Double-box uhpc beam bridge diaphragm structure with pre-tightening function and assembling method thereof

By setting a pre-tightening system consisting of tie rod assemblies, load-bearing lug assemblies, and elastic energy storage assemblies at the lap joints of the steel frame diaphragm system, the problem of loose connection nodes in the steel structure diaphragm system was solved, pre-tightening force compensation and effective transfer of lateral loads were achieved, and the collaborative stress performance and connection stiffness of the double box girder were improved.

CN123064084APending Publication Date: 2026-11-10SHANDONG TRAFFIC PLANNING DESIGN INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611431573.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-15
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

During long-term service, the connection nodes of existing steel diaphragm structures are prone to loosening, which leads to a decrease in preload and affects the lateral connection stiffness and the structural collaborative working ability. Furthermore, there is a lack of effective preload compensation and adjustment mechanisms.

Method used

The pretensioning system, consisting of tie rod assemblies, load-bearing lug assemblies, and elastic energy storage assemblies, forms a connection system with pretensioning force compensation capability by applying pretensioning force at the lap joint of the steel frame diaphragm system and compensating for the pretensioning force by the elastic energy storage assemblies.

Benefits of technology

It achieves effective transfer of lateral loads and coordinated stress distribution between the two box girders, improves lateral connection stiffness and service performance, and can maintain preload during long-term stress, thus mitigating preload decay.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064084A_ABST
    Figure CN123064084A_ABST
Patent Text Reader

Abstract

The application discloses a double-box UHPC beam bridge diaphragm structure with pre-tightening function and an assembling method thereof, and the structure comprises a diaphragm system and an adjustable flexible pre-tightening system; the diaphragm system is formed by a transverse load-bearing component and a diagonal support component into a transverse load-bearing framework, overlapping connection sections are formed between adjacent transverse load-bearing components, and the end of the transverse load-bearing component is assembled and connected with a UHPC box girder web plate. The adjustable flexible pre-tightening system is arranged in the overlapping connection section and comprises a pull rod assembly, a load-bearing lug plate assembly and an elastic energy storage assembly; the pull rod assembly penetrates through the overlapping connection section and applies a pre-tightening force through threaded connection; the load-bearing lug plate assembly is fixed on the transverse load-bearing component to provide counterforce support; and the elastic energy storage assembly is arranged in the stress path of the pull rod assembly and compensates the pre-tightening force through elastic deformation. The application forms a connecting system with pre-tightening force compensation capacity between the double-box girders, realizes effective transverse load transmission, double-box girder cooperative stress and the improvement of transverse connection stiffness and service performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of prefabricated bridge connection technology, specifically relating to a diaphragm structure for a double-box UHPC beam bridge with pre-tightening function and its assembly method. Background Technology

[0002] As bridge engineering develops towards longer spans, lighter weight, and higher durability, ultra-high performance concrete (UHPC) beam bridges have been widely used in the field due to their high strength, high toughness, and excellent durability. For long-span double-box UHPC beam bridges, in order to ensure the coordinated load-bearing performance, overall lateral stiffness, and torsional resistance between the two box girders, it is usually necessary to install transverse diaphragms or transverse connection structures between the two box girders to achieve effective transfer of lateral loads and deformations.

[0003] Currently, concrete diaphragms or steel diaphragms are commonly used as transverse connecting components in engineering projects. Concrete diaphragms offer greater overall stiffness but suffer from drawbacks such as significant weight, long construction periods, difficulty in controlling the quality of wet joints, and challenges in later maintenance and replacement. Steel diaphragms, on the other hand, offer advantages such as lighter weight, easier construction, and a higher degree of prefabrication, making them more aligned with the lightweight development requirements of UHPC bridges. Existing steel diaphragms typically utilize structural steel sections or steel frames, connected to the box girder web via ordinary bolts or rigid connections.

[0004] However, existing steel diaphragm structures have the following problems during long-term service: ordinary bolted or rigid connections are prone to loosening and slight slippage at the connection nodes under the action of vehicle loads, temperature changes, and concrete shrinkage and creep, which leads to a gradual decrease in preload and thus reduces the lateral connection stiffness and the structural collaborative working ability.

[0005] Furthermore, because the web of UHPC box girders is typically thin, the anchorage space on the web of traditional steel structure connections is limited, making it prone to localized stress concentration at connection nodes, which affects connection safety and durability. At the same time, existing diaphragm connection systems generally lack effective preload compensation and adjustment mechanisms. When connection nodes loosen, it is difficult to make convenient adjustments and restore performance without interrupting normal bridge use, thus affecting the long-term service performance of the bridge structure. Summary of the Invention

[0006] The purpose of this invention is to address the problems in the prior art by providing a diaphragm structure for a double-box UHPC beam bridge with pre-tensioning function and its assembly method. This is achieved by setting a pre-tensioning system at the lap joint of the steel frame diaphragm system, consisting of tie rod assemblies, load-bearing lug assemblies, and elastic energy storage assemblies. The tie rod assemblies apply pre-tensioning force, which is compensated by the elastic energy storage assemblies. This forms a connection system with pre-tensioning compensation capability between the double box girders, enabling effective lateral load transfer, coordinated stress distribution between the double box girders, and improved lateral connection stiffness and service performance.

[0007] To achieve the above objectives, the present invention provides the following technical solution: In one aspect, a diaphragm structure for a double-box UHPC beam bridge with pretensioning function is provided, including a diaphragm system and an adjustable flexible pretensioning system. The diaphragm system is composed of transverse load-bearing members and diagonal support members connected to form a transverse load-bearing skeleton. An overlapping connection section is formed between adjacent transverse load-bearing members. The ends of the transverse load-bearing members are provided with end connection nodes for prefabricated connection with the web of the UHPC box girder. The adjustable flexible pretensioning system is installed at the lap joint section and includes a tie rod assembly, a load-bearing lug assembly, and an elastic energy storage assembly. The tie rod assembly passes through the lap joint section and is installed between adjacent transverse load-bearing members, forming a tensioning system capable of applying pretension force through a threaded connection. The load-bearing lug assembly is fixedly installed on the adjacent transverse load-bearing members to transmit pretension force and provide reaction force support. The elastic energy storage assembly is installed in the force path of the tie rod assembly and achieves pretension force compensation through elastic deformation, so that the connection node forms a flexible connection system with pretension force compensation capability.

[0008] As a preferred embodiment, the elastic energy storage component includes a disc spring assembly arranged in series along the axial direction of the tie rod assembly. The disc spring assembly forms initial energy storage through pre-compression and releases elastic potential energy when the structure is loaded or the connection node is displaced, in order to compensate for the loss of preload.

[0009] As a preferred embodiment, the tie rod assembly includes threaded steel bars, and the load-bearing lug assembly includes load-bearing lugs. The two ends of the threaded steel bars pass through pre-drilled holes in the load-bearing lugs and form a tensioning system capable of applying preload through nuts and washers. The load-bearing lugs are made of steel plates and welded to the web or flange of adjacent transverse load-bearing members. Pads are provided at the height difference between adjacent transverse load-bearing members, and stiffening ribs are provided at the connection between the load-bearing lugs and the transverse load-bearing members.

[0010] As a preferred embodiment, the transverse load-bearing member is made of angle steel, and the lap joint is fixed by bolts, nuts and washers. The angle steel has a strip hole that extends along the length of the angle steel.

[0011] As a preferred embodiment, the transverse diaphragm structure of the double-box UHPC girder bridge with pre-tensioning function further includes a pre-embedded connection device. The pre-embedded connection device is set at the connection between the transverse load-bearing member and the web of the UHPC box girder, and includes a pre-embedded flange assembly, a shear force transfer member, and a spatial anchoring member. The pre-embedded flange assembly is used to realize the prefabricated connection between the transverse load-bearing member and the web of the UHPC box girder. The shear force transfer member is used to transfer the shear force generated by the transverse load-bearing member. The spatial anchoring member is connected to the internal reinforcement system of the web, diffusing the concentrated force at the connection node into the interior of the UHPC web.

[0012] As a preferred embodiment, the embedded flange assembly includes a flange and a frame end plate; The flange is pre-embedded in the web of the UHPC box girder, with its exposed surface flush with the web surface. The frame end plate is welded to the end of the transverse load-bearing member and assembled with the flange by bolts. The shear force transmission member adopts a shear key, which is a steel plate or channel steel welded to the side of the flange facing the inside of the UHPC web and embedded in the UHPC web. Shear force is transmitted through local bearing pressure of concrete. The spatial anchoring member includes multiple ribbed steel bars. One end of the ribbed steel bar is welded to the shear key or mechanically connected through a connecting sleeve, and the other end extends into the UHPC web and is tied or welded to the distributed steel mesh in the UHPC web.

[0013] As a preferred embodiment, the pre-embedded connection device adopts a through-pull-pull structure for the middle web of the double box girder and a single-sided implantation structure for the side web of the double box girder.

[0014] Secondly, a method for assembling the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function is provided, comprising the following steps: During the prefabrication stage of UHPC box girder, the flange of the embedded flange assembly, the shear key of the shear force transfer component and the ribbed steel bar of the spatial anchoring component are positioned according to the design position, so that the ribbed steel bar is fixedly connected with the web steel bar skeleton, and the UHPC is cast to form an integral whole. The transverse load-bearing components are hoisted into place, aligning the frame end plate of the pre-embedded flange assembly with the flange on the web of the UHPC box girder, and then initially tightened with bolts. The threaded steel bar of the tie rod assembly is passed through the load-bearing lugs of the load-bearing lug assembly on both sides of the lap joint section. The disc spring of the elastic energy storage assembly and the nuts and washers of the tie rod assembly are installed. The nuts are tightened symmetrically and in stages according to the design preload, so that the disc spring generates the predetermined elastic compression. During operation, when the preload of the connection node decreases, the disc spring releases elastic potential energy to compensate; when the compensation capacity is exceeded, the nut is tightened for secondary tensioning.

[0015] As a preferred option, the design preload is determined based on the lateral relative displacement control index and lateral cooperative force requirements of the double box girder; during operation, the strip holes on the lateral load-bearing components are used to provide adjustment margin for the relative displacement between components.

[0016] As a preferred embodiment, the assembly method of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function further includes a step of local segment finite element analysis. In this step, a local segment finite element model of the double-box UHPC beam bridge is established. Boundary conditions combining rigid and elastic supports are used to equivalently simulate the constraint effect of the unmodeled area of ​​the entire bridge on the local segment. The deformation characteristics of the local model are made consistent with the full bridge model by adjusting the stiffness of the elastic supports. The stiffness of the elastic supports is in the range of 2 × 10⁻⁶. 6 N / mm~4×10 6 N / mm.

[0017] Compared to existing technologies, the pre-tensioning function of the double-box UHPC beam bridge diaphragm structure of this invention has at least the following beneficial effects: A transverse load-bearing skeleton is formed by connecting transverse load-bearing members and diagonal support members. An adjustable flexible pre-tensioning system is set at the lap joint between adjacent transverse load-bearing members. Pre-tensioning force is applied by tie rod assemblies penetrating the lap joint, and the load-bearing lug assemblies transmit the pre-tensioning force and provide reaction support. Pre-tensioning force compensation is then achieved through elastic energy storage components located in the force path of the tie rod assemblies, forming a connection system with pre-tensioning force compensation capability at the connection nodes. This enables the transmission of transverse loads between the double box girders, improving the cooperative load-bearing performance and transverse connection stiffness of the double box girders. Furthermore, it compensates for the reduction in pre-tensioning force at the connection nodes under vehicle loads, temperature changes, and shrinkage / creep, thereby enhancing the service performance of the diaphragm structure.

[0018] Furthermore, the elastic energy storage component employs disc spring assemblies, arranged in series along the axial direction of the tie rod assembly. Initial energy storage is achieved through pre-compression, and elastic potential energy is released when the structure is loaded or the connection nodes undergo displacement, compensating for the reduction in preload. The disc spring assemblies can provide elastic compression stroke within a limited space, allowing the connection nodes to maintain a preloaded state during long-term stress, thus mitigating preload decay.

[0019] Furthermore, the tie rod assembly includes threaded steel bars, both ends of which pass through pre-drilled holes in the load-bearing lug assembly, forming a tensioning system through nuts and washers. The load-bearing lug assembly includes load-bearing lugs, which are made of steel plates and welded to the web or flange of adjacent transverse load-bearing members. Pads are placed at height differences, and stiffening ribs are provided at the connection between the load-bearing lugs and the transverse load-bearing members. Thus, the preload can be reliably transmitted through the threaded steel bars, nuts, and washers; the connection between the load-bearing lugs and the transverse load-bearing members is stable; the pads can compensate for height differences between members; and the stiffening ribs can improve the local stiffness of the connection.

[0020] Furthermore, angle steel is used for the transverse load-bearing components. The lap joints are fixed by bolts, nuts, and washers. Slotted holes are made on the angle steel, extending along its length. Angle steel facilitates the formation of a transverse load-bearing framework, bolted connections facilitate assembly, and the slotted holes provide adjustment allowance along the length of the angle steel, thus accommodating relative displacement requirements during construction and installation errors and subsequent adjustments to the preload.

[0021] Furthermore, the pre-tensioned double-box UHPC girder bridge diaphragm structure of the present invention also includes a pre-embedded connection device, which is set at the connection between the transverse load-bearing member and the web of the UHPC box girder. This device includes a pre-embedded flange assembly, a shear force transfer component, and a spatial anchoring component. The pre-embedded flange assembly is used to achieve an assembled connection between the transverse load-bearing member and the web of the UHPC box girder. The shear force transfer component is used to transfer the shear force generated by the transverse load-bearing member. The spatial anchoring component is connected to the internal reinforcement system of the web, diffusing the concentrated force at the connection node into the interior of the UHPC web. Thus, an assembled connection between the diaphragm and the thin-walled UHPC web can be achieved, transferring shear force and diffusing concentrated force, reducing local stress concentration in the connection area, and improving the load-bearing capacity and durability of the connection node.

[0022] Furthermore, the embedded flange assembly includes a flange and a frame end plate. The flange is embedded within the web of the UHPC box girder, with its exposed surface flush with the web surface. The frame end plate is welded to the end of the transverse load-bearing member and connected to the flange with bolts. The shear force transfer member uses a shear key, which is a steel plate or channel steel welded to the side of the flange facing the interior of the UHPC web and embedded inside the UHPC web, transferring shear force through localized concrete bearing pressure. The spatial anchoring member includes multiple ribbed steel bars. One end of each ribbed steel bar is welded to the shear key or mechanically connected via a connecting sleeve, while the other end extends into the UHPC web and is tied or welded to the distributed steel mesh within the UHPC web. Thus, the flange and frame end plate form an assembled connection, the shear key transfers shear force through localized concrete bearing pressure, and the ribbed steel bars diffuse concentrated force to a wider area within the UHPC, improving the connection reliability of the embedded connection device.

[0023] Furthermore, the pre-embedded connection device adopts a through-pull tie structure for the middle web of the double box girder and a single-sided embedded structure for the side web. Thus, the connection structure can be selected according to the different spatial conditions and stress characteristics of the middle and side webs, meeting the connection requirements of different web positions.

[0024] Compared with existing technologies, the assembly method of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function of the present invention has at least the following beneficial effects: During the prefabrication stage of the UHPC box girder, the flange of the embedded flange assembly, the shear key of the shear force transfer component, and the ribbed steel bars of the spatial anchoring component are positioned according to the design position, so that the ribbed steel bars are fixedly connected with the web steel reinforcement skeleton, and the UHPC is cast to form an integral whole; the transverse load-bearing components are hoisted into place, so that the frame end plate of the embedded flange assembly is aligned with the flange on the web of the UHPC box girder, and is initially tightened by bolts; the threaded steel bars of the tie rod assembly are passed through the load-bearing ear plates of the load-bearing ear plate assembly on both sides of the lap connection section, the disc spring of the elastic energy storage component and the nuts and washers of the tie rod assembly are installed, and the nuts are tightened symmetrically and in stages according to the design pre-tightening force, so that the disc spring generates a predetermined elastic compression amount; during the operation period, when the pre-tightening force of the connection node decreases, the disc spring releases elastic potential energy for compensation; when the compensation capacity is exceeded, the nuts are tightened for secondary tensioning. This enables the integral forming of the pre-embedded connecting device and the UHPC web, the assembly connection of the diaphragm and the web, the establishment of the initial preload, and the compensation and secondary tensioning of the preload during operation, ensuring assembly quality and connection performance.

[0025] Furthermore, the design preload is determined based on the lateral relative displacement control index and lateral coordinated force requirements of the double box girder. During operation, the slotted holes on the lateral load-bearing components provide adjustment margin for the relative displacement between components. This allows the preload design to match the lateral force requirements of the double box girder and provides displacement adjustment space during operational adjustments, facilitating preload recovery.

[0026] Furthermore, the assembly method of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function of the present invention also includes a local segment finite element analysis step. A local segment finite element model of the double-box UHPC beam bridge is established, and the boundary conditions of a combination of rigid and elastic supports are used to equivalently simulate the constraint effect of the unmodeled area of ​​the entire bridge on the local segment. The deformation characteristics of the local model are made consistent with the full bridge model by adjusting the stiffness of the elastic supports. The value range of the elastic support stiffness is 2×10⁻⁶. 6 N / mm~4×10 6 N / mm. Therefore, while ensuring computational accuracy, modeling complexity and computational costs can be reduced, providing analytical tools for diaphragm structure design, parameter optimization, and engineering applications. Attached Figure Description

[0027] The accompanying drawings, which form part of this application, are used to provide a further understanding of the technical solutions of this application. The illustrative embodiments and descriptions of this application are only used to explain this application and do not constitute an improper limitation on the scope of protection of this application.

[0028] Figure 1 A schematic diagram of the overall diaphragm structure of a double-box UHPC beam bridge with pre-tightening function according to an embodiment of the present invention; Figure 2 Assembly isometric view of the adjustable flexible pretensioning system at the lap joint section according to an embodiment of the present invention; Figure 3 A front view of the adjustable flexible pretensioning system at the lap joint section according to an embodiment of the present invention; Figure 4 Rear view of the adjustable flexible pretensioning system at the lap joint section according to an embodiment of the present invention; Figure 5 A top view of the adjustable flexible pretensioning system at the lap joint section according to an embodiment of the present invention; Figure 6 Left view of the adjustable flexible pretensioning system at the overlapping connection section according to an embodiment of the present invention; Figure 7 A schematic diagram of the side-embedded pre-connection device of the present invention applied to the side web of a double box girder; Figure 8 A schematic diagram of the through-type embedded connection device applied to the web of a double box girder according to the present invention; Figure 9 A schematic diagram of the boundary condition setting scheme for four rigid supports in the local model of this invention; Figure 10 A schematic diagram of the boundary condition setting scheme for the combination of two rigid supports and two elastic supports in the local model of this invention; Figure 11 Comparison of vertical relative displacement curves of the top slab at mid-span between the local model and the full bridge model under different boundary conditions; Figure 12 A schematic diagram of a three-dimensional finite element model of the main beam segment and steel frame diaphragm of a double-box UHPC according to an embodiment of the present invention; Figure 13 Comparison curves of vertical displacement of the top slab at mid-span of the double box girder along the transverse direction under different transverse diaphragm schemes.

[0029] In the attached diagram: 1-Bearing lug; 2-Threaded steel bar; 3-Stiffening rib; 4-Plate; 5-Bolt; 6-Angle steel; 7-Nut; 8-Washer; 9-Strip hole; 10-Disc spring; 11-Flange; 12-Frame end plate; 13-Ribbonded steel bar; 14-Shear key. Detailed Implementation

[0030] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0031] It should be noted that, in the description of the embodiments of the present invention, unless otherwise stated, "a plurality of" means two or more; the terms "upper", "middle", "lower", "left", "right", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.

[0032] Furthermore, in the description of this invention, unless otherwise explicitly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0033] To improve the overall stiffness, long-term stability, and service safety of the transverse connection structure, this invention provides a transverse diaphragm structure for a double-box UHPC beam bridge with pre-tensioning function, mainly composed of a transverse diaphragm system, an adjustable flexible pre-tensioning system, and a pre-embedded connection device. For example... Figure 1 As shown, the diaphragm system consists of transverse load-bearing members and diagonal support members connected to form a transverse load-bearing skeleton, which is installed inside the box girders of the double-box UHPC girder bridge and between the two box girders. The transverse load-bearing members are made of angle steel 6.

[0034] In this embodiment, the diaphragm system consists of seven angle steels 6 arranged transversely along the bridge direction and two diagonal angle steels 6. The two transverse angle steels form an lap joint in the area below the mid-span and are prefabricatedly connected to the web of the UHPC box girder at both ends via end-embedded parts. The cross-sectional dimensions of the angle steels are determined based on transverse stress calculations. The lap joint is secured by bolts 5, nuts 7, and washers 8, with the lap length meeting structural stress and construction requirements. Angle steels 6 have slotted holes 9 along their length, providing a certain adjustment margin to accommodate construction and installation errors and relative displacement during subsequent preload adjustments.

[0035] The adjustable flexible pretensioning system, located at the lap joint, is the core structure of this invention for achieving pretension force compensation and flexible adjustment. For example... Figures 2 to 6As shown, the adjustable flexible pretensioning system includes a tie rod assembly, a load-bearing lug assembly, and an elastic energy storage assembly. The tie rod assembly, including a threaded steel bar 2, is transversely inserted between the two angle steels 6. Both ends of the threaded steel bar 2 pass through pre-drilled holes in the load-bearing lug 1, forming a tensioning system capable of applying pretensioning force through a nut 7 and a washer 8. By tightening the nut 7, an axial tension force is applied to the threaded steel bar 2, thereby creating a relative pretensioning constraint along the transverse direction between the two angle steels at the lap joint.

[0036] The load-bearing lug assembly is fixedly mounted on the web or flange of the angle steel 6, serving as a preload transfer and reaction support component. The load-bearing lug 1 is made of steel plate and is welded to the angle steel 6. The height difference between the two overlapping angle steels 6 is compensated by the pad 4, and stiffening ribs 3 are provided at the connection between the load-bearing lug 1 and the angle steel 6 to improve local stiffness and bending load-bearing capacity.

[0037] The flexible energy storage component is connected in series in the force path of the tie rod assembly, such as... Figure 3 and Figure 5 As shown, the elastic energy storage component consists of multiple stacked disc springs 10. The disc springs 10 are fitted onto the threaded steel bars 2, located between the outer side of the load-bearing lug 1 and the washer 8, and are initially elastically deformed by the pre-tightening compression of the nut 7. Under tension, the disc spring assembly can provide a certain axial elastic compression stroke. When the structure undergoes minor deformation under vehicle loads, temperature changes, or material shrinkage and creep, the elastic recovery of the disc springs 10 can automatically compensate for the reduction in pre-tightening force at the connection node, thereby enabling the connection node to have elastic deformation capability under axial tension, effectively delaying pre-tightening force decay and ensuring long-term stability of the lateral connection stiffness.

[0038] like Figures 7 to 8 As shown, the present invention also includes a pre-embedded connection device disposed at the connection between the angle steel 6 and the web of the UHPC box girder, for achieving safe and reliable anchoring between the lightweight steel structure and the thin-walled UHPC structure. The pre-embedded connection device includes a pre-embedded flange assembly, a shear force transfer component, and a spatial anchoring component.

[0039] The embedded flange assembly consists of a flange 11 and a frame end plate 12. The flange 11 is embedded in the web before the UHPC box girder is poured, and its exposed surface is flush with the surface of the web. The frame end plate 12 is welded to the end of the angle steel 6 and is assembled with the flange 11 by bolts 5.

[0040] A shear force transfer component is disposed on the back of flange 11 and extends into the UHPC web to withstand the vertical and lateral shear forces transferred by the diaphragms. In this embodiment, the shear force transfer component is a shear key 14, but those skilled in the art can also use other components with equivalent shear force transfer functions. The shear key 14 is a steel plate or channel steel welded to the back of flange 11, embedded in the UHPC web, and transfers shear force through the local bearing pressure of the concrete, effectively preventing shear slip failure at the connection interface.

[0041] Spatial anchoring components are used to diffuse the concentrated tensile force on the embedded flange assembly into the UHPC web, preventing punching or splitting failure of the thin-walled structure. The spatial anchoring component comprises multiple ribbed steel bars 13. One end of each ribbed steel bar 13 is welded to a shear key 14 or mechanically connected via a connecting sleeve, while the other end extends into the UHPC web and is bound or welded to the distributed reinforcing mesh within the UHPC web, forming an integral reinforcing steel skeleton. Through this spatial anchoring system, the tensile load borne by the flange can be diffused along the ribbed steel bars 13 to a wider area of ​​concrete, significantly reducing the level of local stress concentration at the connection point and ensuring the stress safety of the thin-walled UHPC web.

[0042] like Figure 7 and Figure 8 As shown, this invention provides two structural forms of pre-embedded connection devices to address the differences in spatial conditions and stress characteristics between the middle web and the side web of a double box girder. For the middle web position between the double box girders, since there is operating space on both sides, the pre-embedded connection device adopts a through-pull-through structure, that is, the ends of the transverse diaphragms on both sides are anchored by tie rods or bolts that penetrate the web. For the side web position on the outer side of the double box girder, since there is no operating space on the outer side, the pre-embedded connection device adopts a single-sided implantation structure. The flange and anchoring components are implanted into the UHPC only from the inner side of the web, and stress balance is achieved through inner-side anchoring.

[0043] The assembly method of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function of the present invention includes: First, during the prefabrication stage of the UHPC box girder, the flange 11, shear key 14, and ribbed steel bars 13 of the pre-embedded connecting device are precisely positioned according to the design location and fixedly connected to the web reinforcement skeleton. Four bolts 5 are pre-embedded on the side of the pre-embedded flange facing the inside of the box girder, with their anchoring ends anchored into the UHPC web. The threaded sections pass vertically through the flange and extend into the internal space of the box girder, forming exposed threaded sections. Then, UHPC concrete is poured to integrate the pre-embedded components with the web.

[0044] Secondly, during the installation of the bridge superstructure, the prefabricated angle steel 6 is hoisted into place, aligning the frame end plate 12 with the flange 11 on the web plate, and nuts 7 are installed on the front of the frame end plate 12 and initially tightened.

[0045] Next, the adjustable flexible preload system is installed and the preload is applied. The threaded steel bar 2 is passed through the load-bearing lugs 1 on both sides of the lap joint of the two angle steels 6, and the disc spring 10, nut 7, and washer 8 are installed sequentially. Using a torque wrench, the nut 7 is tightened symmetrically and in stages according to the designed preload value, causing the disc spring 10 to generate a predetermined elastic compression, thereby providing a stable and controllable initial preload at the diaphragm connection node. The designed preload is determined based on the lateral relative displacement control index and lateral cooperative force requirements of the double box girder in the actual engineering project.

[0046] Finally, during the bridge's operational phase, when a slight decrease in preload occurs at the connection nodes due to load or long-term material effects, the elastic potential energy stored in the disc spring 10 is automatically released to compensate for the relaxation displacement of the connection nodes, maintaining the preload within an effective range. When the preload decreases beyond the spring's compensation capacity, it can be manually adjusted and restored by tightening the nut 7. During the adjustment process, the slotted hole 9 provides space for relative displacement between components.

[0047] To verify the ability of the local segmental finite element model to simulate the stress characteristics of the entire bridge structure and to determine the equivalent boundary condition method applicable to the local analysis of double-box UHPC beam bridges, this embodiment of the invention takes a double-box UHPC simply supported beam bridge with a span of 84m as the engineering background and selects the mid-span region to establish a local segmental finite element model.

[0048] Since the local segment model only captures a portion of the entire bridge structure, the spatial constraints exerted by the unmodeled parts on the local segments cannot be directly reflected. Therefore, the appropriate setting of boundary conditions has a significant impact on the accuracy of the calculation results. To ensure that the local segment model can realistically reflect the stress and deformation characteristics of the entire bridge structure, this embodiment employs a simplified transverse frame analysis method to perform equivalent processing on the boundary conditions.

[0049] Regarding the setting of boundary conditions for the local model, this embodiment establishes two simplified schemes for comparative analysis: one is a boundary condition scheme with four rigid supports at the bottom, such as... Figure 9 As shown; another boundary condition scheme is to set two rigid supports and two elastic supports at the bottom, as shown. Figure 10 As shown. Under the combined action of the structure's self-weight and external loads, calculations and analyses were performed on the overall bridge model and local segment models. The displacement responses at key locations in the mid-span region were extracted and compared. The comparison results are as follows. Figure 11 As shown.

[0050] The analysis results show that when the local model uses four completely rigid supports, due to the excessively strong boundary constraints, the overall deformation curve of the local model is significantly different from that of the full bridge model. In particular, in the transverse connection area of ​​the double box girder, it is difficult to reflect the relative displacement and vertical deformation characteristics in the actual structure.

[0051] In contrast, when using boundary conditions combining two rigid supports and two elastic supports, the deformation response of the local model is closer to that of the full-bridge model. By adjusting the stiffness parameters of the elastic supports, the flexible constraint effect of the unmodeled region on local segments can be effectively simulated, thereby improving the local model's ability to represent the stress state of the full-bridge structure.

[0052] Furthermore, in order to determine the reasonable range of values ​​for the elastic support stiffness, this embodiment compares and analyzes the mid-span displacement of the local model and the mid-span displacement of the full bridge model under different elastic support stiffness conditions, and the results are shown in Table 1.

[0053] Table 1 Comparison of Calculation Results of Relative Displacement Error

[0054] The results show that the stiffness of the elastic support has a significant impact on the displacement response of the local model. When the stiffness is small, the boundary constraints are insufficient, leading to a significant amplification of the local model displacement. When the stiffness is too large, the boundary conditions gradually approach rigid constraints, resulting in suppressed structural deformation and a smaller calculated displacement. As the stiffness of the elastic support gradually increases, the calculated results of the local model gradually approach those of the full-bridge model.

[0055] This embodiment uses a mid-span displacement relative error controlled within ±5% as the engineering accuracy control standard. According to the analysis results in Table 1, when the elastic support stiffness is 2×10... 6 N / mm~4×10 6 When the displacement error is N / mm, the displacement error between the local model and the full bridge model both meet the requirements of engineering analysis.

[0056] Where the stiffness of the elastic support is 3×10 6 When the displacement is N / mm, the mid-span displacement calculated by the local model is closest to that of the full-bridge model, with a relative error of approximately 1.1%, indicating the best equivalent effect of the boundary conditions. Therefore, this boundary condition is used as the boundary constraint form for the local segment model in subsequent finite element analyses.

[0057] After determining the boundary conditions of the local segment model, in order to further verify the structural safety, mechanical rationality, and lateral collaborative performance of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function in the embodiment of the present invention, the finite element method was used to compare and analyze different transverse connection schemes.

[0058] This embodiment selects a 4m long local segment at the mid-span of the bridge in the engineering background to establish a refined three-dimensional solid finite element model. The model fully includes components such as the double-box UHPC main beam, lightweight steel frame diaphragms, and pre-embedded connection devices. Figure 12 As shown.

[0059] In this embodiment, the lightweight steel frame diaphragms are made of L150mm×150mm×10mm angle steel components, the UHPC main beams are made of ultra-high performance concrete, and the steel frame diaphragms and embedded connection devices are all made of Q355D steel. All components are discretized using three-dimensional eight-node reduced integral solid elements to improve the accuracy of local stress and deformation simulation of the structure.

[0060] The local model boundary conditions adopt a combination of two rigid supports and two elastic supports, where the stiffness of the elastic supports is 3 × 10⁻⁶. 6 N / mm, to simulate the constraint effect of the unmodeled area of ​​the whole bridge on local segments.

[0061] The local model loads include the structure's self-weight, vehicle loads, and preload loads. The vehicle loads are applied equivalently to the mid-span bridge deck area of ​​the double-box girder; the preload is applied to the lower connecting members of the diaphragm using a temperature load equivalent simulation method to simulate the actual working state after the preload system is established. Under the combined action of the structure's self-weight, vehicle loads, and preload, unfavorable stress states such as lateral opening, vertical displacement, and local torsion of the double-box girder are induced.

[0062] To evaluate the impact of different transverse connection schemes on the collaborative load-bearing performance of the double box girder, four analytical conditions were established for comparative study: no transverse diaphragm, ordinary steel frame transverse diaphragm, concrete transverse diaphragm, and the lightweight steel frame transverse diaphragm with pre-tensioning function of the present invention. Under each condition, the vertical displacement results of the mid-span top slab distributed along the transverse direction of the bridge were extracted, as shown below. Figure 13 As shown.

[0063] Analysis results show that, under the condition of no diaphragm, the double box girder is basically under independent stress, with the largest vertical displacement at mid-span and the weakest lateral cooperative working ability; ordinary steel frame diaphragms can improve the cooperative stress performance of double box girders to a certain extent, but the connection nodes may still loosen due to structural deformation, and its overall constraint capacity is limited; concrete diaphragms have the largest overall stiffness, the smallest vertical displacement at mid-span, and the smoothest overall deformation curve.

[0064] In contrast, the pre-tensioned double-box UHPC beam bridge diaphragm structure of the present invention provides continuous lateral restraint through the pre-tensioning system, effectively suppressing the relative displacement between the two box girders. Its maximum vertical displacement at mid-span is significantly smaller than the corresponding value of the ordinary steel frame diaphragm condition, and its overall deformation curve is closer to that of the concrete diaphragm condition.

[0065] The above results demonstrate that by introducing an adjustable flexible pre-tightening system into the lightweight steel frame diaphragm, the present invention can significantly improve the lateral synergistic load-bearing capacity and overall stiffness of the double box girder while maintaining the advantages of lightweight, prefabricated, and easy-to-maintain steel structure. This achieves a connection effect close to that of a concrete diaphragm, verifying the mechanical rationality and engineering application value of the structural scheme of the present invention.

[0066] As a supporting analysis method for the structural design and performance evaluation of this invention, when establishing the finite element model of a local segment of a double-box UHPC beam bridge, the boundary conditions of the combination of rigid and elastic supports are used to simulate the constraint effect of the unmodeled area of ​​the whole bridge on the local segment. By adjusting the stiffness of the elastic supports, the deformation characteristics of the local model are made consistent with the whole bridge model, thereby achieving efficient evaluation of the lateral bearing capacity and coordinated deformation capacity of the diaphragm structure.

[0067] Compared with existing technologies, this invention uses lightweight steel frame diaphragms as transverse connecting components for double-box UHPC beam bridges. Through prefabricated connection, it achieves effective transmission of transverse forces between the two box girders. While ensuring transverse collaborative performance, it reduces the self-weight of the diaphragms and improves construction efficiency and ease of later maintenance.

[0068] This invention features an adjustable flexible pretensioning system. It establishes pretensioning force at the connection nodes through high-strength tie rod components and utilizes elastic energy storage components to form a continuous pretensioning mechanism. This allows the connection nodes to maintain a stable pretensioning state under vehicle loads, temperature changes, and material shrinkage and creep, effectively mitigating pretensioning force decay and improving the long-term performance of the lateral connection structure.

[0069] This invention combines an elastic energy storage component with an adjustment structure to enable the connection node to have automatic preload compensation and subsequent adjustability. When the connection node becomes loose or the preload is lost, active compensation can be achieved through the release of elastic energy, and the design preload can be restored through secondary tensioning, thereby improving the durability and service reliability of the connection system.

[0070] This invention incorporates a pre-embedded connection device. Through the synergistic effect of the pre-embedded flange assembly, shear force transfer component, and spatial anchoring component, a reliable connection between the steel frame diaphragm and the thin-walled UHPC web is achieved, effectively reducing local stress concentration in the connection area and improving the load-bearing capacity and safety performance of the connection node.

[0071] This invention proposes a simplified analysis method for local segments of double-box UHPC beam bridges. By simulating the constraint effect of the entire bridge structure on local segments through boundary conditions combining rigid and elastic supports, the method significantly reduces modeling complexity and computational cost while ensuring calculation accuracy. This provides an efficient and reliable analysis tool for diaphragm structure design, parameter optimization, and engineering applications.

[0072] The diaphragm structure of the double-box UHPC beam bridge with pre-tensioning function of this invention has the characteristics of lightweight, prefabrication, adjustability and maintainability. While ensuring the lateral coordinated stress performance of the double box beams, it can effectively improve the overall stiffness, long-term stability and service safety of the bridge structure, and has good engineering application prospects.

[0073] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.

Claims

1. A transverse diaphragm structure for a double-box UHPC beam bridge with pre-tensioning function, characterized in that, This includes a diaphragm system and an adjustable flexible pretensioning system; The diaphragm system is composed of transverse load-bearing members and diagonal support members connected to form a transverse load-bearing skeleton. An overlapping connection section is formed between adjacent transverse load-bearing members. The ends of the transverse load-bearing members are provided with end connection nodes for prefabricated connection with the web of the UHPC box girder. The adjustable flexible pretensioning system is installed at the lap joint section and includes a tie rod assembly, a load-bearing lug assembly, and an elastic energy storage assembly. The tie rod assembly passes through the lap joint section and is installed between adjacent transverse load-bearing members, forming a tensioning system capable of applying pretension force through a threaded connection. The load-bearing lug assembly is fixedly installed on the adjacent transverse load-bearing members to transmit pretension force and provide reaction force support. The elastic energy storage assembly is installed in the force path of the tie rod assembly and achieves pretension force compensation through elastic deformation, so that the connection node forms a flexible connection system with pretension force compensation capability.

2. The diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 1, characterized in that, The elastic energy storage component includes a disc spring assembly (10), which is arranged in series along the axial direction of the tie rod assembly. It forms initial energy storage through pre-compression and releases elastic potential energy when the structure is loaded or the connection node is displaced to compensate for the loss of pre-tightening force.

3. The diaphragm structure of the double-box UHPC beam bridge with pre-tensioning function according to claim 1, characterized in that, The tie rod assembly includes a threaded steel bar (2), and the load-bearing lug assembly includes a load-bearing lug (1). The two ends of the threaded steel bar (2) pass through the reserved holes on the load-bearing lug (1) and form a tensioning system that can be pre-stressed by nuts (7) and washers (8). The load-bearing lug (1) is made of steel plate and welded to the web or flange of the adjacent transverse load-bearing member. A pad (4) is set at the height difference between the adjacent transverse load-bearing members, and a stiffening rib (3) is set at the connection between the load-bearing lug (1) and the transverse load-bearing member.

4. The diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 1, characterized in that, The transverse load-bearing member is made of angle steel (6), and the lap joint is connected and fixed by bolts (5), nuts (7) and washers (8). A strip hole (9) is opened on the angle steel (6), and the strip hole (9) extends along the length direction of the angle steel (6).

5. The diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 1, characterized in that, It also includes a pre-embedded connection device, which is set at the connection between the transverse load-bearing member and the web of the UHPC box girder. The pre-embedded connection device includes a pre-embedded flange assembly, a shear force transfer member, and a spatial anchoring member. The pre-embedded flange assembly is used to realize the prefabricated connection between the transverse load-bearing member and the web of the UHPC box girder. The shear force transfer member is used to transfer the shear force generated by the transverse load-bearing member. The spatial anchoring member is connected to the internal reinforcement system of the web to diffuse the concentrated force at the connection node into the interior of the UHPC web.

6. The diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 5, characterized in that, The embedded flange assembly includes a flange (11) and a frame end plate (12). The flange (11) is embedded in the web of the UHPC box girder and its exposed surface is flush with the web surface. The frame end plate (12) is welded to the end of the transverse load-bearing member and assembled with the flange (11) by bolts (5). The shear force transmission member adopts a shear key (14). The shear key (14) is a steel plate or channel steel welded to the side of the flange (11) facing the inside of the UHPC web and embedded in the UHPC web. Shear force is transmitted through local concrete bearing pressure. The spatial anchoring member includes multiple ribbed steel bars (13). One end of the ribbed steel bar (13) is welded to the shear key (14) or mechanically connected by a connecting sleeve. The other end extends into the UHPC web and is tied or welded to the distributed steel mesh in the UHPC web.

7. The diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 5, characterized in that, The pre-embedded connection device adopts a through-pull tie structure for the middle web of the double box girder and a single-sided implantation structure for the side web of the double box girder.

8. An assembly method for a diaphragm structure of a double-box UHPC beam bridge with pre-tightening function as described in any one of claims 1 to 7, characterized in that, Includes the following steps: During the prefabrication stage of UHPC box girder, the flange (11) of the embedded flange assembly, the shear key (14) of the shear force transfer component and the ribbed steel bar (13) of the spatial anchoring component are positioned according to the design position, so that the ribbed steel bar (13) is fixedly connected with the web reinforcement skeleton, and the UHPC is cast to form an integral whole. The transverse load-bearing components are hoisted into place, aligning the frame end plate (12) of the pre-embedded flange assembly with the flange (11) on the web of the UHPC box girder, and initially tightened with bolts (5); The threaded steel bar (2) of the tie rod assembly is passed through the load-bearing ear plate (1) of the load-bearing ear plate assembly on both sides of the lap joint section. The disc spring (10) of the elastic energy storage assembly and the nut (7) and washer (8) of the tie rod assembly are installed. The nut (7) is tightened symmetrically in stages according to the design preload, so that the disc spring (10) generates a predetermined elastic compression. During operation, when the preload of the connection node decreases, the disc spring (10) releases elastic potential energy to compensate; when the compensation capacity is exceeded, the nut (7) is tightened for secondary tensioning.

9. The assembly method of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 8, characterized in that, The design preload is determined based on the control index of the lateral relative displacement of the double box girder and the requirements of lateral cooperative force. During the operation period, the strip holes (9) on the lateral load-bearing components are used to provide adjustment margin for the relative displacement between the components.

10. The assembly method of the transverse diaphragm structure of the double-box UHPC beam bridge with pre-tightening function according to claim 8, characterized in that, The method also includes a step of local segment finite element analysis. In this step, a local segment finite element model of the double-box UHPC beam bridge is established. Boundary conditions combining rigid and elastic supports are used to equivalently simulate the constraint effect of the unmodeled area of ​​the entire bridge on the local segment. The deformation characteristics of the local model are made consistent with the full bridge model by adjusting the stiffness of the elastic supports. The value of the elastic support stiffness ranges from 2 × 10⁻⁶. 6 N / mm~4×10 6 N / mm.