Reverse construction method for steel sheet pile cofferdam of tidal zone cross-sea bridge

By employing reverse construction methods and guide frame positioning technology, combined with environmentally friendly water-stopping materials, the difficulties in foundation treatment and environmental protection issues in the construction of the cofferdam for the cross-sea bridge in tidal areas were resolved, achieving precise positioning and efficient, environmentally friendly construction results.

CN121138318APending Publication Date: 2025-12-16SHANGHAI BAOYE GRP CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202511328155.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-09-17
Publication Date
2025-12-16

AI Technical Summary

Technical Problem

When constructing cofferdams for cross-sea bridges in tidal areas with no or thin overburden, problems arise such as difficulties in foundation treatment, low construction efficiency, inaccurate positioning, and poor environmental performance.

Method used

The reverse construction method is adopted, and steel casing brackets and guide frames are used to accurately position the steel sheet piles. Combined with laser measurement and control equipment and environmentally friendly water-stopping materials, a composite internal support system is formed to ensure the stability and environmental protection of the cofferdam structure.

Benefits of technology

It achieves precise positioning of sheet piles, shortens the construction cycle, improves construction quality and efficiency, reduces environmental pollution, meets green construction requirements, and enhances the stability and deformation resistance of the cofferdam structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

The invention relates to a steel sheet pile cofferdam top-down construction method for a tidal zone cross-sea bridge, which comprises the following steps: mounting brackets by using an early-stage cast-in-place pile steel casing, constructing a steel enclosing purlin and I-shaped steel combined guide frame, and realizing accurate positioning of steel sheet piles; laser vertical measurement and control equipment is used for assisting in applying, so that the perpendicularity and the plane position precision are ensured; an environment-friendly epoxy resin low-VOC material is painted on a lock opening of the steel sheet pile, the water stopping performance is enhanced, and pollution is reduced; the inner supporting system forms a stable enclosure structure through two I-shaped steel outer hoops, two steel enclosing purlins, three bottom steel strand outer hoops and a steel pipe inner support. A steel strand outer hoop and a reinforcing mesh are arranged in bottom sealing concrete construction, and a post-pouring layer is reserved to guarantee the quality. The structural integrity is improved according to the reverse construction sequence, and the method is suitable for cross-sea bridge engineering in the tidal regions of China and has the technical advantages of being high in construction efficiency, excellent in environmental protection performance and high in positioning precision.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of highway bridge and offshore construction, in particular to a reverse construction method of a steel sheet pile cofferdam for a sea-crossing bridge in a tidal zone. BACKGROUND

[0002] I. Current situation of cofferdam construction for sea-crossing bridges In the construction process of a sea-crossing bridge, cofferdam construction is a key link to ensure the stability and safety of the bridge foundation.

[0003] Especially in tidal areas, due to the weakness or absence of the underlying layer under seawater, cofferdam construction faces great challenges.

[0004] Traditionally, steel sheet pile cofferdams, as a common construction method, are widely used in such environments.

[0005] However, when there is no overlying layer, the overlying layer is shallow, or the construction is directly on bare rock, the traditional method exposes many problems.

[0006] II. Limitations of traditional construction methods Difficult foundation treatment: When constructing in areas without or with thin overlying layers, traditional methods require ground reinforcement measures (such as sand cushion, grouting reinforcement, etc.) to improve the bearing capacity of the foundation.

[0007] However, these measures not only require a large amount of manpower, material resources and time, but also have uncertain treatment effects, making it difficult to ensure the overall stability of the cofferdam structure.

[0008] Significant tidal influence: Frequent water level changes in tidal areas significantly affect construction progress and quality.

[0009] The interference of tides is difficult to completely avoid, and the impact of wave, typhoon and other loads may cause the cofferdam structure to deform loosely, affecting construction safety.

[0010] Measurement control is difficult: The construction environment is complex and variable, and measurement control is easily disturbed by external factors, leading to inaccurate positioning of steel sheet piles and affecting the integrity and stability of the cofferdam structure.

[0011] Environmental protection issues are prominent: If not properly handled, traditional water-stopping materials (such as butter mixture oil paste, sawdust, fly ash, etc.) can cause serious environmental pollution.

[0012] With the increasing environmental protection requirements, finding environmentally friendly water-stopping materials has become a pressing problem.

[0013] III. Deficiencies of existing technologies Although existing technologies have solved some problems in the construction of cofferdams for sea-crossing bridges to some extent, there are still the following deficiencies: Low construction efficiency: the traditional construction method takes a long time to process the foundation and the effect is uncertain when constructing in areas without or with thin cover layers, resulting in low construction efficiency.

[0014] Difficult to guarantee construction quality: the positioning of steel sheet piles is inaccurate due to the influence of tides and the difficulty of measurement control, which affects the integrity and stability of the cofferdam structure.

[0015] Poor environmental performance: traditional water-stopping materials can cause environmental pollution, which does not meet the current requirements of green construction. SUMMARY

[0016] The present application aims to overcome the defects of the prior art and provide a tidal zone cross-sea bridge steel sheet pile cofferdam top-down construction method, which solves the construction difficulties in tidal areas and areas without or with thin cover layers under seawater; ensures the construction accuracy of steel sheet piles and realizes precise positioning; and realizes green, low-carbon construction-related environmental protection during the process.

[0017] To solve the above technical problems, the present application is implemented as follows: A tidal zone cross-sea bridge steel sheet pile cofferdam top-down construction method, characterized in that it comprises the following steps: Step one: install corbels using steel casings left over from pre-pouring pile construction; Step two: install steel enclosing purlins and I-beams on the corbels to form a guide frame for steel sheet pile operations; Step three: based on the guide frame, use laser positioning equipment for precise positioning and setting of steel sheet piles; Step four: environmentally friendly water-stopping treatment for steel sheet pile lock joints; Step five: install internal support structures to form a cofferdam internal support system; Step six: strengthen the integrity and stability of the bottom sealing concrete and the cofferdam structure.

[0018] The tidal zone cross-sea bridge steel sheet pile cofferdam top-down construction method, characterized in that the formation of the guide frame comprises: Weld the steel enclosing purlins to the corbels; Weld the I-beams to the outside of the steel enclosing purlins to form a "steel enclosing purlin + I-beam" combined structure; Repeat the above steps to construct two guide frame structures to ensure the accuracy of the preliminary positioning of the steel sheet pile setting.

[0019] The tidal zone cross-sea bridge steel sheet pile cofferdam top-down construction method, characterized in that the precise positioning of the steel sheet piles comprises: Use the guide frame for steel sheet pile setting operations; Start the laser vertical measurement and control equipment to make the laser beam shine on the steel sheet pile; Adjust the position of the steel sheet pile according to the indication of the laser receiver to coincide with the laser beam; By fine-tuning the position and angle of the steel sheet pile, the accuracy of the verticality and horizontal size is ensured.

[0020] The environmental protection type water stop treatment comprises: The surface of the steel sheet pile lock is treated to remove oil stains, rust and impurities; Mix the environmental protection type epoxy resin, curing agent and additive, and brush or pour them into the lock; After curing, check the integrity of the resin layer and test the water stop performance; Local quick-setting mortar and strong magnetic rubber water stop strip are used to assist water stop.

[0021] The environmental protection type water stop treatment comprises: Install the steel pipe inner support to form an inner support system of the cofferdam; Combined with two H-shaped steel outer hoops, two steel surrounding purlins and three steel wire outer hoops at the bottom, a "2+2+3+1" support enclosure system is formed; The overall stability of the cofferdam structure is strengthened to avoid loose deformation.

[0022] The environmental protection type water stop treatment comprises: Three steel wire outer hoops are arranged outside the bottom sealing concrete of the cofferdam; Pour the bottom sealing concrete and lay the steel mesh sheet on the upper surface; Control the continuity of the first batch of concrete pouring of the guide pipe and the distance between the bottom of the guide pipe and the bottom plate; Reserve a 30cm post-cast layer to ensure the leveling quality of the bottom sealing concrete.

[0023] The beneficial effects of the present application are as follows: through the above technical solution, the present application provides a tidal zone cross-sea bridge steel sheet pile cofferdam reverse construction method, which adopts a "reverse construction" sequence, i.e., first installing a guide frame and an inner support system, and then layer by layer setting steel sheet piles, which avoids the problem of difficult foundation treatment when directly constructing on bare rock or thin overburden layer in the traditional method. The method reduces the foundation reinforcement process through the "one material two use" design of the steel casing and the corbel, and the reuse of the steel surrounding purlin and the H-shaped steel combined guide frame, significantly shortens the construction period, and at the same time ensures the integrity and anti-deformation ability of the cofferdam structure, and is especially suitable for the sea environment with frequent tidal changes and complex impact load.

[0024] The joint positioning of the laser vertical measurement and control equipment and the guide frame solves the measurement and control problems caused by tidal interference and complex environment in traditional construction. The laser beam real-time calibrates the verticality and plane position of the steel sheet pile, combined with the preliminary positioning constraint of the guide frame, realizes the millimeter-level construction precision, avoids the leakage or instability risk of the cofferdam structure caused by positioning deviation, and guarantees the foundation quality of the subsequent main structure construction.

[0025] The environmentally friendly epoxy resin low VOC material is used to replace the traditional oil paste, sawdust and other water stop materials. The resin flowability is improved through formula optimization (adding diluent, filler, etc.), a dense isolation layer is formed to reduce the insertion and driving friction resistance and strengthen the anti-seepage performance. The material has no harmful substance emission after curing, and has excellent adhesion and chemical stability, avoiding the pollution of construction wastewater and solid waste to the marine ecology, meeting the green construction requirements. The auxiliary use of rapid-setting mortar and strong magnetic rubber water stop strip further improves the water stop efficiency and reduces material waste.

[0026] The inner support system forms a three-dimensional stress system through the composite structure of "2-way steel outside hoop + 2 steel surrounding purlin + 3 bottom steel strand outside hoop + 1 steel pipe inside support". The guide frame function of the steel I-beam and the steel surrounding purlin, the bottom constraint effect of the steel strand outside hoop, and the lateral stiffness reinforcement of the steel pipe inside support, cooperate to resist tidal force, wave force and typhoon impact, effectively prevent the loose deformation of the cofferdam structure, and ensure the safety during construction and operation. BRIEF DESCRIPTION OF DRAWINGS

[0027] The present application will be further described in detail below in combination with the drawings and embodiments: Figure 1 The construction flowchart of the present application is shown in the following figure:

[0028] Figure 2 The installation of the corbel is shown in the following figure:

[0029] Figure 3 The installation of the steel surrounding purlin is shown in the following figure:

[0030] Figure 4 The installation of the steel I-beam is shown in the following figure:

[0031] Figure 5 The repeated installation of the steel surrounding purlin and the steel I-beam is shown in the following figure:

[0032] Figure 6 The installation of the steel sheet pile is shown in the following figure:

[0033] Figure 7 The installation of the inner support is shown in the following figure:

[0034] Figure 8 The bottom sealing is shown in the following figure: DETAILED DESCRIPTION

[0035] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection claimed in this application. like Figure 1 The following is a method for constructing a steel sheet pile cofferdam in reverse for a cross-sea bridge in the tidal zone. The specific operation steps are as follows: 1. Using steel casing for bracket installation like Figure 2 As shown: The corbels are installed using the steel casings left over from the previous cast-in-place pile construction. The corbels are fixed to the steel casings by welding, and the subsequent construction and installation of steel walers and I-beams are carried out through the corbels. 2. Steel waler installation like Figure 3 As shown: Weld the steel waler to the bracket, ensuring welding quality; 3. I-beam installation like Figure 4 As shown: I-beams are installed on the outer side of the steel waler on the corbel, and then welded and fixed to the corbel. The combination of the I-beams and the steel waler structure forms a "guide frame" for the sheet pile operation, ensuring the accuracy of the initial positioning during the sheet pile driving operation.

[0036] 4. Repeat the above steps, such as... Figure 5 As shown: Construct another "steel waler + I-beam" structure.

[0037] 5. Steel sheet pile driving like Figure 6 As shown: (1) Precise Positioning: The sheet pile driving operation is carried out using the pre-formed guide frame. Laser vertical measurement and control equipment is used to ensure that the sheet pile driving has a high degree of verticality. The laser positioning equipment is activated so that the laser beam is irradiated on the sheet pile. The operator adjusts the position of the sheet pile according to the instructions of the laser receiver so that it coincides with the laser beam. By fine-tuning the position and angle of the sheet pile, the accuracy of the horizontal dimension of the sheet pile is ensured. The combination of the two achieves precise positioning of the sheet pile.

[0038] (2) Enhanced water-stopping effect: Environmentally friendly low-VOC epoxy resin is applied to the interlock of the sheet pile. In the mix design, appropriate amounts of diluent, filler and plasticizer are added to improve the resin's fluidity, filling properties and processing performance. This reduces frictional resistance during driving and enhances seepage prevention performance.

[0039] Operating steps: Surface treatment: First, the steel sheet pile interlocking is surface treated to remove oil, rust and other impurities, ensuring that the surface is clean and has a moderate roughness so that the epoxy resin can adhere firmly.

[0040] Resin Mixing: Mix the environmentally friendly epoxy resin, curing agent, and other additives according to the predetermined mixing ratio. Use clean containers and stirring tools during mixing to ensure a thorough mix free of air bubbles and unmixed particles.

[0041] Application or Injection: Apply or inject the mixed epoxy resin into the interlocking rings of the sheet piles. When applying, ensure the resin evenly covers the surface of the interlocking rings, forming a continuous insulating layer. When injecting, control the injection volume to ensure the resin fills the voids within the interlocking rings and forms a sufficient thickness to prevent water infiltration.

[0042] Curing: Based on the curing time and temperature requirements of epoxy resin, wait for the resin to cure naturally or take auxiliary measures such as heating to accelerate curing. During the curing process, the environment should be kept dry and well-ventilated to avoid contamination or damage to the resin.

[0043] Inspection and Acceptance: After curing, the sheet pile interlocking is inspected to ensure the resin layer is intact, without cracks or peeling. Simultaneously, a water-stopping performance test is conducted to verify that the resin layer's water-stopping effect meets the project requirements.

[0044] Locally, quick-setting mortar combined with strong magnetic rubber waterstop strips is applied to the joints to stop the water.

[0045] (3) Weld the I-beams to the sheet piles.

[0046] (4) Finally, the steel sheet piles at the connection between the guide frame and the corbel are driven. After cutting and removing part of the corbel structure at the connection with the guide frame, the steel sheet piles are driven. At the same time, the water stop of this part is strengthened (high-performance lubricating grease mixture, local quick-setting mortar + strong magnetic rubber water stop strip). 6. Install internal supports like Figure 7 As shown: Install steel pipe internal support structure to form the internal support system of cofferdam structure; 7. Reinforced bottom sealing like Figure 8 As shown: (1) Three steel strand hoops are installed on the outer side of the bottom sealing concrete of the cofferdam structure to enhance the integrity and stability of the bottom sealing concrete and the cofferdam structure. (2) Pour the bottom sealing concrete; (3) Lay a layer of steel mesh on the top surface of the bottom sealing concrete to ensure the quality of the bottom sealing concrete; (4) Each conduit first batch of concrete pouring requirements, can not be continuous, and ensure that the conduit bottom opening from the bottom plate about 20-30 cm remains unchanged, until the pouring design elevation; (5) The height control of the sealing bottom, needs to reserve 30 centimeters post-pouring, can not be poured in place at one time, in order to ensure the leveling quality of the sealing bottom concrete.

[0047] The above technical scheme adopts the construction mode of "reverse construction", guarantees the integrity and stability of the cofferdam structure, avoids the difficulty of directly performing steel sheet pile construction on bare rock or thin overburden, makes the whole construction process more simple, reduces the construction difficulty, speeds up the construction progress, and guarantees the construction quality; By using the steel casing left over in the early stage of pile construction to perform the construction of the corbel, the effect of "one thing with two uses" is achieved, the construction cost is reduced, and the construction period is accelerated; The guide frame formed by the steel enclosing purlin + I-steel outer hoop achieves the effect of "one thing with two uses", guarantees the accuracy of the positioning of the steel sheet pile, and at the same time reduces the construction cost and accelerates the construction period; By using the laser positioning equipment, the verticality, plane position and angle accuracy of the steel sheet pile positioning are guaranteed, and in combination with the "guide frame", the precise positioning of the steel sheet pile construction is realized. The use of the environmentally friendly epoxy resin for water sealing treatment of the steel sheet pile lock buckle not only effectively forms a thick isolation layer to prevent water penetration, ensuring the waterproof performance of the project, but also significantly reduces environmental pollution and reduces harmful substance emissions due to its environmental characteristics. At the same time, the environmentally friendly epoxy resin has good adhesion and chemical stability, can firmly adhere to the surface of the steel sheet pile, and provides long-lasting protection effect, thereby ensuring the long-term stability and reliability of the project. The two I-steel outer hoops correspond to the two enclosing purlins, combined with the three steel wire outer hoops at the bottom, and the steel pipe inner support inside, forming a "2+2+3+1" support and enclosure system, strengthening the overall stability of the cofferdam structure, and avoiding the loose deformation of the overall structure.

[0048] The above are embodiments provided by the present application and do not limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments or make equivalent replacements for some technical features, but any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.

Claims

1. A method for reverse construction of a steel sheet pile cofferdam for a cross-sea bridge in the tidal zone, characterized in that... It includes the following steps: Step 1: Install brackets using the steel casings left over from the previous cast-in-place pile construction; Step 2: Install steel walers and I-beams on the corbels to form a guide frame for the sheet pile operation; Step 3: Based on the guide frame, use laser positioning equipment to accurately position and drive the steel sheet piles; Step 4: Apply environmentally friendly water-stopping treatment to the interlocking joints of the sheet piles; Step 5: Install the internal support structure to form the internal support system of the cofferdam; Step Six: Strengthen the integrity and stability of the bottom sealing concrete and the cofferdam structure.

2. The method for reverse construction of a steel sheet pile cofferdam for a cross-sea bridge in a tidal zone according to claim 1, characterized in that... The formation of the guide frame includes: Weld the steel waler to the corbel; The I-beams are welded to the outside of the steel waler to form a "steel waler + I-beam" combined structure; Repeat the above steps to construct two guide frame structures to ensure the initial positioning accuracy of the sheet piles.

3. The method for reverse construction of a steel sheet pile cofferdam for a cross-sea bridge in a tidal zone according to claim 1, characterized in that... The precise positioning of the steel sheet piles includes: Using a guide frame for sheet pile driving operations; Start the laser vertical measurement and control equipment to irradiate the steel sheet pile with the laser beam; Adjust the position of the sheet pile according to the laser receiver's instructions to make it coincide with the laser beam; By fine-tuning the position and angle of the sheet piles, the accuracy of verticality and horizontal dimensions is ensured.

4. The method for reverse construction of a steel sheet pile cofferdam for a cross-sea bridge in a tidal zone according to claim 1, characterized in that... The environmentally friendly water-stopping treatment includes: Surface treatment of the interlocking joints of the sheet piles is performed to remove oil, rust and impurities; Mix environmentally friendly epoxy resin, curing agent and additives, and apply or pour into the lock opening; After curing, check the integrity of the resin layer and conduct a water-stopping performance test; Quick-setting mortar and strong magnetic rubber waterstop strips are used in some areas to assist in water stopping.

5. The method for reverse construction of a steel sheet pile cofferdam for a cross-sea bridge in a tidal zone according to claim 1, characterized in that... The internal support structure includes: Install steel pipe internal supports to form an internal support system for the cofferdam; Combining two I-beam outer hoops, two steel walers, and three bottom steel strand outer hoops, a "2+2+3+1" support and enclosure system is formed; Strengthen the overall stability of the cofferdam structure to prevent loosening and deformation.

6. The method for reverse construction of a steel sheet pile cofferdam for a cross-sea bridge in a tidal zone according to claim 1, characterized in that... The reinforced back cover includes: Three steel strand hoops are installed on the outside of the bottom sealing concrete of the cofferdam; Pour the bottom sealing concrete and lay the steel mesh on the upper surface; Control the continuity of the first batch of concrete pouring through the tremie pipe and the distance between the bottom of the tremie pipe and the bottom plate; Leave a 30 cm layer for post-pouring to ensure the quality of the bottom sealing concrete leveling.

Citation Information

Patent Citations

  • Mounting and guiding device and positioning method for underwater circuit purlins of steel sheet pile cofferdam

    CN102926387A

  • Underwater bearing platform steel cofferdam and construction method

    CN116290041A

  • Complex riverbed steel sheet pile cofferdam and construction method

    CN118257280A

  • Complex interactive silt geology steel sheet pile cofferdam and construction method

    CN118309091A

  • Method and device for constructing underwater foundation structure

    JP2001348888A