Project management platform and method

Through the project management platform storing specifications and using language operation instructions, the project manager's dependence on tool processes and specifications is solved, and efficient and convenient project management is achieved.

CN120494741APending Publication Date: 2025-08-15永赢金融租赁有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510588912.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-08
Publication Date
2025-08-15

AI Technical Summary

Technical Problem

The operation process and specifications of project management tools are complex and require the project manager to be familiar with, resulting in large management losses and low efficiency.

Method used

It provides a project management platform, including storage units, application service units and project management units, stores project management specifications, executes project management through language operation instructions, lowers operation thresholds, and improves convenience.

Benefits of technology

You don’t need to be familiar with project management tool processes and specifications, and you can manage projects through simple language instructions, reducing management losses and improving efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120494741A_ABST
    Figure CN120494741A_ABST
Patent Text Reader

Abstract

The invention discloses a project management platform and method.The project management platform comprises a first storage unit, an application service unit and a project management unit, the first storage unit stores project management specifications, the project management unit is used for executing project management based on a language operation instruction of project management and the project management specifications, and the application service unit is used for executing project management based on the language operation instruction of project management. The first storage unit is used for receiving the input of the first type and feeding back the execution result of project management, the project management specifications are stored through the first storage unit, it is ensured that the operation of project management is based on the basis, and therefore project management can be conducted according to simple language operation instructions without being familiar with the operation process of a project management tool and the project management specifications, and the project management efficiency is improved. The user operation threshold is reduced, the operation convenience of project management is improved, the user can put more into actual project management, the management loss is reduced, and the project management efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of project management, and in particular to a project management platform and method. Background Art

[0002] Project management is used to plan, organize, coordinate, and control project resources to ensure that projects are completed on time, on budget, and to the required quality. There is a wide range of expertise in project management, and different companies often have customized project management standards.

[0003] In related technologies, project managers can achieve full-cycle management of projects by using project management tools, effectively improving the efficiency of project management.

[0004] However, project managers need to be familiar with the operating procedures of project management tools and the project management standards of different projects. Summary of the Invention

[0005] In view of this, the present application provides a project management platform and method, which can be used to manage projects through simple language operation instructions without having to be familiar with the operating procedures and project management specifications of the project management tools.

[0006] To solve the above problems, the technical solutions provided by this application are as follows:

[0007] In one aspect, the present application provides a project management platform, comprising a first storage unit, an application service unit, and a project management unit:

[0008] The first storage unit is used to store project management specifications, where the project management specifications are used to identify rules that project managers need to follow when managing projects;

[0009] The project management unit is configured to perform project management based on a first type of input and the project management specification, wherein the first type of input is used to identify a language operation instruction instructing to perform project management;

[0010] The application service unit is configured to receive the first type of input and provide feedback on the execution result of the project management.

[0011] In a possible implementation, the project management platform further includes a second storage unit and a large language model:

[0012] The second storage unit is used to store project management expertise;

[0013] The large language model is used to generate a response result based on the second type of input and the project management expertise, wherein the second type of input is used to identify question-and-answer requests;

[0014] The application service unit is further configured to receive the second type of input and feed back the response result.

[0015] In a possible implementation, the first storage unit is used to store project management specifications for multiple projects, and each of the multiple projects has a corresponding uniqueness verification identifier.

[0016] In a possible implementation, the platform further includes a verification unit, configured to perform integrity verification on the first type of input according to the project management specification.

[0017] In a possible implementation manner, the first storage unit and the second storage unit are vector databases.

[0018] In a possible implementation, the project management platform further includes a pre-parser, which is used to identify the type of the input and instruct the platform to perform pre-processing based on the type of the input.

[0019] In a possible implementation, the pre-parser includes calling a project management pre-parser, exiting a project management pre-parser, calling a project management specification management pre-parser, and exiting a project management specification management pre-parser.

[0020] In another aspect, the present application provides a project management method, which is applied to a project management platform, the platform including a first storage unit, an application service unit, and a project management unit, the method comprising:

[0021] Storing project management specifications in the first storage unit, where the project management specifications are used to identify rules that project managers need to follow when managing projects;

[0022] executing project management by the project management unit based on a first type of input and the project management specification, wherein the first type of input is used to identify a language operation instruction instructing to perform project management;

[0023] The first type of input is received through the application service unit, and the execution result of the project management is fed back.

[0024] In a possible implementation, the project management platform further includes a second storage unit and a large language model, and the method further includes:

[0025] storing project management expertise through the second storage unit;

[0026] generating a response result based on the second type of input and the project management expertise using the large language model, where the second type of input is used to identify question-and-answer requests;

[0027] The second type of input is received through the application service unit, and the response result is fed back.

[0028] In a possible implementation, the first storage unit is used to store project management specifications for multiple projects, and each of the multiple projects has a corresponding uniqueness verification identifier.

[0029] In a possible implementation, the platform further includes a testing unit, and the method further includes:

[0030] The verification unit performs an integrity check on the first type of input according to the project management specification.

[0031] In a possible implementation manner, the first storage unit and the second storage unit are vector databases.

[0032] In a possible implementation, the project management platform further includes a pre-parser, and the method further includes:

[0033] The pre-parser identifies the type of the input and instructs the platform to perform preprocessing based on the type of the input.

[0034] In a possible implementation, the pre-parser includes calling a project management pre-parser, exiting a project management pre-parser, calling a project management specification management pre-parser, and exiting a project management specification management pre-parser.

[0035] It can be seen from the above technical solution that the technical solution provides a project management platform, including a first storage unit, an application service unit and a project management unit, wherein the first storage unit stores project management specifications, wherein the project management specifications are used to identify the rules that project managers need to follow when performing project management. The project management unit executes project management based on the language operation instructions of project management and the project management specifications. The application service unit is used to receive language operation instructions for instructing project management and to feedback the execution results of project management. By storing the project management specifications in the first storage unit, it is ensured that the operation of project management has a basis, so there is no need to be familiar with the operation process of the project management tool and the project management specifications. Project management can be performed according to simple language operation instructions, which lowers the threshold for user operation and improves the convenience of project management operations, allowing users to invest more in actual project management, reducing management losses, and effectively improving the efficiency of project management. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments recorded in this application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0037] Figure 1 A schematic diagram of a project management platform provided in an embodiment of the present application;

[0038] Figure 2 A schematic diagram of another project management platform provided in an embodiment of the present application. DETAILED DESCRIPTION

[0039] In order to help those skilled in the art better understand the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.

[0040] As mentioned in the background, project management is a field with extensive expertise, and different companies often have a variety of customized project management standards. Both veteran and new employees need to expend considerable effort to familiarize themselves with project management systems and apply them in practice, resulting in significant management overhead.

[0041] Based on this, in order to solve the problem that project managers need to be familiar with the operating procedures of project management tools and the project management specifications of corresponding projects before they can perform project management operations, the present application implements a project management platform, including a first storage unit, an application service unit and a project management unit, wherein the first storage unit stores project management specifications, wherein the project management specifications are used to identify the rules that project managers need to follow when performing project management, and the project management unit executes project management based on the language operation instructions of project management and the project management specifications, and the application service unit is used to receive the language operation instructions for instructing project management and to feedback the execution results of project management. By storing the project management specifications in the first storage unit, it is ensured that the project management operations have a basis, so that there is no need to be familiar with the operating procedures of project management tools and project management specifications. Project management can be performed according to simple language operation instructions, which lowers the threshold for user operations and improves the convenience of project management operations, allowing users to invest more in actual project management, reducing management losses, and thus effectively improving the efficiency of project management.

[0042] The solution provided in the embodiments of the present application relates to the field of project management technology, and is specifically described through the following embodiments.

[0043] See also Figure 1 As shown, it is a flow chart of a project management platform provided in an embodiment of the present application. The project management platform 100 includes a first storage unit 101, an application service unit 102 and a project management unit 103, which are described below respectively.

[0044] The first storage unit 101 is used to store project management specifications.

[0045] Project management standards are the rules that project managers must follow when managing projects. They include a series of processes, methods, rules, and documents established during the project management process to ensure the smooth implementation, efficient operation, and achievement of the project's ultimate goals. Examples include project definition, feasibility studies, and project charter regulations during the project initiation phase; project planning, schedule planning, cost planning, quality planning, human resource planning, communication planning, risk management planning, and procurement planning during the project planning phase; and team formation, resource allocation, project task execution, communication and coordination, project monitoring, and related requirements during the project closeout phase.

[0046] To ensure the smooth progress of projects, different projects have customized project management specifications, such as technical feasibility studies, business feasibility studies, project kick-off meetings, human resources input, and project handover.

[0047] In order to distinguish project management specifications of different projects, in a possible implementation, the first storage unit is used to store project management specifications of multiple projects, and each of the multiple projects has a corresponding uniqueness verification identifier.

[0048] Based on the unique verification identification, the project management specification contents under different projects can be distinguished. Therefore, through permission setting, the project management platform can ensure the isolation and security of data when facing multiple companies or multiple projects, and customize the storage of project management specification contents, providing a strong basis for the actual operation of project management.

[0049] The project management unit 102 is configured to perform project management based on the first type of input and project management specifications.

[0050] The first type of input is used to identify language instructions for project management operations. Language instructions are instructions expressed in natural language, meaning that users can communicate desired project management operations to the project management platform using simple language instructions that are not restricted by project management expertise or regulatory requirements.

[0051] In this application, project management includes two aspects: project execution management and project management specification management. Project execution management is used to advance the project progress, and project management specification management is used to update and maintain project management specifications.

[0052] The project management unit parses the input content through a parser. If the input content is an instruction to perform project execution management, the retrieval module of the project management unit retrieves normative content related to the input from the first storage unit. Then, based on the provided interface of the project management tool, the project management tool is called and, based on the normative content, the project is automatically created, including project creation, development task creation, user story creation, functional requirement creation, project manager creation, or standard test case generation. The embodiments of the present application do not impose any restrictions on the type of project management tool.

[0053] The project management unit parses the input content through a parser. When the input content is an instruction to perform project management specification management, the retrieval module of the project management unit retrieves the normative content related to the input in the first storage unit, and then updates the relevant content through file operations or database operations, such as modifications to project management specifications, modifications to customized project management specifications, modifications to project launch requirements, modifications to project acceptance standards, etc.

[0054] As an example, the first type of input is an instruction to create a project. When the user inputs "Help me create a project, named core upgrade, with a project cycle of 6 months, a project workload of 50 man-months, and a project manager of Zheng xx", the project management unit can analyze the input content through the parser to obtain keyword information, such as project name, project cycle, project workload, project manager, etc., and retrieve the relevant normative requirements of the keywords in the first storage unit, and then call the project management tool interface for creating the project based on this to automatically create the project and generate a project introduction.

[0055] As another example, when the first type of input is an instruction to modify the project specifications according to the specification document, the user uploads the specification document to the platform and enters "Please revise the project specifications according to this specification document". The project management unit parses the document through the pre-built model architecture, and adjusts the existing information by comparing it with the corresponding normative information in the first storage unit, and performs time marking to complete the update of the project management specifications.

[0056] The application service unit 103 is configured to receive the first type of input and provide feedback on the execution result of the project management.

[0057] The application service unit provides a front-end interactive interface. It connects to the client, which typically runs on a user's personal computer, mobile phone, or tablet. The client is used to initiate project management operation requests and display data returned by the project management platform, enabling interaction between the information management platform and the user.

[0058] The execution results of project management include successful execution results and unsuccessful execution results, among which the unsuccessful execution results may also include the reasons for the unsuccessful execution.

[0059] The application service unit can receive the language operation instructions input by the user through the front-end web page or applet, and then after the project management unit executes the project management operation indicated by the instruction, it returns the execution result to the user through the front-end web interface or applet.

[0060] In order to manage projects more efficiently, integrity constraints need to be placed on user input instructions to help improve the accuracy of project management.

[0061] In a possible implementation, the platform further includes a verification unit configured to perform integrity verification on the first type of input according to project management specifications.

[0062] You can configure a completeness requirements document within your project management specifications to constrain the required elements for different types of instructions. For example, for an instruction to create a project, the required elements in the completeness requirements document are the project name, project duration, project workload, and project manager.

[0063] Based on the project management specifications stored in the first storage unit, the relevant content involved in executing various project management operations, such as creating a project, creating a user story, modifying a specification document, etc., can be known. In the process of executing project management operations, the relevant content in the first storage unit is retrieved for the user input instructions to verify whether the user's input instructions can instruct the project management system to completely execute the project management operations.

[0064] If the user's input instructions lack relevant content that can successfully execute project management operations, the application service unit will feedback the unsuccessful execution result to the user and prompt the user of the missing relevant information in the input instructions to help the user discover the problem and adjust the input instructions in time.

[0065] As an example, the project management specifications clearly define the necessary information when creating functional requirements: the name of the functional requirement and the functional requirement developer. When the user enters the instruction to create the functional requirement, the verification unit performs integrity verification on the instruction entered by the user. When the user's input instruction lacks relevant information of the functional requirement developer, the application service platform will feedback the result of unsuccessful execution and display the reason for the user's unsuccessful execution, namely "lack of relevant information of the functional requirement developer" to help the user complete the input instruction.

[0066] Therefore, by performing integrity verification on user input instructions, the integrity of the input data can be ensured, avoiding the waste of time or resources due to data missing, thereby significantly improving the efficiency and reliability of project management.

[0067] The project management system stores project management specifications through the first storage unit, ensuring that project management operations have a basis to rely on. There is no need to be familiar with the operating procedures and project management specifications of the project management tools. Project management can be carried out according to simple language operating instructions, which lowers the threshold for user operations and improves the convenience of project management operations. It allows users to invest more in actual project management, reduces management losses, and effectively improves the efficiency of project management.

[0068] In one possible implementation, the project management platform further includes a second storage unit and a large language model:

[0069] The second storage unit is used to store project management expertise.

[0070] Project management expertise refers to the general knowledge in the field of project management technology, including an introduction to management methods, processes and tools for each stage of the project.

[0071] A large language model is used to generate response results based on the second type of input and project management expertise.

[0072] The second type of input is used to identify the user's question-and-answer request, which triggers the large language model to provide question-and-answer services. When a user initiates a question-and-answer request, the large language model provides the user with question-and-answer services. This embodiment of the application does not impose any restrictions on the large language model.

[0073] The application server receives the user's question-and-answer request, filters it through the parser, and throws the question to the large language model. The large language model searches in the second storage unit and generates a reply result for the request based on the relevant professional knowledge corresponding to the retrieved request. The reply result is expressed in natural language.

[0074] The application service unit is further configured to receive a second type of input and feed back a response result.

[0075] The application service unit receives the request input by the user through the front-end web page or applet, and then displays the response result to the user through the front-end web interface or applet according to the response result.

[0076] Therefore, the project management platform can not only be used for project management, but also interact with users, provide question-and-answer services on project management expertise, and help users solve questions encountered in the project management process, thus making the platform a comprehensive project management intelligent assistant.

[0077] In a possible implementation, the first storage unit and the second storage unit are vector databases.

[0078] The text content in project management specifications and project management expertise (such as project charters, task descriptions, risk assessments, etc.) can be converted into vector embeddings, and these vectors are stored in a database to form a vector database.

[0079] The vector database has efficient similarity search capabilities. In this way, it can quickly retrieve the content most relevant to the user's input semantics, thereby effectively improving the efficiency of the platform's project management or question-and-answer services.

[0080] In one possible implementation, the project management platform further includes a pre-parser, which is used to identify the type of input and instruct the platform to perform pre-processing based on the type of input.

[0081] Since the information management platform includes two types of inputs, the first type of input is used to instruct the project management platform to perform project management operations, and the second type of input is used to instruct the project management platform to provide question-and-answer services.

[0082] You can use a single pre-parser to handle all types of commands, or you can use multiple parsers to handle specific types of commands.

[0083] The pre-parser functions through a pre-defined action dictionary and pre-set questions. The action dictionary includes attributes for parsing and processing user input, helping the system quickly identify user input and convert it into a format the system can understand or process. Pre-set questions are pre-defined sets of questions and answers that, based on keywords parsed from the action dictionary, help the system quickly provide accurate answers.

[0084] The operation dictionary and preset questions are stored in a storage unit of the platform, which may be a first storage unit, a second storage unit or other databases stored in the platform.

[0085] For example, when a user enters a language instruction for project management, they can add the @PM command before the instruction. The pre-parser can quickly call the relevant interface of the project management tool based on the parameters or environment settings corresponding to the @PM command. When a user enters an instruction for providing question-and-answer services, they can add the @QA command before the instruction. The pre-parser can perform preliminary processing and analysis on the input content based on the operation dictionary and match it with the preset question templates, so that the large model can generate responses efficiently and accurately.

[0086] The project management platform can analyze user input through the front-end parser and make a preliminary judgment on the user's purpose, so as to quickly call the interface of the project management tool or realize the rapid response of the retrieval function of the large language model, thereby effectively improving the interaction efficiency and user experience.

[0087] In order to better improve the operating efficiency of the platform through the pre-parser, multiple pre-parsers can be set to handle specific types of commands respectively.

[0088] In a possible implementation, the pre-parser includes calling the project management pre-parser, exiting the project management pre-parser, calling the project management specification management pre-parser, and exiting the project management specification management pre-parser. The commands and corresponding types are shown in Table 1:

[0089] Table 1

[0090] Order type @PM Call up the project management pre-parser #PM Exit Project Management Pre-parser @PMP Call up the project management specification management pre-parser #PMP Exit Project Management Specification Management Pre-parser

[0091] When the user inputs a language operation instruction to perform a project management operation, if the user adds the @PM command before the instruction, the platform will call up the project management pre-parser and promptly call the relevant interface of the project management tool to perform specific project management operations. If the user adds the #PM command before the input instruction, the platform will exit the project management pre-parser and exit the relevant project management operations.

[0092] The content entered multiple times between @PM and #PM by the user is assumed to be instructions instructing the platform to perform project management operations. However, the platform can further identify the input type through a large language model. When the input content is a question-and-answer request, the platform provides question-and-answer services.

[0093] When a user enters a language operation instruction to perform project management specification management, if the user adds the @PMP command before the instruction, the platform will call the project management specification management pre-parser and modify the content of the project management specification by calling the relevant interface of the project management tool. If the user adds the #PMP command before the input instruction, the platform will exit the relevant operations of project management specification management.

[0094] Therefore, by having multiple front-end parsers responsible for processing specific types of commands, it is convenient to further optimize the corresponding front-end operations, which is beneficial to improving the modular management capabilities of the platform and further improving the operating efficiency of the system.

[0095] In order to more clearly describe the structure of this project management platform, refer to Figure 2 , is a schematic diagram of another project management platform provided in an embodiment of the present application, which includes an application service system (application service unit), a vector knowledge base (a first storage unit and a second storage unit), a large language model, and a project management system (project management unit). The application service system is connected to the client and can interact with the user through a PC or mobile phone.

[0096] When the application service system receives a question-and-answer request from a user, it searches the vector knowledge base through a large language model, generates a response result, and displays the response result on the user's PC or mobile phone.

[0097] When the application service system receives a project management operation request input by the user, it first searches the vector knowledge base through the large language model to determine the completeness of the input. If the input content is an instruction for project execution management, the project management system calls the relevant interface of the project management tool to implement the project management operation. If the user input is an instruction for project management specification management, the vector knowledge base is updated through file operations or database operations, and the execution results are then fed back to the user. If the input content is insufficient to support the completion of the project management operation, the missing relevant information is fed back to the user based on the retrieval results of the large language model.

[0098] Based on the above embodiment, an embodiment of the present application provides a project management method, which is applied to a project management platform. The platform includes a first storage unit, an application service unit, and a project management unit. The method includes:

[0099] Storing project management specifications in the first storage unit, where the project management specifications are used to identify rules that project managers need to follow when managing projects;

[0100] Performing project management based on a first type of input and the project management specification, the first type of input being used to identify a language operation instruction instructing to perform project management;

[0101] The first type of input is received through the application service unit, and the execution result of the project management is fed back.

[0102] Therefore, the project management system stores the project management specifications through the first storage unit, ensuring that the project management operations have a basis to rely on, so there is no need to be familiar with the operating procedures and project management specifications of the project management tools. Project management can be carried out according to simple language operating instructions, which lowers the threshold for user operations and improves the convenience of project management operations, allowing users to invest more in actual project management, reducing management losses, and thus effectively improving the efficiency of project management.

[0103] In a possible implementation, the project management platform further includes a second storage unit and a large language model, and the method further includes:

[0104] storing project management expertise through the second storage unit;

[0105] generating a response result based on the second type of input and the project management expertise using the large language model, where the second type of input is used to identify question-and-answer requests;

[0106] The second type of input is received through the application service unit, and the response result is fed back.

[0107] Therefore, the project management platform can not only be used for project management, but also interact with users, provide question-and-answer services on project management expertise, and help users solve questions encountered in the project management process, thus making the platform a comprehensive project management intelligent assistant.

[0108] In a possible implementation, the first storage unit is used to store project management specifications for multiple projects, and each of the multiple projects has a corresponding uniqueness verification identifier.

[0109] Therefore, through the unique verification identifier corresponding to each project, permissions can be set for project management specifications of different projects, so that the project management platform can ensure data isolation and security when facing multiple companies or multiple projects.

[0110] In a possible implementation, the platform further includes a testing unit, and the method further includes:

[0111] The verification unit performs an integrity check on the first type of input according to the project management specification.

[0112] Therefore, by performing integrity verification on user input instructions, the integrity of the input data can be ensured, avoiding the waste of time or resources due to data missing, thereby significantly improving the efficiency and reliability of project management.

[0113] In a possible implementation manner, the first storage unit and the second storage unit are vector databases.

[0114] The vector database has efficient similarity search capabilities. In this way, it can quickly retrieve the content most relevant to the user's input semantics, thereby effectively improving the efficiency of the platform's project management or question-and-answer services.

[0115] In a possible implementation, the project management platform further includes a pre-parser, and the method further includes:

[0116] The pre-parser identifies the type of the input and instructs the platform to perform preprocessing based on the type of the input.

[0117] The project management platform can analyze user input through the front-end parser and make a preliminary judgment on the user's purpose, so as to quickly call the interface of the project management tool or realize the rapid response of the retrieval function of the large language model, thereby effectively improving the interaction efficiency and user experience.

[0118] In a possible implementation, the pre-parser includes calling a project management pre-parser, exiting a project management pre-parser, calling a project management specification management pre-parser, and exiting a project management specification management pre-parser.

[0119] Therefore, by having multiple front-end parsers responsible for processing specific types of commands, it is convenient to further optimize the corresponding front-end operations, which is beneficial to improving the modular management capabilities of the platform and further improving the operating efficiency of the system.

[0120] It should be noted that the various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. Reference can be made to the common and similar parts between the various embodiments. For the systems or devices disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and the relevant parts can be referred to the method description.

[0121] The above description of the disclosed embodiments is intended to enable one skilled in the art to implement or use the present application. Various modifications to these embodiments will be readily apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application is not limited to the embodiments shown herein, but is intended to conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A project management platform, characterized in that: The platform includes a first storage unit, an application service unit and a project management unit: The first storage unit is used to store project management specifications, where the project management specifications are used to identify rules that project managers need to follow when managing projects; The project management unit is configured to perform project management based on a first type of input and the project management specification, wherein the first type of input is used to identify a language operation instruction instructing to perform project management; The application service unit is configured to receive the first type of input and provide feedback on the execution result of the project management.

2. The platform according to claim 1, characterized in that The project management platform further includes a second storage unit and a large language model: The second storage unit is used to store project management expertise; The large language model is used to generate a response result based on the second type of input and the project management expertise, wherein the second type of input is used to identify question-and-answer requests; The application service unit is further configured to receive the second type of input and feed back the response result.

3. The platform according to claim 1, characterized in that The first storage unit is used to store project management specifications of multiple projects, and each of the multiple projects has a corresponding uniqueness verification identifier.

4. The platform according to claim 1, characterized in that The platform further includes a verification unit configured to perform integrity verification on the first type of input according to the project management specification.

5. The platform according to claim 2, characterized in that The first storage unit and the second storage unit are vector databases.

6. The platform according to claim 2, characterized in that The project management platform also includes a pre-parser, which is used to identify the type of the input and instruct the platform to perform pre-processing based on the type of the input.

7. The platform according to claim 6, characterized in that The pre-parser includes calling the project management pre-parser, exiting the project management pre-parser, calling the project management specification management pre-parser and exiting the project management specification management pre-parser.

8. A project management method, characterized in that: The method is applied to a project management platform, the platform including a first storage unit, an application service unit, and a project management unit, and the method includes: Storing project management specifications in the first storage unit, where the project management specifications are used to identify rules that project managers need to follow when managing projects; executing project management by the project management unit based on a first type of input and the project management specification, wherein the first type of input is used to identify a language operation instruction instructing to perform project management; The first type of input is received through the application service unit, and the execution result of the project management is fed back.

9. The method according to claim 8, characterized in that The project management platform further includes a second storage unit and a large language model, and the method further includes: storing project management expertise through the second storage unit; generating a response result based on the second type of input and the project management expertise using the large language model, where the second type of input is used to identify question-and-answer requests; The second type of input is received through the application service unit, and the response result is fed back.

10. The method according to claim 9, characterized in that The project management platform further includes a pre-parser, and the method further includes: The pre-parser identifies the type of the input and instructs the platform to perform preprocessing based on the type of the input.