Method for decomposing medium-and-long-term traded electric quantity of hydropower station

By analyzing the fluctuation coefficient of the power supply of the reservoir, predicting the deviation of hydrological data, and optimizing the water resource supply and power generation scheduling plan, the fluctuation of power generation caused by climate anomalies is solved, and the stability and reliability of power supply are improved.

CN119990813AActive Publication Date: 2025-05-13HUANENG LANCANG RIVER HYDROPOWER CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202510073370.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-05-13
Estimated Expiration
2045-01-17

Smart Images

  • Figure BDA0005246334950000031
    Figure BDA0005246334950000031
  • Figure BDA0005246334950000032
    Figure BDA0005246334950000032
  • Figure BDA0005246334950000034
    Figure BDA0005246334950000034
Patent Text Reader

Abstract

The invention discloses a hydropower station medium and long term transaction electric quantity decomposition method, and relates to the technical field of electric power dispatching. When climate in a reservoir area is abnormal, a fluctuation coefficient is obtained by analyzing power supply quantity data of a reservoir, and if the influence degree of abnormal climate conditions on the power supply fluctuation coefficient exceeds expectation, the power supply fluctuation coefficient is determined to be abnormal; the method comprises the following steps: acquiring and predicting reservoir hydrological data, generating a deviation degree according to hydrological prediction data, and generating a trend report if the deviation degree exceeds expectation; constructing a response value according to the state number of the received first-level prediction instruction, and if the response value exceeds a response threshold value, optimizing the current water resource supply scheme; performing simulation test on a power generation scheduling plan determined according to the water resource supply scheme, generating plan feasibility according to test data, and if the plan feasibility is lower than a feasible threshold value, making a standby power generation scheme; the current power generation and supply process is intervened, and the unstable condition of power supply is handled in a targeted manner.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Hydropower station optimization scheduling method and system

    CN116258227A

  • Model construction method and device for extracting flexible scheduling interval of reservoir

    CN116502906A

  • Virtual aggregation system and method for regional energy source complex

    WO2021244000A1