The invention relates to the technical field of clean room full-process
intelligent management, and discloses a clean project full-life-cycle
intelligent management digital twin platform, which comprises a full-cycle
data center module, a virtual-real bidirectional interaction engine module, a full-cycle management module and a multi-terminal
collaborative interaction module which are connected with one another, the whole life cycle of design, construction, operation and maintenance and decommissioning is covered, whole-course tracing of design-construction-operation-decommissioning is achieved, closed-loop interaction of
virtual model rehearsal and entity execution feedback is constructed, and an
intelligent decision function is constructed to cover the whole process. Comprising performance rehearsal in a
design stage, progress management and control in a construction stage, deep optimization in an operation and
maintenance stage and resource evaluation in a decommissioning stage. Through deep fusion of the dynamic BIM model and multi-stage multi-
source data, virtual-real two-way interaction and full-period
intelligent management, the method is suitable for full-process
collaborative management of clean environments such as semiconductors, biological medicines and foods, and full-stage precise management and control from early planning to final decommissioning are realized.