An optimization control method for a parallel cold machine group system and a parallel cold machine group system

By accurately measuring the branch flow of the parallel chiller group and constructing chiller characteristic curves, the chiller combination method was optimized, solving the problem of high energy consumption in the existing system and achieving optimal energy efficiency chiller group control.

CN122467766APending Publication Date: 2026-07-28SHANGHAI ELECTRICGROUP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610963483.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-06-30
Publication Date
2026-07-28

AI Technical Summary

Technical Problem

Existing parallel chiller group control systems suffer from insufficient accuracy in branch flow sensing and reliance on empirical chiller combination strategies, resulting in high energy consumption and failing to achieve global energy optimization.

Method used

By accurately measuring the flow rate of the chiller branches, the true characteristic curve of the chiller is constructed, and a multi-constraint model is built to optimize the chiller combination and load factor allocation. The goal is to maximize the overall energy efficiency ratio (COP), and nonlinear programming and hyperparameter optimization algorithms are used to solve the problem.

Benefits of technology

This achieves optimal energy efficiency for the chiller group while meeting load requirements, thus reducing the total energy consumption of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122467766A_ABST
    Figure CN122467766A_ABST
Patent Text Reader

Abstract

The application provides an optimization control method and a parallel cold machine group system, and the method comprises the following steps: collecting operation parameters of the cold machine group system; calculating branch flow of each cold machine by constructing a multi-constraint model based on the operation parameters of the cold machine group system; constructing a characteristic curve of each cold machine based on the operation parameters of the cold machine group system and the branch flow of each cold machine; constructing an optimization model based on the characteristic curve of each cold machine, taking the maximum comprehensive energy efficiency ratio (COP) of the cold machine group system as the target, calculating the combination mode and load rate distribution of each cold machine of the cold machine group system; and outputting an optimal cold machine group system operation scheme based on the combination mode and load rate distribution of each cold machine of the cold machine group system, and controlling the cold machine group system to execute the cold machine group system operation scheme.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of centralized refrigeration and air conditioning system control, and specifically to an optimized control method for a parallel chiller group system and the parallel chiller group system itself. Background Technology

[0002] In centralized refrigeration systems of large buildings, a hybrid architecture of parallel operation of fixed-frequency and variable-frequency chillers is commonly used to adapt to changes in cooling load at different times. Fixed-frequency chillers achieve load regulation through start-stop control, and have the advantages of simple structure and low cost, but their efficiency drops significantly under partial load and their adjustment flexibility is poor. Variable-frequency chillers, on the other hand, can achieve continuous output of cooling capacity (usually covering 20%-100% of rated cooling capacity) through frequency regulation. They can maintain high efficiency in the partial load range, but their coefficient of performance (COP) is usually lower than that of fixed-frequency chillers of the same capacity under high load conditions.

[0003] Existing parallel chiller group control systems face two core problems: First, insufficient accuracy in branch flow sensing: While direct measurement using electromagnetic or ultrasonic flow meters in each branch can yield relatively accurate data, it suffers from high cost per unit, complex maintenance, and stringent installation requirements. Rough estimation based on the assumption of equal branch resistance in the main pipe flow often ignores practical factors such as differences in the operating states of fixed-frequency / variable-frequency chillers and uneven scaling in the pipes, resulting in large estimation errors. Second, the chiller combination strategy relies heavily on experience and lacks global energy consumption optimization: Existing control logic largely depends on the "load threshold triggering" mechanism, failing to fully consider the coordinated optimization of "matching large and small chillers" and "variable-frequency chiller frequency adjustment range," and neglecting to use "minimum total system energy consumption" as the optimization objective. This leads to an imbalance in the matching of large and small chillers, resulting in a total chiller group energy consumption higher than the theoretical optimal value. Summary of the Invention

[0004] To address the aforementioned problems, this invention provides an optimized control method and a parallel chiller group system. By accurately measuring the flow rate of the chiller branches and constructing the true characteristic curves of the chillers, the method ensures that the chiller group achieves optimal energy efficiency while meeting load requirements.

[0005] An optimized control method for a parallel chiller cluster system, the parallel chiller cluster system including fixed-frequency chillers and variable-frequency chillers, comprising: Collect the operating parameters of the parallel chiller group system; Based on the operating parameters of the parallel chiller group system, the branch flow of each chiller is calculated by constructing a multi-constraint model; Based on the operating parameters of the parallel chiller group system and the branch flow of each chiller, the characteristic curves of each chiller are constructed. Based on the characteristic curves of each chiller, an optimization model is constructed with the goal of maximizing the overall energy efficiency ratio (COP) of the parallel chiller group system, and the combination method and load rate allocation of each chiller in the parallel chiller group system are calculated. The Coefficient of Performance (COP) is the overall performance coefficient of the parallel chiller group system, obtained by dividing the sum of the total cooling capacity of all current chillers in the parallel chiller group system by the sum of the input power of all current chillers in the parallel chiller group system; and Based on the combination method and load rate allocation of each chiller in the parallel chiller group system, the optimal operation scheme of the parallel chiller group system is output, and the parallel chiller group system is controlled to execute the operation scheme.

[0006] Preferably, the collected operating parameters of the parallel chiller group system include: chilled water main flow rate, chilled water main supply and return water temperatures, cooling water main flow rate, cooling water main supply and return water temperatures, chilled water branch inlet and outlet temperatures of each chiller on the chiller side, cooling water branch inlet and outlet temperatures of each chiller on the chiller side, operating power of each chiller on the chiller side, and operating frequency of the inverter on the chiller side.

[0007] Preferably, the step of calculating the branch flow of each chiller by constructing the multi-constraint model includes: The decision variables are set as the proportion of the chilled water side branch flow rate of each chiller to the total chilled water side flow rate, and the proportion of the cooling water side branch flow rate to the total cooling water side flow rate. The objective function is set as minimizing the system-level energy and thermal balance deviation; The constraints include: mass balance constraint, i.e., the total flow rate equals the sum of the flow rates of each branch; cooling capacity balance constraint, i.e., the total cooling capacity equals the sum of the cooling capacities of each refrigeration unit; heat balance constraint, i.e., the return water temperature of the main pipe is a weighted average of the return water temperatures of each branch according to flow rate; flow rate safety constraint, i.e., the flow rate of each branch is greater than or equal to the minimum flow rate safety requirement and less than or equal to the maximum flow rate safety requirement; and Based on the aforementioned multi-constraint model, the optimal branch flow of each chiller is obtained by solving a nonlinear programming algorithm.

[0008] Preferably, the characteristic curves of each chiller are constructed as follows: Obtain the branch flow rate of each chiller, as well as the corresponding temperature and power data; By cooling capacity = flow rate Temperature difference The specific heat value of water at constant pressure is used to calculate the actual cooling capacity of each chiller. The actual COP of each chiller can be calculated using the formula: COP = Cooling capacity / Power. The actual coefficient of performance (COP) refers to the current cooling capacity of each individual chiller divided by its current input power, resulting in the actual coefficient of performance for that chiller. By operating each chiller under different system loads and collecting corresponding load rates, multiple sets of load rate-COP data are recorded, and the characteristic curves of each chiller are obtained through fitting.

[0009] Preferably, the construction of the optimization model includes: Decision variables are defined as follows: the number of large and small chillers in operation are discrete variables, and the operating load rate of each chiller is a continuous variable. The objective function is defined as maximizing the overall energy efficiency ratio (COP) of the parallel chiller group system. The following constraints are set: the total cooling capacity of the parallel chiller group system covers the required cooling capacity and reserves a safety redundancy as the load balancing constraint; the actual cooling capacity of the fixed-frequency chiller and the variable-frequency chiller is within a safe range as the equipment safety constraint; and the start-stop interval of the fixed-frequency chiller is greater than or equal to the minimum start-stop interval time as the start-stop constraint.

[0010] Preferably, the calculation of the combination method and load rate allocation of each chiller in the parallel chiller group system includes: When the total number of chillers in the parallel chiller group system is less than or equal to the first threshold number of units, the objective function is solved using the scipy.optimize.minimize function; When the total number of chillers in the parallel chiller group system exceeds the first threshold number, the objective function is solved using the Optuna framework.

[0011] Preferably, based on the number of large and small chillers in operation among the solved decision variables, the corresponding number of chiller combinations in the parallel chiller group system are started. Based on the operating load rate of each operating chiller in the solved decision variables, determine and adjust the target load rate of each fixed-frequency chiller and variable-frequency chiller in the chiller combination, including: For the fixed-frequency chiller, the actual cooling capacity is made close to the cooling capacity of the target load rate by adjusting the chilled water flow rate or the guide vane opening. For the variable frequency chiller, the target load rate is achieved by adjusting the compressor frequency.

[0012] Preferably, the optimization control method of the parallel chiller group further includes real-time monitoring and re-optimization: after each first time interval, operating data is collected once. If the deviation between the actual energy efficiency ratio COP and the maximum value of the comprehensive energy efficiency ratio COP is greater than a first deviation threshold, or the deviation between the total cooling capacity of the system and the required cooling capacity is greater than a second deviation threshold, then the optimization calculation is re-triggered.

[0013] A parallel chiller group system, which executes the above-mentioned optimized control method for the parallel chiller group system during operation.

[0014] The beneficial effects of this invention are: 1. By establishing a multi-constraint calibration model for the chilled water and cooling water sides, and combining it with optimization algorithms to accurately solve the flow rate of each branch, a realistic chiller characteristic curve is constructed. 2. With the sole objective of maximizing the overall system energy efficiency ratio (COP), a global optimization algorithm is used to determine the chiller combination method and unit load rate, ensuring that the chiller group achieves optimal energy efficiency while meeting load requirements. Attached Figure Description

[0015] The above description of the present invention and the following detailed embodiments will be better understood when read in conjunction with the accompanying drawings. It should be noted that the drawings are merely examples of the claimed invention. In the drawings, the same reference numerals represent the same or similar elements.

[0016] Figure 1 This is a flowchart of an optimized control method for a parallel chiller group system according to an embodiment of the present invention; Figure 2 This is a flowchart illustrating the method for calculating the flow rate of each chiller branch in an embodiment of the present invention; Figure 3 This is a flowchart illustrating the method for constructing characteristic curves of each chiller in an embodiment of the present invention; Figure 4 This is a flowchart illustrating the method for calculating the combination of each chiller in a parallel chiller group system and the load rate allocation in an embodiment of the present invention. Figure 5 This is a schematic diagram of a parallel chiller group system according to an embodiment of the present invention. Detailed Implementation

[0017] The following detailed description of the features and advantages of the present invention is sufficient to enable any person skilled in the art to understand the technical content of the present invention and implement it accordingly. Furthermore, based on the specification, claims and drawings disclosed herein, those skilled in the art can easily understand the related objects and advantages of the present invention.

[0018] like Figure 1As shown, this embodiment provides an optimized control method for a parallel chiller group system, the parallel chiller group system including fixed-frequency chillers and variable-frequency chillers, the method including: S101. Real-time acquisition of operating parameters of the parallel chiller group system, including: Chilled water side: Total flow rate Main supply / return water temperature ; Cooling water side: Total pipe flow rate Main supply / return water temperature ; Chiller side: Inlet / outlet water temperature of the chilled water branch for each operating chiller Cooling water branch inlet / outlet water temperature Operating power Variable frequency drive operating frequency .

[0019] S102. Based on the operating parameters of the parallel chiller group system, calculate the branch flow rate of each chiller using a multi-constraint model. For example, a multi-constraint model satisfying the flow rates of the chilled water side and cooling water side can be constructed based on "energy conservation, mass conservation, and heat balance." Figure 2 As shown, step S102 may specifically include: First, calculate the chilled water flow rate of each chiller branch. : S201. Set the decision variable as the percentage of the total flow rate of each chiller chilled water branch. ; S202. Set the objective function to minimize the system-level energy and thermal balance deviation:

[0020] S203. Set constraints, including: Quality balance constraint: Total flow equals the sum of the flows of each branch, i.e. ; Cooling capacity balance constraint: The total cooling capacity equals the sum of the cooling capacities of each refrigeration unit, i.e. ; Thermal balance constraint: The return water temperature of the main pipe is a weighted average of the return water temperatures of each branch pipe according to the flow rate, i.e. ; Flow safety constraints: The flow rate of each branch must be greater than or equal to the minimum flow safety requirement and less than or equal to the maximum flow safety requirement, i.e. ; in These are the weighting coefficients.

[0021] S204. Based on the above multi-constraint model, the optimal flow ratio of each branch is obtained by solving the problem using a nonlinear programming algorithm of sequential quadratic programming. Further through The chilled water flow rate of each chiller branch was calculated. .

[0022] Next, calculate the cooling water flow rate of each chiller branch. : The calculation principle is exactly the same as the calculation of the chilled water flow rate of each chiller branch, that is, by executing steps S201-S204, the flow rate of each chiller branch is solved by establishing symmetrical constraints and objective functions for the cooling water system. This will not be elaborated upon here.

[0023] S103. Based on the operating parameters of the parallel chiller group system and the branch flow rate of each chiller, construct the characteristic curve of each chiller. For example... Figure 3 As shown, step S103 may include: S301. Using the above steps, obtain the precise chilled water flow rate and cooling water flow rate for each chiller branch. And the inlet / outlet water temperatures of the chilled water branches corresponding to each operating chiller branch were collected. Cooling water branch inlet / outlet water temperature Operating power Calculate the actual cooling capacity of each chiller. and actual energy efficiency ratio .

[0024] S302, through formula Calculate the actual cooling capacity of each chiller, where For cooling capacity, This refers to the water flow rate, specifically the chilled water flow rate and cooling water flow rate in each chiller branch. The inlet / outlet water temperature difference can be calculated by subtracting the inlet water temperature from the outlet water temperature of each chiller branch. The specific heat of water at constant pressure is usually a constant value, which can be approximated in engineering. .

[0025] S303, via formula Calculate the actual energy efficiency ratio of each chiller ,in The actual cooling capacity of each chiller calculated above. This represents the actual operating power of each chiller.

[0026] S304. For fixed-frequency chillers, by operating each chiller under different system loads, the corresponding load rate during chiller operation is collected, and the actual energy efficiency ratio (COP) of the chiller under that load rate is calculated using the steps described above. Multiple sets of "load rate-COP" data are recorded, and the true characteristic curve of the fixed-frequency chiller is obtained through fitting. For variable-frequency chillers, by operating each chiller under different system loads, the corresponding load rate during chiller operation is collected, and the actual energy efficiency ratio (COP) of the chiller under that load rate is calculated using the steps described above. Multiple sets of "load rate-COP" data are recorded, and the true characteristic curve of the variable-frequency chiller is obtained through fitting.

[0027] S104. Based on the characteristic curves of each chiller, an optimization model is constructed with the goal of maximizing the overall energy efficiency ratio (COP) of the chiller group system, and the combination method and load rate allocation of each chiller in the chiller group system are calculated. For example... Figure 4 As shown, step S104 may include: First, construct an optimization model, including: S401. Define the decision variables in the model, where discrete variables include the number of large-scale chillers in operation. (Values ​​range from 0 to the total number of large refrigeration units in the refrigeration unit group, integers) and the number of small refrigeration units in operation. (Values ​​range from 0 to the total number of small chillers in the chiller group, integers); the continuous variable is the operating load rate of each operating chiller. Its value range is .

[0028] S402. Set the objective function for optimization, namely, maximizing the overall energy efficiency ratio (COP) of the system:

[0029] In the above formula The actual cooling capacity of the (i)th operating chiller is calculated in step S103 during the process of constructing the true characteristic curves of each chiller. The actual operating power of the (i)th operating chiller is calculated in step S103 during the process of constructing the true characteristic curves of each chiller. This represents the total number of operating chillers.

[0030] S403. Set the optimization constraints, including: Load balancing constraints: The total cooling capacity of the chiller group must cover the required cooling capacity and reserve a safety margin, i.e. .

[0031] In the above formula The system's real-time cooling demand is represented by k, which is the cooling capacity redundancy coefficient (usually taken as 1.05, but can be adjusted according to load fluctuation characteristics).

[0032] Equipment safety constraints: For fixed-frequency chillers, their actual cooling capacity must meet the following requirements. ,in Typically 30% of the rated cooling capacity. Typically, it is 110% of the rated cooling capacity; for inverter chillers, the actual cooling capacity meets... ,in Typically 20% of the rated cooling capacity. It is typically 120% of the rated cooling capacity.

[0033] Start-stop constraints: Start-stop interval of fixed-frequency chiller .

[0034] Next, the optimization algorithm is solved based on the optimization model constructed above. Depending on the applicable scenario, different optimization algorithms can be adopted, including: S404. When the applicable scenario is a small-scale system, such as the total number of chillers in the system being ≤5, and the real-time requirements for solving are high, such as a single solution time being ≤5 seconds, the scipy.optimize.minimize function in Python can be used to solve the optimization objective, including: For discrete variables, namely the combination of the number of large and small chillers. Enumerate all combinations of the number of units that satisfy the basic constraints. ; For continuous variables, namely the load rate of each chiller The initial load rate is the uniformly distributed value, i.e. ; For each combination of units, the minimum function is called to optimize the load factor with the goal of maximizing the overall energy efficiency ratio (COP) of the system. The optimization algorithm in the minimum function can be either SLSQP (Sequential Least Squares Programming) or Trust-Constr (Trust Region Constraint) algorithm. Compare the optimal solutions obtained from all combinations of unit numbers, and select the globally optimal combination of unit numbers and load factor allocation.

[0035] S405. When the applicable scenario involves a large-scale system, such as a system with more than 5 chillers, complex chiller models, and high accuracy requirements, the Optuna framework can be used for hyperparameter optimization, including: Define the number of large and small chillers and the load rate as test parameters, namely suggest_int("N_L", 0, N_L_max) (number of large chillers), suggest_int("N_S", 0, N_S_max) (number of small chillers), and suggest_float("u_j",u_min, 1.0) (load rate of each operating chiller); The overall energy efficiency ratio (COP) of the system is defined as the objective function, i.e., the objective_function. TPE (Tree Parzen Estimator) was chosen as the sampling algorithm; Set the number of trials or timeout period ; The study.optimize() function is called to perform optimization; After optimization, the study.best_trial function is called to obtain the optimal solution.

[0036] Both of the above methods can be integrated into the system to automatically switch between different solution methods according to actual needs.

[0037] S105. Based on the combination method and load rate allocation of each chiller in the parallel chiller group system, output the optimal chiller group system operation plan, and control the chiller group system to execute the operation plan, including: Regarding the control of the number of large and small chillers, the optimized parallel chiller group system operation scheme is as follows: and Perform start-up and stop operations on the fixed-frequency chiller, and strictly adhere to the start-up and stop time interval constraints; In terms of load rate control, for fixed-frequency chillers, the actual cooling capacity can be adjusted to be close to that of the chilled water flow rate or the guide vane opening. For variable frequency chillers, the target load rate is achieved by adjusting the compressor frequency. ; The system is monitored and re-optimized in real time. For example, operating data is collected every 5 minutes. If the actual energy efficiency ratio (COP) deviates from the optimization target by more than 5%, or the total cooling capacity of the system deviates from the required cooling capacity by more than 10%, the optimization calculation is re-triggered.

[0038] This invention also provides a parallel chiller group system, the structure of which is as follows: Figure 5 As shown. This system can execute the optimized control method described above for a parallel chiller group system during operation.

[0039] The terminology and expressions used herein are for descriptive purposes only, and the invention should not be limited to these terms and expressions. The use of these terms and expressions does not mean the exclusion of any illustrative and descriptive equivalents (or parts thereof), and it should be recognized that various modifications that may exist should also be included within the scope of the claims. Other modifications, variations, and substitutions may also exist. Accordingly, the claims should be considered to cover all such equivalents.

[0040] Similarly, it should be noted that although the present invention has been described with reference to the specific embodiments described above, those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and various equivalent changes or substitutions can be made without departing from the spirit of the present invention. Therefore, any changes or modifications to the above embodiments within the scope of the essential spirit of the present invention will fall within the scope of the claims of this application.

Claims

1. An optimized control method for a parallel chiller group system, the parallel chiller group system comprising fixed-frequency chillers and variable-frequency chillers, the method comprising the following steps: Collect the operating parameters of the parallel chiller group system; Based on the operating parameters of the parallel chiller group system, the branch flow of each chiller is calculated by constructing a multi-constraint model; Based on the operating parameters of the parallel chiller group system and the branch flow of each chiller, the characteristic curves of each chiller are constructed. Based on the characteristic curves of each chiller, an optimization model is constructed with the goal of maximizing the overall energy efficiency ratio (COP) of the parallel chiller group system, and the combination method and load rate allocation of each chiller in the parallel chiller group system are calculated. as well as Based on the combination method and load rate allocation of each chiller in the parallel chiller group system, the optimal operation scheme of the parallel chiller group system is output, and the parallel chiller group system is controlled to execute the operation scheme.

2. The optimized control method for a parallel chiller group system according to claim 1, characterized in that, The operating parameters collected for the parallel chiller group system include: chilled water main flow rate, chilled water main supply and return water temperatures, cooling water main flow rate, cooling water main supply and return water temperatures, chilled water branch inlet and outlet temperatures of each chiller on the chiller side, cooling water branch inlet and outlet temperatures of each chiller on the chiller side, operating power of each chiller on the chiller side, and operating frequency of the inverter on the chiller side.

3. The optimized control method for a parallel chiller group system according to claim 1, characterized in that, The calculation of branch flow rates for each chiller by constructing the multi-constraint model includes: Set decision variables as the proportion of chilled water side branch flow rate to chilled water side total flow rate of each chiller, and the proportion of cooling water side branch flow rate to cooling water side total flow rate. The objective function is defined as minimizing the system-level energy and thermal balance deviation; The constraints include: mass balance constraint, i.e., the total flow rate equals the sum of the flow rates of each branch; cooling capacity balance constraint, i.e., the total cooling capacity equals the sum of the cooling capacities of each refrigeration unit; heat balance constraint, i.e., the return water temperature of the main pipe is a weighted average of the return water temperatures of each branch according to flow rate; flow rate safety constraint, i.e., the flow rate of each branch is greater than or equal to the minimum flow rate safety requirement and less than or equal to the maximum flow rate safety requirement; and Based on the aforementioned multi-constraint model, the optimal branch flow of each chiller is obtained by solving a nonlinear programming algorithm.

4. The optimized control method for a parallel chiller group system according to claim 1, characterized in that, The characteristic curves of each chiller are constructed as follows: Obtain the branch flow rate, and corresponding temperature and power data of each chiller; By cooling capacity = flow rate Temperature difference The specific heat value of water at constant pressure is used to calculate the actual cooling capacity of each chiller. The actual COP of each chiller is calculated using the formula: COP = Cooling Capacity / Power; and By operating each chiller under different system loads and collecting corresponding load rates, multiple sets of load rate-COP data are recorded, and the characteristic curves of each chiller are obtained through fitting.

5. The optimized control method for a parallel chiller group system according to claim 1, characterized in that, The optimization model includes: Decision variables are defined as follows: the number of large and small chillers in operation are discrete variables, and the operating load rate of each chiller is a continuous variable. The objective function is defined as maximizing the overall energy efficiency ratio (COP) of the parallel chiller group system. The following constraints are set: the total cooling capacity of the parallel chiller group system covers the required cooling capacity and reserves a safety redundancy as the load balancing constraint; the actual cooling capacity of the fixed-frequency chiller and the variable-frequency chiller is within a safe range as the equipment safety constraint; and the start-stop interval of the fixed-frequency chiller is greater than or equal to the minimum start-stop interval time as the start-stop constraint.

6. The optimized control method for a parallel chiller group system according to claim 5, characterized in that, The calculation of the combination method and load rate allocation of each chiller in the parallel chiller group system includes: when the total number of chillers in the parallel chiller group system is less than or equal to the first threshold number of units, the objective function is solved using the scipy.optimize.minimize function.

7. The optimized control method for a parallel chiller group system according to claim 5, characterized in that, The calculation of the combination method and load rate allocation of each chiller in the parallel chiller group system includes: when the total number of chillers in the chiller group system is greater than the first threshold number of units, the objective function is solved using the Optuna framework.

8. The optimized control method for a parallel chiller group system according to claim 6 or 7, characterized in that, Based on the number of large and small chillers in operation among the decision variables obtained from the solution, the corresponding number of chiller combinations in the parallel chiller group system are started. Based on the operating load rate of each operating chiller in the solved decision variables, determine and adjust the target load rate of each fixed-frequency chiller and variable-frequency chiller in the chiller combination, including: For the fixed-frequency chiller, the actual cooling capacity is made close to the cooling capacity of the target load rate by adjusting the chilled water flow rate or the guide vane opening. For the variable frequency chiller, the target load rate is achieved by adjusting the compressor frequency.

9. The optimized control method for a parallel chiller group system according to claim 1, characterized in that, It also includes real-time monitoring and re-optimization: every time the first time interval is elapsed, the operating data is collected. If the deviation between the actual energy efficiency ratio (COP) of the parallel chiller group system and the maximum COP is greater than the first deviation threshold, or if the deviation between the total cooling capacity of the parallel chiller group system and the required cooling capacity is greater than the second deviation threshold, then the optimization calculation is re-triggered.

10. A parallel chiller group system, characterized in that, When it is in operation, it executes the optimized control method of the parallel chiller group system as described in any one of claims 1 to 9.