A design method for the construction of a split-type vertical non-slipway shallow water jacket foundation
By dividing the jacket into upper and lower parts and constructing them vertically in the non-slide area and assembling them together, the problem of site and slide resource occupation in the traditional construction method is solved, and the effects of short construction period, low cost and simplified installation are achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ZHONGHAI FULU HEAVY IND CO LTD
- Filing Date
- 2025-10-14
- Publication Date
- 2026-05-26
AI Technical Summary
Traditional jacket construction methods require a large amount of site space and slipway resources, have a long construction period, consume a large amount of auxiliary materials, and are complex in offshore righting operations, resulting in high costs.
The shallow water jacket structure is constructed using a split vertical non-slipway construction method, which divides the jacket structure into upper and lower parts and constructs them vertically in the non-slipway area. The parts are then assembled using a crawler crane and finally transported by SPMT (Ship-Ship-Mounted Machine), simplifying the offshore installation process.
Shorten the construction period, reduce the need for auxiliary tools and equipment, reduce site occupation, save on offshore righting operations, reduce project costs, and increase project capacity.
Smart Images

Figure CN120930290B_ABST