Nuclear reactor control rod dropping test apparatus and test method
By designing a control rod dropping experimental device for nuclear reactors, the problem of control rod dropping research in liquid lead-bismuth medium environment was solved, enabling precise measurement of dropping time and visualization of liquid lead-bismuth flow state changes, thus optimizing control rod design.
Patent Information
- Application Number
- CN202510660852.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-21
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2045-05-21
AI Technical Summary
In the existing technology, the control rod dropping device in the water medium environment cannot be directly applied to the liquid lead-bismuth medium environment, and it is not possible to effectively study the operating characteristics of the control rod in the liquid lead-bismuth medium environment, especially the control rod dropping problem in the high density and high buoyancy environment.
A control rod dropping experiment device for a nuclear reactor was designed, including a support frame, a container tube, a drive assembly, an observation window, and a time measurement assembly. The drive assembly drives the control rod to undergo free fall, uniform speed, acceleration, and deceleration motions within the container tube. Combined with a heating assembly, solid lead bismuth is melted into a liquid state. A high-speed camera captures the compression changes, and the time measurement assembly accurately measures the dropping time.
This invention enables precise measurement of the control rod drop time in a liquid lead-bismuth medium environment, visualizes the changes in the liquid lead-bismuth flow state after the control rod is squeezed, provides a reference for control rod design optimization, is applicable to control rod drop studies in various liquid metals, and has a simple and flexible structure.
Smart Images

Figure CN120636875B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of nuclear power technology, and in particular to a nuclear reactor control rod dropping test apparatus and test method. Background Technology
[0002] Reactors rely on control rods to regulate reactivity. In the event of a severe accident, the control rods are inserted into the reactor core by gravity to shut down the reactor. The control rods are crucial for the safe operation of the reactor. Therefore, it is necessary to analyze whether they can fall into the reactor core within a specified time under normal operation and accident conditions such as earthquakes.
[0003] In related technologies, the application of control rod dropping devices is mainly concentrated in aqueous media environments, while research and design of control rod dropping devices in liquid lead-bismuth media environments are relatively few. Aqueous media environments and liquid lead-bismuth media environments have different characteristics. For example, the operation of control rods in lead-bismuth reactors needs to overcome environmental characteristics such as high density and high buoyancy. Generally, it is necessary to add high-density counterweights or utilize the buoyancy characteristics of high-density coolant in liquid lead-bismuth to use a buoyancy dropping method to insert the rods into the reactor core from bottom to top. This means that control rod dropping devices in aqueous media environments cannot be directly applied to experimental research in liquid lead-bismuth media environments. Summary of the Invention
[0004] The technical problem to be solved by the present invention is to provide a nuclear reactor control rod dropping test device.
[0005] The technical solution adopted by this invention to solve its technical problem is:
[0006] A nuclear reactor control rod dropping test apparatus includes:
[0007] Support frame and control rod;
[0008] A container tube, which is mounted on the support frame, has an opening in a receiving cavity containing lead and bismuth.
[0009] A drive assembly is mounted above the support frame and connected to the control rod to suspend the control rod at the opening of the receiving cavity; the drive assembly drives the control rod to rise or fall within the receiving cavity.
[0010] An observation window, connected to the opening of the receiving cavity, is provided to observe the compression state of the lead-bismuth as the control rod falls; and
[0011] A time measurement component is disposed on the container tube to measure the descent time of the control rod.
[0012] Furthermore, in the aforementioned nuclear reactor control rod dropping test apparatus, it is preferable that the nuclear reactor control rod dropping test apparatus further includes a heating component disposed on the container tube, so as to heat and melt solid lead bismuth into liquid lead bismuth before the control rod dropping test.
[0013] Furthermore, in the aforementioned nuclear reactor control rod dropping test apparatus, preferably, the nuclear reactor control rod dropping test apparatus also includes a thermocouple disposed on the container tube for measuring the temperature of the liquid lead bismuth.
[0014] Furthermore, in the aforementioned nuclear reactor control rod dropping test apparatus, preferably, the nuclear reactor control rod dropping test apparatus also includes a high-speed camera, which corresponds to the observation window to capture the instantaneous changes in the compression of the liquid lead-bismuth when the control rod falls.
[0015] Furthermore, in the aforementioned nuclear reactor control rod dropping test device, the driving component preferably includes a driving element, a hook, and a controller;
[0016] The drive unit is connected to the control rod via a hook, and the controller is electrically connected to the drive unit.
[0017] Furthermore, in the aforementioned nuclear reactor control rod dropping test apparatus, preferably, a flow observation cavity is defined within the observation window, and the flow observation cavity is connected to the containment cavity.
[0018] Furthermore, in the aforementioned nuclear reactor control rod dropping test device, the observation window preferably includes a base plate, a surrounding plate, a top plate, a first through hole, and a second through hole;
[0019] The transparent enclosure is disposed at the edge of the base plate, and the top plate covers the enclosure to form the flow observation cavity; the first through hole is formed on the base plate and communicates with the opening of the receiving cavity; the second through hole is formed on the top plate.
[0020] Furthermore, in the aforementioned nuclear reactor control rod dropping test device, the control rod, the first through hole, the second through hole, and the receiving cavity are preferably arranged coaxially.
[0021] Furthermore, in the aforementioned nuclear reactor control rod dropping test apparatus, the time measurement component preferably includes a first sensor, a second sensor, and a processor;
[0022] The first sensor is installed at the end of the container tube near the opening to measure the start time of the control rod's descent; the second sensor is installed at the end of the container tube away from the opening to measure the end time of the control rod's descent; both the first and second sensors are electrically connected to the processor.
[0023] An experimental method for a nuclear reactor control rod dropping test device includes the following steps: S1, fixing the control rod to the drive assembly;
[0024] S2, the drive component drives the control rod to move up and down, eliminating the possibility of abnormal noise, jamming, or failure to fall smoothly during the process of the control rod falling;
[0025] S3, conduct free fall rod dropping, constant speed rod dropping, accelerated rod dropping and deceleration rod dropping experiments in an air environment, record the rod dropping time data, and compare the known free fall rod dropping, constant speed rod dropping, accelerated rod dropping and deceleration rod dropping time values with the time data to see if there is a deviation. If there is a deviation, adjust the nuclear reactor control rod dropping test device according to the deviation value. If there is no deviation, proceed to S4.
[0026] S4, the lead bismuth is placed in the receiving cavity of the container tube, and then the driving component drives the control rod to perform free fall, uniform fall, accelerated fall and decelerated fall in the receiving cavity of the container tube in the liquid lead bismuth environment.
[0027] S5, the time measurement component acquires the time of the free fall, constant speed fall, accelerated fall and deceleration fall of the control rod in real time, and the high-speed camera captures the metal flow state of the liquid lead bismuth after the free fall, constant speed fall, accelerated fall and deceleration fall of the control rod compressing and changing the liquid lead bismuth.
[0028] The present invention has the following advantages: it is used to study the drop time of the control rod and the changes in the liquid lead-bismuth flow state after being squeezed by the control rod during the drop. It can accurately measure the drop time, visualize the changes in the liquid lead-bismuth after being squeezed by the control rod, provide a reference for the design optimization of control rods in liquid lead-bismuth environments, and is applicable to control rod drop studies in various liquid metals. The experimental device has a simple structure, is compact and flexible, and is easy to operate. Attached Figure Description
[0029] The present invention will be further described below with reference to the accompanying drawings and embodiments. In the accompanying drawings:
[0030] Figure 1 This is a first-view structural schematic diagram of a nuclear reactor control rod dropping test device in some embodiments of the present invention;
[0031] Figure 2 yes Figure 1 The diagram shows a longitudinal sectional view of the structure. Detailed Implementation
[0032] To provide a clearer understanding of the technical features, objectives, and effects of this invention, specific embodiments are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the orientations or positional relationships indicated by terms such as "front," "rear," "upper," "lower," "left," "right," "longitudinal," "horizontal," "vertical," "horizontal," "top," "bottom," "inner," "outer," "head," and "tail" are based on the orientations or positional relationships shown in the accompanying drawings, and are constructed and operated in a specific orientation. They are only for the convenience of describing this technical solution and do not indicate that the device or element referred to must have a specific orientation; therefore, they should not be construed as limitations on this invention.
[0033] It should also be noted that, unless otherwise explicitly specified and limited, terms such as "installation," "connection," "linking," "fixing," and "setting" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. When an component is referred to as being "on" or "below" another component, the component can be located "directly" or "indirectly" on the other component, or there may be one or more intermediary components. The terms "first," "second," "third," etc., are only for the convenience of describing this technical solution and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, features defined with "first," "second," "third," etc., may explicitly or implicitly include one or more of that feature. For those skilled in the art, the specific meaning of the above terms in this invention can be understood according to the specific circumstances.
[0034] In the following description, specific details such as particular system architectures and techniques are set forth for illustrative purposes and not for limitation, in order to provide a thorough understanding of the embodiments of the invention. However, those skilled in the art will understand that the invention can be implemented in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, apparatuses, circuits, and methods are omitted so as not to obscure the description of the invention with unnecessary detail.
[0035] The technical solution adopted by this invention to solve its technical problem is:
[0036] like Figure 1 and Figure 2As shown, some embodiments of the present invention disclose a nuclear reactor control rod dropping test apparatus. In some embodiments, this apparatus may include: a support frame 10, a control rod 20, a container tube 30, a drive assembly 40, and a time measurement assembly 60. The container tube 30 is vertically mounted on the support frame 10 and has an open receiving cavity 310. The drive assembly 40 is mounted on the top of the support frame 10 and connected to the top of the control rod 20 to suspend the control rod 20 at the opening of the receiving cavity 310. The time measurement assembly 60 is mounted on the container tube 30. The drive assembly 40 drives the control rod 20 to move up and down within the receiving cavity 310 at a uniform speed, accelerating and decelerating, while the time measurement assembly 60 measures the time of the control rod 20's descent.
[0037] Continue to refer to Figure 2 In some embodiments, the nuclear reactor control rod drop experiment apparatus also includes an observation window 50, a heating assembly 70, and a high-speed camera 80. The aforementioned containment cavity 310 stores lead-bismuth. The transparent observation window 50 is mounted on the support frame 10 and communicates with the containment cavity 310 through the aforementioned opening. The heating assembly 70 is mounted on the container tube 30. The lead-bismuth is stored in solid form; during the control rod drop experiment, the lead-bismuth is melted into liquid lead-bismuth by the heating assembly 70. The high-speed camera 80 corresponds to the observation window 50 and captures the compression state of the liquid lead-bismuth during the drop of the control rod 20.
[0038] In some embodiments, the support frame 10 may include a base 11, support rods 12, and a top seat 13. Four support rods 12 are provided, installed between the base 11 and the top seat 13, and located at the four corners of the base 11 and the top seat 13 to form a stable frame structure.
[0039] Before the experiment, fix the base 11 to the ground or platform to prevent the support frame 10 from tilting during the experiment. Understandably, the base 11 can be fixed to the ground by means of pins, screws, adhesive, snap-fit, etc.
[0040] In some embodiments, the control rod 20 has an annular groove at its top for connection to the drive assembly 40. The control rod 20 is made of a metallic material. Understandably, the control rod 20 is a model of a control rod for a liquid lead-bismuth reactor.
[0041] For reference Figure 1In some embodiments, the container tube 30 is mounted on the upper surface of the base 11 of the support frame 10. Understandably, the container tube 30 is a tube with an opening at the top. Of course, the container tube 30 can also be a square structure with an opening or an irregular shape. Similarly, the shape of the receiving cavity 310 can be a tubular structure, a square structure, etc. It should be noted that the inner diameter of the receiving cavity 310 is greater than or equal to the outer diameter of the control rod 20, so that the control rod 20 can move freely up and down within the receiving cavity 310.
[0042] In some embodiments, the drive assembly 40 may include a drive element 41 mounted on the top seat 13 and a hook connected to the drive element 41. The hook is hooked onto the annular groove of the control rod 20. In addition, the drive element 41 is electrically connected to a controller to control the opening and closing of the drive element 41 and its output frequency (by adjusting the output frequency to control the uniform speed, acceleration, and deceleration of the up-and-down movement of the control rod 20 driven by the hook). It is understood that the drive element 41 may be a motor, a cylinder, a linear module, etc.
[0043] In some embodiments, the output end of the drive unit 41 (which is a motor) is equipped with a drive rod, on which a lifting rope is wound, and the lifting rope is connected to a hook. The drive unit 41 drives the drive rod to wind or lower the lifting rope, so that the hook drives the control rod 20 to rise or fall.
[0044] In other embodiments, the output end of the drive unit 41 (which is a motor) may be equipped with a lead screw, on which a nut is fitted (the nut only moves and does not rotate with the lead screw), and a pawl is mounted on the nut. The drive unit 41 drives the lead screw to rotate, and the nut on the lead screw drives the pawl to rise or fall, thereby causing the control rod 20 to move up and down.
[0045] In other embodiments, the output end of the drive unit 41 (which is a cylinder) can be directly connected to the hook. The drive unit 41 directly drives the hook to move the control rod 20 up and down. Of course, the drive unit 40 can also be configured as other lifting and lowering devices as in the prior art.
[0046] Refer again Figure 2In some embodiments, the observation window 50 may include a base plate 51, a surrounding plate 52, a top plate 53, a first through hole 54, and a second through hole 55. The base plate 51 is mounted on the support rod 12 of the support frame 10, the surrounding plate 52 is mounted between the base plate 51 and the top plate 53, and the top plate 53 is mounted on the support rod 12 of the support frame 10. The base plate 51, the surrounding plate 52, and the top plate 53 form a hexahedral structure, which forms a flow observation cavity 510 inside. When liquid lead bismuth is squeezed, it will splash and flow randomly in the flow observation cavity 510 to facilitate observation of the squeezing state of the liquid lead bismuth by the control rod 20. The first through hole 54 is opened on the base plate 51 and communicates with the opening of the receiving cavity 310 to allow the liquid lead bismuth squeezed in the container tube 30 to enter the flow observation cavity 510. The second through hole 55 is opened on the top plate 53 to allow the control rod 20 to enter the receiving cavity 310 of the container tube 30 through the second through hole 55 when it falls.
[0047] In some embodiments, the time measurement component 60 may include a first sensor 61, a second sensor 62, and a processor 63. The first sensor 61 is mounted at the end of the container tube 30 near the opening to measure the start time of the control rod 20's descent; the second sensor 62 is mounted at the end of the container tube 30 away from the opening to measure the end time of the control rod 20's descent; both the first sensor 61 and the second sensor 62 are electrically connected to the processor 63. Understandably, the first sensor 61 and the second sensor 62 are positioned along the descent path of the control rod 20. When the control rod 20 falls, the first sensor 61 and the second sensor 62 are triggered, and the trigger signal is converted into an electrical signal. The processor 63 receives the electrical signals from the first sensor 61 and the second sensor 62 to measure the descent time of the control rod 20.
[0048] In some embodiments, the first sensor 61 and the second sensor 62 are mounted on the container tube 30 by means of nuts, bolts, snap-fit, adhesive, etc. Of course, a corresponding mounting structure can also be provided on the container tube 30. For example, threads are provided on the container tube 30, and the first sensor 61 and the second sensor 62 are screwed into the threads by bolts.
[0049] In some embodiments, the heating assembly 70 is installed within the receiving cavity 310 of the container tube 30. Since the lead bismuth is stored as a solid, the heating assembly 70 needs to heat and melt the solid lead bismuth into liquid lead bismuth before the experiment. Additionally, a thermocouple 71 is provided on the container tube 30 to measure the temperature of the lead bismuth during heating.
[0050] In some embodiments, the heating component 70 may use coil heating, infrared heating, electromagnetic heating, or other methods. The thermocouple 71 may also use a temperature sensor, infrared detector, or other similar devices.
[0051] In some embodiments, a high-speed camera 80 corresponds to an observation window 50 to capture the instantaneous changes in the compression of liquid lead bismuth as the control rod 20 falls.
[0052] An experimental method for a nuclear reactor control rod dropping test device includes the following steps: S1, fixing the control rod 20 to the drive assembly 40.
[0053] Assemble and fix the support frame 10, container tube 30, drive assembly 40, observation window 50, time measuring device 60 and heating assembly 70, then fix the support frame 10 to the ground, and connect the control rod 20 to the hook of the drive assembly 40 so that the control rod 20 is suspended at the opening of the container tube 30.
[0054] S2, the drive component 40 drives the control rod 20 to move up and down slightly to eliminate abnormal noises, jamming, and whether the control rod 20 can fall smoothly during the process.
[0055] In some embodiments, phenomena such as the control rod 20 getting stuck at the opening of the container tube 30, failing to fall smoothly into the opening of the container tube 30, or bumping into the opening of the container tube 30 are excluded. In addition, it is also necessary to measure whether the control rod 20 can trigger the first sensor 61 and the second sensor 62.
[0056] S3, conduct free fall rod dropping experiments, uniform fall rod dropping experiments, accelerated fall rod dropping experiments, and decelerated fall rod dropping experiments in an air environment, record the rod dropping time data, and compare the known free fall rod dropping time values, uniform fall rod dropping time values, accelerated fall rod dropping time values, and decelerated fall rod dropping time values with the time data to check for deviations. If there is a deviation, adjust the nuclear reactor control rod dropping experiment device according to the deviation value. If there is no deviation, proceed to S4.
[0057] The time measurement component 60 records the time data of the control rod 20 driven by the drive component 40 in the container tube 30 during free fall, constant speed fall, accelerated fall, and deceleration fall in an air environment. The data is compared with the known time values of free fall, constant speed fall, accelerated fall, and deceleration fall to check for deviations. Based on the deviation time values, the system checks whether the control rod 20 is stuck during the drive process. At the same time, the system checks whether the time measurement component 60 is working properly. The system troubleshoots the nuclear reactor control rod falling test device one by one and replaces or repairs the faulty components (parts) of the nuclear reactor control rod falling test device.
[0058] In some embodiments, the times for the control rod 20 to fall freely, fall at a constant speed, fall at an accelerated speed, and fall at a deceleration speed in an air environment are known. After the nuclear reactor control rod falling test device is assembled, the times for the free fall, constant speed, accelerated, and deceleration speeds are tested and recorded. The recorded times are compared with known values (existing experimental falling times) to check for deviations. If there are deviations, it is necessary to check whether the control rod 20 is stuck during the driving process based on the deviation time values. At the same time, it is necessary to check whether the time measurement component 60 is working properly. The faults of the nuclear reactor control rod falling test device are checked one by one, and the faulty components (parts) of the nuclear reactor control rod falling test device are replaced or repaired. If there are no faults, the next step is performed.
[0059] For example, if the drive assembly 40 fails to drive the control rod 20 to fall vertically, a jamming phenomenon will occur; it is necessary to adjust the movement mode of the drive assembly 40 and the connection stability of the control rod 20, etc.
[0060] S4, lead and bismuth are placed in the receiving cavity 310 of the container tube 30, and then the drive assembly 40 drives the control rod 20 to perform free fall, constant speed fall, accelerated fall and decelerated fall in the receiving cavity 310 of the container tube 30 in the liquid lead and bismuth environment.
[0061] Solid lead bismuth is placed into the receiving cavity 310 of container tube 30, and heating component 70 is activated to heat and melt the solid lead bismuth into liquid lead bismuth. The temperature of liquid lead bismuth is fed back in real time through thermocouple 71, and heating component 70 is controlled to stop heating when the melting point temperature is reached.
[0062] S5, the time measurement component 60 acquires the time of the free fall, constant speed fall, accelerated fall and deceleration fall of the control rod 20 in real time, and the high-speed camera 80 captures the compression changes of the control rod 20 on the liquid lead bismuth during the free fall, constant speed fall, accelerated fall and deceleration fall.
[0063] The high-speed camera 80 captures the sputtering state of liquid lead-bismuth under the different speeds of the control rod 20, including free fall, constant speed fall, accelerated fall, and decelerated fall.
[0064] S6. After the experiment, raise the control rod 20 above the container tube 30, turn off the time measurement component 60 and the drive component 40, and treat the liquid lead bismuth inside the observation window 50 with chemical reagents after the liquid lead bismuth temperature drops to the specified temperature.
[0065] It is understood that the above embodiments only illustrate preferred embodiments of the present invention, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the present invention. It should be noted that those skilled in the art can freely combine the above technical features without departing from the concept of the present invention, and can also make several modifications and improvements, all of which fall within the protection scope of the present invention. Therefore, all equivalent transformations and modifications made with respect to the scope of the claims of the present invention should fall within the scope of the claims of the present invention.
Claims
1. A nuclear reactor control rod dropping test apparatus, comprising control rods (20); characterized in that, include: Support frame (10); A container tube (30) is mounted on the support frame (10) and has an opening in a receiving cavity (310) containing lead bismuth. A drive assembly (40) is mounted above the support frame (10) and connected to the control rod (20) to suspend the control rod (20) at the opening of the receiving cavity (310); the drive assembly (40) drives the control rod (20) to rise or fall within the receiving cavity (310); An observation window (50) is connected to the opening of the receiving cavity (310) to observe the compression state of the lead bismuth when the control rod (20) falls; a flow observation cavity (510) is defined within the observation window (50), and the flow observation cavity (510) is connected to the receiving cavity (310); the observation window (50) includes a bottom plate (51), a surrounding plate (52), a top plate (53), a first through hole (54), and a second through hole (55); the transparent... The enclosure plate (52) is disposed at the edge of the base plate (51), and the top plate (53) covers the enclosure plate (52) to form the flow observation cavity (510); the first through hole (54) is opened on the base plate (51) and communicates with the opening of the receiving cavity (310); the second through hole (55) is opened on the top plate (53); the control rod (20), the first through hole (54), the second through hole (55) and the receiving cavity (310) are coaxially arranged; and A time measurement component (60) is disposed on the container tube (30) to measure the fall time of the control rod (20).
2. The nuclear reactor control rod dropping test apparatus according to claim 1, characterized in that, The nuclear reactor control rod drop test device also includes a heating component (70) installed on the container tube (30) to heat and melt solid lead bismuth into liquid lead bismuth before the control rod (20) drops.
3. The nuclear reactor control rod dropping test apparatus according to claim 2, characterized in that, The nuclear reactor control rod drop test apparatus also includes a thermocouple (71) mounted on the container tube (30) for measuring the temperature of the liquid lead bismuth.
4. The nuclear reactor control rod dropping test apparatus according to claim 3, characterized in that, The nuclear reactor control rod dropping test device also includes a high-speed camera (80), which corresponds to the observation window (50) to capture the instantaneous changes in the compression of the liquid lead-bismuth when the control rod (20) falls.
5. The nuclear reactor control rod dropping test apparatus according to claim 1, characterized in that, The drive assembly (40) includes a drive element (41), a pawl, and a controller; The drive unit (41) is connected to the control rod (20) via a hook, and the controller is electrically connected to the drive unit (41).
6. The nuclear reactor control rod dropping test apparatus according to claim 1, characterized in that, The time measurement component (60) includes a first sensor (61), a second sensor (62), and a processor (63). The first sensor (61) is installed at the end of the container tube (30) near the opening to measure the start time of the fall of the control rod (20); the second sensor (62) is installed at the end of the container tube (30) away from the opening to measure the end time of the fall of the control rod (20); both the first sensor (61) and the second sensor (62) are electrically connected to the processor (63).
7. An experimental method for a nuclear reactor control rod dropping test apparatus, comprising the nuclear reactor control rod dropping test apparatus according to any one of claims 1-6, characterized in that, Includes the following steps: S1, fix the control rod (20) to the drive assembly (40); S2, the drive component (40) drives the control rod (20) to move up and down, eliminating the possibility of abnormal noise, jamming, or failure to fall smoothly during the process of the control rod (20) falling; S3, conduct free fall rod dropping, constant speed rod dropping, accelerated rod dropping and deceleration rod dropping experiments in an air environment, record the rod dropping time data, and compare the known free fall rod dropping, constant speed rod dropping, accelerated rod dropping and deceleration rod dropping time values with the time data to see if there is a deviation. If there is a deviation, adjust the nuclear reactor control rod dropping test device according to the deviation value. If there is no deviation, proceed to S4. S4, the lead bismuth is placed in the receiving cavity (310) of the container tube (30), and then the driving component (40) drives the control rod (20) to perform free fall, uniform fall, accelerated fall and decelerated fall in the receiving cavity (310) of the container tube (30) in the liquid lead bismuth environment. S5, the time measurement component (60) acquires the time of free fall, uniform fall, accelerated fall and deceleration fall of the control rod (20) in real time, and the high-speed camera (80) captures the metal flow state after the free fall, uniform fall, accelerated fall and deceleration fall of the control rod (20) on the liquid lead bismuth after compression.
Citation Information
Patent Citations
Control rod for liquid heavy metal cooling reactor
CN103236276A
Acquiring and processing system for reactor control rod drive wire test data
CN105632573A