Wind power prediction precision control method based on current collector direct current side electrochemical energy storage
By introducing an electrochemical energy storage system on the DC side of the collecting line of the wind farm, the charging and discharging target power is tracked and regulated in real time, the problem of wind power prediction deviation is solved, and real-time regulation and operation stability of the actual total power of the wind farm is achieved.
Patent Information
- Application Number
- CN202510062701.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-04-25
AI Technical Summary
There is a large deviation in the prediction of wind power, and it is impossible to control the actual total power of the wind farm in real time, resulting in the assessment and fine for the prediction deviation exceeding the limit.
The wind power prediction accuracy control method based on the DC side of the collector line is adopted. By tracking the charging and discharging target power in real time, each wind turbine in the wind farm is controlled to generate power at the optimal power, and the electrochemical energy storage system is dynamically regulated to ensure that the actual total power of the wind farm is within the deviation limit.
Real-time regulation of the actual total power of the wind farm is achieved, reducing the risk of being assessed and fined due to exceeding the limit of the wind power prediction deviation, and improving the operating stability and economicality of the wind farm.
Smart Images

Figure CN119891320A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power generation, and in particular to a method, device, electronic equipment and storage medium for controlling wind power prediction accuracy based on electrochemical energy storage on the DC side of a collector line. Background Art
[0002] Different from conventional energy, wind energy has the characteristics of randomness, volatility and intermittency, and the output of wind power is unstable. With the large-scale grid connection of wind power, it will inevitably bring challenges to the dispatching and stable operation of the power grid. Therefore, accurate prediction of wind power is particularly important.
[0003] In the relevant technology, wind power prediction is mainly divided into three categories: physical method, statistical method and combined method. The physical method is based on meteorology and the working principle of wind turbines. By establishing a mathematical model, it considers physical factors such as wind speed, wind direction, temperature, air pressure, topography, and wind turbine characteristics to predict power output; the statistical method is based on the analysis and research of historical statistical data and numerical weather forecast (NWP) data, establishes a mapping relationship between NWP data and wind farm output power, and mines the laws and trends in the data for prediction; the combined method combines physical methods and statistical methods, and comprehensively utilizes the advantages of both to improve the accuracy and reliability of wind power prediction. However, regardless of the type of method, the random fluctuations inherent in wind energy itself make the predicted power still have a large deviation from the actual results, and it is impossible to regulate the total power generated by the wind farm in real time. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0005] To this end, the first purpose of the present invention is to propose a wind power prediction accuracy control method based on electrochemical energy storage on the DC side of the collector line. By real-time tracking of the charging and discharging target power, the real-time regulation of the actual total power generated by the wind farm is guaranteed, and the situation of being assessed and fined due to excessive wind power prediction deviation is reduced.
[0006] The second object of the present invention is to provide a wind power prediction accuracy control device based on electrochemical energy storage on the DC side of the collector.
[0007] A third objective of the present invention is to provide an electronic device.
[0008] A fourth object of the present invention is to provide a non-transitory computer-readable storage medium storing computer instructions.
[0009] To achieve the above-mentioned purpose, the first embodiment of the present invention proposes a wind power prediction accuracy control method based on electrochemical energy storage on the DC side of the collector line, wherein the DC bus side of the wind turbine converter at the end of each collector line of the wind farm is incorporated into the electrochemical energy storage system, and the method comprises:
[0010] Obtain the state of charge SOC of each collector electrochemical energy storage system B,i , Charge and discharge power target value and SOC B,i Corresponding to the fault status of the wind turbine;
[0011] In SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,K B_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0, K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative;
[0012] According to the charge and discharge limit coefficient, the charge and discharge participation factor PF of each collector electrochemical energy storage system is calculated. B,i ;
[0013] According to the PF B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B ,i(j), through the maximum charge and discharge power limit P of the electrochemical energy storage system B,i (j) to obtain the target power of charge and discharge
[0014] By controlling each wind turbine in the wind farm to generate electricity at optimal power and controlling the electrochemical energy storage to track Dynamically control the total actual power generated by the wind farm to be within the deviation limit.
[0015] To achieve the above purpose, the second embodiment of the present invention proposes a wind power prediction accuracy control device based on electrochemical energy storage on the DC side of the collector line. The DC bus side of the wind turbine converter at the end of each collector line in the wind farm is incorporated into the electrochemical energy storage system. The device includes:
[0016] The first acquisition module is used to obtain the state of charge SOC of each collector electrochemical energy storage system B,i , Charge and discharge power target value and SOC B,i Corresponding to the fault status of the wind turbine;
[0017] The first computing module is used in SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,K B_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0, K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative;
[0018] The second calculation module is used to calculate the charge and discharge participation factor PF of each collector electrochemical energy storage system according to the charge and discharge limit coefficient. B,i ;
[0019] The third calculation module is used to calculate the B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B,i (j) The maximum charge and discharge power of the electrochemical energy storage system is limited by P B,i (j) to obtain the target power of charge and discharge
[0020] The control module is used to control the wind turbines in the wind farm to generate electricity at the optimal power and control the electrochemical energy storage tracking Dynamically control the total actual power generated by the wind farm to be within the deviation limit.
[0021] To achieve the above-mentioned purpose, the third aspect of the present invention proposes an electronic device, comprising: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the method described in the first aspect.
[0022] In order to achieve the above-mentioned purpose, the fourth aspect of the present invention proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the method described in the first aspect.
[0023] The embodiments of the present invention provide a method, device, electronic device and storage medium for controlling wind power prediction accuracy based on electrochemical energy storage on the DC side of a collector line. The electrochemical energy storage system is incorporated into the DC bus side of the wind turbine converter at the end of each collector line of a wind farm. When the deviation between the predicted power of the wind farm and the actual total power of the wind farm is greater than the deviation limit, the state of charge data of the electrochemical energy storage system of each collector line at the current time node is obtained, and the charge and discharge limit coefficient of each electrochemical energy storage system is calculated based on the charge and discharge limit coefficient, and the charge and discharge target power is solved based on the charge and discharge limit coefficient; by controlling each wind turbine to generate electricity at the optimal power and controlling the electrochemical energy storage system to track the charge and discharge target power, the actual total power of the wind farm is dynamically regulated to be within the deviation limit, and by real-time tracking of the charge and discharge target power, the real-time regulation of the actual total power of the wind farm is guaranteed, and the situation of being assessed and fined due to excessive wind power prediction deviation is reduced.
[0024] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0026] Figure 1 A schematic flow chart of a method for controlling wind power prediction accuracy based on electrochemical energy storage on the DC side of a collector provided by an embodiment of the present invention;
[0027] Figure 2 A schematic diagram of the layout of an electrochemical energy storage system for a wind farm provided by an embodiment of the present invention;
[0028] Figure 3 A schematic diagram of a deviation between a wind farm predicted power and a wind farm actual total power provided by an embodiment of the present invention;
[0029] Figure 4 A diagram of an execution device for tracking the optimal power of a wind turbine set by adopting an optimal power control strategy at the machine-side end rectifier of each wind turbine converter of a collector provided by an embodiment of the present invention;
[0030] Figure 5 A diagram of an execution device for tracking the target power of charging and discharging of an electrochemical energy storage system provided by an embodiment of the present invention;
[0031] Figure 6 A diagram of an execution device for controlling a DC bus voltage through a current loop at a grid-side inverter of each wind turbine converter provided by an embodiment of the present invention;
[0032] Figure 7 An execution flow chart of a phase-locked loop phase angle calculation module provided by an embodiment of the present invention;
[0033] Figure 8 A flow chart of another method for controlling wind power prediction accuracy based on hybrid energy storage on the DC side of a collector provided by an embodiment of the present invention;
[0034] Fig. 9 A schematic structural diagram of a wind power prediction accuracy control device based on electrochemical energy storage on the DC side of a collector provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0035] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0036] It should be noted that the acquisition, storage, use, and processing of data in the technical solution of the present invention are in compliance with the relevant provisions of national laws and regulations.
[0037] The following describes, with reference to the accompanying drawings, a method, device, electronic device, and storage medium for controlling wind power prediction accuracy based on electrochemical energy storage on the DC side of a collector according to an embodiment of the present invention.
[0038] Figure 1 A flow chart of a method for controlling wind power prediction accuracy based on electrochemical energy storage on the DC side of a collector provided in an embodiment of the present invention, wherein the DC bus side of the wind turbine converter at the end of each collector in a wind farm is incorporated into an electrochemical energy storage system.
[0039] Among them, Figure 2 As shown, the wind farm has n collectors 5, each collector 5 is arranged with m wind turbines, and an electrochemical energy storage system 4 is connected to the DC bus side of the wind turbine converter at the end of each collector 5, wherein the wind turbine includes a power generation system 1, a converter 2 and a box transformer 3, and the electrochemical energy storage system 4 is composed of a battery system 4-1, a DC-DC bidirectional converter 4-2, and a circuit breaker 4-3, and the outlet of the circuit breaker 4-3 is connected to the DC bus of the wind turbine converter at the end of each collector 5, and each collector is connected to the AC bus of the booster station 7 through a circuit breaker 6, and then the voltage is increased to a preset voltage through a booster transformer 8 and then connected to the grid.
[0040] like Figure 1 As shown, the method comprises the following steps:
[0041] Step 101, obtaining the state of charge SOC of each collector electrochemical energy storage system B,i , Charge and discharge power target value and SOC B,i Corresponding to the fault status of the wind turbine.
[0042] In some embodiments, when obtaining the state of charge SOC of each collector electrochemical energy storage system B,i , Charge and discharge power target value and SOC B,i Before the corresponding wind turbine fault state, it also includes obtaining the predicted power of the wind farm and the actual total power of the wind farm within the preset control period of the wind farm. One implementation method for obtaining the predicted power of the wind farm and the actual total power of the wind farm can be to receive the short-term prediction data of the wind farm wind power prediction system. 15 minutes (preset control period) can be used as a prediction point, and there are 96 prediction points throughout the day. Any short-term prediction data within 15 minutes is selected as the predicted power of the wind farm. At the same time, the output of the wind farm can be segmented and controlled at intervals of 15 minutes. The whole day is divided into 96 control periods, and the actual power of each wind turbine in a certain minute or one second within the same control period as the prediction point is obtained as the actual total power of the wind farm.
[0043] In some embodiments, the calculation formula of the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is formula (1):
[0044]
[0045] Among them, P f (j) is the predicted power of the wind farm at time j in the control period, It is the actual power generated by each wind turbine on the i-th collector at time j during the control period.
[0046] Furthermore, the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * Under the condition of One implementation method may be,
[0047] The deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * There are two cases: the electrochemical energy storage system is discharged, and the discharge power is positive when β(j)>β * , and the electrochemical energy storage system is charged, and the charging power is negative when β(j)<-β * ;
[0048] When β(j)>β * Or β(j)<-β * When the total charge and discharge power target value of the electrochemical energy storage system is The calculation formula is (2)
[0049]
[0050] Specifically, Figure 3 As shown, β * The assessment value is usually 85% when |β(j)|≤β * When the actual power generated by the wind farm is within the deviation limit β * Within this period, the electrochemical energy storage system does not perform charging and discharging operations; when |β(j)>β * When the actual power generated by the wind farm exceeds the deviation limit β * The electrochemical energy storage system performs charging and discharging operations according to the power allocation value. The schematic diagram of the deviation between the predicted power of the wind farm and the actual total power of the wind farm is shown in Figure 3 As shown in the figure, the black curve is the actual total power of the wind farm, and there is a gray prediction box every 15 minutes (the predicted power of the wind farm P f (j) At 0-15 minutes, it is at P f (1)×(1-β *) to P f (1)×(1+β * ) within 15-30 minutes, it is in P f (2)×(1-β * ) to P f (2)×(1+β * )). When the black curve falls within the gray prediction box, the actual total power generated by the wind farm is within the deviation limit β * When the black curve exceeds the gray prediction box, the actual total power generated by the wind farm exceeds the deviation limit β * The part beyond the gray prediction box is transferred by the electrochemical energy storage system through charging and discharging operations.
[0051] Among them, the state of charge (SOC) B,i , which represents the ratio of the remaining power of an energy storage device (such as an electrochemical energy storage device, i.e. a battery) to its rated capacity, usually expressed as a percentage.
[0052] Step 102, in SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,K B_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0, K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative.
[0053] In some embodiments, the SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,K B_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0; K B,i The calculation formula is as follows:
[0054]
[0055] K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative.
[0056] Step 103, based on the charge and discharge limit coefficient, calculate the charge and discharge participation factor PF of each collector electrochemical energy storage system B,i .
[0057] According to K B,i Calculate PF B,i The formulas are as follows:
[0058]
[0059] Step 104, according to PF B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B ,i(j), through the maximum charge and discharge power limit P of the electrochemical energy storage system B,i (j) to obtain the target power of charge and discharge
[0060] In some embodiments, according to PF B,i Calculate P B ,i(j) is calculated as shown in formula (6), and the maximum charge and discharge power of the electrochemical energy storage system is limited to P B,i (j), we get The formula is as follows (7):
[0061]
[0062] Step 105, by controlling each wind turbine in the wind farm to generate electricity at optimal power and controlling the electrochemical energy storage to track Dynamically control the total actual power generated by the wind farm to be within the deviation limit.
[0063] In some embodiments, the rectifier at the side of each wind turbine converter of the collector line adopts an optimal power control strategy to track the optimal power of each wind turbine in the wind farm. To control the wind turbines in the wind farm to the optimal power Power generation, to achieve the goal of maximizing wind energy absorption, reference Figure 4 , Figure 4 The diagram shows an execution device for tracking the optimal power of a wind turbine set by using an optimal power control strategy for the rectifier at the machine side of each wind turbine converter of the collector line. The execution device mainly includes a generator rotor phase calculation module 10 corresponding to the wind turbine set, an optimal power operation control module 11 and a current inner loop control module 12.
[0064] The input of the generator rotor phase calculation module 10 is the generator measured speed ω of the transmission system corresponding to the wind farm g , the output is the generator rotor phase θ g , the calculation formula is as follows:
[0065]
[0066] The optimal power operation control module 11 is composed of an optimal power control torque calculation 11-1 and a q-axis current control target value calculation 11-2. The input of the optimal power control torque calculation 11-1 is the generator measured speed ω g , the output is the generator control target torque T * , the formula is as formula (9):
[0067]
[0068] In formula (9), K opt is the optimal power control torque coefficient, and the q-axis current control target value calculation 11-2 input is the generator control target torque T * , the output is the generator q-axis current control target value The formula is as follows (10):
[0069]
[0070] In formula (20), n p is the number of generator pole pairs, ψ f is the permanent magnet flux of the generator.
[0071] The current inner loop calculation module 12 includes PI calculation (proportional and integral) 12-1 and 12-2, dq coordinate transformation 12-3 and dq coordinate inverse transformation (dq inverse transformation) 12-4. First, the three-phase current measurement value i of the generator is sabc (i sa 、i sb 、i sc ) is converted into dq axis current i through dq transformation sdq (i sd 、i sq ), such as formula (11) and formula (12):
[0072]
[0073] Then, the voltage value corresponding to the current loop is calculated by PI, as shown in formula (13):
[0074]
[0075] Afterwards, by introducing the dq axis cross-influence term (ω e L sq ,ω e L sd ,ω e ψ f ) to obtain the generator stator dq axis voltage control target value, the formula is as follows (14):
[0076]
[0077] In formula (14), ω e is the electromagnetic speed of the generator rotor, which is ω e and n p Finally, the generator stator dq axis voltage control target value formula (14) Substitute the dq coordinate inverse transformation to calculate the modulation voltage control target value of the converter on the machine side of the converter And through sinusoidal pulse width modulation (SPWM) The size and shape of The measured value of the converter DC bus capacitance U is calculated by using 2-1 multiple insulated gate bipolar transistor (IGBT) modules (S1, S2, S3, S4, S5, S6) DC (DC bus voltage), based on U DC Tracking Optimum Power The formulas are as follows (15) and (16):
[0078]
[0079]
[0080] In other embodiments, the electrochemical energy storage system at the DC side of the wind turbine at the end of each collector tracks the charging and discharging target power through the DC-DC bidirectional converter 4-2. refer to Figure 5 , Figure 5 The electrochemical energy storage system configured for the wind turbine converter at the end of the collector tracks the target power of the electrochemical energy storage system through the DC-DC bidirectional converter 4-2. The execution device mainly includes a charging control process 20 and a discharging control process 21. The charging control process 20 is mainly composed of S1 controlling the conversion switches 20-1 and 20-2, and the charging reference current calculation 20-3. The discharging control process 21 is mainly composed of S2 controlling the conversion switch 21-1, the discharge modulation voltage PI (proportional-integral) calculation 21-2, and the discharge reference current calculation 21-3.
[0081] When the electrochemical energy storage system is charged, S1 controls the conversion switch to switch to the charging controller, and S2 controls the conversion switch to switch off. The DC-DC bidirectional converter 4-2 charges the energy storage battery (electrochemical energy storage system) through the step-down conversion mode. First, the charging reference current is calculated by the charging reference power, as shown in formula (17):
[0082]
[0083] Then, by substituting the charging reference current and the charging measured current into the PI module (discharge modulation voltage PI calculation 21-2), the charging modulation voltage (pulse width modulation) is calculated as follows (18):
[0084]
[0085] Finally, the IGBT module T1 is controlled to switch on and off at a certain duty cycle by charging modulation voltage, so that the electrochemical energy storage system can be charged according to the specified reference power (through voltage UESS The current loop L charges the energy storage battery or C1, and the current passing through the resistor L is I L ).
[0086] When the electrochemical energy storage system is discharged, S1 controls the conversion switch to switch off, and S2 controls the conversion switch to switch to the discharge controller. The DC-DC bidirectional converter 4-2 discharges the energy storage battery through the boost conversion mode. First, the charging reference current is calculated by the charging reference power, as shown in formula (19):
[0087]
[0088] Then, the discharge reference current and the discharge measured current I L Substitute into the PI module and calculate the discharge modulation voltage, as shown in (20):
[0089]
[0090] Finally, the discharge modulation voltage is used to control the IGBT module T2 to be turned on and off at a certain duty cycle, so that the electrochemical energy storage system can discharge according to the specified reference current (through the voltage U DC And switch QF discharges the energy storage battery C2).
[0091] Therefore, by controlling each wind turbine in the wind farm to generate electricity at the optimal power and controlling the electrochemical energy storage system to track Dynamically control the total power generated by the wind farm to be within the deviation limit, that is, each wind turbine set controls the current loop of the inverter on the grid side of the wind turbine converter to maintain the DC bus voltage stable, so as to transmit the actual power generated by each wind turbine set on each collector of the wind farm to the grid, see Figure 6 , Figure 6 The wind turbine converter grid-side inverter mainly includes a phase-locked loop phase angle calculation module 30, a current outer loop calculation module 31 and a current inner loop calculation module 32.
[0092] The phase angle calculation module (phase locked loop) 30 input is the three-phase voltage u measured by the power grid oabc (u oa 、u ob 、u oc ),u oabc Through multiple resistors R, current loop L f , switch QF, common connection point PCC, current loop L g The output is the grid frequency and phase angle. The execution process of the phase-locked loop phase angle calculation module 30 is shown in Figure 7 First, set the initial phase to θ, substitute it into the dq coordinate transformation, and calculate the grid voltage uod and u oq Value, the formula is as follows (21):
[0093]
[0094] will u oq Substitute into the PI formula to calculate the grid frequency, as shown in formula (22):
[0095]
[0096] Integrate ω to calculate the grid phase angle, as shown in formula (23):
[0097]
[0098] If u oq If it is not close to 0, substitute the calculated grid phase angle into equations (21) to (23) to recalculate the grid frequency and grid phase angle until u oq Close to 0, locking the target grid frequency and grid phase angle.
[0099] The current outer loop calculation module 31 includes a d-axis current outer loop PI calculation 31-1 and a q-axis current outer loop PI calculation 31-2. The d-axis current outer loop PI calculation 31-1 inputs the converter DC bus capacitance measurement value U DC and reference value Output is the d-axis current control target value The calculation formula is as follows (24):
[0100]
[0101] The input of the q-axis current outer loop PI calculation 31-2 is the reactive power measurement value Q i and reference value Output is the q-axis current control target value The calculation formula is as follows (25):
[0102]
[0103] The current inner loop calculation module 32 includes PI calculations 32-1 and 32-2, dq coordinate transformation 32-3 and dq coordinate inverse transformation 32-4. First, the inverter output three-phase current measurement value i abc (i a 、i b 、i c ) is converted into dq axis current i through dq transformation dq (i d 、i q ). Then, the voltage value corresponding to the current loop is calculated by PI, as shown in formula (26):
[0104]
[0105] Afterwards, the inverter dq axis voltage control target value is obtained by introducing the dq axis cross-influence term The formula is as follows (27):
[0106]
[0107] Finally, the inverter dq axis voltage control target value Substitute the dq coordinate inverse transformation to calculate the inverter modulation voltage control target value And through sinusoidal pulse width modulation (SPWM) The size and shape of The measured value U of the DC bus capacitance of the converter is controlled by 2-3 IGBT modules (S1, S2, S3, S4, S5, S6) DC (DC bus voltage), The formula is as follows (28):
[0108]
[0109] In the wind power prediction accuracy control method based on electrochemical energy storage on the DC side of the collector line of the embodiment of the present invention, the electrochemical energy storage system is integrated into the DC bus side of the wind turbine converter at the end of each collector line of the wind farm. When the deviation between the predicted power of the wind farm and the actual total power of the wind farm is greater than the deviation limit, the charge state data of each collector line electrochemical energy storage system at the current time node is obtained, and the charge and discharge limit coefficient of each electrochemical energy storage system is calculated according to the charge state data, and the charge and discharge target power is solved based on the charge and discharge limit coefficient; by controlling each wind turbine to generate electricity at the optimal power and controlling the electrochemical energy storage system to track the charge and discharge target power, the actual total power of the wind farm is dynamically regulated to be within the deviation limit, and by real-time tracking of the charge and discharge target power, the real-time regulation of the actual total power of the wind farm is guaranteed, and the situation of being assessed and fined due to excessive wind power prediction deviation is reduced.
[0110] In summary, if Figure 8 As shown, when the DC bus side of the wind turbine converter at the end of each collector line of the wind farm is connected to the electrochemical energy storage system, the wind power prediction accuracy control method based on the electrochemical energy storage on the DC side of the collector line includes: obtaining the predicted power of the wind farm and the actual total power of the wind farm within a preset control period of the wind farm, the predicted power of the wind farm is obtained through the wind power prediction system, and the actual total power of the wind farm is determined by summing the actual power of each wind turbine unit on the collector line; the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β *Under the condition of According to the state of charge SOC of the electrochemical energy storage system of each collector B,i , Determine the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i , and according to K B,i , calculate the charge and discharge participation factor PF of each collector electrochemical energy storage system B,i According to PF B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B,i (j) The maximum charge and discharge power of the electrochemical energy storage system is limited by P B,i (j) to obtain the target power of charge and discharge By controlling each wind turbine in the wind farm to generate electricity at optimal power and controlling the electrochemical energy storage to track Dynamically regulate the total actual power of the wind farm to be within the deviation limit; realize real-time control of the predicted power of the wind farm.
[0111] In order to implement the above-mentioned embodiment, the present invention further proposes a wind power prediction accuracy control device based on electrochemical energy storage on the DC side of the collector.
[0112] Fig. 9 A schematic structural diagram of a wind power prediction accuracy control device based on electrochemical energy storage on the DC side of a collector provided in an embodiment of the present invention, wherein the DC bus side of the wind turbine converter at the end of each collector line in a wind farm is incorporated into the electrochemical energy storage system.
[0113] like Fig. 9 As shown, the wind power prediction accuracy control device 90 based on electrochemical energy storage on the DC side of the collector includes: an acquisition module 91, a first calculation module 92, a second calculation module 93, a third calculation module 94, and a control module 95.
[0114] The first acquisition module 91 is used to obtain the state of charge SOC of each collector electrochemical energy storage system. B,i , Charge and discharge power target value and SOC B,i Corresponding to the fault status of the wind turbine;
[0115] The first calculation module 92 is used to calculate the SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,KB_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0, K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative;
[0116] The second calculation module 93 is used to calculate the charge and discharge participation factor PF of each collector electrochemical energy storage system according to the charge and discharge limit coefficient. B,i ;
[0117] The third calculation module 94 is used to calculate the B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B,i (j) The maximum charge and discharge power of the electrochemical energy storage system is limited by P B,i (j) to obtain the target power of charge and discharge
[0118] The control module 95 is used to control each wind turbine in the wind farm to generate electricity at the optimal power and control the electrochemical energy storage to track Dynamically control the total actual power generated by the wind farm to be within the deviation limit.
[0119] Furthermore, in a possible implementation of the embodiment of the present invention, the device further includes:
[0120] The second acquisition module is used to obtain the predicted power of the wind farm and the actual total power of the wind farm within the preset control period of the wind farm. The predicted power of the wind farm is obtained through the wind power prediction system, and the actual total power of the wind farm is determined by summing the actual power of each wind turbine on the collector line;
[0121] The fourth calculation module is used to calculate the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * Under the condition of
[0122] Furthermore, in a possible implementation of an embodiment of the present invention, the wind farm has n collectors 5, each collector 5 is arranged with m wind turbines, and an electrochemical energy storage system 4 is connected to the DC bus side of the wind turbine converter at the end of each collector 5, wherein the wind turbine includes a power generation system 1, a converter 2 and a box transformer 3, and the electrochemical energy storage system 4 is composed of a battery system 4-1, a DC-DC bidirectional converter 4-2, and a circuit breaker 4-3, and the outlet of the circuit breaker 4-3 is connected to the DC bus of the wind turbine converter at the end of each collector 5, and each collector is connected to the AC bus of the booster station 7 through a circuit breaker 6, and then the voltage is increased to a preset voltage through a booster transformer 8 and then connected to the power grid.
[0123] Further, in a possible implementation of the embodiment of the present invention, the calculation formula of the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is:
[0124]
[0125] Among them, P f (j) is the predicted power of the wind farm at time j in the control period, It is the actual power generated by each wind turbine on the i-th collector at time j during the control period.
[0126] Further, in a possible implementation of the embodiment of the present invention, the first calculation module 92 is specifically configured to:
[0127] The deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * There are two cases: the electrochemical energy storage system is discharged, and the discharge power is positive when β(j)>β * , and the electrochemical energy storage system is charged, and the charging power is negative when β(j)<-β * ;
[0128] When β(j)>β * Or β(j)<-β * When the total charge and discharge power target value of the electrochemical energy storage system is The calculation formula is
[0129]
[0130] It should be noted that the above explanation of the method embodiment is also applicable to the device of this embodiment, and will not be repeated here.
[0131] In the wind power prediction accuracy control device based on electrochemical energy storage on the DC side of the collector line of the embodiment of the present invention, the electrochemical energy storage system is integrated into the DC bus side of the wind turbine converter at the end of each collector line of the wind farm. When the deviation between the predicted power of the wind farm and the actual total power of the wind farm is greater than the deviation limit, the charge state data of each collector line electrochemical energy storage system at the current time node is obtained, the charge and discharge limit coefficient of each electrochemical energy storage system is calculated according to the charge state data, and the charge and discharge target power is solved based on the charge and discharge limit coefficient; by controlling each wind turbine to generate electricity at the optimal power and controlling the electrochemical energy storage system to track the charge and discharge target power, the actual total power of the wind farm is dynamically regulated to be within the deviation limit, and by real-time tracking of the charge and discharge target power, the real-time performance of regulating the actual total power of the wind farm is guaranteed, and the situation of being assessed and fined due to excessive wind power prediction deviation is reduced.
[0132] In order to implement the above embodiment, the present invention further provides an electronic device, including:
[0133] at least one processor; and
[0134] a memory communicatively connected to the at least one processor; wherein,
[0135] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can perform the aforementioned method.
[0136] In order to implement the above embodiment, the present invention further proposes a non-transitory computer-readable storage medium storing computer instructions, where the computer instructions are used to enable the computer to execute the above method.
[0137] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0138] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0139] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.
[0140] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0141] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0142] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.
[0143] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of software functional modules. If the integrated module is implemented in the form of software functional modules and sold or used as an independent product, it may also be stored in a computer-readable storage medium.
[0144] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A wind power prediction accuracy control method based on electrochemical energy storage on the DC side of a collector, characterized in that: The DC bus side of the wind turbine converter at the end of each collector line of the wind farm is connected to the electrochemical energy storage system, and the method includes: Obtain the state of charge SOC of each collector electrochemical energy storage system B,i , Charge and discharge power target value and SOC B,i Corresponding to the fault status of the wind turbine; In SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,K B_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0, K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative; According to the charge and discharge limit coefficient, the charge and discharge participation factor PF of each collector electrochemical energy storage system is calculated. B,i ; According to the PF B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B ,i(j), through the maximum charge and discharge power limit P of the electrochemical energy storage system B,i (j) to obtain the target power of charge and discharge By controlling each wind turbine in the wind farm to generate electricity at optimal power and controlling the electrochemical energy storage to track Dynamically control the total actual power generated by the wind farm to be within the deviation limit.
2. The method according to claim 1, characterized in that The method further comprises: Obtain the predicted power of the wind farm and the actual total power of the wind farm within the preset control period of the wind farm. The predicted power of the wind farm is obtained through the wind power prediction system, and the actual total power of the wind farm is determined by summing the actual power of each wind turbine on the collector line; The deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * Under the condition of 3. The method according to claim 1, characterized in that The wind farm has n collectors 5, each collector 5 is arranged with m wind turbines, and an electrochemical energy storage system 4 is connected to the DC bus side of the wind turbine converter at the end of each collector 5, wherein the wind turbine includes a power generation system 1, a converter 2 and a box transformer 3, and the electrochemical energy storage system 4 consists of a battery system 4-1, a DC-DC bidirectional converter 4-2, and a circuit breaker 4-3, and the outlet of the circuit breaker 4-3 is connected to the DC bus of the wind turbine converter at the end of each collector 5, and each collector is connected to the AC bus of the booster station 7 through a circuit breaker 6, and then the voltage is increased to a preset voltage through a booster transformer 8 and then connected to the power grid.
4. The method according to claim 2, characterized in that: The calculation formula of the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is: Among them, P f (j) is the predicted power of the wind farm at time j in the control period, It is the actual power generated by each wind turbine on the i-th collector at time j during the control period.
5. The method according to claim 4, characterized in that The deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * Under the condition of include: The deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * There are two cases: the electrochemical energy storage system is discharged, and the discharge power is positive when β(j)>β * , and the electrochemical energy storage system is charged, and the charging power is negative when β(j)<-β * ; When β(j)>β * Or β(j)<-β * When the total charge and discharge power target value of the electrochemical energy storage system is The calculation formula is 6. A wind power prediction accuracy control device based on electrochemical energy storage on the DC side of a collector, characterized in that: The DC bus side of the wind turbine converter at the end of each collector line in the wind farm is connected to the electrochemical energy storage system, and the device includes: The first acquisition module is used to obtain the state of charge SOC of each collector electrochemical energy storage system B,i , Charge and discharge power target value and SOC B,i Corresponding to the fault status of the wind turbine; The first computing module is used in SOC B,i <0.1 or when the corresponding wind turbine fails, the charge and discharge limit coefficient K of each collector electrochemical energy storage system B,i K B_d,i , K B_d,i =0; when 0.1≤SOC B,i <0.2 or the corresponding wind turbine has no fault, K B,i K B_d,i ,K B_d,i =10×(SOC B,i -0.1); in SOC B,i ≥0.2 or when the corresponding wind turbine has no fault, K B,i K B_d,i , K B_d,i =1; in SOC B,i <0.8 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =1; at 0.8≤SOC B,i <0.9 or the corresponding wind turbine has no fault, K B,i K B_c,i , K B_c,i =10×(0.9-SOC B,i );In SOC B,i ≥0.9 or when the corresponding wind turbine fails, K B,i K B_c,i , K B_c,i =0, K B_d,i for is the positive charge and discharge limit coefficient, K B_c,i for The charge and discharge limit coefficient when it is negative; The second calculation module is used to calculate the charge and discharge participation factor PF of each collector electrochemical energy storage system according to the charge and discharge limit coefficient. B,i ; The third calculation module is used to calculate the B,i , calculate the charge and discharge distribution power P of the electrochemical energy storage system B,i (j) The maximum charge and discharge power of the electrochemical energy storage system is limited by P B,i (j) to obtain the target power of charge and discharge The control module is used to control the wind turbines in the wind farm to generate electricity at the optimal power and control the electrochemical energy storage tracking Dynamically control the total actual power generated by the wind farm to be within the deviation limit.
7. The device according to claim 6, characterized in that The device further comprises: The second acquisition module is used to obtain the predicted power of the wind farm and the actual total power of the wind farm within the preset control period of the wind farm. The predicted power of the wind farm is obtained through the wind power prediction system, and the actual total power of the wind farm is determined by summing the actual power of each wind turbine on the collector line; The fourth calculation module is used to calculate the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * Under the condition of 8. The device according to claim 6, characterized in that The wind farm has n collectors 5, each collector 5 is arranged with m wind turbines, and an electrochemical energy storage system 4 is connected to the DC bus side of the wind turbine converter at the end of each collector 5, wherein the wind turbine includes a power generation system 1, a converter 2 and a box transformer 3, and the electrochemical energy storage system 4 is composed of a battery system 4-1, a DC-DC bidirectional converter 4-2, and a circuit breaker 4-3, and the outlet of the circuit breaker 4-3 is connected to the DC bus of the wind turbine converter at the end of each collector 5, and each collector is connected to the AC bus of the booster station 7 through a circuit breaker 6, and then the voltage is increased to a preset voltage through a booster transformer 8 and then connected to the power grid.
9. The device according to claim 6, characterized in that The calculation formula of the deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is: Among them, P f (j) is the predicted power of the wind farm at time j in the control period, It is the actual power generated by each wind turbine on the i-th collector at time j during the control period.
10. The device according to claim 9, characterized in that The first calculation module is specifically used for: The deviation β(j) between the predicted power of the wind farm at time j in the control period and the actual total power of the wind farm is greater than the deviation limit β * There are two cases: the electrochemical energy storage system is discharged, and the discharge power is positive when β(j)>β * , and the electrochemical energy storage system is charged, and the charging power is negative when β(j)<-β * ; When β(j)>β * Or β(j)<-β * When the total charge and discharge power target value of the electrochemical energy storage system is The calculation formula is 11. An electronic device, characterized in that: include: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method according to any one of claims 1 to 5.
12. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to cause the computer to execute the method according to any one of claims 1-5.