Information processing method and device applied to construction of electrolytic cell, electronic equipment, storage medium and program product

CN122114824APending Publication Date: 2026-05-29PETROCHINA SHENZHEN NEW ENERGY RESEARCH INSTITUTE CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
PETROCHINA SHENZHEN NEW ENERGY RESEARCH INSTITUTE CO LTD
Filing Date
2024-11-27
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

In existing technologies, the planning of hydrogen production equipment relies on human experience and simple calculations, resulting in low efficiency and a high risk of errors or oversights.

Method used

By retrieving detailed operating parameters of various types of electrolytic cells from the database, receiving construction planning information input by users, and applying overall constraints to the operating parameters of the electrolytic cells based on preset constraints, the system outputs suggested electrolytic cell models and quantities to ensure the feasibility and rationality of the planning.

Benefits of technology

It improved the efficiency and speed of information processing and computing for the construction of electrolytic cells, ensuring the accuracy and rationality of the planning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122114824A_ABST
    Figure CN122114824A_ABST
Patent Text Reader

Abstract

Embodiments of the present application provide an information processing method and device applied to building electrolytic cells, electronic equipment, storage medium and program product. The method comprises: obtaining running parameters of multiple types of electrolytic cells in a database, and obtaining building planning information input by a user, wherein the building planning information represents target overall demand for building electrolytic cells; according to a preset constraint condition, overall constraint is performed on the running parameters of all the electrolytic cells, and a processing result information is output; wherein the preset constraint condition indicates a constraint on building electrolytic cells based on the building planning information; the preset constraint condition includes a maximum number of buildable electrolytic cells for pre-input; and the processing result information represents the type and number of electrolytic cells to be built. The method is used to improve the computing efficiency and processing speed of information processing for building electrolytic cells.
Need to check novelty before this filing date? Find Prior Art