Dual-power dynamic reconstruction method and system

By deploying the acquisition terminal and CNN-LSTM network in a dual-power system, identifying faults and reconstructing, the problem of node-level faults and load imbalance in the prior art is solved, and the load balancing and power supply stability of the dual-power system is improved.

CN120150338AActive Publication Date: 2025-06-13DATANG SHAANXI POWER GENERATION CO LTD XIAN THERMAL POWER PLANT

Patent Information

Application Number
CN202510618722.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-14
Publication Date
2025-06-13
Estimated Expiration
2045-05-14

AI Technical Summary

Technical Problem

The existing technology cannot accurately identify isolated node-level faults, and lacks adaptive adjustments to dynamic load changes and topological structures, resulting in unbalanced load of dual power supplies and poor power supply stability.

Method used

By deploying the acquisition terminal to collect waveform data on the nodes of the power supply topology network, using the CNN-LSTM network for fault identification and feature analysis, building power supply labels, and performing first-order and second-order reconstruction to achieve load balancing.

Benefits of technology

Dual power supply load balancing is achieved, dual power supply stability is improved, and overall resource utilization is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120150338A_ABST
    Figure CN120150338A_ABST
Patent Text Reader

Abstract

The invention discloses a dual-power-supply dynamic reconstruction method and system, and relates to the related technical field of power management, and the method comprises the steps: deploying an acquisition terminal to carry out waveform data acquisition on each node of a power supply topology network; adopting a CNN-LSTM network to carry out fault identification on the time sequence waveform sequence; constructing a power supply label of the power supply topology network; performing first-order reconstruction on nodes except the fault node set, and outputting a first power supply topology network and a second power supply topology network; performing load balancing analysis on the node path corresponding to the hybrid power supply label, and outputting a hybrid node reconstruction path; and generating a reconstructed power supply topology network. The technical problems that in the prior art, only power supply side abnormity can be responded, isolation node-level faults cannot be accurately recognized, self-adaptive adjustment on load changes and topological structures is lacked, and consequently dual-power-supply loads are unbalanced, and the power supply stability is poor are solved, dual-power-supply load balancing is achieved, and the technical effect of improving the dual-power-supply power supply stability is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of power management, and specifically relates to a dual-power dynamic reconstruction method and system. Background Art

[0002] The automatic switching of dual power supplies mainly switches the main power supply and the standby power supply automatically to avoid power outages caused by single power supply failures. Existing automatic transfer switches (ATS) and static transfer switches (STS) both perform switching control based on real-time monitoring of the power supply status. When the main power supply voltage is detected to be abnormal (such as power outage, voltage drop, frequency fluctuation, etc.), the load is switched to the standby power supply. However, the existing methods only respond to voltage / frequency abnormalities on a single power supply side and cannot accurately identify and isolate node-level faults (such as branch line short circuits, local overloads) in the power supply topology network; and lack the ability to adaptively adjust to dynamic load changes and topological structures, resulting in the standby power supply being in an overloaded, no-load or low-load state, making the dual-power power supply stability insufficient and the overall resource utilization rate low.

[0003] Therefore, in the current related technologies, there are technical problems such as only being able to respond to power supply side abnormalities, being unable to accurately identify and isolate node-level faults, lacking adaptive adjustment to load changes and topological structures, resulting in unbalanced dual-power loads and poor power supply stability. Summary of the Invention

[0004] By providing a dual-power dynamic reconstruction method and system, this application solves the technical problems in the existing technology, such as only being able to respond to power supply side abnormalities, being unable to accurately identify and isolate node-level faults, lacking adaptive adjustment to load changes and topological structures, resulting in unbalanced dual-power loads and poor power supply stability, realizes balanced dual-power loads, and achieves the technical effect of improving the stability of dual-power power supply.

[0005] The present application provides a dual-power dynamic reconstruction method, which includes: deploying acquisition terminals to collect waveform data of each node in the power supply topology network to generate a timing waveform sequence, where the power supply topology network includes a first power supply and a second power supply; using a CNN-LSTM network to perform fault identification on the timing waveform sequence to obtain a set of fault nodes; constructing power supply source labels for each node in the power supply topology network, where the power supply source labels include a first power supply label, a second power supply label, and a hybrid power supply label; performing first-order reconstruction on the nodes other than the set of fault nodes according to the first power supply label and the second power supply label to output a first power supply topology network based on the first power supply and a second power supply topology network based on the second power supply; taking load balancing between the first power supply and the second power supply as the second-order reconstruction target, performing load balancing analysis on the node paths corresponding to the hybrid power supply label to output a hybrid node reconstruction path; updating the first power supply topology network and the second power supply topology network according to the hybrid node reconstruction path to generate a reconstructed power supply topology network.

[0006] In a possible implementation, the dual-power dynamic reconstruction method further performs the following processing: using a CNN-LSTM network to perform feature recognition on the timing waveform sequence to output CNN short-cycle features and LSTM long-cycle features, where the CNN short-cycle features include local voltage changes and current peak changes, and the LSTM long-cycle features include timing oscillations, drift data, and periodic changes; analyzing the states of each node in the power supply topology network according to the CNN short-cycle features and the LSTM long-cycle features, marking the nodes that do not meet the preset feature thresholds as fault nodes to obtain a set of fault nodes.

[0007] In a possible implementation, the dual-power dynamic reconstruction method further performs the following processing: the hybrid power supply label includes a first type of hybrid power supply label and a second type of hybrid power supply label, where the first type of hybrid power supply label is a label that requires simultaneous power supply from the first power supply and the second power supply, and the second type of hybrid power supply label is a label for switched power supply from the first power supply or the second power supply; performing load balancing analysis on the node paths corresponding to the hybrid power supply label, respectively performing load balancing analysis on the node paths corresponding to the first type of hybrid power supply label and the second type of hybrid power supply label to output a hybrid node reconstruction path.

[0008] In a possible implementation, the dual-power dynamic reconfiguration method further performs the following processing: for the nodes corresponding to the first type of hybrid power supply tags, construct a combined power supply path diagram of the first power supply and the second power supply; identify the real-time power demand of each node in the combined power supply path diagram; perform power supply ratio analysis using a ratio model based on the real-time power demand, calculate the load difference between the first power supply and the second power supply under different ratios, and take minimizing the load difference as the load balancing target to output the reconfiguration path of the first type of hybrid nodes, thereby obtaining the reconfiguration path of the hybrid nodes.

[0009] In a possible implementation, the dual-power dynamic reconfiguration method further performs the following processing: for the nodes corresponding to the second type of hybrid power supply tags, respectively evaluate the line impedance, network structure complexity, and source load status of their connections to the first power supply and the second power supply to obtain a first load index and a second load index; select the smaller one of the first load index and the second load index as the node belonging path to output the reconfiguration path of the second type of hybrid nodes; synthesize the reconfiguration path of the first type of hybrid nodes and the reconfiguration path of the second type of hybrid nodes to obtain the reconfiguration path of the hybrid nodes.

[0010] In a possible implementation, the dual-power dynamic reconfiguration method further performs the following processing: update the first power supply topology network according to the reconfiguration path of the hybrid nodes to obtain a first updated power supply topology network, and update the second power supply topology network according to the reconfiguration path of the hybrid nodes to obtain a second updated power supply topology network; couple the first updated power supply topology network and the second updated power supply topology network to generate a reconfigured power supply topology network.

[0011] In a possible implementation, the dual-power dynamic reconfiguration method further performs the following processing: perform load stability simulation, overload risk assessment, and network voltage quality detection on the reconfigured power supply topology network; if any one of the load stability simulation, overload risk assessment, and network voltage quality does not meet the corresponding threshold, roll back to the previous stage of the reconfiguration state and update the reconfiguration path of the hybrid nodes.

[0012] The present application also provides a dual - power dynamic reconstruction system, which includes: a timing waveform sequence generation module for deploying a collection terminal to collect waveform data of each node in a power supply topology network, generating a timing waveform sequence, where the power supply topology network includes a first power supply and a second power supply; a fault identification module for using a CNN - LSTM network to identify faults in the timing waveform sequence and obtaining a set of fault nodes; a power supply label construction module for constructing power supply labels for each node in the power supply topology network, where the power supply labels include a first power supply label, a second power supply label, and a hybrid power supply label; a power supply topology network output module for performing a first - order reconstruction on the nodes other than the set of fault nodes according to the first power supply label and the second power supply label, and outputting a first power supply topology network based on the first power supply and a second power supply topology network based on the second power supply; a load - balancing analysis module for taking the load balancing of the first power supply and the second power supply as the second - order reconstruction target, performing a load - balancing analysis on the node paths corresponding to the hybrid power supply label, and outputting a reconstructed path for hybrid nodes; a reconstructed power supply topology network generation module for updating the first power supply topology network and the second power supply topology network according to the reconstructed path for hybrid nodes, and generating a reconstructed power supply topology network.

[0013] It is intended to deploy a collection terminal to collect waveform data of each node in a power supply topology network through a dual - power dynamic reconstruction method and system proposed in the present application; use a CNN - LSTM network to identify faults in the timing waveform sequence; construct power supply labels for the power supply topology network; perform a first - order reconstruction on the nodes other than the set of fault nodes and output a first power supply topology network and a second power supply topology network; perform a load - balancing analysis on the node paths corresponding to the hybrid power supply label and output a reconstructed path for hybrid nodes; generate a reconstructed power supply topology network. This solves the technical problems existing in the prior art, such as being able to only respond to abnormalities on the power supply side, being unable to accurately identify and isolate node - level faults, lacking adaptive adjustment to load changes and topological structures, resulting in unbalanced loads of dual - power supplies and poor power supply stability. It realizes the load balancing of dual - power supplies and achieves the technical effect of improving the power supply stability of dual - power supplies. Description of the Drawings

[0014] To more clearly illustrate the technical solutions of the embodiments of the present disclosure, the drawings of the embodiments of the present disclosure will be briefly introduced below. Flowcharts are used in this application to illustrate the operations performed by the system according to the embodiments of the present application. It should be understood that the operations before or below do not necessarily need to be executed precisely in order. On the contrary, according to needs, they can be executed in reverse order or simultaneously. At the same time, other operations can also be added to these processes, or one or several operations can be removed from these processes.

[0015] Figure 1Schematic flowchart of a dual - power dynamic reconstruction method provided by an embodiment of the present application.

[0016] Figure 2 Schematic structural diagram of a dual - power dynamic reconstruction system provided by an embodiment of the present application.

[0017] Explanation of reference numerals: Timing waveform sequence generation module 10, fault identification module 20, power supply label construction module 30, power supply topology network output module 40, load - balancing analysis module 50, reconstructed power supply topology network generation module 60. Detailed implementation manners

[0018] The above description is only an overview of the technical solution of the present application. In order to understand the technical means of the present application more clearly, it can be implemented according to the content of the description. And in order to make the above and other purposes, features and advantages of the present application more obvious and understandable, the following specifically gives the detailed implementation manners of the present application.

[0019] In order to make the purpose, technical solution and advantages of the present application clearer, the present application will be further described in detail below with reference to the accompanying drawings. The described embodiments should not be regarded as limitations of the present application. All other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present application.

[0020] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments. However, it can be understood that "some embodiments" can be the same subset or different subsets of all possible embodiments and can be combined with each other without conflict. The terms "first" and "second" involved are only used to distinguish similar objects and do not represent a specific order for the objects. The terms "including" and "having" and any variations thereof are intended to cover non - exclusive inclusion. For example, a process, method, system, product or server including a series of steps or units does not necessarily limit to those clearly listed steps or units, but may include other steps or modules not clearly listed or inherent to these processes, methods, products or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field to which the present application belongs. The terms used herein are only for the purpose of describing the embodiments of the present application.

[0021] An embodiment of the present application provides a dual - power dynamic reconstruction method, as Figure 1 shown. The method includes: Step S100, deploying a collection terminal to collect waveform data of each node of the power supply topology network, generating a timing waveform sequence, where the power supply topology network includes a first power supply and a second power supply.

[0022] Preferably, acquisition terminals, including high-precision voltage and current sensors, etc., are deployed at various key positions of the power supply topology network, such as the power output end, the intersection of transmission lines, the incoming and outgoing line ends of substations, important power distribution equipment, and the access points of large power-consuming equipment, etc., to monitor the power data of each node of the power supply topology network in real time. Specifically, the sensors of the acquisition terminal are used to monitor and record the voltage and current data of the nodes of the power supply topology network. Since the voltage and current of the power supply system are periodic signals that change with time, their waveforms contain rich information, such as amplitude, frequency, phase, and harmonic components, etc. The acquisition terminal samples the signal at a certain sampling frequency, converts the continuous analog signal into a discrete digital signal, and arranges them in chronological order to form a time-series waveform sequence, which contains the electrical signal characteristic information of the corresponding node at each time point, such as the amplitude, frequency, phase, etc. of the voltage, reflecting the changes of voltage, current, etc. with time at the nodes of the power supply topology network. When a fault (such as a short circuit, overload, etc.) occurs at a certain node, the corresponding time-series waveform sequence will change accordingly. By analyzing the time-series waveform sequence, the power operation status of each node in the power supply topology network can be understood, and the fault node can be identified. Among them, the power supply topology network includes a first power supply and a second power supply, and the first power supply and the second power supply are independent of each other and jointly supply power to each node in the network to improve the reliability and stability of power supply.

[0023] Step S200, use the CNN-LSTM network to perform fault identification on the time-series waveform sequence to obtain a set of fault nodes.

[0024] Preferably, the CNN-LSTM network includes a CNN (Convolutional Neural Network) and an LSTM (Long Short-Term Memory Network). Among them, the convolutional neural network can automatically extract local features in the data. When processing a time series waveform sequence, it can slide a convolutional kernel over the data to capture local patterns and features in the waveform, such as the peak value, valley value, slope change, etc. of the waveform; the long short-term memory network is used to process long-term dependencies in the sequence data and can effectively capture the data associations at different time points in the time series waveform sequence, such as the change trend and periodicity of voltage or current over a period of time. Before inputting the time series waveform sequence into the CNN-LSTM network, the data is preprocessed, including smoothing the data to remove noise interference and make the waveform smoother, and also normalizing the data to map the value range of the data to a specific interval to accelerate the convergence speed of the model. Then, the preprocessed time series waveform sequence is input into the CNN-LSTM network, and the CNN-LSTM network is used to identify faults in the time series waveform sequence. Specifically, first, the CNN layer performs a convolution operation on the waveform sequence to extract local features of the waveform, including key information in different local regions of the waveform; then, the LSTM layer receives the features extracted by the CNN and further processes them, considering the time order of the sequence and capturing the long-term dependencies between the features; then, the feature vectors obtained by feature extraction are input into the fully connected layer for classification, that is, the input waveform sequence is classified into different categories, such as normal state, different types of fault states, etc., so as to establish the corresponding relationship between the waveform features and the fault nodes, thereby determining the specific nodes where the faults occur, and finally quickly and accurately obtaining the fault node set.

[0025] Further, step S200 further includes step S210 of using a CNN-LSTM network to perform feature recognition on the time series waveform sequence and outputting CNN short-cycle features and LSTM long-cycle features. The CNN short-cycle features include local voltage changes and current peak changes, and the LSTM long-cycle features include time series oscillations, drift data, and periodic changes; step S220 of analyzing the states of each node in the power supply topology network according to the CNN short-cycle features and the LSTM long-cycle features, marking the nodes that do not meet the preset feature threshold as fault nodes, and obtaining a fault node set.

[0026] Preferably, the sequential waveform sequence collected from the power supply topology network is used as the input of the CNN-LSTM network. The CNN processes the sequential waveform sequence to capture features within a short period, including local voltage changes and current peak changes. Among them, the local voltage change reflects the voltage fluctuation of a node at a certain moment, while the current peak change can reflect the extreme value change of the current within a short time, which helps to determine whether there is an instantaneous fault or abnormality at the node; the LSTM extracts long-period features from the sequential waveform sequence, including sequential oscillation, drift data, and periodic changes. Among them, the sequential oscillation reflects the periodic fluctuation of the signal over a long time, the drift data reflects the trend of the signal gradually deviating from the normal range over time, and the periodic change can help to discover the periodic regular changes of the signal on a long time scale, which helps to detect faults that develop relatively slowly or have periodicity.

[0027] Preferably, according to the normal operating state and historical data of the power supply topology network, preset feature thresholds are set for the short-period features of the CNN and the long-period features of the LSTM respectively, which are used to judge whether a node is normal. There are normal ranges for the voltage fluctuation range, current peak range, sequential oscillation amplitude, drift speed, and periodic change of the node. Then, the states of each node in the power supply topology network are analyzed, that is, the short-period features of the CNN and the long-period features of the LSTM extracted are respectively compared with the preset feature thresholds to analyze the states of each node in the power supply topology network. For each node, check whether its features such as local voltage change, current peak change, sequential oscillation, drift data, and periodic change are within the normal range. If the short-period features of the CNN or the long-period features of the LSTM of a certain node do not meet the preset feature thresholds, mark this node as a faulty node. Finally, all the nodes marked as faulty nodes are integrated to form a faulty node set.

[0028] Step S300, construct power supply labels for each node of the power supply topology network, and the power supply labels include a first power supply label, a second power supply label, and a hybrid power supply label.

[0029] Preferably, the positions of the first power source and the second power source, the connection mode of the transmission lines, the distribution of transformers and switchgears, etc. are obtained through the power supply network topology. The mathematical model of the power supply topology network is established using graph theory. Each node (such as a power source, a transformer, a load, etc.) is abstracted as a vertex in the graph, and the transmission line is abstracted as an edge in the graph. The connection between each node and the first power source and the second power source is analyzed, including checking the direction of the transmission line, the state of the switch, etc., to determine the electrical connection existing between the node and the power source. Then, a simulation test is carried out. The first power source and the second power source are respectively powered on, and sensors are installed to monitor the electrical parameters such as the voltage and current of the node in real time. The power supply state of the node is judged according to the monitoring data. For example, if the node voltage is consistent with the output voltage of the first power source and has nothing to do with the output voltage of the second power source, it is judged that the node is only powered by the first power source. Furthermore, the power supply source labels of each node are established, including the first power source label, the second power source label, and the hybrid power source label. Among them, when a certain node is only powered by the first power source, this node is marked with the first power source label, indicating that the power supply of this node completely depends on the first power source. If the first power source fails or the power supply is interrupted, this node will lose power supply. Similarly, if a certain node is only powered by the second power source, this node is marked with the second power source label. If the second power source fails or the power supply is interrupted, this node will lose power supply. If a certain node can be powered by the first power source and the second power source at the same time, or switch the power supply between the two power sources, this node is marked with the hybrid power source label. When one power source fails, the other power source can continue to supply power to the node, or the two power sources can supply power to the node at the same time during the peak power consumption period, enhancing the reliability and stability of the node power supply.

[0030] Step S400, perform a first-order reconstruction on the nodes other than the set of faulty nodes according to the first power source label and the second power source label, and output a first power supply topology network based on the first power source and a second power supply topology network based on the second power source.

[0031] Preferably, the nodes in the faulty node set are excluded from the power supply topology network, and the remaining normal nodes are divided according to the first power supply label and the second power supply label. Specifically, the nodes with the first power supply label are grouped into one group, which are normally powered only by the first power supply; the nodes with the second power supply label are grouped into another group, which are powered only by the second power supply; then a first-order reconstruction is performed, that is, with the first power supply as the core, the nodes with the first power supply label are reconnected to form a first power supply topology network based on the first power supply, and it is ensured that power can be smoothly transmitted from the first power supply to each node. For example, some lines may be in a complex connection state due to the existence of faulty nodes, and now they are adjusted to a more direct and effective connection method to reduce power transmission losses; similarly, with the second power supply as the core, the nodes with the second power supply label are reconnected to construct a second power supply topology network based on the second power supply, including all normal nodes with the second power supply label.

[0032] Step S500 , taking balancing the loads of the first power source and the second power source as a second-order reconstruction target, performing load balancing analysis on the node paths corresponding to the hybrid power source labels, and outputting hybrid node reconstruction paths.

[0033] Preferably, after completing the first-order reconstruction based on the first power supply and the second power supply, two relatively independent power supply topology networks (the first power supply topology network and the second power supply topology network) are obtained. At this time, the node corresponding to the hybrid power supply label may be unbalancedly powered by the first power supply and the second power supply. The load balancing of the first power supply and the second power supply is taken as the second-order reconstruction goal, and the node path corresponding to the hybrid power supply label is subjected to load balancing analysis to make the load distribution of the two power supplies more reasonable, so as to avoid the situation where one power supply is overloaded and the other power supply is underloaded. Specifically, for the node path corresponding to the hybrid power supply label, data related to the load is collected, such as the power demand of each node, the current or power currently passing through each path, and other information, and these data are analyzed to evaluate the current Based on the current load distribution, determine which paths have heavier loads and which paths have lighter loads, then adjust the state of some switches to change the direction of current flow, so that the load is transferred from the heavier path to the lighter path to achieve load balancing; finally determine the adjustment plan for the node path corresponding to the hybrid power supply label, that is, the hybrid node reconstruction path, which can adjust some nodes that were originally borne by the first power supply to bear a part of the load by the second power supply. By replanning the power supply path, the loads of the two power supplies are within a reasonable range, thereby making the power supply of the first power supply and the second power supply to the hybrid power supply node more balanced, reducing the risk of equipment damage and unstable power supply due to load imbalance, and improving the performance and reliability of the entire power supply network.

[0034] Further, step S500 further includes step S510. The hybrid power supply tags include first - type hybrid power supply tags and second - type hybrid power supply tags. Among them, the first - type hybrid power supply tags are tags that require both the first power supply and the second power supply to supply power simultaneously, and the second - type hybrid power supply tags are tags that are powered by switching between the first power supply and the second power supply; step S520, perform a load - balancing analysis on the node paths corresponding to the hybrid power supply tags, respectively perform a load - balancing analysis on the node paths corresponding to the first - type hybrid power supply tags and the second - type hybrid power supply tags, and output a reconstructed hybrid node path.

[0035] Preferably, the hybrid power supply tags include first - type hybrid power supply tags and second - type hybrid power supply tags. Among them, the first - type hybrid power supply tags are tags that require both the first power supply and the second power supply to supply power simultaneously. During the power - supply process, the two power supplies work together to provide power for the nodes; the second - type hybrid power supply tags are tags that are powered by switching between the first power supply and the second power supply. That is, in different situations, the nodes select one of the power supplies to supply power according to different conditions or strategies. For example, when the first power supply fails, has too high a load, or other abnormal situations occur, the nodes will automatically switch to the second power supply to supply power to ensure their normal operation. Then, perform a load - balancing analysis on the node paths corresponding to the hybrid power supply tags. Specifically, clarify the power - demand characteristics of the nodes of the first - type hybrid power supply tags, including the power - demand ratio of the first power supply and the second power supply and voltage requirements under different working states, and then analyze the load conditions when the current first power supply and the second power supply supply power to these nodes. For example, measure the actual current and power obtained by each node from the first power supply and the second power supply to understand the load magnitudes borne by each power supply when supplying power to these nodes. Then, according to the power demands of the nodes and the current load conditions, find an optimized power - supply path, which may include adjusting the connection mode of the transmission lines, changing the states of certain switches, etc., to make the loads of the first power supply and the second power supply when supplying power to these nodes more balanced.

[0036] Preferably, for the nodes with the second type of hybrid power supply tags, clarify the power supply switching conditions. For example, determine whether to switch based on the load size or voltage stability, and then analyze whether the current power supply switching strategy is reasonable, as well as the time ratio and load conditions of the first power supply and the second power supply for these nodes under different working states, including checking whether the power supply switches in a timely manner during peak load and low load, and whether there is a situation where a certain power supply bears too much load for a long time; then, according to the evaluation results, optimize the power supply switching strategy and power supply path. For example, if a certain power supply bears too heavy a load in some cases, adjust the switching conditions to enable another power supply to participate in power supply earlier, or optimize the connection path between the nodes and the power supply to reduce losses and imbalance during power supply. For example, when there is a risk of overload for the first power supply under high load, switch some loads to the second power supply in advance, or adjust the circuit so that the second power supply can supply power to these nodes more efficiently. Finally, integrate the results of the load balance analysis of the node path corresponding to the first type of hybrid power supply tag and the second type of hybrid power supply tag to generate a reconstructed path for hybrid nodes, including how the nodes corresponding to each hybrid power supply tag are connected to the first power supply and the second power supply, and the power supply methods and switching strategies of the power supply under different working states, etc., so as to achieve load balance between the first power supply and the second power supply in the entire power supply system and improve the reliability and efficiency of power supply.

[0037] Further, step S520 further includes step S521, constructing a combined power supply path diagram for the first power supply and the second power supply for the nodes corresponding to the first type of hybrid power supply tag; step S522, identifying the real-time power demand of each node in the combined power supply path diagram; step S523, based on the real-time power demand, performing power supply ratio analysis using a ratio model, calculating the load difference between the first power supply and the second power supply under different ratios, taking minimizing the load difference as the load balance target, and outputting a reconstructed path for the first type of hybrid nodes to obtain a reconstructed path for hybrid nodes.

[0038] Preferably, for the nodes corresponding to the first type of hybrid power supply tag, construct a combined power supply path diagram to show how the first power supply and the second power supply are connected to these nodes through transmission lines, switching equipment, etc., and the connection relationship between the nodes; then, through the power sensors installed at the nodes, monitor and identify the power demand of each node in the diagram in real time, obtain the power data obtained by each node from the first power supply and the second power supply at different times, and then determine the real-time power demand, that is, a load is simultaneously supplied by two power supplies in proportion.

[0039] Preferably, using the obtained real-time power demand data, a matching model is adopted for power supply ratio analysis, that is, according to the capacity of the power source, the loss of the transmission line, the power demand characteristics of the node, etc., the load conditions of the first power source and the second power source under different power supply ratios are calculated. For example, by changing the power supply ratios of the first power source and the second power source to a certain node, the load changes of the two power sources are observed, so as to find different power supply ratio combinations and their corresponding load states; then the load difference between the two power sources under each combination is calculated to evaluate the load balance degree of the two power sources under different power supply ratios. The smaller the load difference, the more balanced the load distribution of the two power sources; the larger the load difference, the more uneven the load distribution. Then, minimizing the load difference between the first power source and the second power source is taken as the goal of load balance. Among different power supply ratio combinations and their corresponding load differences, the power supply ratio combination with the smallest load difference is found, and then the original combined power supply path is adjusted and optimized to output the reconstruction path of the first type of hybrid node, improving the load balance degree and operation efficiency of the power supply system.

[0040] Further, step S520 further includes step S524. For the nodes corresponding to the second type of hybrid power source label, the line impedance, network structure complexity, and source load state of their connections to the first power source and the second power source are respectively evaluated to obtain a first load index and a second load index; step S525, select the smaller one of the first load index and the second load index as the node attribution path, and output the reconstruction path of the second type of hybrid node; step S526, combine the reconstruction path of the first type of hybrid node and the reconstruction path of the second type of hybrid node to obtain the reconstruction path of the hybrid node.

[0041] Preferably, for the nodes corresponding to the second type of hybrid power supply tags (i.e., the nodes powered by switching between the first power supply and the second power supply), the line impedance, network structure complexity, and source load status of the lines connecting them to the first power supply and the second power supply are evaluated respectively. Specifically, the line impedance affects the loss during the power transmission process. If the line impedance is large, more electrical energy loss will be generated when transmitting the same power, increasing the power supply cost. Evaluating the line impedance of the lines connected to the first power supply and the second power supply is to evaluate the loss situation during the power transmission from the power supply to the nodes. The network structure complexity includes the connection mode of the lines, the number and layout of intermediate devices (such as switches, transformers, etc.). A complex network structure may increase the difficulty of maintenance, the time and cost of troubleshooting, and may also affect the reliability of power supply. Evaluating the network structure complexity of the lines connected to the two power supplies to determine which connection mode is more convenient for management and maintenance. The source load status refers to the load conditions of the first power supply and the second power supply themselves. If a power supply is already in a high-load state, connecting more loads may cause it to be overloaded, affecting the power supply quality and even causing failures. Evaluating the source load status of the lines connected to the first power supply and the second power supply helps to reasonably allocate the nodes. Furthermore, the first load index corresponding to the connection to the first power supply and the second load index corresponding to the connection to the second power supply are obtained, and the smaller one is selected as the attribution path of the node, indicating that the comprehensive situation of connecting to this power supply is better, such as lower loss, simpler network, and less impact on the load of the power supply. Then, the reconstruction path of the second type of hybrid nodes is output, that is, it is determined whether these nodes should be connected to the first power supply or the second power supply. Finally, the reconstruction path of the first type of hybrid nodes (for the nodes that require simultaneous power supply from the first power supply and the second power supply) and the reconstruction path of the second type of hybrid nodes (for the nodes that can be powered by switching between the first power supply and the second power supply) are integrated to obtain the complete reconstruction path of the hybrid nodes, which helps to achieve more reasonable power distribution and load balancing, and improve the reliability and efficiency of the power supply system.

[0042] Step S600, update the first power supply topology network and the second power supply topology network according to the hybrid node reconstruction path to generate a reconstructed power supply topology network.

[0043] Preferably, the first power supply topology network and the second power supply topology network are updated according to the hybrid node reconstruction path. Specifically, the hybrid nodes are connected to the first power supply topology network and the second power supply topology network according to the planning of the hybrid node reconstruction path. For example, the connection relationships of some transmission lines are changed or the states of some switches are adjusted so that the hybrid nodes can obtain a more balanced power supply from the first power source and the second power source. Then, other power supply nodes and paths in the first power supply topology network and the second power supply topology network are adjusted. For example, the power transmission paths are reallocated and the current distribution on each line is optimized to adapt to the changes after the hybrid nodes are connected, ensuring the power transmission efficiency and stability of the entire network. Through the update of the first power supply topology network and the second power supply topology network, a reconstructed power supply topology network is finally generated, which includes both the parts independently powered by the first power source and the second power source separated during the first-order reconstruction, and realizes the load balance of the hybrid power nodes through the hybrid node reconstruction path, making the entire power supply system more reasonable, efficient, and reliable, reducing the situations of power source overload or load imbalance, and thus improving the stability and fault resistance of the power supply system.

[0044] Further, step S600 further includes step S610 of updating the first power supply topology network according to the hybrid node reconstruction path to obtain a first updated power supply topology network, and updating the second power supply topology network according to the hybrid node reconstruction path to obtain a second updated power supply topology network; step S620 of coupling the first updated power supply topology network and the second updated power supply topology network to generate a reconstructed power supply topology network.

[0045] Preferably, the first power supply topology network is updated according to the node - power connection relationship of the reconstructed path of the hybrid node. For example, if the reconstructed path of the hybrid node indicates that a node originally powered by the first power supply now needs to be connected to the second power supply to achieve a better power supply effect, a connection line between the node and the second power supply is added to the first power supply topology network, and relevant line parameters, node attributes and other information are adjusted to obtain the first updated power supply network topology. Similarly, according to the reconstructed path of the hybrid node, the second power supply topology network is updated. For example, if the power supply mode of a node is switched from the second power supply to the first power supply, or its connection mode with the second power supply needs to be changed, corresponding adjustments are made in the second power supply topology network, including deleting unnecessary connections, adding new connections, and updating relevant parameters of nodes and lines, to obtain the second updated power supply topology network. Then, the first updated power supply topology network and the second updated power supply topology network are coupled, that is, the first updated power supply topology network and the second updated power supply topology network are integrated into a reconstructed power supply topology network, including integrating nodes, lines and connection relationships in the two networks. For nodes that exist in both networks, their attributes and connection relationships are unified according to the actual situation; for different parts, reasonable fusion is carried out so that the reconstructed power supply topology network can comprehensively reflect the optimization effect brought by the reconstructed path of the hybrid node, forming a more efficient and reliable power supply network structure to meet the operation requirements of the entire power supply system.

[0046] Further, step S600 further includes step S630, performing load stability simulation, overload risk assessment and network voltage quality detection on the reconstructed power supply topology network; step S640, if any one of the load stability simulation, overload risk assessment and network voltage quality does not meet the corresponding threshold, reverting to the previous - stage reconstruction state and updating the reconstructed path of the hybrid node.

[0047] Preferably, perform load stability simulation, overload risk assessment, and network voltage quality detection on the reconstructed power supply topology network. Specifically, for the load stability simulation of the reconstructed power supply topology network, that is, through simulation software under different load scenarios (such as peak load, valley load, etc.), simulate the load changes of each node and line in the network. By observing whether the load distribution in the network is uniform and whether there are situations where the load fluctuations of certain nodes or lines are too large, evaluate the load stability of the network; analyze the carrying capacity of each power source, line, and device in the reconstructed power supply topology network, combine the current load situation and the predicted future load change trend, evaluate whether there is an overload risk in the network. By calculating the load rate of each part (the ratio of the actual load to the rated load), if the load rate is too high, it indicates an overload risk; detect the voltage levels of each node in the reconstructed power supply topology network, including indicators such as voltage amplitude, voltage fluctuation, and voltage harmonics. Excessive or too low voltage, large voltage fluctuations, and severe voltage harmonics may all affect the performance and lifespan of equipment.

[0048] Preferably, set corresponding thresholds for each index of load stability simulation, overload risk assessment, and network voltage quality detection according to the equipment operation requirements and power supply network standards. Compare the results obtained from the simulation and detection with the corresponding thresholds to determine whether the requirements are met. If one or more indicators do not meet the corresponding thresholds in the load stability simulation, overload risk assessment, and network voltage quality detection, it means that there are still problems with the reconstructed power supply topology network and adjustments are needed. Roll back the network to the previous stage of the reconstruction state, that is, restore it to the state after the previous reconstruction. Then, according to the evaluation results, analyze the reasons for not meeting the thresholds and update the reconstruction path of the hybrid nodes. For example, if the load stability in a certain area does not meet the requirements, it may be that the power supply distribution of the hybrid nodes is unreasonable. Then, re-adjust the connection method and power supply ratio of the hybrid nodes, update the reconstruction path of the hybrid nodes, so as to perform reconstruction and evaluation again until all indicators meet the thresholds, thereby continuously optimizing the reconstructed power supply topology network, improving its stability, reliability, and voltage quality, and ensuring that the power supply system can operate safely and efficiently.

[0049] In the above text, with reference to Figure 1 A dual - power dynamic reconstruction method according to an embodiment of the present invention is described in detail. Next, with reference to Figure 2 Describe a dual - power dynamic reconstruction system according to an embodiment of the present invention.

[0050] A dual - power dynamic reconfiguration system according to an embodiment of the present invention is used to solve the technical problems existing in the prior art, such as being able to only respond to abnormalities on the power supply side, unable to accurately identify and isolate node - level faults, lacking adaptive adjustment to load changes and topological structures, resulting in unbalanced dual - power loads and poor power supply stability. It realizes balanced dual - power loads and achieves the technical effect of improving the power supply stability of dual - power. As Figure 2 shown, a dual - power dynamic reconfiguration system includes: a timing waveform sequence generation module 10, a fault identification module 20, a power supply label construction module 30, a power supply topology network output module 40, a load balance analysis module 50, and a reconfigured power supply topology network generation module 60.

[0051] The timing waveform sequence generation module 10 is used to deploy acquisition terminals to collect waveform data of each node of the power supply topology network and generate a timing waveform sequence. The power supply topology network includes a first power supply and a second power supply. The fault identification module 20 is used to use a CNN - LSTM network to identify faults in the timing waveform sequence and obtain a set of fault nodes. The power supply label construction module 30 is used to construct power supply labels for each node of the power supply topology network. The power supply labels include a first power supply label, a second power supply label, and a hybrid power supply label. The power supply topology network output module 40 is used to perform first - order reconfiguration on the nodes other than the set of fault nodes according to the first power supply label and the second power supply label, and output a first power supply topology network based on the first power supply and a second power supply topology network based on the second power supply. The load balance analysis module 50 is used to take balancing the loads of the first power supply and the second power supply as the second - order reconfiguration target, perform load balance analysis on the node paths corresponding to the hybrid power supply label, and output a hybrid node reconfiguration path. The reconfigured power supply topology network generation module 60 is used to update the first power supply topology network and the second power supply topology network according to the hybrid node reconfiguration path to generate a reconfigured power supply topology network.

[0052] Next, the specific configuration of the fault identification module 20 will be described in detail. The fault identification module 20 further includes: using a CNN - LSTM network to perform feature identification on the timing waveform sequence and output CNN short - cycle features and LSTM long - cycle features. The CNN short - cycle features include local voltage changes and current peak changes. The LSTM long - cycle features include timing oscillations, drift data, and periodic changes. Analyze the states of each node of the power supply topology network according to the CNN short - cycle features and the LSTM long - cycle features, mark the nodes that do not meet the preset feature threshold as fault nodes, and obtain a set of fault nodes.

[0053] Next, the specific configuration of the load balancing analysis module 50 will be described in detail. The load balancing analysis module 50 further includes: The hybrid power supply tags include a first type of hybrid power supply tag and a second type of hybrid power supply tag. Among them, the first type of hybrid power supply tag is a tag that requires both the first power supply and the second power supply to supply power simultaneously, and the second type of hybrid power supply tag is a tag that is powered by switching between the first power supply and the second power supply; perform load balancing analysis on the node paths corresponding to the hybrid power supply tags, respectively perform load balancing analysis on the node paths corresponding to the first type of hybrid power supply tag and the second type of hybrid power supply tag, and output the reconstructed path of the hybrid nodes.

[0054] Next, the specific configuration of the load balancing analysis module 50 will be further described in detail. The load balancing analysis module 50 further includes: For the nodes corresponding to the first type of hybrid power supply tag, construct a combined power supply path diagram of the first power supply and the second power supply; identify the real-time power demands of each node in the combined power supply path diagram; based on the real-time power demands, use a ratio model to perform power supply ratio analysis, calculate the load difference between the first power supply and the second power supply under different ratios, and take minimizing the load difference as the load balancing target, output the reconstructed path of the first type of hybrid nodes, and obtain the reconstructed path of the hybrid nodes.

[0055] Next, the specific configuration of the load balancing analysis module 50 will be further described in detail. The load balancing analysis module 50 further includes: For the nodes corresponding to the second type of hybrid power supply tag, respectively evaluate the line impedance, network structure complexity, and source load status of their connections to the first power supply and the second power supply, and obtain a first load index and a second load index; select the smaller one of the first load index and the second load index as the node belonging path, output the reconstructed path of the second type of hybrid nodes; combine the reconstructed path of the first type of hybrid nodes and the reconstructed path of the second type of hybrid nodes to obtain the reconstructed path of the hybrid nodes.

[0056] Next, the specific configuration of the reconstructed power supply topology network generation module 60 will be described in detail. The reconstructed power supply topology network generation module 60 further includes: Update the first power supply topology network according to the reconstructed path of the hybrid nodes to obtain a first updated power supply topology network, and update the second power supply topology network according to the reconstructed path of the hybrid nodes to obtain a second updated power supply topology network; couple the first updated power supply topology network and the second updated power supply topology network to generate a reconstructed power supply topology network.

[0057] Next, the specific configuration of the reconstructed power supply topology network generation module 60 will be described in detail. The reconstructed power supply topology network generation module 60 further includes: performing load stability simulation, overload risk assessment, and network voltage quality detection on the reconstructed power supply topology network; if any one of the load stability simulation, overload risk assessment, and network voltage quality does not meet the corresponding threshold, reverting to the previous stage of the reconstruction state and updating the reconstructed path of the hybrid node.

[0058] A dual-power dynamic reconstruction system provided by an embodiment of the present invention can execute a dual-power dynamic reconstruction method provided by any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution of the method.

[0059] Although this application makes various references to certain modules in the system according to the embodiments of this application, however, any number of different modules can be used and run on the user terminal and / or server. The included individual units and modules are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for easy distinction from each other and do not limit the protection scope of the present invention.

[0060] The above specific embodiments do not constitute a limitation to the protection scope of this application. Those skilled in the art should understand that various modifications, combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principle of this application shall be included within the protection scope of this application.

Claims

1. A dual power supply dynamic reconstruction method, characterized in that: The method comprises: Deploy a collection terminal to collect waveform data from each node of a power supply topology network to generate a time-series waveform sequence, wherein the power supply topology network includes a first power supply and a second power supply; Using a CNN-LSTM network to perform fault identification on the time series waveform sequence to obtain a set of fault nodes; Constructing power supply source tags of each node of the power supply topology network, wherein the power supply source tags include a first power supply tag, a second power supply tag and a mixed power supply tag; Performing first-order reconstruction on nodes other than the set of faulty nodes according to the first power supply label and the second power supply label, and outputting a first power supply topology network based on the first power supply and a second power supply topology network based on the second power supply; Taking balancing the loads of the first power source and the second power source as the second-order reconstruction target, performing load balancing analysis on the node paths corresponding to the hybrid power source labels, and outputting hybrid node reconstruction paths; The first power supply topology network and the second power supply topology network are updated according to the hybrid node reconstruction path to generate a reconstructed power supply topology network.

2. A dual power supply dynamic reconfiguration method as claimed in claim 1, characterized in that: A CNN-LSTM network is used to perform fault identification on the time series waveform sequence to obtain a set of fault nodes, the method comprising: Using a CNN-LSTM network to perform feature recognition on the timing waveform sequence, outputting CNN short-cycle features and LSTM long-cycle features, wherein the CNN short-cycle features include local voltage changes and current peak changes, and the LSTM long-cycle features include timing oscillations, drift data, and period changes; The status of each node of the power supply topology network is analyzed according to the CNN short-cycle features and the LSTM long-cycle features, the nodes that do not meet the preset feature threshold are marked as faulty nodes, and a set of faulty nodes is obtained.

3. A dual power supply dynamic reconfiguration method as claimed in claim 1, characterized in that: The hybrid power tag includes a first type of hybrid power tag and a second type of hybrid power tag, wherein the first type of hybrid power tag is a tag that requires the first power source and the second power source to supply power at the same time, and the second type of hybrid power tag is a tag that switches between the first power source or the second power source to supply power; A load balancing analysis is performed on the node paths corresponding to the hybrid power label, and load balancing analysis is performed on the node paths corresponding to the first type of hybrid power label and the second type of hybrid power label respectively, and a hybrid node reconstruction path is output.

4. A dual power supply dynamic reconfiguration method as claimed in claim 3, characterized in that: Performing load balancing analysis on the node paths corresponding to the first type of hybrid power supply labels, the method comprising: For the nodes corresponding to the first type of hybrid power supply labels, construct a joint power supply path diagram of the first power supply and the second power supply; Identifying the real-time power demand of each node in the joint power supply path diagram; Based on the real-time power demand, a ratio model is used to analyze the power supply ratio, and the load difference between the first power supply and the second power supply under different ratios is calculated. The load balancing goal is to minimize the load difference, and a first type of hybrid node reconstruction path is output to obtain a hybrid node reconstruction path.

5. A dual power supply dynamic reconfiguration method as claimed in claim 4, characterized in that: Performing load balancing analysis on the node paths corresponding to the second type of hybrid power supply labels, the method comprising: For the nodes corresponding to the second type of hybrid power supply labels, the line impedance, network structure complexity and source load status of the nodes connected to the first power supply and the second power supply are evaluated respectively to obtain a first load index and a second load index; Selecting the smaller one of the first load indicator and the second load indicator as the node attribution path, and outputting a second type of hybrid node reconstruction path; The first type of hybrid node reconstruction path and the second type of hybrid node reconstruction path are combined to obtain a hybrid node reconstruction path.

6. A dual power supply dynamic reconfiguration method as claimed in claim 1, characterized in that: The first power supply topology network and the second power supply topology network are updated according to the hybrid node reconstruction path to generate a reconstructed power supply topology network, the method comprising: The first power supply topology network is updated according to the hybrid node reconstruction path to obtain a first updated power supply topology network, and the second power supply topology network is updated according to the hybrid node reconstruction path to obtain a second updated power supply topology network; The first updated power supply topology network and the second updated power supply topology network are coupled to generate a reconstructed power supply topology network.

7. A dual power supply dynamic reconfiguration method as claimed in claim 1, characterized in that: The feasibility of the generated reconstructed power supply topology network is verified by: Performing load stability simulation, overload risk assessment and network voltage quality detection on the reconstructed power supply topology network; If one of the load stability simulation, overload risk assessment and network voltage quality does not meet the corresponding threshold, it will fall back to the reconstruction state of the previous stage and update the hybrid node reconstruction path.

8. A dual power supply dynamic reconstruction system, characterized in that: The system is used to implement a dual power supply dynamic reconstruction method according to any one of claims 1 to 7, and the system comprises: A timing waveform sequence generation module, used to deploy a collection terminal to collect waveform data from each node of a power supply topology network to generate a timing waveform sequence, wherein the power supply topology network includes a first power supply and a second power supply; A fault identification module is used to use a CNN-LSTM network to perform fault identification on the timing waveform sequence and obtain a set of fault nodes; A power supply source label construction module, used to construct a power supply source label of each node of the power supply topology network, wherein the power supply source label includes a first power supply label, a second power supply label and a mixed power supply label; A power supply topology network output module, configured to perform first-order reconstruction on nodes other than the set of faulty nodes according to the first power supply label and the second power supply label, and output a first power supply topology network based on the first power supply and a second power supply topology network based on the second power supply; A load balancing analysis module, configured to perform load balancing analysis on the node path corresponding to the hybrid power supply label with balancing the load of the first power supply and the second power supply as the second-order reconstruction target, and output a hybrid node reconstruction path; The reconstructed power supply topology network generation module is used to update the first power supply topology network and the second power supply topology network according to the hybrid node reconstruction path to generate a reconstructed power supply topology network.

Citation Information

Patent Citations

  • Network reconfiguration technology of power supply and distribution network based on multiple generator sets

    CN102664408A

  • Node merge method based dynamic network topology analysis method

    CN103178516A

  • Alternating current and direct current mixed microgrid dynamic architecture and recombination method therefor

    CN105226702A

  • Microgrid fault reconstruction method and system based on expert system

    CN106786774A

  • Intelligent power distribution network power supply recovery method based on distributed power generation isolated island operation mode

    CN116154855A

Cited By

  • Network automatic topology method and system for safety control of industrial Internet of Things

    CN120956609A

  • Automatic Network Topology Method and System for Security Control in Industrial Internet of Things

    CN120956609B