Calculate the responsibility implementation rate based on the report service data, the personnel attendance information data and the progress management information data in the processing information data; Determine security analysis information data based on the monitoring information.

10. The factory construction management method according to claim 8, characterized in that: The plant construction management method also includes: The analysis data is stored, and management report information is determined based on the analysis data; the management report information includes: personnel attendance report, safety analysis report, quality inspection report and progress management report.