A method and system for disassembling waste and old electric energy meters

By analyzing historical dismantling document data and topology identification results, a scientific dismantling scheme for electricity meters is generated, which solves the problems of damage to valuable components and leakage of hazardous substances during manual dismantling, and realizes efficient and safe dismantling of waste electricity meters.

CN122133676BActive Publication Date: 2026-07-21STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
Filing Date
2026-05-07
Publication Date
2026-07-21

AI Technical Summary

Technical Problem

In the existing technology, manual dismantling of waste electricity meters can easily lead to damage to valuable components and leakage of harmful substances. Furthermore, the dismantling sequence lacks scientific basis, posing safety hazards and low efficiency.

Method used

By identifying the semantic results of historical dismantling document data, dismantling paths and related groups are generated. Combined with the topology identification results of the electricity meters to be dismantled, the dismantling sequence is analyzed using a Bayesian network model to generate a scientific dismantling plan.

Benefits of technology

It enables efficient and reliable dismantling of used electricity meters, reduces damage to valuable components and leakage of hazardous substances, improves dismantling efficiency and safety, and ensures the standardization and customization of dismantling solutions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122133676B_ABST
    Figure CN122133676B_ABST
Patent Text Reader

Abstract

The application discloses a kind of waste electric energy meter disassembly method and system, applied to electric power system equipment disassembly technical field, including identifying the semantic result corresponding to all historical disassembly document data of waste electric energy meter;Based on semantic result, obtain each disassembly path, wherein, each disassembly path is obtained by arranging each waste electric energy meter subcomponent according to disassembly order of succession;Analysis of the dependency relationship between any two adjacent subcomponents in all disassembly paths, obtain the disassembly association group formed by two subcomponents with dependency relationship;Based on the topological identification result of waste electric energy meter to be disassembled, obtain each subcomponent to be disassembled;Based on disassembly association group, analyze all subcomponents to be disassembled, and at least based on analysis result determine the disassembly order corresponding to waste electric energy meter to be disassembled;With disassembly order, generate the disassembly scheme of waste electric energy meter to be disassembled.The method of the application can realize efficient and reliable waste electric energy meter disassembly.
Need to check novelty before this filing date? Find Prior Art