Open-pit mine comprehensive cost calculation method based on mathematical regression model
By constructing a full-process cost function based on a mathematical regression model, the blasting parameters in the open-pit mine production process are optimized, solving the local optimization problem of traditional mine cost management and achieving a systematic reduction in full-process costs and data-driven production optimization.
Patent Information
- Application Number
- CN202511749146.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-06-09
- Estimated Expiration
- 2045-11-26
AI Technical Summary
Traditional open-pit mine production cost management has limitations in localized optimization. The fragmented control of each process link makes it difficult to coordinate the contradictions of cost increases and decreases between processes. Existing cost analysis methods fail to cover the entire process and are not accurate enough.
A full-process cost function model based on mathematical regression is constructed. The mathematical relationship between explosive consumption, hole mesh parameters and rock fragmentation degree is revealed through the blasting block size distribution model. Cost function models for each production link are established, and blasting parameters are optimized to achieve full-process optimization.
It has achieved systematic optimization of the entire process cost, reduced wear and tear on loading equipment, empty load rate of transport vehicles, risk of crusher overload and redundant energy consumption in grinding, promoted the transformation of the production system from experience-driven to data-driven, improved resource utilization and equipment life, and enhanced the responsiveness of the production system.
Smart Images

Figure CN121210833B_ABST
Abstract
Citation Information
Patent Citations
Comprehensive evaluation method for surface blasting engineering
CN116050706A
Method for predicting energy consumption and cost of full process of mining and selection based on while-drilling parameters
CN119150535A
