Method for decomposing medium-and-long-term traded electric quantity of hydropower station
By analyzing the fluctuation coefficient of the power supply of the reservoir, predicting the deviation of hydrological data, and optimizing the water resource supply and power generation scheduling plan, the fluctuation of power generation caused by climate anomalies is solved, and the stability and reliability of power supply are improved.
CN119990813AActive Publication Date: 2025-05-13HUANENG LANCANG RIVER HYDROPOWER CO LTD
Patent Information
- Application Number
- CN202510073370.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2025-05-13
- Estimated Expiration
- 2045-01-17
Smart Images

Figure BDA0005246334950000031 
Figure BDA0005246334950000032 
Figure BDA0005246334950000034
Abstract
The invention discloses a hydropower station medium and long term transaction electric quantity decomposition method, and relates to the technical field of electric power dispatching. When climate in a reservoir area is abnormal, a fluctuation coefficient is obtained by analyzing power supply quantity data of a reservoir, and if the influence degree of abnormal climate conditions on the power supply fluctuation coefficient exceeds expectation, the power supply fluctuation coefficient is determined to be abnormal; the method comprises the following steps: acquiring and predicting reservoir hydrological data, generating a deviation degree according to hydrological prediction data, and generating a trend report if the deviation degree exceeds expectation; constructing a response value according to the state number of the received first-level prediction instruction, and if the response value exceeds a response threshold value, optimizing the current water resource supply scheme; performing simulation test on a power generation scheduling plan determined according to the water resource supply scheme, generating plan feasibility according to test data, and if the plan feasibility is lower than a feasible threshold value, making a standby power generation scheme; the current power generation and supply process is intervened, and the unstable condition of power supply is handled in a targeted manner.
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Hydropower station optimization scheduling method and system
CN116258227A
Model construction method and device for extracting flexible scheduling interval of reservoir
CN116502906A
Virtual aggregation system and method for regional energy source complex
WO2021244000A1