A design method for active slope reinforcement

By refining the design of prestressed anchor cables, and combining damage variable definition and numerical algorithm simulation, the problem of local damage and water-rock coupling deterioration in slope reinforcement design was solved, achieving precise matching and improved economy of slope reinforcement.

CN123069818APending Publication Date: 2026-11-10SOUTHWEST FORESTRY UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610683680.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-05-18
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing slope reinforcement design methods are unable to reflect the spatial differences in the distribution of local damage and stability within the slope, and fail to simultaneously consider the coupled deterioration effect of excavation disturbance damage and water-rock interaction, resulting in insufficient or excessive reinforcement. Furthermore, the lack of quantitative indicators to classify reinforcement strength zones makes it difficult to achieve precise matching.

Method used

A refined active reinforcement design method for prestressed anchor cables is adopted. By defining the pre-peak damage variable and obtaining the mechanical deterioration law, the damage evolution is simulated by the discrete element numerical algorithm. The local safety factor method is used to calculate the compensation stress, define the active compensation stress ratio index, accurately divide the reinforcement zone, and optimize the layout of prestressed anchor cables.

Benefits of technology

It enables quantitative characterization of slope damage, accurately reflects the deterioration effect of water and rock action, avoids insufficient or excessive reinforcement, improves the economy and stability of reinforcement, and is applicable to slope stability control in highway, railway and other engineering projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069818A_ABST
    Figure CN123069818A_ABST
Patent Text Reader

Abstract

This application provides an active slope reinforcement design method. Addressing the instability problem caused by the coupled deterioration of slope damage due to excavation disturbance and water-rock interaction, it quantitatively characterizes rock mass damage by defining a pre-peak damage variable. A dynamic damage evolution algorithm is developed based on a discrete element numerical platform, and a graded excavation model of the slope is established to obtain damage distribution characteristics. The local safety factor method is used to calculate the unit compensation stress, and an active compensation stress ratio index is defined to divide reinforcement strength zones, ultimately completing the refined active reinforcement design using prestressed anchor cables. This application can accurately match the slope damage evolution law, quantify local reinforcement needs, and avoid insufficient or excessive reinforcement. It is applicable to the reinforcement design of excavated slopes in mountainous transportation, water conservancy, and mining engineering projects, and features a clear mechanical mechanism, high calculation accuracy, and a balance between economy and safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of slope reinforcement technology in geotechnical engineering, and specifically to a design method for active slope reinforcement. Background Technology

[0002] Slopes are widely distributed in the construction of infrastructure such as transportation, water conservancy, and mining in mountainous areas. Excavation and unloading disturbance can cause initial damage to the rock mass, and the water-rock interaction caused by rainfall infiltration can further deteriorate the mechanical properties of the rock mass. The coupling of these two factors drives the continuous expansion of slope damage and the continuous decay of strength, eventually inducing slope slippage along the bedding plane and shear failure at the toe of the slope, which seriously threatens the safety of engineering construction and the surrounding living environment.

[0003] Currently, there are many slope reinforcement measures available, including slope cutting and load reduction techniques, drainage and interception measures, anchoring measures, concrete shear structures, retaining structures, slope compression measures, and vegetation-framed slope protection and facing. Slope treatment projects emphasize the principle of comprehensive multi-measure management to enhance slope stability. Existing slope reinforcement design methods are mostly based on overall safety factors, making it difficult to reflect the spatial differences in local damage distribution and stability within the slope, easily leading to insufficient reinforcement or over-reinforcement.

[0004] Furthermore, some methods fail to simultaneously consider the coupled deterioration effect of excavation disturbance damage and water-rock interaction, making it impossible to achieve precise matching of damage dynamic evolution and reinforcement parameters; at the same time, the lack of quantitative indicators to divide reinforcement strength into zones makes it difficult to achieve refined and differentiated deployment of prestressed anchor cables, resulting in a failure to balance reinforcement effectiveness and economy.

[0005] The determination of the reinforcement scheme must analyze the safety reliability and economic rationality, including two aspects: (1) Analyze the stability of the slope or make an engineering judgment, calculate the additional anti-sliding force required to make the slope meet the engineering requirements safety factor, or the increase in stability factor after the soil and rock strength increases. (2) Analyze the structural stress of the reinforcement components and calculate the strength, or analyze the anti-sliding and anti-overturning stability of the retaining structure.

[0006] Therefore, developing an active reinforcement design method that can quantitatively characterize the evolution of excavation damage, the deterioration effect of coupled water and rock action, and accurately quantify reinforcement requirements based on local stability is of great significance for improving the level of disaster prevention and control and the quality of engineering slope reinforcement. Summary of the Invention

[0007] In view of this, this application proposes a refined active reinforcement design method for prestressed anchor cables that considers the coupled deterioration effect of excavation disturbance damage and water-rock interaction, which is applicable to the stability control and reinforcement design of excavated slopes in highway, railway and other engineering projects.

[0008] Specifically, a slope active reinforcement design method is provided, characterized by mainly including: (1) Definition of pre-peak damage variable and acquisition of mechanical deterioration law; Based on the crack volumetric strain method, the pre-peak damage variable Da of rock is defined, and the damage of excavated rock is obtained through indoor triaxial tests. Deterioration law of coupled mechanical forces between water and rock; (2) Construction of numerical algorithm for excavation-water-rock coupling damage evolution: Based on the 3DEC discrete element platform and Fish language, a numerical algorithm for dynamic damage evolution was developed to realize the synchronous update of rock mass damage calculation and mechanical parameters during the excavation process. A three-dimensional discrete element model of graded excavation of slope was established to simulate the whole process of graded excavation and extract the slope damage distribution characteristics. (3) Element compensation stress based on local safety factor; The local safety factor method is used to calculate the local stability state of the slope element and the compensation stress required to meet the design safety factor; (4) The reinforcement stress ratio quantifies the degree of reinforcement required at different locations of the slope; the active compensation stress ratio index Qr is defined, and the slope is divided into strong reinforcement zone, weak reinforcement zone, and unreinforced zone according to the value of Qr. (5) Design of prestressed anchor cable reinforcement parameters and verification of reinforcement effect; Based on the compensation stress and reinforcement zoning results, complete the active reinforcement design of prestressed anchor cables and verify the reinforcement effect.

[0009] Furthermore, the definition of pre-peak damage variables and the acquisition of mechanical degradation laws include the following steps: Step 1. Determine the rock initiation stress σ based on the crack volumetric strain method. ci Using the initiation stress as the damage initiation threshold, the rock peak damage variable Da is defined as follows: (1) In the formula, The stress is in any state before the peak, and its range is between the crack initiation stress and the stress before the peak. and peak stress Between; Da ranges from (0, 1), when When Da=0, it means there is no damage under this stress state; When Da=1, it means that the stress state at this time is the stress state when the rock reaches the peak strength, which means that the rock has reached the peak strength and entered the post-peak failure stage, and the degree of damage has reached the critical state. Step 2. Prepare soft rock samples with different initial damage levels, and conduct triaxial compression tests under dry and saturated conditions to quantitatively obtain the degradation law of rock peak strength, elastic modulus, cohesion and internal friction angle under the coupling of initial damage and water-rock interaction.

[0010] Further excavation The numerical algorithm for water-rock coupled damage evolution is constructed, and a numerical model for graded excavation of slopes is established and damage distribution is extracted, including the following steps: Step 1. Develop a numerical algorithm for dynamic characterization of rock mass and structural surface damage based on the Fish language built into the discrete element software 3DEC; Step 2. Using the initiation stress as the damage criterion, calculate the principal stress and damage variable Da of each unit of the slope during the excavation process, and update the mechanical parameters of the rock mass and structural surfaces simultaneously to achieve excavation disturbance. Iterative calculation of damage evolution and parameter deterioration under water-rock interaction; Step 3. Establish a three-dimensional discrete element model of the slope for graded excavation, set the model boundary conditions and displacement and stress monitoring points, and simulate the entire process of graded excavation on site; extract the spatiotemporal distribution characteristics of the plastic zone, displacement field, stress field, and damage zone of the slope through numerical calculation, and determine the slope toe. The slope waist is the core damage area and the potential instability control zone.

[0011] Furthermore, the element compensation stress calculation based on the local safety factor includes the following steps: Step 1. Quantitatively evaluate the local stability state of any element of the slope using the local safety factor method. For any element to meet the engineering design safety factor standard, sufficient stress compensation must be provided. Assuming the design safety factor is Fst, the required stress Δσ to satisfy Fst can be determined. 3e It should be the minimum principal stress σ required to satisfy Fst. 3e The difference between the actual minimum principal stress and the stress when the slope is unreinforced, Δσ 3e It can be obtained from the following formula: (2) In the formula, σ3 is the minimum principal stress when the slope is unreinforced; Δσ 3e To satisfy the stress compensation required by the element when Fst; σ 3e To satisfy the minimum principal stress of the element at Fst, σ 3e It can be calculated using the following formula: (3) In the formula, Fst is the design safety factor. When the confining pressure reaches a certain value, the stress σ1 for slope stability increases exponentially with the internal friction angle θ. Step 2. The local safety factor can quantitatively characterize the stability state of local elements of a slope. For any element, its local safety factor F s The expression is: (4); Step 3. Based on the stress that the unit needs to compensate for, the total anchoring force required for the entire slope can be calculated, and the stress that the slope needs to compensate for can be obtained. If the area of ​​each anchor cable bundle during reinforcement is S... i Given a total of n anchor cables, the anchoring force required to satisfy the design safety standard for the slope can be calculated as F. r Specifically, it can be calculated using the following formula: (5).

[0012] Furthermore, the reinforcement stress ratio quantifies the required reinforcement strength at different locations on the slope, accurately dividing the reinforcement zones. Based on the definition of active compensation stress ratio and reinforcement zone division, the process includes the following steps: Using the unit active compensation stress ratio index It is defined as the ratio of the required compensation stress of the element to the initial minimum principal stress of the element, and is specifically obtained by the following formula: (6) Active compensation stress ratio The physical meaning is clear. The larger the value, the higher the proportion of stress that needs to be compensated relative to the initial stress, and the stronger the need for reinforcement, requiring strong reinforcement; conversely, the smaller the value, the weaker the need for reinforcement, and weak reinforcement or no reinforcement may be necessary; according to The numerical values ​​are used to divide the slope into strongly reinforced, weakly reinforced, and unreinforced zones, thus accurately defining the reinforcement area.

[0013] Furthermore, the design of prestressed anchor cable reinforcement parameters and the verification of reinforcement effects include the following steps: Step 1. Based on the unit compensation stress and reinforcement zoning results, calculate the total anchoring force Fr required for the entire slope, and determine the layout location, spacing, inclination angle and prestress design value of the prestressed anchor cables; Step 2. After completing the reinforcement design, recalculate the overall and local safety factors of the slope to verify that the overall and local stability of the slope meets the engineering design requirements.

[0014] The technical solution proposed in this application has the following innovations and beneficial effects compared with the prior art: This application achieves quantitative characterization of excavation disturbance damage through the pre-peak damage variable Da, simultaneously coupling the mechanical degradation effect of water-rock interaction, accurately restoring the actual disaster-inducing evolution process of the slope, with a clear mechanical mechanism and reliable evaluation results. By actively compensating for the stress ratio Qr to quantify the spatial differences in reinforcement requirements, it can effectively avoid insufficient or excessive reinforcement, improving the economic efficiency of reinforcement. Damage evolution is realized based on discrete element numerical calculation. Parameter update The entire process of reinforcement design is iterative, and the method can directly guide the precise layout of prestressed anchor cables on the engineering site. It is suitable for the reinforcement needs of hidden bedding rock slope projects and has high application value. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments or prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of this application. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0016] The structures, proportions, sizes, etc., shown in the accompanying drawings are only for the purpose of assisting those skilled in the art in understanding and reading the content disclosed in the specification, and are not intended to limit the implementation conditions of this application. Therefore, they have no substantial technical significance. Any modifications to the structure, changes in the proportions, or adjustments to the size should still fall within the scope of the technical content disclosed in this application, provided that they do not affect the effects and purposes that this application can produce.

[0017] Figure 1 This is a schematic diagram of a slope active reinforcement design method according to this application; Figure 2 This is a diagram showing the evolution of slope mechanical parameters and principal stresses in this application; Figure 3 This is a schematic diagram illustrating the principle of active slope reinforcement in this application; Figure 4 shows the stress-strain curves of soft rock under different confining pressures and damage levels in an example of the active slope reinforcement design method proposed in this application. Figure 5 is a schematic diagram of the numerical analysis model for excavation of a concealed bedding rock slope in an example of the active slope reinforcement design method proposed in this application. Figure 6 is a schematic diagram of the global point safety factor Fs after applying the active reinforcement of the slope with prestressed anchor cables in an example of the slope active reinforcement design method proposed in this application. Detailed Implementation

[0018] The embodiments of this application are described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of the embodiments. Based on the embodiments of this application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this application.

[0019] This application will now be described in further detail. (Refer to...) Figure 1 An active slope reinforcement design method that takes into account excavation damage is described below, with the following specific implementation steps: (1) Definition of pre-peak damage variable and acquisition of mechanical deterioration law; Based on the crack volumetric strain method, the pre-peak damage variable Da of rock is defined, and the damage of excavated rock is obtained through indoor triaxial tests. Deterioration law of coupled mechanical forces between water and rock; (2) Construction of numerical algorithm for excavation-water-rock coupling damage evolution: Based on the 3DEC discrete element platform and Fish language, a numerical algorithm for dynamic damage evolution was developed to realize the synchronous update of rock mass damage calculation and mechanical parameters during the excavation process. A three-dimensional discrete element model of graded excavation of slope was established to simulate the whole process of graded excavation and extract the slope damage distribution characteristics. (3) Element compensation stress based on local safety factor; The local safety factor method is used to calculate the local stability state of the slope element and the compensation stress required to meet the design safety factor; (4) The reinforcement stress ratio quantifies the degree of reinforcement required at different locations of the slope; the active compensation stress ratio index Qr is defined, and the slope is divided into strong reinforcement zone, weak reinforcement zone, and unreinforced zone according to the value of Qr. (5) Design of prestressed anchor cable reinforcement parameters and verification of reinforcement effect; Based on the compensation stress and reinforcement zoning results, complete the active reinforcement design of prestressed anchor cables and verify the reinforcement effect.

[0020] Step (1), which defines the pre-peak damage variables and obtains the mechanical degradation laws, includes the following steps: Step 1.1: Determine the rock initiation stress σ based on the crack volumetric strain method. ci Using the initiation stress as the damage initiation threshold, the rock peak damage variable D is defined. a : (1) In the formula, The stress is in any state before the peak, and its range is between the crack initiation stress and the stress before the peak. and peak stress Between; Da ranges from (0, 1). When When Da=0, it means there is no damage under this stress state. When Da=1, it represents the stress state at which the rock reaches its peak strength. This indicates that the rock has reached its peak strength and entered the post-peak failure stage, with the damage reaching a critical state.

[0021] Step 1.2: Prepare soft rock samples with different initial damage levels, and conduct triaxial compression tests under dry and saturated conditions to quantitatively obtain the degradation law of rock peak strength, elastic modulus, cohesion and internal friction angle under the coupling of initial damage and water-rock interaction.

[0022] Among them, step (2) excavation The numerical algorithm for water-rock coupled damage evolution is constructed, and a numerical model for graded excavation of slopes is established and damage distribution is extracted, including the following steps: Step 2.1: Based on the Fish language built into the discrete element software 3DEC, develop a numerical algorithm for dynamic characterization of rock mass and structural surface damage.

[0023] Step 2.2: Using the initiation stress as the damage criterion, calculate the principal stress and damage variable Da of each unit of the slope during the excavation process, and update the mechanical parameters of the rock mass and structural surfaces simultaneously to realize the excavation disturbance. Iterative calculation of damage evolution and parameter deterioration under water-rock interaction.

[0024] Step 2.3: Establish a three-dimensional discrete element model of the slope for graded excavation, set the model boundary conditions and displacement and stress monitoring points, and simulate the entire process of graded excavation on site; extract the spatiotemporal distribution characteristics of the plastic zone, displacement field, stress field, and damage zone of the slope through numerical calculation, and determine the slope toe. The slope waist is the core damage area and the potential instability control zone.

[0025] Step (3), which involves calculating the element compensation stress based on the local safety factor, includes the following steps: Step 3.1: The local stability state of any element of the slope is quantitatively evaluated using the local safety factor method. For any element to meet the engineering design safety factor standard, sufficient stress compensation must be provided. Assuming the design safety factor is Fst, the required stress Δσ to satisfy Fst can be determined. 3e It should be the minimum principal stress σ required to satisfy Fst. 3e The difference between the actual minimum principal stress and the stress when the slope is unreinforced, Δσ 3e It can be obtained from the following formula: (2) In the formula, σ3 is the minimum principal stress when the slope is unreinforced; Δσ 3e To satisfy the stress compensation required by the element when Fst; σ 3e To satisfy the minimum principal stress of the element at Fst, σ 3e It can be calculated using the following formula: (3) In the formula, Fst is the design safety factor. When the confining pressure reaches a certain value, the stress σ1 for slope stability increases exponentially with the internal friction angle θ, as shown in the attached figure. Figure 2 As shown, attached Figure 2The evolution relationship between the self-stabilizing potential of rock mass (maximum principal stress σ1) and strength parameters (internal friction angle θ) and confining pressure σ3 was quantitatively described. The results show that σ1 increases exponentially with the internal friction angle, indicating that the self-stabilizing capacity of the rock mass is highly sensitive to strength parameters. When the rock mass strength parameters have not significantly deteriorated, only a small compensating stress is needed to significantly improve its self-stabilizing capacity, resulting in high reinforcement efficiency. Conversely, when the rock mass strength parameters have deteriorated significantly, even a substantial increase in compensating stress will have a very limited effect on reinforcement. Therefore, [the following is a continuation of the previous paragraph]. Figure 2 This provides a key quantitative basis for decision-making on the timing of preventive reinforcement, namely, reinforcement can be carried out in the early stage of rock mass deformation and before the strength has deteriorated significantly, which can achieve the engineering effect of "low input and high efficiency".

[0026] Step 3.2: The local safety factor can quantitatively characterize the stability state of local elements of the slope. For any element, the expression for its local safety factor Fs is: (4) Step 3.3: Based on the stress that the unit needs to compensate for, the total anchoring force required for the entire slope can be calculated, and the stress that the slope needs to compensate for can be obtained. If the area of ​​each anchor cable bundle during reinforcement is S... i Given a total of n anchor cables, the anchoring force Fr required to satisfy the design safety standard of the slope can be calculated. The principle is as follows: Figure 3 As shown, attached Figure 3 This diagram illustrates the mechanical mechanism of stress compensation reinforcement. The failure stress curve (strength envelope) in the diagram defines the stability boundary of the rock mass: when the Mohr's circle corresponding to the rock mass stress state intersects or is tangent to the envelope, the rock mass is in a critical state of instability; when the Mohr's circle is completely within the envelope, the rock mass is in a stable state. Stress compensation reinforcement is a key external factor in achieving rock mass stability. Its core principle is to actively adjust the principal stress state, causing the Mohr's circle, which was originally at the critical instability point, to return to within the strength envelope. In engineering, stress compensation is often achieved through methods such as prestressed anchor cables and slope geometry optimization: prestressed anchor cables actively increase the minimum principal stress σ3 by applying confining pressure, thus reducing the radius of the stress Mohr's circle; slope geometry optimization optimizes the distribution of the maximum principal stress σ1 by adjusting the slope shape. Both methods can transform the rock mass stress state from the initial unstable stress circle to a stable stress circle after reinforcement, thereby keeping the slope stress state within a safe range for a long time. Specifically, this can be calculated using the following formula: (5).

[0027] Among them, step (4) quantifies the required reinforcement strength at different locations of the slope by the reinforcement stress ratio, and accurately divides the reinforcement zones. Based on the definition of active compensation stress ratio and the division of reinforcement zones, it includes the following steps: Using the unit active compensation stress ratio index It is defined as the ratio of the required compensation stress of the element to the initial minimum principal stress of the element, and is specifically obtained by the following formula: (6) Active compensation stress ratio The physical meaning is clear. The larger the value, the higher the proportion of stress that needs to be compensated relative to the initial stress, and the stronger the need for reinforcement, requiring strong reinforcement; conversely, the smaller the value, the weaker the need for reinforcement, and weak reinforcement or no reinforcement may be necessary; according to The numerical values ​​are used to divide the slope into strongly reinforced, weakly reinforced, and unreinforced zones, thus accurately defining the reinforcement area.

[0028] Step (5), the design of prestressed anchor cable reinforcement parameters and the verification of reinforcement effect, includes the following steps: Step 5.1: Based on the unit compensation stress and reinforcement zoning results, calculate the total anchoring force Fr required for the entire slope, and determine the layout position, spacing, inclination angle and prestress design value of the prestressed anchor cables. Step 5.2 After completing the reinforcement design, recalculate the overall and local safety factors of the slope to verify that the overall and local stability of the slope meets the engineering design requirements.

[0029] The following example, using the mudstone slope reinforcement process of an actual dam project, describes the specific engineering implementation process of the above-mentioned active slope reinforcement design method that takes into account excavation damage.

[0030] (1) Definition of pre-peak damage and indoor mechanical tests Typical mudstone from the engineering area was selected, and standard cylindrical specimens were prepared. Initial damage specimens were prepared using the triaxial preloading method. Some specimens were soaked in water for 48 hours to saturate them, and triaxial compression tests were conducted to obtain damage data. Data on the deterioration of mechanical parameters under water-rock coupling. See appendix. Figure 4 The data includes stress-strain curves of soft rock under different confining pressures and damage levels: (a) confining pressure of 0 MPa; (b) confining pressure of 1.5 MPa; (c) confining pressure of 3.0 MPa; and (d) confining pressure of 4.5 MPa.

[0031] (2) Development of numerical algorithms for damage evolution The Coulomb slip shear model is used in the discrete element method software. The following is implemented through programming: all rock mass and structural surface elements are traversed to calculate the principal stress, crack initiation stress, and pre-peak damage variable Da; when the element stress exceeds the crack initiation stress, the cohesion, internal friction angle, and elastic modulus are automatically updated according to the degradation law of the laboratory test to complete the iterative calculation.

[0032] (3) Construction of slope numerical model and excavation simulation A three-dimensional model of a concealed bedding rock slope with a height of 60m, a slope angle of 60°, and a structural surface dip angle of 60° was established. The bottom of the model was fixed with displacement boundaries, the left and right sides were horizontally constrained, and the slope surface was a free boundary. Monitoring points were set at the slope shoulder, middle of the slope, and toe of the slope. The slope was excavated in four stages to the designed slope height. The calculated physical and mechanical parameters are shown in Table 1.

[0033] Table 1 Physical and mechanical parameters of bedding rock slopes

[0034] (4) Compensation stress calculation and reinforcement zoning Set the engineering design safety factor Fst = 1.20, and calculate the safety factor Fs and compensation stress Δσ for each element point. 3e Solve for the active compensation stress ratio Qr and divide the reinforcement zones: Qr>0.8 is a strong reinforcement zone (slope toe, slope waist), 0.4≤Qr≤0.8 is a weak reinforcement zone (slope shoulder), and Qr<0.4 is an unreinforced zone.

[0035] (5) Anchor cable reinforcement design and effect verification Following the principle of denser reinforcement in strong reinforcement zones and conventional reinforcement in weak reinforcement zones, the total horizontal reinforcement force of the slope was calculated to be 2446 kN / m. The anchor cable hole diameter, length, spacing, and prestress value were then determined. (See appendix) Figure 6 Numerical calculations after reinforcement show that the overall point safety factor Fs ≥ 1.20 after active reinforcement with prestressed anchor cables on the slope meets the design requirements for both overall and local stability.

[0036] Finally, it should be noted that the above embodiments are merely specific implementations of this application, used to illustrate the technical solutions of this application, and not to limit them. The scope of protection of this application is not limited thereto. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that any person skilled in the art can still modify or easily conceive of changes to the technical solutions described in the foregoing embodiments, or make equivalent substitutions for some of the technical features, within the scope of the technology disclosed in this application. Such modifications, changes, or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application, and should all be covered within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A design method for active slope reinforcement, characterized in that, Mainly includes: (1) Definition of pre-peak damage variable and acquisition of mechanical deterioration law; Based on the crack volumetric strain method, the pre-peak damage variable Da of rock is defined, and the damage of excavated rock is obtained through indoor triaxial tests. Deterioration law of coupled mechanical forces between water and rock; (2) Construction of numerical algorithm for excavation-water-rock coupling damage evolution; Based on the 3DEC discrete element platform and Fish language, a numerical algorithm for dynamic damage evolution was developed to realize the synchronous update of rock mass damage calculation and mechanical parameters during the excavation process. A three-dimensional discrete element model of slope graded excavation was established to simulate the whole process of graded excavation and extract the slope damage distribution characteristics. (3) Element compensation stress based on local safety factor; The local safety factor method is used to calculate the local stability state of the slope element and the compensation stress required to meet the design safety factor; (4) The reinforcement stress ratio quantifies the degree of reinforcement required at different locations of the slope; the active compensation stress ratio index Qr is defined, and the slope is divided into strong reinforcement zone, weak reinforcement zone, and unreinforced zone according to the value of Qr. (5) Design of prestressed anchor cable reinforcement parameters and verification of reinforcement effect; Based on the compensation stress and reinforcement zoning results, complete the active reinforcement design of prestressed anchor cables and verify the reinforcement effect.

2. The active slope reinforcement design method considering excavation damage as described in claim 1, characterized in that... The definition of pre-peak damage variables and the acquisition of mechanical degradation laws include the following steps: Step 1. Determine the rock initiation stress σ based on the crack volumetric strain method. ci Using the initiation stress as the damage initiation threshold, the rock peak damage variable Da is defined as follows: (1) In the formula, The stress is in any state before the peak, and its range is between the crack initiation stress and the stress before the peak. and peak stress Between; Da ranges from (0, 1), when When Da=0, it means there is no damage under this stress state; When Da=1, it means that the stress state at this time is the stress state when the rock reaches the peak strength, which means that the rock has reached the peak strength and entered the post-peak failure stage, and the degree of damage has reached the critical state. Step 2. Prepare soft rock samples with different initial damage levels, and conduct triaxial compression tests under dry and saturated conditions to quantitatively obtain the degradation law of rock peak strength, elastic modulus, cohesion and internal friction angle under the coupling of initial damage and water-rock interaction.

3. The active slope reinforcement design method considering excavation damage as described in claim 1, characterized in that... Excavation The numerical algorithm for water-rock coupled damage evolution is constructed, and a numerical model for graded excavation of slopes is established and damage distribution is extracted, including the following steps: Step 1. Develop a numerical algorithm for dynamic characterization of rock mass and structural surface damage based on the Fish language built into the discrete element software 3DEC; Step 2. Using the initiation stress as the damage criterion, calculate the principal stress and damage variable Da of each unit of the slope during the excavation process, and update the mechanical parameters of the rock mass and structural surfaces simultaneously to achieve excavation disturbance. Iterative calculation of damage evolution and parameter deterioration under water-rock interaction; Step 3. Establish a three-dimensional discrete element model of the slope excavation in stages, set the model boundary conditions and displacement and stress monitoring points, and simulate the entire process of staged excavation on site; extract the spatiotemporal distribution characteristics of the plastic zone, displacement field, stress field and damage zone of the slope through numerical calculation, and determine the slope toe. The slope waist is the core damage area and the potential instability control zone.

4. The active slope reinforcement design method considering excavation damage as described in claim 1, characterized in that... The calculation of element compensation stress based on the local safety factor includes the following steps: Step 1. Quantitatively evaluate the local stability state of any element of the slope using the local safety factor method. For any element to meet the engineering design safety factor standard, sufficient stress compensation must be provided. Assuming the design safety factor is Fst, the required stress Δσ to satisfy Fst can be determined. 3e It should be the minimum principal stress σ required to satisfy Fst. 3e The difference between the actual minimum principal stress and the stress when the slope is unreinforced, Δσ 3e It can be obtained from the following formula: (2) In the formula, σ3 is the minimum principal stress when the slope is unreinforced; Δσ 3e To satisfy the stress compensation required by the element when Fst; σ 3e To satisfy the minimum principal stress of the element at Fst, σ 3e It can be calculated using the following formula: (3) In the formula, Fst is the design safety factor. When the confining pressure reaches a certain value, the stress σ1 for slope stability increases exponentially with the internal friction angle θ. Step 2. The local safety factor can quantitatively characterize the stability state of local elements of a slope. For any element, its local safety factor F s The expression is: (4); Step 3. Based on the stress that the unit needs to compensate for, the total anchoring force required for the entire slope can be calculated, and the stress that the slope needs to compensate for can be obtained. If the area of ​​each anchor cable bundle during reinforcement is S... i Given a total of n anchor cables, the anchoring force required to satisfy the design safety standard for the slope can be calculated as F. r Specifically, it can be calculated using the following formula: (5)。 5. The active slope reinforcement design method considering excavation damage as described in claim 1, characterized in that... The reinforcement stress ratio quantifies the required reinforcement strength at different locations on the slope, accurately dividing the slope into reinforcement zones. Based on the active compensation stress ratio definition and reinforcement zone division, the process includes the following steps: Using the unit active compensation stress ratio index It is defined as the ratio of the required compensation stress of the element to the initial minimum principal stress of the element, and is specifically obtained by the following formula: (6) Active compensation stress ratio The physical meaning is clear. The larger the value, the higher the proportion of stress that needs to be compensated relative to the initial stress, and the stronger the need for reinforcement, requiring strong reinforcement; conversely, the smaller the value, the weaker the need for reinforcement, and weak reinforcement or no reinforcement may be necessary; according to The numerical values ​​are used to divide the slope into strongly reinforced, weakly reinforced, and unreinforced zones, thus accurately defining the reinforcement area.

6. The active slope reinforcement design method considering excavation damage as described in claim 1, characterized in that... The design of prestressed anchor cable reinforcement parameters and the verification of reinforcement effect include the following steps: Step 1. Based on the unit compensation stress and reinforcement zoning results, calculate the total anchorage force Fr required for the entire slope, and determine the layout location, spacing, inclination angle and prestress design value of the prestressed anchor cables; Step 2. After completing the reinforcement design, recalculate the overall and local safety factors of the slope to verify that the overall and local stability of the slope meets the engineering design requirements.