A welding method for 12Cr2Mo1V steel and 20MnMo steel

CN122400727APending Publication Date: 2026-07-17HANGZHOU BOILER GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610439538.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-04-03
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

12Cr2Mo1V steel and 20MnMo steel have significant differences in chemical composition and mechanical properties, and their post-weld stress-relief heat treatment temperature ranges do not overlap, making direct welding impossible.

Method used

The first bevel is machined on 12Cr2Mo1V steel to form the first weld. After cutting to form a transition layer, the second bevel is machined on the transition layer and then assembled with 20MnMo steel to form the fourth bevel. Alloy steel welding materials are used for welding to form the second weld. The transition layer is increased to reduce the welding difficulty.

Benefits of technology

It reduced welding difficulty, decreased cracking problems, improved production efficiency, and met the welding requirements of 12Cr2Mo1V steel and 20MnMo steel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122400727A_ABST
    Figure CN122400727A_ABST
Patent Text Reader

Abstract

本发明涉及焊接加工技术领域,尤其涉及一种用于12Cr2Mo1V钢与20MnMo钢的焊接方法。焊接方法包括:S1、在12Cr2Mo1V钢材的一端加工出第一坡口,并将两个第一坡口对接后采用第一合金钢焊材通过焊接方式形成第一焊缝;S2、切割第一焊缝,得到具有过渡层的12Cr2Mo1V钢材,过渡层为第一焊缝的一部分,切割位置为第一焊缝的焊缝中心线;S3、在过渡层上加工第二坡口;S4、在20MnMo钢材上加工第三坡口,将第三坡口与第二坡口组对后形成第四坡口,在第四坡口内采用第二合金钢焊材通过焊接方式形成第二焊缝,其中,第一焊缝的熔敷金属包括铬元素、钼元素和镍元素。这种焊接方法可以实现12Cr2Mo1V钢与20MnMo钢之间的焊接。
Need to check novelty before this filing date? Find Prior Art