A digital management system
By managing production factors, documents, resources, and business models through the digital management system, the problem that existing information management systems cannot achieve full-scenario business synchronization and intelligent management has been solved. This enables global control and intelligent management of the target organization, thereby improving management efficiency.
Patent Information
- Application Number
- CN202510954132.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-10
- Publication Date
- 2025-10-28
- Estimated Expiration
- 2045-07-10
AI Technical Summary
Existing information management systems lack attention to the full range of business scenarios of enterprises and organizations, making it difficult to achieve intelligent management, resulting in low management efficiency and failing to meet the management needs and flexible adjustments of enterprises and organizations.
A digital management system is provided, including a production factor management module, a document management module, a resource planning module, a business model management module, and a project management module. Through automatic data empowerment, global resource planning, and business modeling, it enables global control and intelligent management of the target organization.
It improves the management efficiency of enterprises and organizations, realizes overall control and intelligent management, and meets the management needs and flexible adjustments of enterprises and organizations.
Smart Images

Figure CN120450397B_ABST
Abstract
Description
Technical Field
[0001] This disclosure relates to the field of information technology, and more particularly to a digital management system. Background Technology
[0002] In existing technologies, information management systems used by enterprises and organizations typically focus only on functional design and lack attention to actual business scenarios. They are unable to synchronously express the full range of business operations of enterprises and organizations in a digital twin space, thus failing to achieve intelligent management and limiting the management efficiency of enterprises and organizations. Summary of the Invention
[0003] In view of this, this disclosure proposes a technical solution for a digital management system.
[0004] According to one aspect of this disclosure, a digital management system is provided, comprising: a production factor management module for determining a production factor library corresponding to a target organization; a document management module for determining a standard document library corresponding to the target organization; a resource planning module for determining a global resource plan corresponding to the target organization, wherein the global resource plan is used to indicate the work time and work location arrangements for each position in the target organization, the positions including business positions and process positions; a business model management module for performing business modeling for any business scenario of the target organization based on the production factor library, the standard document library, the global resource plan, and the labor form corresponding to the business scenario, and determining the business model corresponding to the business scenario, wherein the business model corresponding to any business scenario includes the expression result of the labor form corresponding to the business scenario and the business process; and a project management module for determining the global control status of the target organization based on the production factor library, the standard document library, the global resource plan, and all business models corresponding to the target organization, wherein the global control status includes the real-time operating status of any business scenario in the target organization throughout its entire lifecycle.
[0005] In one possible implementation, the production factor management module is configured to: for any production factor of the target organization, instantiate the production factor according to a preset standard data specification, and determine the instance data table corresponding to the production factor; and determine the production factor database according to the instance data table corresponding to each production factor in the target organization.
[0006] In one possible implementation, the file management module is configured to: perform structured processing on any operational document of the target organization to determine the structured electronic document corresponding to the operational document, wherein the operational document includes: the target organization's basic knowledge documents, rules and regulations, and historical business records corresponding to any business scenario; and determine the standard file library based on the structured electronic document corresponding to each operational document in the target organization.
[0007] In one possible implementation, the resource planning module is used to: determine all positions in the target organization, and the personnel information corresponding to each position, wherein the personnel information corresponding to any position includes: the number of personnel corresponding to the position, and the position permissions corresponding to each personnel; and perform resource scheduling based on the personnel information corresponding to each position in the target organization to determine the global resource plan.
[0008] In one possible implementation, the business model management module is configured to: for any given business scenario, determine the business rules corresponding to that business scenario based on the standard file library; determine the labor form expression result, production factors, and personnel positions corresponding to that business scenario based on the labor form expression result, production factors, personnel positions, and business rules corresponding to that business scenario; and perform business process modeling based on the labor form expression result, production factors, personnel positions, and business rules corresponding to that business scenario to determine the business process corresponding to that business scenario.
[0009] In one possible implementation, the project management module is configured to: monitor in real time the changes in production factors and personnel corresponding to any given business scenario, and determine the real-time resource status of that business scenario; record the real-time running data of the business model corresponding to that business scenario while executing the business process corresponding to that business scenario; and determine the real-time running status of the entire lifecycle of any given business scenario based on the real-time resource status and the real-time running data of the business model corresponding to that business scenario.
[0010] In one possible implementation, the project management module is further configured to: determine the three-dimensional scene model and multi-dimensional monitoring data corresponding to the target organization, wherein the multi-dimensional monitoring data includes: IoT data, video surveillance data, and operational data of at least one working system corresponding to the target organization; map the global control status and the multi-dimensional monitoring data to the three-dimensional scene model to determine the visualization monitoring model corresponding to the target organization.
[0011] In one possible implementation, the system further includes: an approval process management module; the approval process management module is used to: approve the object to be approved according to its type, and determine the approval result corresponding to the object to be approved, wherein the object to be approved includes any one of: newly added or changed production factors, operating documents, personnel, labor forms, and global resource plans; and register the object to be approved in the system if the approval result corresponding to the object to be approved is that it has been approved.
[0012] In one possible implementation, the system further includes a development platform module; the development platform module is used to provide a user entry point for any given position to access the system based on the user authentication information corresponding to that position.
[0013] In one possible implementation, the development platform module is further configured to: adjust the functions of the system according to user development needs, and determine the corresponding integration adjustment result of the system.
[0014] The digital management system of this disclosure can determine the production factor library and document management library corresponding to the target organization through the production factor management module and the document management module, thereby realizing automatic digital empowerment of the target organization and providing a data foundation for the collaborative operation of the entire system. Based on the resource planning module, it can determine the global resource plan corresponding to the target organization according to the principle of "assigning resources according to tasks and one resource per position" to indicate the work time arrangement of the position resources corresponding to each business position and process position in the target organization. It is not restricted by administrative management and can ensure sufficient position resources for each position in the target organization while meeting administrative needs and business scenario execution needs. The business model management module can take production factors, positions, and operations as the three key points, and based on the principle of position execution of operations and operation consumption of production factors, for any business scenario, it can perform business modeling according to the production factor library, standard document library, global resource plan, and the labor form corresponding to the business scenario, to achieve multi-dimensional, fully automatic, and standardized business modeling, and determine the business model corresponding to the business scenario, including the expression results of labor form and business process. By utilizing the project management module, the overall control status of the target organization can be determined based on the production factor library, standard document library, global resource plan, and all business models corresponding to the target organization. This allows for real-time monitoring of the entire lifecycle of any business scenario within the target organization, enabling full-process orchestration and control of the target organization's production management and business operations. This ensures the refinement of project-based production, thereby achieving comprehensive digital twin and intelligent management of the target organization, forming a customized digital management system for the target organization, and ultimately improving the management efficiency of the target organization.
[0015] Other features and aspects of this disclosure will become clear from the following detailed description of exemplary embodiments with reference to the accompanying drawings. Attached Figure Description
[0016] The accompanying drawings, which are included in and form part of this specification, illustrate exemplary embodiments, features, and aspects of this disclosure together with the specification and serve to explain the principles of this disclosure.
[0017] Figure 1 A block diagram of a digital management system according to an embodiment of the present disclosure is shown.
[0018] Figure 2 A flowchart illustrating a production factor registration and data instantiation according to an embodiment of this disclosure is shown.
[0019] Figure 3 A block diagram of an electronic device according to an embodiment of the present disclosure is shown. Detailed Implementation
[0020] Various exemplary embodiments, features, and aspects of this disclosure will now be described in detail with reference to the accompanying drawings. The same reference numerals in the drawings denote elements that have the same or similar functions. Although various aspects of the embodiments are shown in the drawings, they are not necessarily drawn to scale unless specifically indicated otherwise.
[0021] As used herein, the terms “comprising,” “including,” “having,” or variations thereof are open-ended and include one or more of the stated features, integrals, elements, steps, components, or functions, but do not exclude the presence or addition of one or more other features, integrals, elements, steps, components, functions, or groups thereof.
[0022] When an element is referred to as “connected,” “coupled,” “responding,” or a variation thereof relative to another element, it may be directly connected, coupled, or responding to another element, or there may be an intermediate element present.
[0023] Although the terms first, second, third, etc., may be used herein to describe various elements / operations, these elements / operations should not be limited by these terms. These terms are only used to distinguish one element / operation from another. Therefore, without departing from the teachings of the inventive concept, a first element / operation in some embodiments may be referred to as a second element / operation in other embodiments.
[0024] The term “exemplary” as used herein means “serving as an example, embodiment, or illustration.” Any embodiment illustrated herein as “exemplary” is not necessarily to be construed as superior to or better than other embodiments.
[0025] The term "and / or" herein simply describes an association relationship between associated objects, indicating that three relationships can exist. For example, "A and / or B" can represent the existence of three situations: A alone, A and B simultaneously, and B alone. Furthermore, the term "at least one" herein refers to any combination of at least two of any one or more of a plurality of items. For example, "at least one of A, B, and C" can represent any one or more elements selected from the set consisting of A, B, and C.
[0026] Furthermore, to better illustrate this disclosure, numerous specific details are set forth in the following detailed description. Those skilled in the art will understand that this disclosure can be practiced without certain specific details. In some instances, methods, means, components, and circuits well known to those skilled in the art have not been described in detail in order to highlight the main points of this disclosure.
[0027] In existing technologies, information management systems used by enterprises and organizations typically focus only on functional design, lacking attention to actual business scenarios. They struggle to synchronously represent the full range of business operations within a digital twin space, failing to achieve intelligent management and limiting management efficiency. Furthermore, the informatization process of enterprise management systems often lacks methodological guidance, resulting in low system construction efficiency. These systems cannot comprehensively and accurately reflect the real-world social production and operational activities of enterprises and organizations, failing to meet their management needs or allow for flexible and dynamic adjustments based on their development.
[0028] In view of this, embodiments of this disclosure provide a digital management system that can automatically empower a target organization with data across different dimensions such as production factors, documents, and job resources. Furthermore, it can analyze the target organization's social production and operation activities based on its business scenarios and processes, achieving comprehensive control over the target organization, realizing intelligent management, and improving management efficiency. The digital management system provided by embodiments of this disclosure is described in detail below.
[0029] Figure 1 A block diagram of a digital management system according to an embodiment of the present disclosure is shown. Figure 1 As shown, the digital management system 100 includes:
[0030] The production factor management module 101 is used to determine the production factor database corresponding to the target organization.
[0031] The document management module 102 is used to determine the standard document library corresponding to the target organization.
[0032] Resource planning module 103 is used to determine the global resource plan for the target organization. The global resource plan is used to indicate the job resource work time and work location arrangements for each position in the target organization. Positions include business positions and process positions.
[0033] The business model management module 104 is used to perform business modeling for any business scenario of the target organization, based on the production factor library, standard document library, global resource plan, and the labor form corresponding to the business scenario, and to determine the business model corresponding to the business scenario. The business model corresponding to any business scenario includes the expression result of the labor form corresponding to the business scenario and the business process.
[0034] Project management module 105 is used to determine the global control status of the target organization based on the production factor library, standard document library, global resource plan, and all business models corresponding to the target organization. The global control status includes the real-time operating status of any business scenario in the target organization throughout its entire lifecycle.
[0035] Specifically, the digital management system 100 can also be called the iMedical Computer integrated manufacturing system (iCIMS) based on medical methodology.
[0036] The target organization here can refer to any enterprise, unit, organization or group with the ability to engage in social production and operation activities. Its specific form can be flexibly set according to actual usage needs. For example, the target organization can be set as a hospital, medical enterprise, etc. This disclosure does not make specific limitations on this.
[0037] Any business scenario of the target organization is determined by the target organization to achieve any business goal (or organizational vision) and obtain corresponding deliverables, and has a corresponding form of labor; wherein, the form of labor corresponding to any business scenario may include the scope of labor (or work scope), labor object, labor content, labor method, etc. of the business scenario, and its specific content can be flexibly set according to actual usage needs, and this disclosure does not make specific limitations on it.
[0038] Based on the form of labor, all business scenarios of the target organization can be decomposed, and the business domain architecture and task domain architecture corresponding to the target organization can be constructed by combining all labor scopes, labor objects, labor content and labor methods. Thus, through the hierarchical structure of business domains, task domains and work tasks, any business scenario and its form of labor of the target organization can be expressed.
[0039] In this context, a business domain can represent a collection of all work items aimed at achieving any business objective of the target organization. Its specific form can be flexibly configured according to actual usage needs, depending on the actual situation of the target organization and its related business objectives; this disclosure does not impose specific limitations on it. Furthermore, any work item can be broken down into multiple tasks to represent the specific operations required to complete that work item.
[0040] The task domain is determined by instantiating and decomposing the business domain based on the type of labor object and output. It can be represented as a refined expression of the business domain and is used to reflect the set of work items that must be completed at least to achieve the business goal corresponding to a business domain. It can also be called the minimum form of labor.
[0041] In one example, the target institution is a medical institution, and its corresponding business scenario is patient consultation, with the required deliverable being an electronic medical record. In this case, the business domain corresponding to this business scenario can include multiple different consultation methods, and any consultation method can be considered a work item; any consultation method that can obtain an electronic medical record can be identified as an item domain.
[0042] It is important to note that business domains can be divided into various types and levels based on the scope, content, and working methods involved in work items. Work items can also be understood as the smallest business domain.
[0043] In one example, the target organization is a medical institution, and the corresponding business domains for the medical institution can include: a business activity business domain and an operational management business domain. The business activity business domain can include five sub-business domains: medical service business domain, medical management business domain, clinical teaching business domain, clinical research business domain, and disease prevention business domain. The operational management business domain can include five sub-business domains: comprehensive management business domain, financial management business domain, asset management business domain, human resource management business domain, and event management business domain.
[0044] The production factor database corresponding to the target institution can include all the production factors that the target institution needs to use in its operation. It can include not only the production factors of the target institution itself, but also the production factors of other institutions in the industry to which the target institution belongs. The specific content of the production factor database can be flexibly set according to actual usage needs. This disclosure does not make any specific limitations in this regard.
[0045] In one example, the target institution is a medical institution belonging to the healthcare industry. Its corresponding production factor database can include the production factors of the medical institution itself, as well as production factors related to other types of institutions, such as elderly care institutions, which also belong to the healthcare industry.
[0046] The factors of production here are a basic category in economics, which can include human factors, material factors, and the combination of both. They can represent the various social resources needed to carry out social production and business activities. Their specific content can be flexibly set according to actual usage needs, and this disclosure does not make specific limitations on them.
[0047] In one example, factors of production can include six types: labor, land, capital, technology, information, and management. Labor can represent the personnel involved in the production process, including manual laborers, mental laborers, and artificial intelligence agents. Land can represent various natural resources untouched by human labor, including arable land and building land, as well as forests, mineral deposits, water bodies, and the sky. Capital can include capital goods and financial assets; capital goods can include buildings, equipment, intangible assets, materials, and pharmaceuticals, while financial assets can include funds, stocks, and securities. Technology can represent knowledge and skills invented by humans based on practice through experience, scientific research, and experimentation that can directly improve production or life. Information can represent various messages, intelligence, data, and instructions reflecting the actual situation and characteristics of economic activities, and can be expressed through data, text, charts, and signals to represent the characteristics and development trends of economic activities. Management can represent the process of achieving the business objectives of a target organization through planning, organization, leadership, control, and innovation, combined with human, material, financial, and informational resources.
[0048] During the social production and operation activities of the target organization, the production factors involved may differ depending on the actual needs; on the other hand, the names, symbols, etc., of the same production factor may also differ in different application scenarios. Therefore, in order to manage the production factors required by the target organization in a unified manner, the production factor management module 101 can be used to build a production factor database corresponding to the target organization and realize the standardization and normalization of production factors.
[0049] In addition, the digital management system 100 can also refer to production factors other than labor as carriers to distinguish between the labor resources and material resources required to complete business scenarios.
[0050] The specific form of the production factor database can be flexibly set according to actual usage needs and depends on the actual situation of the target organization. This disclosure does not impose specific limitations on it.
[0051] The following sections will describe in detail the process by which the production factor management module 101 determines the production factor database corresponding to the target organization, taking into account the possible implementation methods of this disclosure. These details will not be elaborated upon here.
[0052] The standard document library corresponding to the target organization may include various electronic documents that support the operation and management of the target organization. For example, it may include the rules and regulations, meeting minutes, notices and other documents of the target organization, as well as industry standards and industry development documents of other similar organizations in the target organization's industry, and relevant documents of other organizations of different types in the target organization's industry. The specific form and content of the standard document library can be flexibly set according to actual usage needs and depends on the actual situation of the target organization. This disclosure does not impose specific limitations on this.
[0053] By building a standard document library corresponding to the target organization through the document management module 102, various documents of the target organization can be digitally managed, which is convenient for reference in the process of project initiation and execution in various business scenarios. This enables the various rules and regulations of the target organization to be implemented in specific business scenarios and can help managers grasp the implementation status of rules and regulations.
[0054] The following sections will describe in detail the process by which the file management module 102 determines the standard file library corresponding to the target organization, taking into account the possible implementation methods of this disclosure. These details will not be elaborated upon here.
[0055] Common work scheduling methods in existing technologies are based on the departmental divisions of the target organization's administrative management. However, in the process of the target organization's social production and operation activities, the departmental structure of administrative management often differs significantly from the organizational structure required for business execution. This makes it difficult for work scheduling to simultaneously meet both administrative management needs and business execution requirements. For example, in the case of a medical institution, administrative management and clinical management are two different management structures. Scheduling based on administrative management may not meet clinical needs.
[0056] The global resource plan determined by the resource planning module 103 in this disclosure is determined based on business scenarios and is used to indicate the work time and work location arrangements for each position in the target organization. The position resources corresponding to any position include the labor resources corresponding to that position and asset elements other than labor resources (such as physical resources such as work equipment).
[0057] Specifically, based on business domains, the digital management system 100 can construct multiple business units of the target organization. Any business unit can represent a set of business positions or process positions that perform the same type of work in at least one business domain, thereby obtaining an architecture different from the traditional administrative management architecture. It also ensures that there is a time-related relationship between the business units and the administrative management architecture, and realizes business scenario-oriented architecture management.
[0058] In this system, each business position or process position is used to perform a single work task, adhering to the principle of "one task, one position," which differs from the target organization's positions within its administrative management structure. Business positions are determined based on the target organization's existing business domains, while process positions are determined based on the target organization's existing business processes. Any business position can be involved in multiple different business processes simultaneously, while the business processes to which each process position belongs are fixed. Through business positions and process positions, the target organization's job allocation can be described from two dimensions, offering greater flexibility compared to the job setup of a traditional administrative management structure.
[0059] Resource Planning Module 103 can determine the overall resource plan for the target organization based on the principle of "assigning resources according to tasks and one resource per position" by business positions and process positions. This plan instructs the work hours and work locations of personnel in each position within the target organization, without being restricted by administrative management. It can ensure sufficient labor resources for each position within the target organization while simultaneously meeting administrative and business execution requirements. Furthermore, by arranging the work hours and work locations of personnel in each position, the plan can also rationally plan the usage time and location of asset elements beyond labor resources, further improving the reliability and applicability of the overall resource plan.
[0060] The following sections will describe in detail the process by which the resource planning module 103 determines the global resource plan corresponding to the target organization, taking into account the possible implementation methods of this disclosure. These details will not be elaborated upon here.
[0061] The business model management module 104, also known as the business twin and decision support module (Digital Twin for Process and Decision Support, DTS), is used to automatically model any business scenario of a target organization based on the production factor library, standard document library, global resource plan, and the labor form corresponding to that business scenario. This achieves business digital twinning and determines the business model corresponding to the business scenario, including the expression results of the labor form and business process corresponding to that business scenario. The expression results of the labor form corresponding to any business scenario can include the business domain, event domain, work items, and procedures corresponding to that business scenario. Its actual content can also be flexibly adjusted according to actual usage needs. For example, it can also include the labor objects, deliverables, and operations related to each procedure in the business scenario; this disclosure does not specifically limit this.
[0062] The specific method for determining the expression result of the labor form corresponding to any business scenario can be flexibly set according to actual usage needs, and this disclosure does not impose specific limitations on it.
[0063] In one example, for any given business scenario, if the business scenario is an existing business scenario, the corresponding labor form expression result can be determined based on historical business records.
[0064] In one example, for any business scenario, if the business scenario is a new business scenario, similar existing business scenarios can be referenced, or the labor form expression result corresponding to the business scenario can be determined by decomposing the work items of the business scenario.
[0065] The specific form of the business process corresponding to any business scenario can be flexibly set according to actual usage needs. For example, it can be set as a flowchart, etc. This disclosure does not impose specific limitations on it. It should be noted that any business scenario can correspond to multiple different and parallel business processes.
[0066] In addition, the business model management module 104 can determine the job information corresponding to any business scenario, thereby improving the convenience of managing business processes outside the digital management system 100. Its specific content can be flexibly set according to actual usage needs. For example, it can include business positions, process positions, and professional positions in the administrative management structure corresponding to the business scenario. This disclosure does not make specific limitations on this.
[0067] Project Management Module 105, also known as the Comprehensive Management Module, is used to determine the overall control status of a target organization based on the production element library, standard document library, global resource plan, and all business models corresponding to the target organization. This allows for real-time monitoring of the entire lifecycle of any business scenario within the target organization, enabling full-process orchestration and lifecycle control of production management and business operations, ensuring refined project-based production. The specific form and content of the real-time lifecycle status of any business scenario can be flexibly configured according to actual usage needs; this disclosure does not impose specific limitations on this.
[0068] The project management module 105 will be described in detail later in conjunction with the possible implementation methods disclosed herein, and will not be repeated here.
[0069] The digital management system of this disclosure can determine the production factor library and document management library corresponding to the target organization through the production factor management module and the document management module, thereby realizing the automatic digital empowerment of the target organization and providing a data foundation for the collaborative operation of the entire system. Based on the resource planning module, it can determine the global resource plan corresponding to the target organization according to the principle of "assigning resources according to tasks and one resource per position" to indicate the work time arrangement of the position resources corresponding to each business position and process position in the target organization. It is not restricted by administrative management and can ensure that the position resources of each position in the target organization are sufficient while meeting the administrative needs and business scenario execution needs. The business model management module can take production factors, positions, and operations as the three elements, and based on the principle of position execution of operations and operation consumption of production factors, for any business scenario, according to the production factor library, standard document library, global resource plan, and the labor form corresponding to the business scenario, perform multi-dimensional, fully automatic, and standardized business modeling to determine the business model corresponding to the business scenario, including the expression results of labor form and business process. By utilizing the project management module, the overall control status of the target organization can be determined based on the production factor library, standard document library, global resource plan, and all business models corresponding to the target organization. This allows for real-time monitoring of the entire lifecycle of any business scenario within the target organization, enabling full-process orchestration and control of the target organization's production management and business operations. This ensures the refinement of project-based production, thereby achieving comprehensive digital twin and intelligent management of the target organization, forming a customized digital management system for the target organization, and ultimately improving the management efficiency of the target organization.
[0070] In one possible implementation, the digital management system 100 can also be configured as a production side (iMedical Manufacturing Side, iMS) and a customer side (iMedical Client Side, iCS).
[0071] iMS can be used to flexibly configure business scenarios, business domains, event domains, work items, procedures, business processes, and deliverables to generate new business scenarios, business domains, event domains, work items, procedures, business processes, and deliverables; iCS, on the other hand, can only use the business scenarios, business domains, event domains, work items, procedures, business processes, and deliverables already configured in the digital management system 100 for localized implementation. It can only produce new business scenarios, business domains, event domains, work items, procedures, business processes, and deliverables after obtaining production authorization from iMS.
[0072] The target organization can also achieve a collaborative production mode through iMS and iCS, and deeply customize the digital management system 100 by utilizing real-time data interaction and business collaboration between iMS and iCS.
[0073] On the other hand, depending on whether the target organization has production attributes, only one side of iMS and iCS can be configured for the digital management system 100. Where the target organization has production attributes, it means that the target organization will generate new business scenarios, business domains, event domains, work items, procedures, and business processes during its social production and operation activities; where the target organization does not have production attributes, it means that the target organization will not generate new business scenarios, business domains, event domains, work items, procedures, and business processes during its social production and operation activities.
[0074] If the target organization has production attributes, the digital management system 100 can be configured as iMS, allowing the target organization to configure business scenarios, business domains, task domains, work items, procedures, business processes, and deliverables according to the actual situation of social production and operation activities.
[0075] If the target organization does not have production attributes, the digital management system 100 can be configured as an iCS, so that the target organization can only use the business scenarios, business processes and deliverables configured in the digital management system 100 for localized implementation.
[0076] When a target organization needs to add new production factors in its social production and operation activities, the production factor management module 101 can first perform standardized maintenance on the newly added production factors, register them in the digital management system 100, and then introduce the newly added production factors. The specific method can be flexibly set according to actual usage needs, and this disclosure does not make specific limitations on it.
[0077] Figure 2 A flowchart illustrating a production factor registration and data instantiation according to an embodiment of this disclosure is shown. Figure 2 As shown, for any newly added production factor, standardized maintenance includes: registration, approval, and data standardization.
[0078] Specifically, the production factor management module 101 can initiate a registration and approval process for the newly added production factor based on the data item name and reason for its addition; if the registration and approval process for the newly added production factor is approved, the module determines the classification result, grading result, and data source of the newly added production factor; based on the classification result, grading result, and data source of the newly added production factor, the module performs standardized data maintenance on the initial data of the newly added production factor to determine the standard data of the newly added production factor.
[0079] In one possible implementation, the production factor management module 101 is used to: for any production factor of the target organization, instantiate the production factor according to a preset standard data specification, and determine the instance data table corresponding to the production factor; and determine the production factor library according to the instance data table corresponding to each production factor in the target organization.
[0080] Specifically, for any existing production factor of the target organization, or after the data import of a newly added production factor, the production factor management module 101 can instantiate the production factor according to preset standard data specifications, thereby enabling the production factor's data and determining the corresponding instance data table. The specific content of the standard data specifications can be flexibly set according to actual usage needs, and this disclosure does not impose specific limitations on it. Similarly, the specific method of data instantiation can be flexibly set according to actual usage needs, and this disclosure does not impose specific limitations on it.
[0081] Based on the above Figure 2 For example, Figure 2 As shown, data instantiation includes: data import, standard data specification import, and data retrieval.
[0082] Specifically, the production factor management module 101 can determine the standard data specifications and the initial example data table, and construct a comparison relationship between the standard data specifications and the initial example data table to complete the introduction of the standard data specifications; based on the comparison relationship, the standard data of the production factor determined by the production factor management module 101 is pulled to the initial example data table to obtain the instance data table corresponding to the production factor.
[0083] The specific content of the standard data for any production factor can be flexibly set according to actual usage needs. For example, it may include the historical full data of the production factor, real-time synchronized incremental data, etc. This disclosure does not make specific limitations on this.
[0084] The specific method for determining the standard data of any production factor by the production factor management module 101 can refer to the implementation methods in related technologies. For example, it can access the existing data source system of the target organization through the service bus and receive the historical full data of the production factor. This disclosure does not make specific limitations in this regard.
[0085] Based on the above Figure 2 For example, Figure 2 As shown, the production factor management module 101 can also perform instantiated data maintenance, instantiated data authorization, instantiated data distribution, and instantiated data application on the instance data table corresponding to any production factor.
[0086] Instantiated data maintenance can refer to operations such as adding, deleting, querying, and modifying data in the instance data table corresponding to any production factor.
[0087] Instantiated data authorization can represent hierarchical authorization of an instance data table corresponding to any production factor, enabling relevant organizational departments within the target organization to obtain operational permissions for that instance data table. They can also query authorization information and records to determine which organizational departments, the authorization period, and the authorized operators have been granted permissions for that instance data table. The specific content of the operational permissions for any instance data table corresponding to a production factor can be flexibly set according to actual usage needs; for example, it may include management permissions and viewing permissions. This disclosure does not impose specific limitations on this.
[0088] Instantiated data distribution can refer to the distribution of the instance data table corresponding to a production factor to the relevant organizational departments through the service bus, based on the permission allocation of the instance data table.
[0089] An instanced data application can represent sharing the instanced data table corresponding to the production factor with other modules in the digital management system 100, so that other modules can use the instanced data table corresponding to the production factor.
[0090] In one possible implementation, the document management module 102 is used to: perform structured processing on any operational document of the target organization to determine the structured electronic document corresponding to the operational document, wherein the operational document includes: the target organization's basic knowledge documents, rules and regulations, and historical business records corresponding to any business scenario; and determine a standard document library based on the structured electronic document corresponding to each operational document in the target organization.
[0091] Specifically, the operational documents corresponding to the target organization may include the target organization's basic knowledge documents, rules and regulations, and historical business records corresponding to any business scenario. The specific content of the basic knowledge documents can be flexibly set according to actual usage needs. For example, it may include knowledge of the target organization's corporate culture, basic technical knowledge, core technical knowledge, and common knowledge of the target organization's industry. This disclosure does not impose specific limitations on this. The specific content of the rules and regulations can be flexibly set according to actual usage needs. For example, it may include the execution standards for any work item within the target organization, the job requirements for personnel, or industry-wide standards within the target organization's industry. This disclosure does not impose specific limitations on this. The specific content of the historical business records corresponding to any business scenario can be flexibly set according to actual usage needs. For example, it may include meeting minutes, operation records, communication records, and transaction records generated during the operation of that business scenario. This disclosure does not impose specific limitations on this.
[0092] In addition, operational documents may include other documents, which can be flexibly set according to actual usage needs, and this disclosure does not impose specific limitations on this.
[0093] The document management module 102 can perform structured processing on each operational document of the target organization, decomposing it according to dimensions such as work items and business positions to form a structured electronic document corresponding to each operational document. The specific method for structuring any operational document and the specific format of its corresponding structured electronic document can be flexibly set according to actual usage needs; this disclosure does not impose specific limitations on this.
[0094] Based on the structured electronic files corresponding to all operational documents in the target organization, the document management module 102 can build a standard document library corresponding to the target organization, so as to map the operational documents to specific business scenarios.
[0095] Furthermore, the file management module 102 can also perform operations such as creating, editing, and publishing electronic files based on the standard file library, thereby improving the flexibility of file management.
[0096] In one possible implementation, the resource planning module 103 is used to: determine all positions in the target organization and the personnel information corresponding to each position, wherein the personnel information corresponding to any position includes: the number of personnel corresponding to the position and the position permissions corresponding to each personnel; and perform resource scheduling based on the personnel information corresponding to each position in the target organization to determine the global resource plan.
[0097] Specifically, the resource planning module 103 can uniformly manage all positions in the target organization, realizing position authorization and resource scheduling. Among them, position authorization means that the resource planning module 103 assigns at least one business position or process position to any employee and determines the corresponding position permissions, so that the employee can perform the work tasks corresponding to the business position or process position. The specific method can refer to the implementation methods in related technologies, and this disclosure does not make specific limitations in this regard. The specific content of the job permissions corresponding to any one position can be flexibly set according to actual usage needs. For example, after completing the job authorization for each position, the resource planning module 103 can determine all business positions and process positions of the target organization, as well as the number of personnel corresponding to each position, the job permissions corresponding to each personnel, and other personnel information. Then, based on the personnel information, resource scheduling is carried out to plan the working time and work location arrangements of labor resources, as well as the working time and work location arrangements of other asset elements, and to determine the global resource plan corresponding to the target organization. This enables the overall management of the target organization based on business scenarios and business units, without being restricted by administrative management. It can ensure sufficient human resources for each business position and process position in the target organization while simultaneously meeting administrative needs and business scenario execution needs.
[0098] The specific method of resource scheduling can be flexibly set according to actual usage needs, and this disclosure does not impose specific restrictions on it.
[0099] In one possible implementation, the business model management module 104 is used to: for any given business scenario, determine the business rules corresponding to that business scenario based on a standard document library; determine the expression results of the labor form, production factor library, and global resource plan corresponding to that business scenario; and perform business process modeling based on the expression results of the labor form, production factor, job personnel, and business rules corresponding to that business scenario to determine the business process corresponding to that business scenario.
[0100] Specifically, for any given business scenario, the business model management module 104 can query the execution steps, execution requirements, execution standards for each work item corresponding to the business scenario, and job requirements for relevant personnel based on structured electronic documents in the standard document library, thereby determining the business rules corresponding to the business scenario. The specific form and content of the business rules can be flexibly set according to actual usage needs, and this disclosure does not impose specific limitations on them.
[0101] The business model management module 104 can determine the expression result of the labor form corresponding to the business scenario by decomposing the business domain architecture and the event domain architecture. Based on the business domain and production factor library corresponding to the business scenario, the business model management module 104 can determine the production factors corresponding to the business scenario based on the principle of operation consuming production factors. Based on the business domain and global resource plan corresponding to the business scenario, the business model management module 104 can determine the personnel for the corresponding business scenario based on the principle of job execution. On this basis, the business model management module 104 can use production factors, positions, and operations as the three key points, and based on the principle of job execution and operation consuming production factors, to achieve multi-dimensional, fully automated, and standardized business process modeling for any business scenario, determining the business process corresponding to that business scenario. The specific number of business processes corresponding to any business scenario can be flexibly set according to actual usage needs; this disclosure does not impose specific limitations on this.
[0102] Furthermore, the business model management module 104 can automatically publish and execute each approved business process, thereby achieving automated execution of the business process.
[0103] In one possible implementation, the project management module 105 is used to: monitor in real time the changes in production factors and personnel corresponding to any business scenario, and determine the real-time resource status of the business scenario; record the real-time running data of the business model corresponding to the business scenario while executing the business process corresponding to the business scenario; and determine the real-time running status of the entire lifecycle of any business scenario based on the real-time resource status and the real-time running data of the business model corresponding to the business scenario.
[0104] Specifically, for any given business scenario, the project management module 105 can monitor in real time the changes in production factors and personnel corresponding to that scenario, grasp the dynamics of the scenario in terms of both carriers and labor resources, and determine the real-time resource status of that scenario. The specific content of the real-time resource status for any given business scenario can be flexibly set according to actual usage needs. For example, it may include the real-time change rate of any production factor corresponding to that scenario, the on-duty status of personnel in that scenario, etc., without specific limitations in this disclosure.
[0105] On the other hand, for any given business scenario, when executing the business process corresponding to that scenario, the project management module 105 can record the real-time operational data of the business model corresponding to that scenario, thereby achieving full control over the business process and determining the real-time operational data of the business model. The specific content of the real-time operational data of the business model corresponding to any given business scenario can be flexibly set according to actual usage requirements. For example, it may include changes in the expression results of labor forms, real-time execution nodes of the business process, the execution status of each step in the business process, the health status of the business model, operational indicators, etc. This disclosure does not impose specific limitations on this.
[0106] Based on this, for any given business scenario, the data quality and health status of the real-time operational data of the business model corresponding to that business scenario can be analyzed based on the real-time operational data of that business scenario. A business scenario assessment can then be conducted to determine corresponding optimization suggestions. These optimization suggestions are used to optimize and adjust the business processes corresponding to that business scenario and intervene in the operational status of those processes.
[0107] For any given business scenario, based on the real-time resource status and the real-time operational data of the corresponding business model, the project management module 105 can determine the real-time operational status of the entire lifecycle of that business scenario. This enables real-time monitoring of the target organization and the digital management system 100 based on the business scenario, achieving seamless flow of production data and close collaboration of the business model. This facilitates the full-process orchestration and control of the target organization's production management and business operations, ensuring the precision of project-based production. The specific content of the real-time operational status of any given business scenario throughout its lifecycle can be flexibly set according to actual usage needs; this disclosure does not impose specific limitations on it.
[0108] Based on the real-time operational status of all business scenarios throughout their entire lifecycle within the target organization, the project management module 105 can construct a global control system for the target organization, enabling comprehensive digital twinning and intelligent management of the target organization, thereby improving its management efficiency.
[0109] In one possible implementation, the project management module 105 is further used to: determine the three-dimensional scene model and multi-dimensional monitoring data corresponding to the target organization, wherein the multi-dimensional monitoring data includes: IoT data, video surveillance data, and operational data of at least one working system corresponding to the target organization; map the global control status and multi-dimensional monitoring data to the three-dimensional scene model to determine the visual monitoring model corresponding to the target organization.
[0110] By combining 3D visualization technology, the project management module 105 can determine the 3D scene model corresponding to the target organization, forming a 1:1 visual digital twin of the target organization. The specific content of the 3D scene model corresponding to the target organization can be flexibly set according to actual usage needs. For example, it may include information on the building's exterior and interior space, as well as information models of key items within the target organization. This disclosure does not impose specific limitations on this.
[0111] In one example, the target institution is a medical institution, and its corresponding 3D scene model can include the hospital area, buildings and floor interior spaces of the medical structure. Furthermore, each interior space is classified according to different criteria to distinguish spaces with different business function attributes such as consultation rooms, wards, operating rooms, cashiers, nurses' stations, and pharmacy windows.
[0112] On the other hand, the digital management system 100 can also communicate with the target organization's existing Internet of Things (IoT) sensing system, video surveillance system, and work system. The specific form of the work system depends on the actual situation of the target organization. For example, in the case of a medical institution, the work system could be a doctor's workstation, a nurse's workstation, a surgical anesthesia system, a laboratory information management system, etc. This disclosure does not impose specific limitations on this. The specific methods for the digital management system 100 to achieve communication connections with other systems can be flexibly configured according to actual usage needs; this disclosure does not impose specific limitations on this.
[0113] Based on the communication connection between the digital management system 100 and these systems, the project management module 105 can obtain IoT data, video surveillance data, and operational data of at least one working system corresponding to the target organization, and determine the multi-dimensional monitoring data corresponding to the target organization.
[0114] By mapping the multi-dimensional monitoring data and overall control status of the target organization to a three-dimensional scene model, the project management module 105 can determine the corresponding visual monitoring model of the target organization. This allows the operation of the business process of each business scenario to be expressed in the three-dimensional scene model, enabling managers to intuitively browse the business domains, task domains, work items, and business processes that can be carried out in each space of the target organization. They can also intuitively browse the simulated route of the business process of each business scenario in the target organization in the three-dimensional scene model, determine the location of any operation, and provide support for users to review the rationality of the business carried out in each space. This also assists managers in optimizing the business processes of each business scenario.
[0115] At the same time, the utilization of various carriers and labor resources in the target organization can be intuitively displayed in the three-dimensional scene model, especially the utilization of space resources and equipment resources, so as to facilitate the scheduling and optimization of carriers and labor resources by managers.
[0116] The specific method for mapping the multi-dimensional monitoring data and global control status of the target organization to the three-dimensional scene model can be flexibly set according to actual usage needs, and this disclosure does not impose specific limitations on it.
[0117] In one example, any space in the 3D scene model corresponding to the target organization can be mapped to spatial elements such as workplaces and business locations in the production elements of the digital management system 100, and belong to the same business unit. Based on the division of business units, the multi-dimensional monitoring data and global control status corresponding to the target organization are mapped to the 3D scene model to construct a visual monitoring model for the target organization.
[0118] In one possible implementation, the digital management system 100 further includes: an approval process management module 106; the approval process management module is used to: approve the objects to be approved according to their type, and determine the approval result corresponding to the objects to be approved, wherein the objects to be approved include: any one of the following: newly added or changed production factors, operating documents, personnel, labor forms, and global resource plans; and register the objects to be approved in the digital management system 100 if the approval result corresponding to the objects to be approved is that the approval is passed.
[0119] Based on the above Figure 1 For example, Figure 1 As shown, the digital management system 100 also includes an approval process management module 106 (Business Process Management, BPM). The approval process management module 106 can be used to approve any process within the digital management system 100 to ensure the accuracy and reliability of the data and business processes within the digital management system 100, ensuring that each object to be approved complies with the target organization's rules and regulations. These processes may include registration processes for adding new production factors, operational documents, personnel positions, labor types, and global resource plans to the digital management system 100, or for changing existing production factors, operational documents, personnel positions, labor types, and global resource plans, as well as processes for adding or changing other relevant information of the digital management system 100 (e.g., project information, development information). These processes can be flexibly configured according to actual usage needs, and this disclosure does not impose specific limitations on them.
[0120] New or changed production factors, operating documents, personnel positions, labor forms, and overall resource plans need to be approved and registered through the approval process management module 106 in their corresponding processes before they can officially take effect and be used in the digital management system 100.
[0121] Specifically, the approval process management module 106 can automatically push the approval process for the object to be approved to the corresponding approval / review committee based on the type of the object to be approved, and determine the approval result for the object. If the approval result for the object to be approved is "passed", the object to be approved is automatically registered in the digital management system 100.
[0122] In addition, the business process can be approved through the approval process management module 106 before it is released for any business scenario.
[0123] In one possible implementation, the digital management system 100 further includes: a development platform module 107; the development platform module is used to provide a user entry point for personnel in any position to access the digital management system 100 based on the user authentication information corresponding to that position.
[0124] Based on the above Figure 1 For example, Figure 1 As shown, the digital management system 100 also includes a development platform module 107 (Basic Development Platform, iBDP). The development platform module 107 can realize portal management of the digital management system 100, manage the user authentication information corresponding to all positions, and provide a user entry point for any position to access the digital management system 100 based on the user authentication information corresponding to that position, thereby improving the security and access convenience of the digital management system 100.
[0125] In one possible implementation, the development platform module 107 is also used to: adjust the system's functions according to user development needs and determine the integrated adjustment results corresponding to the digital management system 100.
[0126] The development platform module 107 can also provide low-code components to facilitate user adjustments to the functionality of the digital management system 100. This improves the flexibility and scalability of the digital management system 100, reduces the amount of code required for adjustments, and increases development efficiency. The specific form of the low-code components can be found in related technical implementations; for example, it may include components that enable low-code development through graphical operations such as drag-and-drop. This disclosure does not impose specific limitations on this.
[0127] Specifically, the development platform module 107 can adjust the system's functions using low-code components based on the input user development requirements, combined with the business architecture and intelligent capabilities (AI) provided by the digital management system 100. It automatically constructs new system functional modules (e.g., business workstations) according to the parsed requirements, generating new business scenarios, business processes, business positions, process positions, work items, and tasks, thus determining the corresponding integrated adjustment result for the digital management system 100. The specific content of the integrated adjustment result depends on the actual situation of the user's development requirements; for example, it may include independent functional modules, which this disclosure does not specifically limit.
[0128] The digital management system of this disclosure can determine the production factor library and document management library corresponding to the target organization through the production factor management module and the document management module, thereby realizing the automatic digital empowerment of the target organization and providing a data foundation for the collaborative operation of the entire system. Based on the resource planning module, it can determine the global resource plan corresponding to the target organization according to the principle of "assigning resources according to tasks and one resource per position" to indicate the work time arrangement of the position resources corresponding to each position in the target organization. It is not subject to administrative management restrictions and can ensure sufficient position resources for each position in the target organization while meeting administrative needs and business scenario execution needs. The business model management module can take production factors, business positions, and operations as the three key points. Based on the principle of position execution of operations and operation consumption of production factors, for any business scenario, it can perform multi-dimensional, fully automatic, and standardized business modeling according to the production factor library, standard document library, global resource plan, and the labor form corresponding to the business scenario, to determine the business model corresponding to the business scenario, including the expression results of labor form and business process. By utilizing the project management module, the overall control status of the target organization can be determined based on the production factor library, standard document library, global resource plan, and all business models corresponding to the target organization. This allows for real-time monitoring of the entire lifecycle of any business scenario within the target organization, enabling full-process orchestration and control of production management and business operations. This ensures refined project-based production, achieving comprehensive digital twin and intelligent management of the target organization, forming a customized digital management system, and thus improving management efficiency. Furthermore, the project management module can map the multi-dimensional monitoring data and overall control status of the target organization onto a 3D scene model, determining the corresponding visual monitoring model. This model expresses the operational status of the business processes in each business scenario within the 3D scene model, intuitively displaying the business domains, task domains, work items, business processes, and simulated routes of each business scenario's business processes within the target organization. It also identifies the location of any operation, providing support for managers to review the rationality of business operations in each space and assisting them in optimizing the business processes of each business scenario.
[0129] This disclosure also provides an electronic device, including a memory, a processor, and a computer program stored in the memory, wherein the processor executes the computer program to implement the steps of the above method.
[0130] This disclosure also provides a non-volatile computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the steps of the above-described method.
[0131] This disclosure also provides a computer program product, including a computer program or a non-volatile computer-readable storage medium carrying the computer program, wherein the computer program, when executed by a processor, implements the steps of the above method.
[0132] Figure 3 A block diagram of an electronic device according to an embodiment of the present disclosure is shown. For example, electronic device 1900 may be provided as a server or terminal device. (Refer to...) Figure 3 The electronic device 1900 includes a processing component 1922, which further includes one or more processors, and memory resources represented by memory 1932 for storing instructions, such as application programs, that can be executed by the processing component 1922. The application programs stored in memory 1932 may include one or more modules, each corresponding to a set of instructions. Furthermore, the processing component 1922 is configured to execute instructions to perform the methods described above.
[0133] Electronic device 1900 may also include a power supply component 1926 configured to perform power management of electronic device 1900, a wired or wireless network interface 1950 configured to connect electronic device 1900 to a network, and an input / output interface 1958 (I / O interface). Electronic device 1900 can operate on an operating system, such as Windows Server, stored in memory 1932. TM Mac OS X TM Unix TM Linux TM FreeBSD TM Or similar.
[0134] In an exemplary embodiment, a non-volatile computer-readable storage medium is also provided, such as a memory 1932 including computer program instructions that can be executed by a processing component 1922 of an electronic device 1900 to perform the above-described method.
[0135] Computer-readable storage media can be tangible devices capable of holding and storing programs / instructions used by instruction execution devices. Computer-readable storage media can be, for example—but not limited to—electrical storage devices, magnetic storage devices, optical storage devices, electromagnetic storage devices, semiconductor storage devices, or any suitable combination of the foregoing. More specific examples (a non-exhaustive list) of computer-readable storage media include: portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), static random access memory (SRAM), portable compact disc read-only memory (CD-ROM), digital multifunction disc (DVD), memory sticks, floppy disks, mechanical encoding devices, such as punch cards or recessed protrusions storing instructions thereon, and any suitable combination of the foregoing. The computer-readable storage media used herein are not to be construed as transient signals themselves, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through waveguides or other transmission media (e.g., light pulses through fiber optic cables), or electrical signals transmitted through wires.
[0136] The computer program (or computer-readable program instructions) described herein can be downloaded from a computer-readable storage medium to various computing / processing devices, or downloaded via a network, such as the Internet, local area network, wide area network, and / or wireless network, to an external computer or external storage device. The network may include copper transmission cables, fiber optic transmission, wireless transmission, routers, firewalls, switches, gateway computers, and / or edge servers. A network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards them to the computer-readable storage medium in the respective computing / processing device.
[0137] The computer program (or computer program instructions) used to perform the operations of this disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages such as Smalltalk, C++, etc., and conventional procedural programming languages such as the "C" language or similar programming languages. The computer-readable program instructions may execute entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer via any type of network—including a local area network (LAN) or a wide area network (WAN)—or may be connected to an external computer (e.g., via the Internet using an Internet service provider). In some embodiments, electronic circuitry, such as programmable logic circuitry, field-programmable gate arrays (FPGAs), or programmable logic arrays (PLAs), is personalized by utilizing state information from the computer-readable program instructions to implement various aspects of this disclosure.
[0138] Various aspects of this disclosure are described herein with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this disclosure. It should be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer-readable program instructions.
[0139] These computer-readable program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing apparatus to produce a machine such that, when executed by the processor of the computer or other programmable data processing apparatus, they create means for implementing the functions / actions specified in one or more blocks of the flowchart and / or block diagram. These computer-readable program instructions can also be stored in a computer-readable storage medium that causes a computer, programmable data processing apparatus, and / or other device to operate in a particular manner; thus, the computer-readable medium storing the instructions comprises an article of manufacture that includes instructions for implementing aspects of the functions / actions specified in one or more blocks of the flowchart and / or block diagram.
[0140] Computer-readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other device to cause a series of operational steps to be performed on the computer, other programmable data processing apparatus, or other device to produce a computer-implemented process, thereby causing the instructions executed on the computer, other programmable data processing apparatus, or other device to perform the functions / actions specified in one or more boxes of a flowchart and / or block diagram.
[0141] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of the present disclosure. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of an instruction containing one or more executable instructions for implementing a specified logical function. In some alternative implementations, the functions marked in the blocks may occur in a different order than those shown in the drawings. For example, two consecutive blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts, may be implemented using a dedicated hardware-based system that performs the specified function or action, or using a combination of dedicated hardware and computer instructions.
[0142] The various embodiments of this disclosure have been described above. These descriptions are exemplary and not exhaustive, nor are they limited to the disclosed embodiments. Many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments. The terminology used herein is chosen to best explain the principles, practical application, or technical improvements to the embodiments in the market, or to enable others skilled in the art to understand the embodiments disclosed herein.
Claims
1. A digital management system, characterized in that, include: The production factor management module is used to determine the production factor database corresponding to the target organization; The file management module is used to determine the standard file library corresponding to the target organization; The resource planning module is used to determine the global resource plan corresponding to the target organization. The global resource plan is used to indicate the work time and work location arrangement of each position in the target organization. The positions include business positions and process positions. The position resources corresponding to any position include the labor resources corresponding to the position and asset elements other than labor resources. The business positions are determined based on the existing business domains of the target organization, and the process positions are determined based on the existing business processes of the target organization. The business model management module is used to perform business modeling for any business scenario of the target organization, based on the production factor library, the standard document library, the global resource plan, and the labor form corresponding to the business scenario, and to determine the business model corresponding to the business scenario. The business model corresponding to any business scenario includes the expression result of the labor form corresponding to the business scenario and the business process. The expression result of the labor form corresponding to any business scenario includes the business domain, event domain, work item and process of the business scenario, as well as the labor object, result and operation corresponding to each process. The project management module is used to determine the global control status of the target organization based on the production factor library, the standard document library, the global resource plan, and all business models corresponding to the target organization. The global control status includes the real-time operating status of any business scenario in the target organization throughout its entire lifecycle.
2. The system according to claim 1, characterized in that, The production factor management module is used for: For any production factor of the target organization, according to the preset standard data specifications, the production factor is instantiated to determine the corresponding instance data table. The production factor database is determined based on the instance data table corresponding to each production factor in the target organization.
3. The system according to claim 1, characterized in that, The file management module is used for: For any operational document of the target organization, the operational document is processed in a structured manner to determine the corresponding structured electronic document. The operational document includes: the target organization's basic knowledge document, rules and regulations, and historical business records corresponding to any business scenario. The standard document library is determined based on the structured electronic file corresponding to each operational document in the target organization.
4. The system according to any one of claims 1 to 3, characterized in that, The resource planning module is used for: Identify all positions within the target organization, as well as the personnel information corresponding to each position. The personnel information for any given position includes: the number of personnel for that position, and the position permissions for each personnel. Based on the personnel information corresponding to each position in the target organization, resource scheduling is performed to determine the global resource plan.
5. The system according to claim 4, characterized in that, The business model management module is used for: For any given business scenario, the corresponding business rules are determined based on the standard file library. Based on the labor form corresponding to the business scenario, the production factor library, and the global resource plan, determine the expression result of the labor form, production factors, and personnel for the business scenario. Based on the labor form expression results, production factors, job personnel and business rules corresponding to the business scenario, business process modeling is carried out to determine the business process corresponding to the business scenario.
6. The system according to any one of claims 1 to 3, characterized in that, The project management module is used for: For any given business scenario, monitor in real time the changes in production factors and personnel in the corresponding positions to determine the real-time resource status of that business scenario; For any given business scenario, while executing the business process corresponding to that scenario, record the real-time running data of the business model corresponding to that scenario; For any given business scenario, the real-time operational status of the entire lifecycle of the business scenario is determined based on the real-time resource status corresponding to that business scenario and the real-time operational data of the business model corresponding to that business scenario.
7. The system according to any one of claims 1 to 3, characterized in that, The project management module is also used for: The three-dimensional scene model and multi-dimensional monitoring data corresponding to the target institution are determined, wherein the multi-dimensional monitoring data includes: IoT data, video surveillance data, and operational data of at least one working system corresponding to the target institution; The overall control situation and the multi-dimensional monitoring data are mapped to the three-dimensional scene model to determine the visualization monitoring model corresponding to the target organization.
8. The system according to any one of claims 1 to 3, characterized in that, The system also includes: an approval process management module; The approval process management module is used for: Based on the type of the object to be approved, the object to be approved is approved, and the approval result corresponding to the object to be approved is determined. The object to be approved includes any one of the following: newly added or changed production factors, operating documents, personnel, labor forms, and global resource plans. If the approval result for the object to be approved is "approved", then the object to be approved is registered in the system.
9. The system according to any one of claims 1 to 3, characterized in that, The system also includes: a development platform module; The development platform module is used to provide a user entry point for personnel in any given position to access the system, based on their user authentication information.
10. The system according to claim 9, characterized in that, The development platform module is also used for: Based on user development needs, the system's functions are adjusted, and the corresponding integration adjustment results are determined.
Citation Information
Patent Citations
Business process construction and execution system and device and electronic equipment
CN117952403A