Supply chain management method and system
By determining the planned change information of order change events on the market side and transmitting it to the production and transportation side through the data management center, adjusting the corresponding production, delivery and delivery plans, the one-way problem of information interaction in the existing supply chain system is solved, and timely response and cost reduction of the supply chain are achieved.
Patent Information
- Application Number
- CN202510092356.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-21
- Publication Date
- 2025-05-16
AI Technical Summary
In the existing supply chain system, the information interaction between production, transportation and market is often one-way and cannot respond in a coherent manner, resulting in waste of resources and additional costs.
The plan change information corresponding to the order change event is determined through the market side, and transmitted to the production and transportation side through the data management center, so that the production and transportation side can adjust the current production plan, delivery plan and delivery plan according to the plan change information.
In the event of changes in orders on the market side, both the production and transportation side can respond in a timely manner, adjust production, shipment and delivery plans, and reduce resource waste and additional costs in the supply chain system.
Smart Images

Figure CN120013161A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the technical field of supply chain management, and in particular, to a supply chain management method and system. Background Art
[0002] In the existing supply chain system, the information exchange between production, transportation and market is often one-way and cannot respond in an overall coherent manner. In the case of market changes such as increasing or canceling orders, market changes are often passively transmitted to the production side in a one-way manner. The production side realizes production based on market changes, and the transportation side passively accepts increasing or canceling orders, resulting in resource waste and additional costs in the resource call process. Summary of the invention
[0003] The present invention provides a supply chain management method and system, which can reduce resource waste and extra costs in the supply chain system.
[0004] In a first aspect, an embodiment of the present invention provides a supply chain management method, which is applied to a supply chain management system, wherein the system includes a production end, a market end, a transportation end, and a data management center, and the method includes:
[0005] Determine the plan change information corresponding to the order change event through the market end, and transmit the plan change information to the production end and the transportation end through the data management center;
[0006] By means of the production end, adjusting the current production plan according to the plan change information to obtain a target production plan, wherein the target production plan is used to realize product production;
[0007] Through the transportation end, the current shipping plan is adjusted according to the plan change information to obtain a target shipping plan, and the current delivery plan is adjusted to obtain a target delivery plan. The target shipping plan and the target delivery plan are used to achieve the delivery of the produced products.
[0008] In a second aspect, an embodiment of the present invention provides a supply chain management system, the system comprising a production end, a market end, a transportation end and a data management center;
[0009] The market end is used to determine the plan change information corresponding to the order change event, and transmit the plan change information to the production end and the transportation end through the data management center;
[0010] The production end is used to adjust the current production plan according to the plan change information to obtain a target production plan, and the target production plan is used to realize product production;
[0011] The transport end is used to adjust the current shipping plan according to the plan change information to obtain a target shipping plan, and to adjust the current delivery plan to obtain a target delivery plan. The target shipping plan and the target delivery plan are used to achieve the delivery of the produced products.
[0012] The technical solution of the embodiment of the present invention is that when an order change event occurs on the market side, the market side transmits the plan change information corresponding to the order change event to the production side and the transportation side through the data management center, so that the production side adjusts the current production plan based on the plan change information, and the transportation side adjusts the current shipment plan and the current delivery plan based on the plan change information. In the case of changes in orders on the market side, the solution allows both the production side and the transportation side to respond in a timely manner and adjust the current production plan, the current shipment plan, and the current delivery plan accordingly, which can reduce resource waste and additional costs in the supply chain system.
[0013] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0015] Figure 1 is a flow chart of a supply chain management method provided according to Embodiment 1 of the present invention;
[0016] Figure 2 is a schematic diagram of the structure of a supply chain management system provided according to Embodiment 1 of the present invention;
[0017] Figure 3 It is a schematic diagram of the structure of another supply chain management system provided according to the first embodiment of the present invention. DETAILED DESCRIPTION
[0018] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0019] It should be noted that the terms "first", "second", etc. in the present invention are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0020] Embodiment 1
[0021] Figure 1 This is a flow chart of a supply chain management method provided according to Embodiment 1 of the present invention. This embodiment is applicable to situations where supply chain management is implemented, and the method can be applied to supply chain management systems.
[0022] Figure 2 is a schematic diagram of a supply chain management system provided according to the first embodiment of the present invention. Figure 2 As shown, the supply chain management system includes a production end, a market end, a transportation end and a data management center, and the production end, the market end and the transportation end communicate with each other through the data management center.
[0023] The production end may be a part used to determine the production plan to realize product production based on the production plan. The production plan can be understood as a plan for realizing product production determined based on market demand, own production capacity, etc. The production plan may include one or more production scheduling plans. The production scheduling plan may be understood as a more detailed and accurate production plan for allocating time and resources for production.
[0024] The transportation end may be the part used to determine the shipping plan and delivery plan corresponding to the production plan.
[0025] The delivery plan can be understood as a plan for implementing product delivery based on the production plan. The delivery plan can include one or more delivery batches. A delivery batch can be understood as dividing the products in the delivery plan into different units according to certain rules for delivery. It is a specific subdivision and execution unit of the delivery plan.
[0026] The delivery plan can be understood as a plan for product delivery determined by the shipping plan and production plan. The delivery plan can include one or more delivery batches. Delivery batches can be understood as the products in the delivery plan are divided into different units according to certain rules for delivery, which is the specific subdivision and execution unit of the delivery plan.
[0027] The market side may be a part for determining market demand, such as market demand indicating an increase in orders or a decrease in orders.
[0028] The core of the supply chain management system can be formed through the production end, transportation end and market end, forming an information link of the entire supply chain in a connecting manner.
[0029] The data management center can be a center for data management in the supply chain management system, which can be realized through DataHub. DataHub is a data center, which can be understood as a metadata management platform. The production end, market end and transportation end can communicate with each other through the data management center to achieve a coherent response.
[0030] Combination Figure 2 The system shown is Figure 1 The method shown is described as follows: Figure 1 As shown, the method includes:
[0031] S110. Determine plan change information corresponding to the order change event through the market end, and transmit the plan change information to the production end and the transportation end through the data management center.
[0032] An order change event may be an event in which an order change occurs based on a predetermined order, such as an order increase or order decrease. Plan change information may be information indicating a plan change due to an order change event, and may indicate a change in one or more of the production scheduling plan included in the production plan, the shipping batch included in the shipping plan, and the delivery batch included in the delivery plan.
[0033] In this step, a visual interactive interface can be provided to market personnel through the market end, and the plan change information corresponding to the order change event can be obtained through the visual interactive interface, and then the plan change information is transmitted to the production end and the market end through the data management center. Optionally, when the order change event indicates an increase in orders, the plan change information can indicate an increase in the production schedule corresponding to the increased order; when the order change event indicates a decrease in orders, the plan change information can indicate the termination of the production schedule corresponding to the decreased order, the termination of the shipment batch, and the termination of the delivery batch.
[0034] S120. Through the production end, adjust the current production plan according to the plan change information to obtain a target production plan, where the target production plan is used to realize product production.
[0035] The current production plan may be the production plan currently adopted by the production end, that is, the production plan adopted when the order change event does not occur. The target production plan may be the production plan obtained by adjusting the current production plan when the order change event occurs, which is used to finally realize product production.
[0036] In this step, through the production side, when the plan change information indicates the increase of the production schedule corresponding to the added order, the production schedule corresponding to the added order is added to the current production plan to obtain the target production plan; through the production side, when the plan change information indicates the termination of the production schedule corresponding to the reduced order, the production schedule to be terminated is directly terminated in the current production plan or the production schedule to be terminated continues to be produced but does not participate in subsequent delivery to obtain the target production plan.
[0037] Optionally, through the production side, when the target production plan is determined, the target production plan can be transmitted to the market side via the data management center, so that the market side can conduct operational monitoring of the target production plan.
[0038] S130. Through the transportation end, the current shipping plan is adjusted according to the plan change information to obtain a target shipping plan, and the current delivery plan is adjusted to obtain a target delivery plan. The target shipping plan and the target delivery plan are used to achieve the delivery of the produced products.
[0039] The current shipping plan can be the shipping plan currently adopted by the transport end, that is, the shipping plan adopted when the order change event does not occur. The current delivery plan can be the delivery plan currently adopted by the transport end, that is, the delivery plan adopted when the order change event does not occur. The current shipping plan and the current delivery plan correspond to the current production plan, and together realize product delivery when the order change event does not occur.
[0040] The target shipping plan can be a shipping plan obtained by adjusting the current shipping plan when an order change event occurs. The target delivery plan can be a delivery plan obtained by adjusting the current delivery plan when an order change event occurs. The target shipping plan and the target delivery plan correspond to the target production plan and jointly achieve product delivery when an order change event occurs.
[0041] In this step, through the transportation end, when the plan change information indicates the increase of the production schedule corresponding to the added order, the current shipment plan is adjusted based on the production schedule to be increased corresponding to the added order to obtain the target shipment plan, and the current delivery plan is adjusted to obtain the target delivery plan, so that the products produced by the production schedule to be increased corresponding to the added order can be delivered normally; through the transportation end, when the plan change information indicates the termination of the shipment batch corresponding to the reduced order, the shipment batch to be terminated is directly terminated in the current shipment plan or the shipment batch to be terminated is continued to be shipped but does not participate in subsequent delivery, so as to obtain the target shipment plan; through the transportation end, when the plan change information indicates the termination of the delivery batch corresponding to the reduced order, the delivery batch to be terminated is directly terminated in the current delivery plan to obtain the target delivery plan.
[0042] Optionally, through the transportation end, when the target shipment plan and the target delivery plan are determined, the target shipment plan and the target delivery plan can be transmitted to the market end via the data management center, so that the market end can conduct operational monitoring of the target shipment plan and the target delivery plan.
[0043] The technical solution of the embodiment of the present invention is that when an order change event occurs on the market side, the market side transmits the plan change information corresponding to the order change event to the production side and the transportation side through the data management center, so that the production side adjusts the current production plan based on the plan change information, and the transportation side adjusts the current shipment plan and the current delivery plan based on the plan change information. In the case of changes in orders on the market side, the solution allows both the production side and the transportation side to respond in a timely manner and adjust the current production plan, the current shipment plan, and the current delivery plan accordingly, which can reduce resource waste and additional costs in the supply chain system.
[0044] The following content provides a detailed description of the steps included in the above supply chain management method and the interactions in the supply chain management system:
[0045] Figure 3 is a schematic diagram of the structure of another supply chain management system provided according to the first embodiment of the present invention, combined with Figure 3 The architecture shown in FIG. 1 illustrates the steps included in the above supply chain management method as follows.
[0046] The following is a detailed description of the S110:
[0047] The plan change information corresponding to the order change event is determined through the market end, and the plan change information is transmitted to the production end and the transportation end through the data management center. Among them, the generation of market demand is the order change event corresponding to the increase of order, and the termination of market demand is the order change event corresponding to the decrease of order.
[0048] Here is a breakdown of the S120 and S130 as orders increase:
[0049] In one embodiment, the plan change information includes a production schedule to be added corresponding to the order added by the order change event, and the production end adjusts the current production plan according to the plan change information to obtain a target production plan, including:
[0050] By means of the production end, if the production schedule to be added is approved, the production schedule to be added is added to the current production plan to obtain the target production plan, wherein the current production plan includes one or more production schedules;
[0051] The method further includes: transmitting the target production plan to the transportation end through the production end and via the data management center.
[0052] Through the production side, the production schedule of the added orders is arranged based on market demand, and the production schedule to be added is reviewed, such as feasibility review. If the review is passed, the production schedule to be added is added to the current production plan to obtain the target production plan. Through the production side, when the target production plan is determined, the target production plan is transmitted to the transportation side and the market side through the data management center. Among them, the production schedule to be added can be the production schedule that needs to be added for the orders added due to the order change event.
[0053] In one embodiment, by the transport end, adjusting the current shipping plan according to the plan change information to obtain a target shipping plan, and adjusting the current delivery plan to obtain a target delivery plan, includes:
[0054] Determine, by the transport end, an expected adjusted shipment plan corresponding to the current shipment plan and an expected adjusted delivery plan corresponding to the current delivery plan according to the production schedule to be added;
[0055] The target shipment plan and the target delivery plan are determined through the transportation end based on the target production plan, the expected adjusted shipment plan and the expected adjusted delivery plan.
[0056] The expected adjusted shipment plan may be the shipment plan to which the current shipment plan is expected to be adjusted after the production schedule to be added is added, as determined by the transport end. The expected adjusted delivery plan may be the delivery plan to which the current delivery plan is expected to be adjusted after the production schedule to be added is added, as determined by the transport end.
[0057] Through the transportation end, arrange shipment and delivery based on market demand, determine the expected adjusted shipment plan and expected adjusted delivery plan based on the production schedule to be added and the current transportation capacity; combined with the target production plan, determine whether the expected adjusted shipment plan can meet the shipment requirements corresponding to the target production plan, determine whether the expected adjusted delivery plan can meet the delivery requirements corresponding to the target production plan, and if the expected adjusted shipment plan is determined as the target shipment plan, the expected adjusted delivery plan is determined as the target delivery plan. Through the transportation end, when the target shipment plan and target delivery plan are determined, the target shipment plan and target delivery plan can be transmitted to the market end through the data management center.
[0058] Here is a breakdown of what's happening with the S120 and S130 amid the drop in orders:
[0059] In one embodiment, the plan change information includes a first plan termination instruction corresponding to the order reduced by the order change event, and adjusting the current production plan according to the plan change information to obtain the target production plan through the production end includes:
[0060] Determine, by the production end, a production schedule to be terminated in the current production plan indicated by the first termination plan instruction;
[0061] Through the production end, in the current production plan, the production schedules that are not scheduled for production in the to-be-terminated production schedules are terminated, and the production schedules that are scheduled for production are not processed, thereby obtaining the target production plan.
[0062] The first plan termination instruction may be an instruction for instructing to process the production schedule to be terminated. The production schedule to be terminated may be a production schedule affected by orders reduced due to an order change event in the current production plan.
[0063] Through the production end, the production schedule is terminated based on market demand. When the first termination plan instruction is received, the production schedule to be terminated indicated by the first termination plan instruction can be determined; in the current production plan, it is determined whether the production schedule in the production schedule to be terminated has been scheduled. If it has not been scheduled, the execution is terminated directly. If it has been scheduled, production continues but does not participate in subsequent shipments to obtain the target production plan. Through the production end, when the target production plan is determined, the target production plan is transmitted to the market end through the data management center.
[0064] In one embodiment, the plan change information includes a second plan termination instruction corresponding to the order reduced by the order change event, and the transport end adjusts the current shipment plan according to the plan change information to obtain a target shipment plan, and adjusts the current delivery plan to obtain a target delivery plan, including:
[0065] Determine, through the transport terminal, the shipment batch to be terminated in the current shipment plan and the delivery batch to be terminated in the current delivery plan indicated by the second termination plan instruction;
[0066] By means of the transport terminal, in the current delivery plan, the delivery batches that have not been scheduled for delivery in the to-be-terminated delivery batches are terminated, and the delivery batches that have been scheduled for delivery are not processed, so as to obtain the target delivery plan;
[0067] Through the transport end, in the current delivery plan, the delivery batch to be terminated is terminated to obtain the target delivery plan.
[0068] The second termination plan instruction may be an instruction for instructing to process the shipment batch to be terminated and the delivery batch to be terminated. The shipment batch to be terminated may be a shipment batch affected by the order reduction due to the order change event in the current shipment plan. The delivery batch to be terminated may be a delivery batch affected by the order reduction due to the order change event in the current delivery plan.
[0069] Through the transportation end, based on market demand, shipment and delivery are terminated. When the second termination plan instruction is received, the shipment batches to be terminated and the delivery batches to be terminated indicated by the second termination plan instruction can be determined; in the current shipment plan, it is determined whether the shipment batches in the shipment batches to be terminated have been shipped. If not, the execution is terminated. If it has been shipped, the shipment continues but does not participate in subsequent delivery, and the target shipment plan is obtained; in the current delivery plan, the delivery batches to be terminated are terminated to obtain the target delivery plan. Through the transportation end, when the target shipment plan and the target delivery plan are determined, the target shipment plan and the target delivery plan can be transmitted to the market end through the data management center.
[0070] The following is an explanation of what the supply chain management approach also includes:
[0071] In one embodiment, the method further comprises:
[0072] Determine, through the transport end, transport restriction information corresponding to the transport restriction event, and transmit the transport restriction information to the production end and the market end through the data management center;
[0073] Through the transport end, according to the transport restriction information and in combination with the market end, the current shipment plan is adjusted to obtain a transport restricted shipment plan, and the current delivery plan is adjusted to obtain a transport restricted delivery plan, and the transport restricted shipment plan and the transport restricted delivery plan are transmitted to the production end through the data management center;
[0074] Through the production end, based on the transportation-constrained shipment plan and the transportation-constrained delivery plan, the current production plan is adjusted to obtain a transportation-constrained production plan.
[0075] The transportation restriction event may be an event in which transportation resources at the transportation end are restricted, such as a transportation route restriction or a transportation destination restriction, etc. The transportation restriction information may be information indicating specific restrictions corresponding to the transportation restriction event, such as indicating which specific transportation route is restricted or which transportation destination is restricted.
[0076] Through the transportation end, a visual interactive interface can be provided for transportation personnel, through which the transportation restricted information corresponding to the transportation restricted event can be obtained, and then the transportation restricted information can be transmitted to the production end and the market end through the data management center.
[0077] Through the transportation end, the current shipment plan and the current delivery plan are adjusted based on the transportation restriction information, and the two adjusted plans are transmitted to the market end for review; after the market end reviews and approves the plan, it will feedback the approved information to the transportation end; the transportation end will determine the approved adjusted current shipment plan as the transportation restricted shipment plan, and determine the approved adjusted current delivery plan as the transportation restricted delivery plan, and transmit the transportation restricted shipment plan and the transportation restricted delivery plan to the production end.
[0078] Through the production side, the current production plan is adjusted based on the transportation-constrained shipment plan and the transportation-constrained delivery plan, such as adjusting the execution order of the production scheduling plan in the current production plan, to obtain the transportation-constrained production plan.
[0079] The transportation-restricted production plan may be a production plan obtained by adjusting the current production plan when a transportation-restricted event occurs. The transportation-restricted shipment plan may be a shipment plan obtained by adjusting the current shipment plan when a transportation-restricted event occurs. The transportation-restricted delivery plan may be a delivery plan obtained by adjusting the current delivery plan when a transportation-restricted event occurs.
[0080] In one embodiment, the method further comprises:
[0081] Determine, through the production end, the production restriction information corresponding to the production restriction event, adjust the current production plan according to the production restriction information to obtain a production restriction production plan, and transmit the production restriction production plan to the transportation end and the market end through the data management center;
[0082] Through the transportation end, the current shipment plan is adjusted according to the production-constrained production plan to obtain a production-constrained shipment plan, and the current delivery plan is adjusted to obtain a production-constrained delivery plan.
[0083] The production restriction event may be an event of production restriction at the production end, such as insufficient production capacity, etc. The production restriction information may be information indicating specific restrictions corresponding to the production restriction event, such as indicating which specific raw materials are restricted, etc.
[0084] Through the production end, a visual interactive interface can be provided for production personnel, through which production restricted information corresponding to production restricted events can be obtained; the current production plan is adjusted according to the production restricted information to adjust the part of the current production plan that is restricted and affected by the production restricted information, to obtain a production restricted production plan, and then transmit the production restricted production plan to the transportation end and the market end through the data management center.
[0085] Through the transportation side, the current shipping plan is adjusted according to the production-restricted production plan, such as changing or canceling some shipping batches in the current shipping plan, to obtain a production-restricted shipping plan; the current delivery plan is adjusted according to the production-restricted production plan, such as changing or canceling some delivery batches in the current delivery plan, to obtain a production-restricted delivery plan.
[0086] The production-restricted production plan may be a production plan obtained by adjusting the current production plan when a production-restricted event occurs. The production-restricted shipment plan may be a shipment plan obtained by adjusting the current shipment plan when a production-restricted event occurs. The production-restricted delivery plan may be a delivery plan obtained by adjusting the current delivery plan when a production-restricted event occurs.
[0087] The above technical solution can timely terminate the affected production schedule, shipment batches and delivery batches when there is a delivery risk due to force majeure factors such as customer cancellation of the order, thereby reducing risks and losses and releasing transportation capacity in a timely manner; in the case of limited transportation capacity or production, alternative plans can be made as soon as possible to reduce delivery risks.
[0088] The above technical solutions can solve the disordered and untraceable status from production to transportation, and open up the information flow of the production, transportation and market ends of the entire supply chain; it can solve sudden market changes, transportation restrictions and production restrictions, and can respond quickly and adjust corresponding plans in any situation; it can improve the ability to allocate transportation resources and enhance the control of transportation risks.
[0089] Embodiment 2
[0090] The embodiment of the present invention provides a supply chain management system. The embodiment can be applied to the situation of implementing supply chain management. The architecture of the system can be as follows: Figure 2 shown.
[0091] The system includes a production end, a market end, a transportation end and a data management center;
[0092] The market end is used to determine the plan change information corresponding to the order change event, and transmit the plan change information to the production end and the transportation end through the data management center;
[0093] The production end is used to adjust the current production plan according to the plan change information to obtain a target production plan, and the target production plan is used to realize product production;
[0094] The transport end is used to adjust the current shipping plan according to the plan change information to obtain a target shipping plan, and to adjust the current delivery plan to obtain a target delivery plan. The target shipping plan and the target delivery plan are used to achieve the delivery of the produced products.
[0095] The supply chain management system provided in this embodiment, the market end is used to determine the plan change information corresponding to the order change event, and transmit the plan change information to the production end and the transportation end through the data management center; the production end is used to adjust the current production plan according to the plan change information to obtain the target production plan, and the target production plan is used to achieve product production; the transportation end is used to adjust the current shipment plan according to the plan change information to obtain the target shipment plan, and adjust the current delivery plan to obtain the target delivery plan, and the target shipment plan and the target delivery plan are used to achieve the delivery of the produced products. In the case of changes in orders on the market end, this solution can enable both the production end and the transportation end to respond in a timely manner, and adjust the current production plan, the current shipment plan, and the current delivery plan accordingly, which can reduce resource waste and additional costs in the supply chain system.
[0096] Furthermore, the plan change information includes a production schedule to be added corresponding to the order added by the order change event, and the production end is specifically used for:
[0097] If the production schedule to be added is approved, the production schedule to be added is added to the current production plan to obtain the target production plan, and the current production plan includes one or more production schedules;
[0098] The production end is also used for:
[0099] The target production plan is transmitted to the transportation end via the data management center.
[0100] Furthermore, the transport end is specifically used for:
[0101] Determine, according to the production schedule to be added, an expected adjusted shipment plan corresponding to the current shipment plan and an expected adjusted delivery plan corresponding to the current delivery plan;
[0102] The target shipment plan and the target delivery plan are determined based on the target production plan, the expected adjusted shipment plan and the expected adjusted delivery plan.
[0103] Further, the plan change information includes a first plan termination instruction corresponding to the order reduced by the order change event, and the production end is specifically used to:
[0104] Determine the production schedule to be terminated in the current production plan indicated by the first termination plan instruction;
[0105] In the current production plan, the production schedules that are not scheduled for production in the to-be-terminated production schedules are terminated, and the production schedules that are scheduled for production are not processed, so as to obtain the target production plan.
[0106] Further, the plan change information includes a second plan termination instruction corresponding to the order reduced by the order change event, and the transport end is specifically configured to:
[0107] Determine the shipment batch to be terminated in the current shipment plan and the delivery batch to be terminated in the current delivery plan indicated by the second termination plan instruction;
[0108] In the current delivery plan, the delivery batches that have not been scheduled for delivery among the to-be-terminated delivery batches are terminated, and the delivery batches that have been scheduled for delivery are not processed, so as to obtain the target delivery plan;
[0109] In the current delivery plan, the delivery batch to be terminated is terminated to obtain the target delivery plan.
[0110] Furthermore, the transport end is also used for:
[0111] Determine the transportation restriction information corresponding to the transportation restriction event, and transmit the transportation restriction information to the production end and the market end via the data management center;
[0112] According to the transportation restriction information and in combination with the market end, the current shipment plan is adjusted to obtain a transportation restricted shipment plan, the current delivery plan is adjusted to obtain a transportation restricted delivery plan, and the transportation restricted shipment plan and the transportation restricted delivery plan are transmitted to the production end via the data management center;
[0113] The production end is also used for:
[0114] Based on the transportation-constrained shipment plan and the transportation-constrained delivery plan, the current production plan is adjusted to obtain a transportation-constrained production plan.
[0115] Furthermore, the production end is also used for:
[0116] Determine production restriction information corresponding to the production restriction event, adjust the current production plan according to the production restriction information to obtain a production restriction production plan, and transmit the production restriction production plan to the transportation end and the market end via the data management center;
[0117] The transport end is also used for:
[0118] The current shipment plan is adjusted according to the production-constrained production plan to obtain a production-constrained shipment plan, and the current delivery plan is adjusted to obtain a production-constrained delivery plan.
[0119] The supply chain management system provided by the embodiment of the present invention can execute the supply chain management method provided by the embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0120] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0121] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A supply chain management method, characterized in that: Applied to a supply chain management system, the system includes a production end, a market end, a transportation end and a data management center, and the method includes: Determine the plan change information corresponding to the order change event through the market end, and transmit the plan change information to the production end and the transportation end through the data management center; By means of the production end, adjusting the current production plan according to the plan change information to obtain a target production plan, wherein the target production plan is used to realize product production; Through the transportation end, the current shipping plan is adjusted according to the plan change information to obtain a target shipping plan, and the current delivery plan is adjusted to obtain a target delivery plan. The target shipping plan and the target delivery plan are used to achieve the delivery of the produced products.
2. The method according to claim 1, characterized in that The plan change information includes a production schedule to be added corresponding to the order added by the order change event. The production end adjusts the current production plan according to the plan change information to obtain a target production plan, including: By means of the production end, if the production schedule to be added is approved, the production schedule to be added is added to the current production plan to obtain the target production plan, wherein the current production plan includes one or more production schedules; The method further comprises: The target production plan is transmitted to the transportation end through the production end and the data management center.
3. The method according to claim 2, characterized in that By the transport end, adjusting the current shipping plan according to the plan change information to obtain a target shipping plan, and adjusting the current delivery plan to obtain a target delivery plan, including: Determine, by the transport end, an expected adjusted shipment plan corresponding to the current shipment plan and an expected adjusted delivery plan corresponding to the current delivery plan according to the production schedule to be added; The target shipment plan and the target delivery plan are determined through the transportation end based on the target production plan, the expected adjusted shipment plan and the expected adjusted delivery plan.
4. The method according to claim 1, characterized in that: The plan change information includes a first plan termination instruction corresponding to the order reduced by the order change event, and the production end adjusts the current production plan according to the plan change information to obtain a target production plan, including: Determine, by the production end, a production schedule to be terminated in the current production plan indicated by the first termination plan instruction; Through the production end, in the current production plan, the production schedules that are not scheduled for production in the to-be-terminated production schedules are terminated, and the production schedules that are scheduled for production are not processed, thereby obtaining the target production plan.
5. The method according to claim 1, characterized in that The plan change information includes a second plan termination instruction corresponding to the order reduced by the order change event, and the transport end adjusts the current shipment plan according to the plan change information to obtain a target shipment plan, and adjusts the current delivery plan to obtain a target delivery plan, including: Determine, through the transport terminal, the shipment batch to be terminated in the current shipment plan and the delivery batch to be terminated in the current delivery plan indicated by the second termination plan instruction; By means of the transport terminal, in the current delivery plan, the delivery batches that have not been scheduled for delivery in the to-be-terminated delivery batches are terminated, and the delivery batches that have been scheduled for delivery are not processed, so as to obtain the target delivery plan; Through the transport end, in the current delivery plan, the delivery batch to be terminated is terminated to obtain the target delivery plan.
6. The method according to claim 1, characterized in that Also includes: Determine, through the transport end, transport restriction information corresponding to the transport restriction event, and transmit the transport restriction information to the production end and the market end through the data management center; Through the transport end, according to the transport restriction information and in combination with the market end, the current shipment plan is adjusted to obtain a transport restricted shipment plan, and the current delivery plan is adjusted to obtain a transport restricted delivery plan, and the transport restricted shipment plan and the transport restricted delivery plan are transmitted to the production end through the data management center; Through the production end, based on the transportation-constrained shipment plan and the transportation-constrained delivery plan, the current production plan is adjusted to obtain a transportation-constrained production plan.
7. The method according to claim 1, characterized in that Also includes: Determine, through the production end, the production restriction information corresponding to the production restriction event, adjust the current production plan according to the production restriction information to obtain a production restriction production plan, and transmit the production restriction production plan to the transportation end and the market end through the data management center; Through the transportation end, the current shipment plan is adjusted according to the production-constrained production plan to obtain a production-constrained shipment plan, and the current delivery plan is adjusted to obtain a production-constrained delivery plan.
8. A supply chain management system, characterized in that: The system includes a production end, a market end, a transportation end and a data management center; The market end is used to determine the plan change information corresponding to the order change event, and transmit the plan change information to the production end and the transportation end through the data management center; The production end is used to adjust the current production plan according to the plan change information to obtain a target production plan, and the target production plan is used to realize product production; The transport end is used to adjust the current shipping plan according to the plan change information to obtain a target shipping plan, and to adjust the current delivery plan to obtain a target delivery plan. The target shipping plan and the target delivery plan are used to achieve the delivery of the produced products.
9. The system according to claim 8, characterized in that The plan change information includes a production schedule to be added corresponding to the order added by the order change event, and the production end is specifically used for: If the production schedule to be added is approved, the production schedule to be added is added to the current production plan to obtain the target production plan, and the current production plan includes one or more production schedules; The production end is also used for: The target production plan is transmitted to the transportation end via the data management center.
10. The system according to claim 9, characterized in that The transport end is specifically used for: Determine, according to the production schedule to be added, an expected adjusted shipment plan corresponding to the current shipment plan and an expected adjusted delivery plan corresponding to the current delivery plan; The target shipment plan and the target delivery plan are determined based on the target production plan, the expected adjusted shipment plan and the expected adjusted delivery plan.