Performance testing system and method for cavitation venturi tubes
By designing a cavitation venturi tube performance testing system, and using a control console to control flow and pressure, a relationship curve is generated to calculate the critical cavitation pressure ratio. This solves the problem of inaccurate measurement in existing technologies and achieves more accurate performance evaluation of cavitation venturi tubes.
Patent Information
- Application Number
- CN202510557562.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-29
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2045-04-29
AI Technical Summary
Existing technologies make it difficult to accurately measure the critical cavitation pressure ratio of a cavitation venturi tube, leading to inaccurate flow regulation and difficulties in system performance evaluation.
A cavitation venturi tube performance testing system was designed, including an upstream module, a plunger pump, a flow meter, a cavitation venturi tube, an electric regulating valve, and a downstream module. The system controls the speed of the plunger pump's drive shaft and the opening of the electric regulating valve through a control console to generate a relationship curve and calculate the critical cavitation pressure ratio of the cavitation venturi tube.
This technology enables the transition control of a cavitating venturi tube from a cavitating state to a non-cavitating state under constant flow conditions, improving the accuracy of critical cavitating pressure ratio measurement and the accuracy of system performance evaluation.
Smart Images

Figure CN120160701B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of flow regulation device technology, and in particular to a performance testing system and method for cavitation venturi tubes. Background Technology
[0002] A Venturi tube, also known as a venturi tube, is a type of tube that initially contracts and then gradually expands. When a stable cavitation zone forms behind the throat of the Venturi tube, it is in normal operating condition and is called a cavitating Venturi tube. The critical cavitation pressure ratio is a key performance parameter of the cavitating Venturi tube; it is the ratio of the outlet pressure to the inlet pressure when the tube is operating in a critical cavitation state. When the actual ratio of the outlet pressure to the inlet pressure is higher than the critical cavitation pressure ratio, the cavitating Venturi tube will fail to reliably cavitate, thus losing its ability to prevent combustion chamber pressure oscillations from being transmitted upstream. Therefore, the critical cavitation pressure ratio is a key parameter for evaluating the performance of a cavitating Venturi tube. Currently, a squeeze-type supply system is commonly used to measure the critical cavitation pressure ratio of the cavitating Venturi tube. This involves increasing the outlet pressure of the cavitating Venturi tube by reducing the opening of the back pressure valve, while simultaneously identifying the inflection point of the inlet pressure. However, the data curves near the cavitation critical point measured by this method are very steep, and with the influence of dynamically adjusting the hysteresis time, accurate value acquisition and calculation are quite difficult. Exceeding the critical cavitation pressure ratio will cause changes in the system flow rate, and the medium velocity, flow pattern and flow resistance will also change accordingly. The parameter change law under non-cavitation state is difficult to determine, and it is also very difficult to deduce the critical cavitation pressure ratio from the non-cavitation state data. In summary, the existing technology is difficult to accurately measure the critical cavitation pressure ratio of cavitating Venturi tubes. Summary of the Invention
[0003] The purpose of this invention is to provide a performance testing system and method for cavitation venturi tubes, so as to accurately measure the critical cavitation pressure ratio of the venturi tube.
[0004] This invention provides a performance testing system for a cavitation venturi tube. The system includes: an upstream module assembly, a plunger pump, a flow meter, a cavitation venturi tube, an electric regulating valve, and a downstream module assembly connected in sequence. A first pressure gauge is connected to the input end of the cavitation venturi tube; a second pressure gauge is connected to the output end of the cavitation venturi tube; the plunger pump, flow meter, first pressure gauge, second pressure gauge, and electric regulating valve are respectively connected to a control console; initially, the valve opening of the electric regulating valve is a first preset opening; the upstream module assembly is used to input the test medium into the plunger pump, and outputs a specified flow rate of the test medium through the plunger pump, which then flows sequentially through the cavitation venturi tube and the electric regulating valve into the downstream module assembly; wherein, the specified flow rate is positively correlated with the rotational speed of the plunger pump's drive shaft; the rotational speed of the plunger pump's drive shaft is controlled by the control console; the control console is used to gradually decrease the valve opening of the electric regulating valve from the first preset opening to the second preset opening according to a preset adjustment step, obtaining multiple data sets; wherein... Each data set includes: flow data read by a flow meter; the first inlet pressure of the cavitating venturi tube read by a first pressure gauge; and the first outlet pressure of the cavitating venturi tube read by a second pressure gauge. A first relationship curve is generated based on the data in each data set. This first relationship curve characterizes the changes in the first inlet pressure and the first outlet pressure of the cavitating venturi tube over time. Under cavitation conditions and at the cavitation critical point, the first inlet pressure of the cavitating venturi tube is a first constant value, and the first outlet pressure increases linearly with time. At the cavitation critical point and in non-cavitation conditions, the first inlet pressure of the cavitating venturi tube increases linearly with time in sync with the first outlet pressure, and the difference between the first inlet pressure and the first outlet pressure is a second constant value. The difference between the first constant value and the second constant value is calculated to obtain the critical outlet pressure of the cavitating venturi tube at the cavitation critical point. The ratio between the critical outlet pressure and the first constant value is calculated to obtain the critical cavitation pressure ratio of the cavitating venturi tube.
[0005] Furthermore, the control console is also used to: determine whether the first inlet pressure of the cavitation venturi tube is greater than the preset pressure threshold during the process of adjusting the valve opening of the electric regulating valve; if the first inlet pressure is not greater than the preset pressure threshold, determine whether the valve opening has been reduced to the second preset opening; if the valve opening has been reduced to the second preset opening, shut down the plunger pump to stop outputting the test medium at the specified flow rate.
[0006] Furthermore, the system also includes: an overflow valve; the overflow valve is connected between the output end of the plunger pump and the input end of the flow meter; the overflow valve is also connected to the input end of the plunger pump; the overflow valve is used to open when the first inlet pressure is greater than a preset pressure threshold, so as to discharge at least a portion of the test medium to the input end of the plunger pump until the first inlet pressure is not greater than the preset pressure threshold.
[0007] Furthermore, the control console is also used to: adjust the valve opening of the electric regulating valve to the maximum opening, and shut down the plunger pump to stop outputting the test medium at a specified flow rate.
[0008] Furthermore, the system also includes: an air tank; the output end of the plunger pump is also connected to the air tank; the air stored in the air tank is used to buffer pressure fluctuations in the performance testing system.
[0009] Furthermore, the downstream module assembly includes a downstream tank and a downstream level gauge, the downstream level gauge being used to detect the downstream level value of the test medium in the downstream tank; the upstream module assembly includes an upstream tank and an upstream level gauge, the upstream level gauge being used to detect the upstream level value of the test medium in the upstream tank; a reflux assembly is connected between the upstream and downstream tanks; the volume of the upstream tank and the volume of the downstream tank are matched; in the initial state, the upstream level value is not lower than a second proportional value of the maximum capacity of the upstream tank; the control console is used to: if it is confirmed that the upstream level value is not higher than a first proportional value of the maximum capacity of the upstream tank, or if it is confirmed that the downstream level value is not lower than a second proportional value of the maximum capacity of the downstream tank, to open the reflux assembly so that the test medium in the downstream tank flows back to the upstream tank; wherein, the first proportional value is less than the second proportional value; if it is confirmed that the valve opening has been reduced to a second preset opening, to close the plunger pump to stop outputting the test medium at a specified flow rate.
[0010] Furthermore, the control console is also used to: shut down the reflux assembly if it is confirmed that the upstream liquid level is not lower than a second proportional value of the maximum capacity of the upstream tank, and / or the downstream liquid level is not higher than a first proportional value of the maximum capacity of the downstream tank.
[0011] Furthermore, the control console is also used to: maintain the current state of the reflux assembly if it is confirmed that the upstream liquid level is higher than a first proportional value of the maximum capacity of the upstream tank and lower than a second proportional value of the maximum capacity of the upstream tank, and the downstream liquid level is higher than a first proportional value of the maximum capacity of the downstream tank and lower than a second proportional value of the maximum capacity of the downstream tank.
[0012] Furthermore, the reflux assembly includes: a reflux filter, a reflux check valve, a first reflux pneumatic valve, a reflux water pump, and a second reflux pneumatic valve connected in sequence; the input end of the reflux filter is connected to the downstream storage tank; and the output end of the second reflux pneumatic valve is connected to the upstream storage tank.
[0013] This invention provides a performance testing method for a cavitation venturi tube. The method includes: an upstream module component inputting a test medium into a plunger pump, outputting a test medium at a specified flow rate through the plunger pump, and sequentially flowing into a downstream module component through a cavitation venturi tube and an electric regulating valve; wherein the specified flow rate is positively correlated with the rotational speed of the plunger pump's drive shaft; the rotational speed of the plunger pump's drive shaft is controlled by a control console; the control console gradually reduces the valve opening of the electric regulating valve from a first preset opening to a second preset opening according to a preset adjustment step, obtaining multiple data sets; wherein each data set includes: flow rate data read by a flow meter; the first inlet pressure of the cavitation venturi tube read by a first pressure gauge; and the first outlet pressure of the cavitation venturi tube read by a second pressure gauge; based on... Based on the data in each data set, a first relationship curve is generated. This first relationship curve characterizes the changes in the first inlet pressure and the first outlet pressure of the cavitation venturi tube over time. Under cavitation conditions and at the cavitation critical point, the first inlet pressure of the cavitation venturi tube is a first constant value, while the first outlet pressure increases linearly with time. At the cavitation critical point and in non-cavitation conditions, the first inlet pressure of the cavitation venturi tube increases linearly with time in sync with the first outlet pressure, and the difference between the first inlet pressure and the first outlet pressure is a second constant value. The difference between the first constant value and the second constant value is calculated to obtain the critical outlet pressure of the cavitation venturi tube at the cavitation critical point. The ratio between the critical outlet pressure and the first constant value is calculated to obtain the critical cavitation pressure ratio of the cavitation venturi tube.
[0014] The performance testing system and method for cavitation venturi tubes provided by this invention, when the test medium is an incompressible fluid, a plunger pump outputs a constant specified flow rate of the test medium at a determined rotational speed. The flow velocity, flow pattern, and flow resistance in the pipeline are constant. The pressure changes caused by the pipeline structure, flow pattern, and flow velocity can be regarded as constant values. The system has only one independent variable: the valve opening of the electric regulating valve. This achieves the transition of the cavitation venturi tube from the cavitation state to the non-cavitation state under constant flow, making the control and judgment of the working state of the cavitation venturi tube more accurate. In the cavitation state and at the cavitation critical point, the first inlet pressure of the cavitation venturi tube is a first constant value. At the cavitation critical point and in the non-cavitation state, the difference between the first inlet pressure and the first outlet pressure of the cavitation venturi tube is a second constant value. Based on the first and second constant values, the critical cavitation pressure ratio of the cavitation venturi tube can be calculated more accurately. Attached Figure Description
[0015] To more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0016] Figure 1 This is a schematic diagram of a performance testing system for a cavitation venturi tube provided in an embodiment of the present invention;
[0017] Figure 2 A schematic diagram of a first relationship curve provided for an embodiment of the present invention;
[0018] Figure 3 A schematic diagram of another cavitation venturi tube performance testing system provided in an embodiment of the present invention;
[0019] Figure 4 A flowchart of a cavitation venturi tube performance testing method based on a constant current system provided in an embodiment of the present invention;
[0020] Figure 5 A flowchart of a pressure control method for testing the performance of a cavitation venturi tube, provided in an embodiment of the present invention;
[0021] Figure 6 A flowchart of a working fluid circulation method for testing the performance of a cavitation venturi tube, provided in an embodiment of the present invention;
[0022] Figure 7 A flowchart illustrating a method for calculating the critical cavitation pressure ratio of a cavitation venturi tube, provided as an embodiment of the present invention. Detailed Implementation
[0023] The technical solution of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0024] As a crucial flow control element in liquid rocket engines, the cavitation venturi tube boasts a simple structure and stable, reliable operation. It effectively isolates the combustion chamber pressure oscillations from the supply system. The critical cavitation pressure ratio (CNPPR) is a key parameter for evaluating CNPPR performance. Various factors influence the CNPPR, including but not limited to friction between the fluid and the tube wall, as well as friction between the gas and liquid phases. Furthermore, pipe structure, wall roughness, medium flow rate, flow velocity, and flow pattern all significantly affect the CNPPR. Existing technologies struggle to accurately measure the CNPPR of cavitation venturi tubes. Therefore, this invention provides a performance testing system and method for cavitation venturi tubes, applicable to applications requiring measurement of the CNPPR.
[0025] To facilitate understanding of this embodiment, a performance testing system for cavitation venturi tubes disclosed in this embodiment of the invention will first be introduced, such as... Figure 1 As shown, the system includes: an upstream module assembly 100, a plunger pump S05, a flow meter S07, a cavitation venturi tube S08, an electric regulating valve S09, and a downstream module assembly 101 connected in sequence; the input end of the cavitation venturi tube S08 is also connected to a first pressure gauge; the output end of the cavitation venturi tube S08 is also connected to a second pressure gauge; the plunger pump S05, the flow meter S07, the first pressure gauge, the second pressure gauge, and the electric regulating valve S09 are respectively connected to the control console 102. The cavitation venturi tube can be a venturi tube with an adjustable throat area or a venturi tube with a fixed throat area. If it is a venturi tube with an adjustable throat area, it is usually also connected to the control console 102; in the initial state, the valve opening of the electric regulating valve S09 is a first preset value. Opening degree; the plunger pump S05 is a positive displacement pump that changes the volume of the cylinder by the reciprocating motion of the plunger in the cylinder, thereby realizing the intake and discharge of the test medium; the electric regulating valve S09 is an electrically driven valve, mainly used in automatic control systems to regulate the flow rate, pressure and other parameters of the test medium in the pipeline. The electric regulating valve S09 combines the actuator and the regulating valve and can automatically adjust the valve opening degree according to the instructions issued by the control console 102 to achieve the required control effect; the above-mentioned first preset opening degree is usually the opening degree with a throttling area greater than the throat area of the cavitation venturi tube S08. For example, it can be the maximum opening degree of the electric regulating valve S09, or it can be a suitable opening degree selected according to actual needs, such as 90% opening degree, etc.
[0026] The upstream module assembly 100 is used to input the test medium into the plunger pump S05, and the plunger pump S05 outputs the test medium at a specified flow rate, which then flows sequentially through the cavitation venturi tube S08 and the electric regulating valve S09 into the downstream module assembly 101. The specified flow rate is positively correlated with the rotational speed of the drive shaft of the plunger pump S05. The rotational speed of the plunger pump's drive shaft is controlled by a control console. The test medium can be deionized water or other liquid media, which can be selected according to actual needs. The specified flow rate can be set according to actual needs. Under ideal conditions where leakage is not considered, the plunger pump S05 can be regarded as a constant flow pump with flow rate independent of pressure, and its theoretical volumetric flow rate is:
[0027] Q V =nASZ;
[0028] In the formula, n is the drive shaft speed, A is the piston cross-sectional area, S is the piston stroke, and Z is the number of connections. Therefore, the specified flow rate is only controlled by the drive shaft speed of the piston pump S05 and is not affected by changes in upstream and downstream pressure. Furthermore, it can be seen from the above formula that the specified flow rate is positively correlated with the drive shaft speed; that is, the faster the drive shaft speed, the larger the specified flow rate, and the slower the drive shaft speed, the smaller the specified flow rate. The test medium with the specified flow rate output by the piston pump S05 can be transported to the cavitation venturi tube S08 and then flow into the downstream module assembly 101 through the electric regulating valve S09.
[0029] The control console 102 is used to gradually reduce the valve opening of the electric regulating valve S09 from the first preset opening to the second preset opening according to the preset adjustment step, thereby obtaining multiple data sets; wherein, each data set includes: flow data read by the flow meter S07; the first inlet pressure of the cavitation venturi tube S08 read by the first pressure gauge; and the first outlet pressure of the cavitation venturi tube S08 read by the second pressure gauge.
[0030] The aforementioned preset adjustment step can be understood as the adjustment amount each time the electric regulating valve S09 is adjusted. This adjustment step can be pre-calculated based on the rated flow, rated pressure, and throat area of the cavitation venturi tube S08. Specific calculation methods can be found in relevant technologies and will not be elaborated here. The aforementioned second preset opening is usually an opening where the throttling area is smaller than the throat area of the cavitation venturi tube S08, generally a small opening, such as a 5% opening. The specific setting can be determined according to actual needs and is not limited here. Ideally, the flow data read by the flow meter S07 is the value corresponding to the specified flow rate calculated using the above formula. Considering potential fluctuations in actual applications, the flow data read by the flow meter S07 may fluctuate within a preset range of the specified flow rate. This can be addressed by adjusting the flow meter's reading. The flow meter S07 reads the actual flow data. Since the first pressure gauge is set at the input end of the cavitation venturi tube S08 and the second pressure gauge is set at the output end of the cavitation venturi tube S08, the first inlet pressure corresponding to the test medium at the input end of the cavitation venturi tube S08 can be read through the first pressure gauge, and the first outlet pressure corresponding to the test medium at the output end of the cavitation venturi tube S08 can be read through the second pressure gauge. In actual implementation, the control console 102 can smoothly reduce the valve opening of the electric regulating valve S09 according to the preset adjustment step obtained in advance, and can obtain multiple data sets corresponding to multiple time points. Each data set includes the flow data read by the flow meter S07, the first inlet pressure read by the first pressure gauge, and the first outlet pressure read by the second pressure gauge.
[0031] Based on the data in each data group, a first relationship curve is generated. This first relationship curve characterizes the changes in the first inlet pressure and first outlet pressure of the cavitating venturi tube S08 over time. Under cavitation conditions and at the cavitation critical point, the first inlet pressure of the cavitating venturi tube S08 is a first constant value, while the first outlet pressure increases linearly with time. At the cavitation critical point and in non-cavitation conditions, the first inlet pressure of the cavitating venturi tube S08 increases linearly with time in sync with the first outlet pressure, and the difference between the first inlet pressure and the first outlet pressure is a second constant value. The difference between the first constant value and the second constant value is calculated to obtain the critical outlet pressure of the cavitating venturi tube S08 at the cavitation critical point. The ratio between the critical outlet pressure and the first constant value is calculated to obtain the critical cavitation pressure ratio of the cavitating venturi tube S08.
[0032] In practical applications, the primary relationship curve is actually representative of a series of test curves. Although the horizontal axis represents time, the rate of change here has no practical significance; the pressure is ultimately directly related to the opening degree of the electric control valve. The time here is converted from the change pattern of the electric control valve opening to make the pressure curve a linear transition. All test curves can be transformed into the form of the primary relationship curve through data processing. The specific conversion relationship can be found in relevant technologies, which will not be described in detail here.
[0033] Based on the data in each of the above data groups, the first relationship curve can be plotted, such as... Figure 2 The diagram shows a first relationship curve. This first relationship curve typically also includes a flow rate curve. This flow rate curve is calculated by averaging the flow rate data read from multiple time points during the stable phase across multiple data sets. The average flow rate data is then used to plot the flow rate curve, corresponding to the system flow rate curve in the diagram. According to this first relationship curve, as the control console 102 smoothly reduces the valve opening of the electric regulating valve S09, the performance testing system will sequentially exhibit the following phenomena:
[0034] ① The system flow rate is constant, the first inlet pressure of the cavitation venturi tube S08 remains unchanged, and the first outlet pressure gradually increases;
[0035] ② With a constant system flow, after the cavitation venturi tube S08 reaches the cavitation critical point, the first inlet pressure of the cavitation venturi tube S08 increases synchronously with the first outlet pressure.
[0036] Since the output of the plunger pump S05 is connected to the input of the cavitation venturi tube S08 via the flow meter S07, the aforementioned first constant value usually refers to the plunger pump supply pressure, and the first inlet pressure p of the cavitation venturi tube S08 under cavitation conditions. in This equals the first constant value, which is the pressure p supplied to the plunger pump. pumpfeedAt the cavitation critical point and in non-cavitation state, the difference Δp between the first inlet pressure and the first outlet pressure of the cavitation venturi tube S08 is a second constant value.
[0037] At the cavitation critical point and under non-cavitation conditions, the pressure data of the cavitation venturi tube S08 conforms to the following relationship:
[0038] Δp=p in -p out ;
[0039] In the formula, p in p is the first inlet pressure of the cavitation venturi tube S08. out The first outlet pressure of the cavitation venturi tube S08; therefore, the critical outlet pressure p of the cavitation venturi tube S08 at the cavitation critical point. critical for:
[0040] p critical =p pumpfeed -Δp;
[0041] Based on the definition of critical cavitation pressure ratio, the critical cavitation pressure ratio p of the cavitation Venturi tube S08 can be calculated. r for:
[0042] p r =p critical / p pumpfeed ;
[0043] Theoretically, the plunger pump supply pressure p can be obtained by selecting one data set at each time point when the cavitation venturi tube S08 is in a cavitation state and a non-cavitation state. pumpfeed And the difference Δp between the first inlet pressure and the first outlet pressure of the cavitation venturi tube S08 under cavitation critical point and non-cavitation conditions, thus the critical cavitation pressure ratio p of the cavitation venturi tube S08 can be calculated. r In actual testing, data sets corresponding to 2-3 time points can be selected for both cavitation and non-cavitation states of the cavitation venturi tube S08 to confirm its working state and reduce random errors. The average value of the corresponding data in each data set can be used to calculate the critical cavitation pressure ratio p of the cavitation venturi tube S08. r The basis for this is as follows: For example, in the cavitation state, the plunger pump supply pressure at three time points is selected, and the average value is taken to obtain the average plunger pump supply pressure. In the non-cavitation state, the first inlet pressure and first outlet pressure corresponding to three time points are selected respectively, and three Δp values can be calculated. The average value of these three Δp values is taken. Subtracting the average Δp from the average plunger pump supply pressure yields the critical outlet pressure of the cavitation venturi tube S08. Dividing this critical outlet pressure by the average plunger pump supply pressure gives the critical cavitation pressure ratio p of the cavitation venturi tube S08. r.
[0044] In the aforementioned performance testing system for cavitation venturi tubes, the plunger pump S05 can output a constant, specified flow rate of test medium. Therefore, for incompressible fluids, the flow velocity, flow pattern, and flow resistance of the test medium in the performance testing system pipeline are essentially constant (only minor changes occur in the cavitation zone of the venturi tube and at the electrically controlled regulating valve, the impact of which is negligible). The pressure changes caused by the pipeline structure, flow velocity, and flow pattern can be considered constant values. Key data for the critical cavitation point of the venturi tube can be measured at points in both the cavitation and non-cavitation states. The performance testing system achieves the transition from the cavitation to the non-cavitation state of the venturi tube at a constant flow rate with only one independent variable: the valve opening of the electrically controlled regulating valve S09. The critical cavitation point of this scheme... The pressure ratio calculation method allows for the acquisition of required data in a single test, enabling more accurate control and determination of the operating state of the cavitation venturi tube S08. Under cavitation conditions and at the cavitation critical point, the first inlet pressure of the cavitation venturi tube S08 is a first constant value. At the cavitation critical point and in non-cavitation conditions, the difference between the first inlet pressure and the first outlet pressure of the cavitation venturi tube S08 is a second constant value. Based on the first and second constant values, the critical outlet pressure of the cavitation venturi tube S08 at the cavitation critical point can be calculated. By calculating the ratio between the critical outlet pressure and the first constant value, the critical cavitation pressure ratio of the cavitation venturi tube S08 can be derived, allowing for a more accurate calculation of the critical cavitation pressure ratio of the cavitation venturi tube S08.
[0045] Furthermore, the control console 102 is also used to: determine whether the first inlet pressure of the cavitation venturi tube S08 is greater than the preset pressure threshold during the process of adjusting the valve opening of the electric regulating valve S09; if the first inlet pressure is not greater than the preset pressure threshold, determine whether the valve opening has been reduced to the second preset opening; if the valve opening has been reduced to the second preset opening, shut down the plunger pump S05 to stop outputting the test medium at the specified flow rate.
[0046] The aforementioned preset pressure threshold can be set according to actual needs. By setting this preset pressure threshold, the reliable operation of the plunger pump S05 and the cavitation venturi tube S08 can be guaranteed. During the process of adjusting the valve opening of the electric regulating valve S09 on the control console 102, it can be determined in real time whether the first inlet pressure of the cavitation venturi tube S08 is within the preset pressure threshold. If it is within the preset pressure threshold, it can be determined whether the valve opening of the electric regulating valve S09 has been reduced to the second preset opening. If the valve opening has been reduced to the second preset opening, the flow source can be shut off, that is, the plunger pump S05 can be shut off, so as to stop supplying the test medium at the specified flow rate. Usually, it is also necessary to vent the high-pressure gas and test medium remaining in the pipeline to restore the performance test system to the initial state. If the valve opening has not been reduced to the second preset opening, the valve opening of the electric regulating valve S09 can be reduced steadily.
[0047] Furthermore, the system also includes: an overflow valve; the overflow valve is connected between the output end of the plunger pump S05 and the input end of the flow meter S07; the overflow valve is also connected to the input end of the plunger pump S05; the overflow valve is used to open when the first inlet pressure is greater than a preset pressure threshold, so as to discharge at least a portion of the test medium to the input end of the plunger pump S05 until the first inlet pressure is not greater than the preset pressure threshold.
[0048] When the first inlet pressure of the cavitation venturi tube S08 exceeds the preset pressure threshold, the overflow valve connected between the plunger pump S05 and the flow meter S07 will automatically open based on the pressure of the test medium, releasing part of the test medium to the input end of the plunger pump S05. The overflow valve will automatically close when the first inlet pressure is limited to the allowable preset pressure threshold. By setting the overflow valve, the safe operation of the plunger pump S05, the flow meter S07, the cavitation venturi tube S08, and the electric regulating valve S09 is ensured.
[0049] Furthermore, the control console 102 is also used to: adjust the valve opening of the electric regulating valve S09 to its maximum opening, and shut down the plunger pump S05 to stop the output of the test medium at a specified flow rate. Specifically, after the relief valve is activated and the first inlet pressure is limited to the allowable preset pressure threshold, the control console 102 typically controls the electric regulating valve S09 to smoothly open its valve opening to its maximum opening, causing the internal pressure in the pipeline to drop further; finally, the flow source is shut off, i.e., the plunger pump S05 is shut off, to stop the supply of the test medium at a specified flow rate. It is also usually necessary to vent the high-pressure gas and test medium remaining in the pipeline and restore the performance testing system to its initial state. At the end of the test, the valve opening of the electric regulating valve S09 is restored to its initial state.
[0050] Furthermore, the system also includes: an air tank; the output of the plunger pump S05 is also connected to the air tank; the air stored in the air tank is used to buffer pressure fluctuations in the performance testing system. In actual implementation, clean air is usually pre-stored in the air tank, which can act as a buffer to buffer pressure fluctuations in the performance testing system and maintain stable pressure in the performance testing system.
[0051] Furthermore, the downstream module component 101 includes a downstream storage tank and a downstream level gauge, the latter used to detect the downstream level value of the test medium in the downstream storage tank; the upstream module component 100 includes an upstream storage tank and an upstream level gauge, the former used to detect the upstream level value of the test medium in the upstream storage tank; in actual implementation, the downstream level gauge can detect the downstream level value of the test medium in the downstream storage tank at a preset detection frequency, and the upstream level gauge can detect the upstream level value of the test medium in the upstream storage tank at a preset detection frequency, for example, the preset detection frequency can be detection at a preset time interval or real-time detection, etc.; a reflux component is connected between the upstream and downstream storage tanks; the volume of the upstream storage tank and the volume of the downstream storage tank are matched; for example, upstream and downstream storage tanks with the same or similar volumes can be selected, etc.; to avoid the reflux pump running dry, before the test begins, in the initial state, the upstream level value should not be lower than the second proportional value of the maximum capacity of the upstream storage tank; the control console 102 is used for:
[0052] If it is confirmed that the upstream liquid level is not higher than a first proportional value of the maximum capacity of the upstream tank, or if it is confirmed that the downstream liquid level is not lower than a second proportional value of the maximum capacity of the downstream tank, the reflux assembly is activated to allow the test medium in the downstream tank to flow back to the upstream tank; wherein the first proportional value is less than the second proportional value; if it is confirmed that the valve opening has been reduced to a second preset opening, the plunger pump S05 is shut off to stop outputting the test medium at the specified flow rate.
[0053] The first and second proportional values mentioned above can be set according to actual needs, and the first proportional value is usually less than the second proportional value. For example, the first proportional value is one-third and the second proportional value is two-thirds. In actual implementation, if the upstream liquid level of the test medium in the upstream tank is equal to or lower than the first proportional value of the maximum capacity of the upstream tank, or if the downstream liquid level of the test medium in the downstream tank reaches or exceeds the second proportional value of the maximum capacity of the downstream tank, the reflux assembly can be activated to replenish the test medium from the downstream tank to the upstream tank. During the reflux control process, the control console 102 usually judges in real time whether the valve opening of the electric regulating valve S09 has been reduced to the second preset opening. If it is confirmed that the electric regulating valve S09 has been reduced to the second preset opening, the flow source is usually shut off, that is, the plunger pump S05 is shut off, to stop supplying the test medium at the specified flow rate. It is also usually necessary to vent the high-pressure gas and test medium remaining in the pipeline to restore the performance test system to its initial state.
[0054] If the upstream liquid level is confirmed to exceed a first proportion of the maximum capacity of the upstream tank, while the downstream liquid level is confirmed to be lower than a second proportion of the maximum capacity of the downstream tank, further judgment is usually required. Specifically, the control console 102 is also used to: close the reflux assembly if the upstream liquid level is confirmed to be not lower than the second proportion of the maximum capacity of the upstream tank, and / or the downstream liquid level is confirmed to be not higher than the first proportion of the maximum capacity of the downstream tank. If the upstream liquid level of the test medium in the upstream tank reaches or exceeds the second proportion of the maximum capacity of the upstream tank, and / or the downstream liquid level of the test medium in the downstream tank is equal to or lower than the first proportion of the maximum capacity of the downstream tank, it can be considered that there is already a large amount of test medium in the upstream tank, and / or that there is a small amount of test medium in the downstream tank. In this case, the reflux assembly can be closed to stop the replenishment of test medium from the downstream tank to the upstream tank.
[0055] If it is confirmed that the upstream liquid level is higher than a first percentage of the maximum capacity of the upstream tank and lower than a second percentage of the maximum capacity of the upstream tank, and the downstream liquid level is higher than a first percentage of the maximum capacity of the downstream tank and lower than a second percentage of the maximum capacity of the downstream tank, the current state of the reflux assembly is maintained, wherein the current state can be either closed or open.
[0056] Furthermore, the reflux assembly includes: a reflux filter, a reflux check valve, a first reflux pneumatic valve, a reflux water pump, and a second reflux pneumatic valve connected in sequence; the input end of the reflux filter is connected to the downstream storage tank; the output end of the second reflux pneumatic valve is connected to the upstream storage tank. In actual implementation, when the reflux assembly needs to be activated, the first and second reflux pneumatic valves can be opened, and the reflux water pump can be started; when the reflux assembly needs to be deactivated, the first and second reflux pneumatic valves can be closed, and the reflux water pump can be shut down.
[0057] For ease of understanding, see Figure 3 The schematic diagram shown is of another performance testing system for a cavitation venturi tube, which includes: a pressurization and purging system, a constant current supply and component testing system, a working fluid reflux system, a measurement and control system, and sensors.
[0058] The pressurization and purging system includes: nitrogen tank ZX01, safety valve AQ01, solenoid valve DC01, solenoid valves Q05, Q07, and Q10, filter Q01, filter Q12, check valve Q02, check valve Q08, check valve Q11, gate valve Q03, pressure regulator Q04, pressure regulator Q06, and pressure regulator Q09. Nitrogen tank ZX01 stores pure, high-pressure nitrogen. Safety valve AQ01 is normally closed. If the pressure in nitrogen tank ZX01 exceeds the specified safety value, safety valve AQ01 will automatically open based on the medium pressure, rapidly discharging a portion of the medium until the pressure in nitrogen tank ZX01 drops back to the specified safety range, at which point safety valve AQ01 will automatically close. Solenoid valve DC01 controls the addition or discharging of nitrogen to nitrogen tank ZX01 during the test preparation phase and is normally closed during the formal test. Filter Q01 prevents impurities in nitrogen storage tank ZX01 from entering the pressurization and purging system pipeline, while filter Q12 prevents impurities in the pressurization and purging system pipeline from entering upstream storage tank ZX02. Filters require regular cleaning and maintenance to ensure effective filtration. Check valves Q02, Q08, and Q11 prevent reverse flow of the medium, ensuring the safety and cleanliness of upstream pipelines and components. Gate valve Q03 is manually opened or closed by the testing personnel to control the flow of nitrogen to the pressure reducer in the pressurization and purging branch. Pressure reducers Q04, Q06, and Q09 output high-pressure gas from the upstream source as stable low-pressure gas. Their output pressures need to be set according to downstream operating conditions. Pressure reducer Q04 controls the compression pressure of upstream storage tank ZX02, pressure reducer Q06 controls the purging pressure of the constant flow supply and component testing system, and pressure reducer Q09 controls the purging pressure of the working fluid return system. The purging pressure refers to the gas pressure required to remove impurities such as gas and dust from the pipeline. The purging line controls the supply of purging gas, which is used to purge the pipeline, blowing impurities downstream until they are discharged from the system through an open port. Purging gas can also be used for functions other than purging, such as pressurizing the pipeline during leak checks. Therefore, the gas pressure in the purging line can be adjusted according to actual needs. Solenoid valves Q05, Q07, and Q10 respectively control the pressurization of nitrogen to the upstream storage tank ZX02, the constant flow supply and purging of the component testing system, and the purging of the working fluid return system.
[0059] The constant current supply and component testing system includes upstream tank ZX02, air tank ZX03, safety valves AQ02 and AQ03, solenoid valves DC02, DC03, and DC05, vacuum pump ZK01, pneumatic valves QD01, S04, S10, gate valves ZF01 and S03, filters GL01, S01, and S11, check valve S02, plunger pump S05, relief valve S06, flow meter S07, cavitation venturi tube (adjustable / fixed throat area) S08, and electric regulating valve S09. Upstream tank ZX02 stores deionized water to provide the test medium; tank ZX03 stores clean air and acts as a buffer to mitigate system pressure fluctuations and maintain stable system pressure. Safety valves AQ02 and AQ03 are normally closed. If the pressure in upstream storage tank ZX02 or air storage tank ZX03 exceeds the specified safety value, the corresponding safety valves AQ02 and AQ03 will automatically open based on the medium pressure, rapidly discharging some of the medium until the tank pressure drops back to the specified safety range, at which point the safety valves will automatically close. During the test preparation phase, solenoid valve DC02 controls upstream storage tank ZX02 to discharge excess nitrogen. Upstream storage tank ZX02 is used to store and supply liquid working medium. The lower part of upstream storage tank ZX02 contains the liquid working medium, and the upper part contains gas (air cushion) used for pressurization and buffering. Solenoid valve DC03 controls the flow of air into or out of air storage tank ZX03. During the formal test, both solenoid valves DC02 and DC03 are normally closed. Vacuum pump ZK01 generates and maintains a vacuum environment by evacuating gas from the container. Solenoid valve DC05 controls whether vacuum pump ZK01 is connected to upstream storage tank ZX02. The pneumatic valve QD01 allows the test personnel to remotely operate it and execute preset commands via a control console, while the gate valve ZF01 requires manual opening or closing by the test personnel. Together, they control the on / off relationship between the upstream storage tank ZX02 and the external deionized water container. The filter GL01 prevents external impurities from entering the upstream storage tank ZX02. During the test preparation phase, the solenoid valve DC05, vacuum pump ZK01, pneumatic valve QD01, gate valve ZF01, and filter GL01 work together to add deionized water to the upstream storage tank ZX02: Keep solenoid valves DC02, DC05, Q05, QD01, S16 (second reflux pneumatic valve), and S03 closed, and connect the open end of filter GL01 to an external deionized water container; manually open gate valve ZF01, start vacuum pump ZK01, and open solenoid valve DC05. After the pressure in the upstream storage tank ZX02 drops significantly, open pneumatic valve QD01, at which point deionized water is drawn into the upstream storage tank ZX02; continuously monitor the value of the upstream level gauge YW01 and add enough water to meet the test requirements; sequentially close pneumatic valve QD01, gate valve ZF01, and solenoid valve DC05, and then turn off vacuum pump ZK01 to complete the deionized water addition.Filter S01 prevents impurities in the upstream storage tank ZX02 from entering the constant flow supply and component testing system pipeline, while filter S11 prevents impurities in the constant flow supply and component testing system pipeline from entering the downstream storage tank ZX04. All filters require regular cleaning and maintenance to ensure good filtration performance. Because the cavitation venturi tube S08 (adjustable / fixed throat area) upstream of filter S11, which is the component under test, needs to be frequently removed and installed, filter S11 needs to be cleaned and maintained after each test. One-way valve S02 prevents reverse flow of the medium, ensuring the safety and cleanliness of its upstream pipeline and components. Gate valve S03 requires manual opening or closing by the test personnel, while pneumatic valve S04 allows remote operation and execution of preset commands via a control console. Both valves work together to control the on / off state of the constant flow supply and component testing system pipeline. The plunger pump S05 is a pressure boosting component in a constant flow supply and component testing system. Under ideal conditions where leakage is not considered, the plunger pump S05 can be regarded as a constant flow pump whose flow rate is independent of pressure. The system flow rate is only regulated by the rotational speed of the plunger pump S05 and is not affected by changes in upstream and downstream pressure. Changes in the throttling area of the downstream throttling element of the plunger pump S05 will not change the system flow rate, but can only change the pressure distribution in the downstream pipeline of the plunger pump S05, and cannot regulate the system flow rate. The outlet pressure of the plunger pump S05 is as follows:
[0060]
[0061] In the formula, p s ρ is the saturated vapor pressure of the fluid under its current state (obtained from a table), ρ is the fluid density (obtained from a table), μ is the flow coefficient of the cavitation venturi tube S08 (adjustable / fixed throat area) (calculated from experimental data), and A is the fluid density. S05_out A is the cross-sectional area of the outlet pipe of the plunger pump S05 (calculated according to pipe specifications); t The cross-sectional area of the throttling position in the pipeline of the constant flow supply and component testing system corresponds to the throat area of the cavitation venturi tube S08 (adjustable / fixed throat area) or the throttling area of the electric regulating valve S09. Specifically, when the cavitation venturi tube is operating in the cavitation state, the outlet pressure of the cavitation venturi tube ÷ the inlet pressure of the cavitation venturi tube ≤ the critical cavitation pressure ratio of the venturi tube. At this time, the throttling position downstream of the plunger pump S05 is at the throat of the cavitation venturi tube. A t Corresponding to the throat area (adjustable / fixed throat area) of the cavitation venturi tube S08; when the cavitation venturi tube is working in a non-cavitation state, the outlet pressure of the cavitation venturi tube ÷ the inlet pressure of the cavitation venturi tube > the critical cavitation pressure ratio of the cavitation venturi tube. At this time, the throttling position downstream of the plunger pump S05 is at the narrowest position of the electric regulating valve S09, A t The corresponding throttling area of the electric regulating valve S09; the outlet pressure p of the plunger pump S05. S05_out Flow data Q was directly measured by experiment. VThe results were directly measured experimentally. The system flow rate remained constant throughout the test. Therefore, for incompressible fluids, the flow velocity, flow pattern, and flow resistance of the test medium in the performance testing system pipeline are essentially constant (only minor changes occur in the cavitation zone of the Venturi tube and at the electrically controlled regulating valve; the impact of these minor changes is negligible). Pressure changes caused by pipeline structure, flow velocity, and flow pattern can be considered constant values. The performance testing system achieves constant flow by having only one independent variable: the valve opening of the electrically controlled regulating valve. This allows for a more accurate understanding of the transition from the cavitation to the non-cavitation state in the Venturi tube, and the critical cavitation pressure ratio can be deduced from the non-cavitation state data. With constant flow supply and the cross-sectional area A at the throttling position of the component testing system pipeline... t Reduce the outlet pressure p of the plunger pump S05 S05_out It should be noted that a decrease in the opening of the electric regulating valve S09 does not necessarily cause A to rise. t To reduce, specifically, when the cavitation venturi tube is operating in a cavitation state, A t It is unaffected by the opening degree of the electric regulating valve S09, A t The throat area of the cavitation venturi tube is always considered; the opening of the electric regulating valve S09 needs to be reduced to a certain extent to allow the cavitation venturi tube to transition to a non-cavitation state. At this time, A t The reduction in the opening degree of the electric regulating valve S09, corresponding to the throttling area of the electric regulating valve S09, will cause A to occur. t To ensure the pipeline pressure does not exceed the safe range, a relief valve S06 is installed downstream of the plunger pump S05, forming an relief circuit with the plunger pump S05. Under normal circumstances, the relief valve S06 only connects the plunger pump S05 and the downstream pipeline, and the relief valve S06 is normally closed; however, if the first inlet pressure of the cavitation venturi tube exceeds the preset pressure threshold, or the outlet pressure p of the plunger pump S05 exceeds the threshold, the pressure will be reduced. S05_out If the pressure exceeds the specified safety value, the relief valve S06 will automatically open based on the medium pressure, releasing part of the medium to the inlet of the plunger pump S05 until the outlet pressure of the plunger pump S05 reaches p. S05_out When the pressure drops back to the specified safe range, the overflow valve S06 automatically closes. The flow meter S07 monitors the flow rate of the constant flow supply and component testing system in real time. The cavitation venturi tube S08 (adjustable / fixed throat area) is the component under test; its critical cavitation pressure ratio is a key performance parameter. The electrically controlled regulating valve S09 allows control of the valve core position via a control panel, thereby adjusting the outlet pressure of the cavitation venturi tube S08 (adjustable / fixed throat area). The pneumatic valve S10 allows the test personnel to remotely operate and execute preset commands via a control panel to control the discharge of the test medium from the constant flow supply and component testing system to the downstream storage tank ZX04.
[0062] The working fluid reflux system includes: downstream tank ZX04, safety valve AQ04, solenoid valve DC04, pneumatic valve QD02, first reflux pneumatic valve S14, second reflux pneumatic valve S16, gate valve ZF02, reflux filter S12, reflux check valve S13, and reflux pump S15. Downstream tank ZX04 stores the test medium discharged from the constant flow supply and component testing system, and also serves as the flow source for the working fluid reflux system. Upstream tank ZX02 and downstream tank ZX04 of the testing system should have the same or similar volumes. Safety valve AQ04 is normally closed. If the pressure in downstream tank ZX04 exceeds the specified safety value, safety valve AQ04 will automatically open based on the medium pressure, rapidly discharging a portion of the medium until the pressure in downstream tank ZX04 drops back to the specified safety range, at which point safety valve AQ04 will automatically close. Solenoid valve DC04 controls the flow of air into or out of downstream storage tank ZX04, regulating the internal air pressure of ZX04. Pneumatic valve QD02 allows remote operation by the test personnel and execution of preset commands via a control console. Gate valve ZF02 requires manual opening or closing by the test personnel. Both valves work together to control the discharge of excess test medium from downstream storage tank ZX04. Filter S12 prevents impurities in downstream storage tank ZX04 from entering the working medium return system pipeline. The filter requires regular cleaning and maintenance to ensure its good filtration effect. Return check valve S13 prevents reverse flow of the medium, ensuring the safety and cleanliness of its upstream pipelines and components. First return pneumatic valve S14 and second return pneumatic valve S16 allow remote operation by the test personnel and execution of preset commands via a control console, respectively controlling the flow of test medium into return water pump S15 and the delivery from return water pump S15 to upstream storage tank ZX02. The return water pump S15 is a pressurizing component of the working fluid return system. It transports the test working fluid collected in the downstream storage tank ZX04 and discharged from the constant flow supply and component testing system back to the flow source of the constant flow supply and component testing system—the upstream storage tank ZX02, so as to realize the continuous recycling of the test working fluid.
[0063] The monitoring and control system and sensors include: upstream level gauge YW01, downstream level gauge YW02, thermometer WD01, thermometer WD02, pressure gauge YL01, pressure gauge YL02, pressure gauge YL03, pressure gauge YL04, pressure gauge YL05, pressure gauge YL06, pressure gauge YL07, pressure gauge YL08, pressure gauge YL09, pressure gauge YL10, pressure gauge YL11, pressure gauge YL12, pressure gauge YL13, pressure gauge YL14, and a monitoring and control console. Upstream level gauge YW01 and downstream level gauge YW02 monitor the water levels in upstream tank ZX02 and downstream tank ZX04, respectively. Thermometers WD01 and WD02 monitor the internal temperatures of upstream tank ZX02 and downstream tank ZX04, respectively. Pressure gauges YL01-YL14 monitor the pressure at their respective locations. The control console is used to read, display, and store measurement point data, as well as to receive action commands for each component during preset tests, and to control the start, stop, and end of the tests. The control console is also used for remotely controlling valve opening and closing, and monitoring the operating status of each sensor.
[0064] Based on the above system, the following are provided: Figure 4 The method for testing the cavitation venturi tube performance based on a constant current system is shown below, with the following specific steps:
[0065] ST101. Select the test object. The test object should be a cavitation venturi tube with adjustable or fixed throat area, or a throttling element with the same working principle.
[0066] ST102: Determine the test conditions and calculate system parameters. Specifically, based on the rated flow rate, rated pressure, and throat area of the test object, calculate the test system parameters, including supply pressure, pipe diameter, back pressure valve (corresponding to electric regulating valve S09) adjustment step, first preset opening degree, and second preset opening degree. The supply pressure specifically includes the nitrogen pressure stored in nitrogen tank ZX01, the pressure of the pressure cushion in upstream tank ZX02, and the outlet pressure of plunger pump S05 / inlet pressure of the test object, such as the inlet pressure of the cavitation venturi tube (adjustable / fixed throat area). The pipe diameter must be the diameter of each part of the pipe. Ensure that the throttling position of the system occurs at the cavitation venturi tube S08 (adjustable / fixed throat area) or electric regulating valve S09, not within the pipe itself, and avoid pressure losses that may affect measurement accuracy. In practical applications, a minimum pipe diameter threshold can be preset; the pipe diameter of the entire system must not be smaller than this threshold. The back pressure valve adjustment step can be understood as the adjustment amount each time the back pressure valve is adjusted.
[0067] ST103, install test elements and confirm system status; specifically, check the system's sealing, gas source pressure and tank level, and valve status, etc.
[0068] ST104, start the test system.
[0069] ST105, by steadily reducing the back pressure valve opening of the cavitation venturi tube, the test system will exhibit the following phenomena in sequence:
[0070] ① The system flow rate is constant, the first inlet pressure of the cavitation venturi tube remains unchanged, and the first outlet pressure gradually increases; the system flow rate is the same as the plunger pump flow rate. When the relief valve S06 is not open, the system flow rate is also the flow rate through the test object (adjustable / fixed throat area) cavitation venturi tube S08. When the relief valve S06 is not open, the system flow rate can be directly measured by the flow meter during the test.
[0071] ② With a constant system flow rate, after the cavitation venturi condition reaches the cavitation critical point, the first inlet pressure of the cavitation venturi increases synchronously with the first outlet pressure.
[0072] ③The relief valve opens after the first inlet pressure of the cavitation venturi tube reaches the maximum allowable value of the system.
[0073] If the overflow valve opens immediately when the test system is started, it indicates that the system flow rate is too high and the speed of the piston pump drive shaft needs to be reduced.
[0074] If the test is completed before the first inlet pressure of the cavitation venturi tube reaches the maximum allowable value of the system, the test can be ended directly without the relief valve opening.
[0075] ST106, shut off the flow source, stop the flow supply, vent the high-pressure gas and test medium remaining in the pipeline, and restore the test system to its initial state. Typically, after shutting down the plunger pump S05, the pneumatic valve S04 is closed (to prevent the plunger pump S05 from running dry and to cut off the working medium after the plunger pump S05 is shut down).
[0076] ST107, shut down the test system.
[0077] ST108, based on the data curves and referring to the calculation method for the critical cavitation pressure ratio of the venturi tube in the above embodiment, the critical cavitation point of the cavitation venturi tube is deduced. The data curves refer to the original curves of the changes of various parameters over time obtained from the experiment. The curves required for the calculation include the flow rate curve, the first inlet pressure curve of the cavitation venturi tube, and the first outlet pressure curve of the cavitation venturi tube.
[0078] Based on the above system, the following are provided: Figure 5 The pressure control method for testing the performance of a cavitation venturi tube, as shown, includes the following specific steps:
[0079] ST201, test begins.
[0080] ST202, fill the test medium before the main valve (pneumatic valve S04).
[0081] ST203, plunger pump S05 starts, and the main valve opens at the same time.
[0082] ST204, smoothly reduce the back pressure valve opening of the cavitation venturi tube. At this time, the following will occur in sequence: ① The system flow rate is constant, the first inlet pressure of the cavitation venturi tube remains unchanged, and the first outlet pressure gradually increases; ② The system flow rate is constant, and after the cavitation venturi tube reaches the cavitation critical point, the first inlet pressure of the cavitation venturi tube increases synchronously with the first outlet pressure.
[0083] ST205 determines whether the cavitation venturi inlet pressure is within the maximum allowable value of the system.
[0084] ① If the result of ST205 is "yes", execute ST206 to determine whether the opening of the cavitation venturi back pressure valve has been reduced to the target value (corresponding to the second preset opening mentioned above). If the result of ST206 is "yes", execute ST207 to shut off the flow source, stop the flow supply, vent the high-pressure gas and test medium remaining in the pipeline, and restore the test system to its initial state; if the result of ST206 is "no", execute ST204 to continue to steadily reduce the opening of the cavitation venturi back pressure valve.
[0085] ② If the result of ST205 is "No", execute ST211 to start the overflow valve and limit the internal pressure of the pipeline to below the maximum allowable safe pressure; execute ST212 to smoothly open the cavitation venturi back pressure valve to the maximum opening degree, and the internal pressure of the pipeline will further drop; execute ST207 to shut off the flow source, stop the flow supply, drain the high-pressure gas and test medium remaining in the pipeline, and restore the test system to the initial state.
[0086] If the relief valve opens before the cavitation venturi back pressure valve opening decreases to the target value, it is necessary to determine whether the completed operating condition covers the cavitation critical point based on the obtained venturi inlet pressure data. If the cavitation venturi inlet pressure has shown a stable upward segment, it indicates that the measured operating condition covers the cavitation critical point well, and no retesting is required; if the cavitation venturi inlet pressure does not show an upward segment or the upward segment is very short, it indicates that the system flow rate setting is too high, and the preset plunger pump target speed needs to be lowered, and the test needs to be repeated.
[0087] ST208, test completed.
[0088] Based on the above system, the following are provided: Figure 6 The following is a method for testing the performance of a cavitation venturi tube using a circulating working fluid, with the specific steps as follows:
[0089] ST301, test begins.
[0090] ST302, fill the test medium before the main valve (pneumatic valve S04).
[0091] ST303, start piston pump S05, and open the main valve at the same time.
[0092] ST304 monitors the liquid level of each tank in real time, including the upstream liquid level gauge YW01 and the downstream liquid level gauge YW02 of the test system.
[0093] ST305, determine the relationship between the liquid level and the maximum capacity of each tank. The upstream and downstream tanks of the test system should be of the same or similar volume; to avoid the backflow pump running dry, the upstream liquid level should not be lower than the second proportion of the maximum capacity of the upstream tank before the test begins.
[0094] ① If the liquid level YW01 in the upstream storage tank of the test system is equal to or lower than 1 / 3 of the maximum capacity of the storage tank, or the liquid level YW02 in the downstream storage tank of the test system reaches or exceeds 2 / 3 of the maximum capacity of the storage tank, execute ST311, open the first reflux pneumatic valve S14 and the second reflux pneumatic valve S16 in the working medium reflux system, start the reflux water pump S15, and replenish the test medium from the downstream storage tank of the test system to the upstream storage tank of the test system.
[0095] ② If the liquid level YW01 in the upstream storage tank of the test system is higher than 1 / 3 of the maximum capacity of the storage tank, and the liquid level YW02 in the downstream storage tank of the test system is lower than 2 / 3 of the maximum capacity of the storage tank, execute ST306 for further judgment, as follows:
[0096] (a) If the liquid level YW01 in the upstream storage tank of the test system reaches or exceeds 2 / 3 of the maximum capacity of the storage tank, and / or the liquid level YW02 in the downstream storage tank of the test system is equal to or lower than 1 / 3 of the maximum capacity of the storage tank, ST307 is executed to close the first reflux pneumatic valve S14 and the second reflux pneumatic valve S16 of the working fluid reflux system and to close the reflux water pump S15.
[0097] (b) If the liquid level YW01 in the upstream storage tank of the test system is lower than 2 / 3 of the maximum capacity of the storage tank, and the liquid level YW02 in the downstream storage tank of the test system is higher than 1 / 3 of the maximum capacity of the storage tank, the working fluid reflux system shall maintain its current working state and shall not be adjusted.
[0098] ST308 determines whether the opening of the cavitation venturi back pressure valve has been reduced to the target value.
[0099] ① If the ST308 judgment result is "yes", execute ST309 to shut off the flow source, stop the flow supply, vent the high-pressure gas and test medium remaining in the pipeline, and restore the test system to its initial state.
[0100] ②If ST308 determines "No", then ST304 will be executed to continue real-time monitoring of the liquid level in each tank.
[0101] ST310, test complete.
[0102] Based on the above system, the following are provided: Figure 7 A method for calculating the critical cavitation pressure ratio of a cavitation venturi tube, provided in this embodiment of the invention, comprises the following specific steps:
[0103] ST401, during the cavitation stage of the cavitation venturi tube, the pressure measured by the first pressure gauge at a certain moment (or the average of the pressure measured by the first pressure gauge at multiple moments after removing outliers) is taken as the cavitation critical point venturi tube inlet pressure p. in .
[0104] ST402, in the non-cavitation stage of the cavitation venturi tube, the difference between the pressure measured by the first pressure gauge and the second pressure gauge at a certain moment (or the difference between the pressure measured by the first pressure gauge and the second pressure gauge at multiple moments, and the average value after removing outliers) is taken as the difference Δp between the inlet pressure and the outlet pressure of the cavitation venturi tube at the cavitation critical point.
[0105] ST403, based on the cavitation critical point venturi inlet pressure p in The difference Δp between the inlet and outlet pressures of the cavitation venturi tube at the cavitation critical point is used to obtain the outlet pressure p of the cavitation venturi tube at the cavitation critical point. out .
[0106] ST404, based on the cavitation critical point Venturi tube outlet pressure p out The cavitation venturi inlet pressure p at the cavitation critical point in Compared to obtaining the critical cavitation pressure ratio p of the cavitation venturi tube, r .
[0107] The aforementioned cavitation venturi tube performance testing system is suitable for testing the cavitation venturi tube performance of liquid rocket engines, as well as solid-liquid rocket engines, combined-fuel engines, and other engines with high requirements for the reliability and accuracy of flow control. This solution also solves the problem of test medium circulation during cavitation venturi tube performance testing, enabling long-term testing with a limited test medium.
[0108] The aforementioned performance testing system for cavitation venturi tubes proposes a novel method for accurately measuring the critical cavitation pressure ratio of cavitation venturi tubes: maintaining a constant system flow rate, reducing the opening of the back pressure valve of the cavitation venturi tube, and calculating the difference between the outlet and inlet pressures of the cavitation venturi tube under critical cavitation conditions based on non-cavitation state data, thus inversely estimating the critical cavitation pressure ratio of the cavitation venturi tube. This method ensures a constant system flow rate throughout the test. Under non-cavitation conditions, for incompressible fluids, the flow velocity, flow pattern, and flow resistance are also constant, allowing for the inverse estimation of the critical cavitation pressure ratio based on non-cavitation state data. Based on this testing method, the performance testing system designed in this scheme is a plunger pump-based test system. This test system uses nitrogen pressurization and purging; an air buffer tank and an overflow valve are installed downstream of the plunger pump to ensure stable flow rate and pressure within a safe range; an electric regulating valve is installed downstream of the cavitation venturi tube to adjust the back pressure; two water tanks are installed upstream and downstream of the system, and the deionized water in the two tanks can circulate, allowing the system to conduct long-term continuous testing.
[0109] The aforementioned performance testing system can accurately calculate the critical cavitation pressure ratio of the cavitation Venturi tube based on a constant flow system: keeping the system flow rate constant, steadily reducing the opening of the cavitation Venturi tube back pressure valve, and measuring the system flow rate Q (constant value) and the inlet pressure p of the cavitation Venturi tube under cavitation conditions. in (i.e., the plunger pump supply pressure p) pumpfeed The pressure difference Δp (constant value) between the inlet and outlet pressures of the cavitation venturi tube under cavitation critical and non-cavitation conditions; the pressure difference Δp between the outlet and inlet pressures of the cavitation venturi tube under critical cavitation conditions and the plunger pump supply pressure p. pumpfeed Back-calculation Venturi critical cavitation pressure ratio p r .
[0110] The proposed method for measuring and calculating the critical cavitation pressure ratio of a venturi tube in this invention maintains a constant system flow rate throughout the test. Therefore, for incompressible fluids, the flow velocity, flow pattern, and flow resistance of the test medium in the performance testing system pipeline are essentially constant (only minor changes occur in the cavitation zone of the cavitating venturi tube and at the electrically controlled regulating valve, the impact of which is negligible). Pressure changes caused by pipeline structure, flow velocity, and flow pattern can be considered constant values. The performance testing system achieves the transition from the cavitating to the non-cavitating state of the venturi tube under constant flow rate with only one independent variable: the valve opening of the electrically controlled regulating valve. The operating state of the component is more accurate, and the critical cavitation pressure ratio can be deduced from the non-cavitating state data. Compared with existing technologies, this scheme avoids the nonlinear pressure loss caused by changes in pipeline structure and flow pattern in the performance testing of cavitating venturi tubes, and can calculate the critical cavitation pressure ratio of the venturi tube more accurately.
[0111] Compared to existing technologies, the proposed method for measuring and calculating the critical cavitation pressure ratio of cavitation venturi tubes allows for measurement of only selected key points without needing to continuously measure the entire variation curve. The pressure control method for cavitation venturi tube performance testing based on a constant flow system, proposed in this scheme, utilizes a plunger pump, a cavitation venturi tube back pressure valve, and a relief valve in synergy to transition the cavitation venturi tube from the cavitation state to the critical cavitation state, and finally to the non-cavitation state. The testing process covers all operating states of the cavitation venturi tube, achieving the target for measuring the critical cavitation pressure ratio. Simultaneously, the relief valve ensures that the pipeline pressure of the testing system remains within a safe range. Compared to venturi tube performance testing methods using vane pumps, this scheme avoids damage to the pressurization components caused by changes in flow rate and pressure.
[0112] Compared to traditional methods, the proposed cavitation venturi tube performance testing working medium circulation method can collect the discharged test medium, filter it, pressurize it via a water pump, and then transport it back to the flow source of the constant flow supply and component testing system. The test medium circulation system collects the discharged test medium and transports it back to the flow source of the performance testing system, realizing continuous circulation of the test medium throughout the system during the test, allowing the system to conduct long-term continuous testing. Furthermore, the entire test only requires one refill before system startup, and the total water consumption is at most the full volume of the upstream tank ZX02. Compared to traditional testing systems that require refilling only when needed before the test ends, this reduces the number of refills, saves test preparation time and manpower, reduces water consumption, and achieves economical use of the test medium.
[0113] The proposed method for testing the working fluid circulation of cavitation Venturi tubes, compared to the traditional method that relies on manual judgment to determine the start and stop of the reflux system, allows the system to automatically switch the working state of the reflux system based on the real-time monitoring values of the upstream level gauge YW01 and the downstream level gauge YW02. This effectively avoids situations where the water volume in the upstream tank of the test system is insufficient or the water level in the downstream tank of the test system is too high.
[0114] Because the pressure change that occurs when a cavitated venturi tube transitions from a cavitated to a non-cavitated state is very small and difficult to distinguish from system pressure oscillations, existing technologies for testing the performance of cavitated venturi tubes typically require test personnel to rely on experience to determine whether the tube is at the critical cavitation point. The proposed method for measuring and calculating the critical cavitation pressure ratio of cavitated venturi tubes eliminates the need for subjective judgment and decision-making by test personnel throughout the measurement and calculation process. The measurement and calculation results are objective, allowing the control console to autonomously execute the experimental and calculation programs and train a highly reliable machine learning model for venturi tubes based on the measurement and calculation results. This model can then be used to predict the performance of cavitated venturi tubes in various tasks.
[0115] This invention provides a performance testing method for cavitation venturi tubes, the method comprising the following steps:
[0116] Step 1: The upstream module component inputs the test medium into the plunger pump, and the plunger pump outputs the test medium at a specified flow rate, which then flows into the downstream module component sequentially through the cavitation venturi tube and the electric regulating valve; wherein, the specified flow rate is positively correlated with the speed of the plunger pump's drive shaft; the speed of the plunger pump's drive shaft is controlled by the control console;
[0117] Step 2: The control console gradually reduces the valve opening of the electric regulating valve from the first preset opening to the second preset opening according to the preset adjustment step, obtaining multiple data sets; wherein, each data set includes: flow data read by the flow meter; the first inlet pressure of the cavitation venturi tube read by the first pressure gauge; and the first outlet pressure of the cavitation venturi tube read by the second pressure gauge.
[0118] Step 3: Generate a first relationship curve based on the data in each data group; the first relationship curve is used to characterize the changes in the first inlet pressure and the first outlet pressure of the cavitation venturi tube with time; under cavitation conditions and at the cavitation critical point, the first inlet pressure of the cavitation venturi tube is a first constant value, and the first outlet pressure increases linearly with time; at the cavitation critical point and in non-cavitation conditions, the first inlet pressure of the cavitation venturi tube increases linearly with time in sync with the first outlet pressure, and the difference between the first inlet pressure and the first outlet pressure is a second constant value;
[0119] Step 4: Calculate the difference between the first constant value and the second constant value to obtain the critical outlet pressure of the cavitation venturi tube at the cavitation critical point;
[0120] Step 5: Calculate the ratio between the critical outlet pressure and the first constant value to obtain the critical cavitation pressure ratio of the cavitation venturi tube.
[0121] The above-mentioned performance testing method for cavitation venturi tubes uses a first constant value for the first inlet pressure of the cavitation venturi tube S08 under cavitation conditions and at the cavitation critical point. Under non-cavitation conditions at the cavitation critical point, the difference between the first inlet pressure and the first outlet pressure of the cavitation venturi tube S08 is a second constant value. Based on the first and second constant values, the critical outlet pressure of the cavitation venturi tube S08 at the cavitation critical point can be calculated. By calculating the ratio between the critical outlet pressure and the first constant value, the critical cavitation pressure ratio of the cavitation venturi tube S08 can be derived, allowing for a more accurate calculation of the critical cavitation pressure ratio of the cavitation venturi tube S08.
[0122] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A performance testing system for cavitation venturi tubes, characterized in that, The system includes: an upstream module assembly, a plunger pump, a flow meter, a cavitation venturi tube, an electric regulating valve, and a downstream module assembly connected in sequence; the input end of the cavitation venturi tube is also connected to a first pressure gauge; the output end of the cavitation venturi tube is also connected to a second pressure gauge; the plunger pump, the flow meter, the first pressure gauge, the second pressure gauge, and the electric regulating valve are respectively connected to a control console; in the initial state, the valve opening of the electric regulating valve is a first preset opening. The upstream module assembly is used to input the test medium into the plunger pump, and the plunger pump outputs the test medium at a specified flow rate, which then flows into the downstream module assembly sequentially through the cavitation venturi tube and the electric regulating valve; wherein, the magnitude of the specified flow rate is positively correlated with the rotational speed of the plunger pump's drive shaft; the rotational speed of the plunger pump's drive shaft is controlled by the control console; The control console is used to gradually reduce the valve opening of the electric regulating valve from the first preset opening to the second preset opening according to a preset adjustment step, thereby obtaining multiple data sets; wherein, each data set includes: flow data read by the flow meter; the first inlet pressure of the cavitation venturi tube read by the first pressure gauge; and the first outlet pressure of the cavitation venturi tube read by the second pressure gauge. Based on the data in each data group, a first relationship curve is generated; wherein, the first relationship curve is used to characterize the change law of the first inlet pressure and the first outlet pressure of the cavitation venturi tube with time; in the cavitation state and at the cavitation critical point, the first inlet pressure of the cavitation venturi tube is a first constant value, and the first outlet pressure increases linearly with time; at the cavitation critical point and in the non-cavitation state, the first inlet pressure and the first outlet pressure of the cavitation venturi tube increase linearly with time simultaneously, and the difference between the first inlet pressure and the first outlet pressure is a second constant value; Calculate the difference between the first constant value and the second constant value to obtain the critical outlet pressure of the cavitation venturi tube at the cavitation critical point; Calculate the ratio between the critical outlet pressure and the first constant value to obtain the critical cavitation pressure ratio of the cavitation venturi tube; The control console is also used for: During the process of adjusting the valve opening of the electric regulating valve, it is determined whether the first inlet pressure of the cavitation venturi tube is greater than a preset pressure threshold. If the first inlet pressure is not greater than the preset pressure threshold, determine whether the valve opening has been reduced to the second preset opening; If the valve opening has been reduced to the second preset opening, the plunger pump is turned off to stop outputting the test medium at the specified flow rate; The system further includes: an overflow valve; the overflow valve is connected between the output end of the plunger pump and the input end of the flow meter; the overflow valve is also connected to the input end of the plunger pump; The overflow valve is used to open when the first inlet pressure is greater than the preset pressure threshold, so as to discharge at least a portion of the test medium to the input end of the plunger pump until the first inlet pressure is not greater than the preset pressure threshold.
2. The system according to claim 1, characterized in that, The control console is also used for: Adjust the valve opening of the electric regulating valve to the maximum opening and turn off the plunger pump to stop outputting the test medium at the specified flow rate.
3. The system according to claim 1, characterized in that, The system also includes: an air tank; the output end of the plunger pump is also connected to the air tank; The air stored in the air tank is used to buffer pressure fluctuations in the performance testing system.
4. The system according to claim 1, characterized in that, The downstream module assembly includes a downstream tank and a downstream level gauge, the downstream level gauge being used to detect the downstream level of the test medium in the downstream tank; the upstream module assembly includes an upstream tank and an upstream level gauge, the upstream level gauge being used to detect the upstream level of the test medium in the upstream tank; a reflux assembly connects the upstream tank and the downstream tank; the volume of the upstream tank matches the volume of the downstream tank; initially, the upstream level is not lower than a second proportional value of the maximum capacity of the upstream tank; the control console is used for: If it is confirmed that the upstream liquid level is not higher than a first proportion of the maximum capacity of the upstream tank, or if it is confirmed that the downstream liquid level is not lower than a second proportion of the maximum capacity of the downstream tank, the reflux assembly is activated to allow the test medium in the downstream tank to flow back to the upstream tank; wherein the first proportion is less than the second proportion. If it is confirmed that the valve opening has been reduced to the second preset opening, the plunger pump is turned off to stop outputting the test medium at the specified flow rate.
5. The system according to claim 4, characterized in that, The control console is also used for: If it is confirmed that the upstream liquid level is not lower than a second proportional value of the maximum capacity of the upstream tank, and / or the downstream liquid level is not higher than a first proportional value of the maximum capacity of the downstream tank, the reflux assembly is shut down.
6. The system according to claim 4, characterized in that, The control console is also used for: If it is confirmed that the upstream liquid level is higher than a first percentage of the maximum capacity of the upstream tank and lower than a second percentage of the maximum capacity of the upstream tank, and the downstream liquid level is higher than a first percentage of the maximum capacity of the downstream tank and lower than a second percentage of the maximum capacity of the downstream tank, the current state of the reflux assembly is maintained.
7. The system according to claim 4, characterized in that, The reflux assembly includes: a reflux filter, a reflux check valve, a first reflux pneumatic valve, a reflux water pump, and a second reflux pneumatic valve connected in sequence; the input end of the reflux filter is connected to the downstream storage tank; and the output end of the second reflux pneumatic valve is connected to the upstream storage tank.
8. A method for testing the performance of a cavitation venturi tube, wherein the method is applied to the performance testing system according to any one of claims 1-7; characterized in that, The method includes: The upstream module assembly inputs the test medium into the plunger pump, and the plunger pump outputs the test medium at a specified flow rate, which then flows sequentially through the cavitation venturi tube and the electric regulating valve into the downstream module assembly; wherein, the magnitude of the specified flow rate is positively correlated with the rotational speed of the plunger pump's drive shaft; the rotational speed of the plunger pump's drive shaft is controlled by the control console; The control console gradually reduces the valve opening of the electric regulating valve from the first preset opening to the second preset opening according to the preset adjustment step, thereby obtaining multiple data sets; wherein, each data set includes: flow data read by the flow meter; the first inlet pressure of the cavitation venturi tube read by the first pressure gauge; and the first outlet pressure of the cavitation venturi tube read by the second pressure gauge. Based on the data in each data group, a first relationship curve is generated; wherein, the first relationship curve is used to characterize the change law of the first inlet pressure and the first outlet pressure of the cavitation venturi tube with time; in the cavitation state and at the cavitation critical point, the first inlet pressure of the cavitation venturi tube is a first constant value, and the first outlet pressure increases linearly with time; at the cavitation critical point and in the non-cavitation state, the first inlet pressure and the first outlet pressure of the cavitation venturi tube increase linearly with time simultaneously, and the difference between the first inlet pressure and the first outlet pressure is a second constant value; Calculate the difference between the first constant value and the second constant value to obtain the critical outlet pressure of the cavitation venturi tube at the cavitation critical point; The critical cavitation pressure ratio of the cavitation venturi tube is obtained by calculating the ratio between the critical outlet pressure and the first constant value.
Citation Information
Patent Citations
Device and method for testing back pressure performance of venturi tube
CN114166641A
Flow control device and method based on venturi tube and electromagnetic valve duty ratio adjustment
CN117093023A