318 results about "Factor of safety" patented technology

In engineering, a factor of safety (FoS), also known as (and used interchangeably with) safety factor (SF), expresses how much stronger a system is than it needs to be for an intended load. Safety factors are often calculated using detailed analysis because comprehensive testing is impractical on many projects, such as bridges and buildings, but the structure's ability to carry a load must be determined to a reasonable accuracy.

Design of computer based risk and safety management system of complex production and multifunctional process facilities-application to fpso's

InactiveUS20120317058A1Strong robust attributeStrong robust attributesDigital computer detailsFuzzy logic based systemsProcess systemsNerve network
A method for predicting risk and designing safety management systems of complex production and process systems which has been applied to an FPSO System operating in deep waters. The methods for the design were derived from the inclusion of a weight index in a fuzzy class belief variable in the risk model to assign the relative numerical value or importance a safety device or system has contain a risk hazards within the barrier. The weights index distributes the relative importance of risk events in series or parallel in several interactive risk and safety device systems. The fault tree, the FMECA and the Bow Tie now contains weights in fizzy belief class for implementing safety management programs critical to the process systems. The techniques uses the results of neural networks derived from fuzzy belief systems of weight index to implement the safety design systems thereby limiting use of experienced procedures and benchmarks. The weight index incorporate Safety Factors sets SFri {0, 0.1, 0.2 . . . 1}, and Markov Chain Network to allow the possibility of evaluating the impact of different risks or reliability of multifunctional systems in transient state process. The application of this technique and results of simulation to typical FPSO/Riser systems has been discussed in this invention.
Owner:ABHULIMEN KINGSLEY E

Determination method for rainstorm-induced shallow landslide disaster warning threshold value

The invention discloses a determination method for a rainstorm-induced shallow landslide disaster warning threshold value. The method comprises the steps of first, performing slope unit division basedon a DEM (Digital Elevation Model); then, establishing a stability analysis warning model based on the slope units and a critical infiltration capacity; setting five warning grades, and calculating acritical infiltration capacity threshold value of each of the five warning grades according to a meaning represented by an FS (Factor of Safety) index; and finally, establishing a landslide rainfall-infiltration model based on the slope units, calculating a relation between the infiltration capacity and a rainfall capacity of each slope unit under a specific raining condition, and reversely deducing a critical rainfall capacity of each slope unit through the critical infiltration capacity. According to the determination method for the rainstorm-induced shallow landslide disaster warning threshold value, the slope units and rainstorm influence coefficients are imported into rainstorm-induced shallow landslide mass measurement modeling, thereby improving the work efficiency of landslide warning, improving the spatial precision of landslide warning and providing basic data for researches of landslide control. The method can be applied to landslide disaster warning work in a mountainousarea and provide scientific basis for disaster prevention and reduction of the mountainous area.
Owner:GUANGZHOU INST OF GEOGRAPHY GUANGDONG ACAD OF SCI

Bending failure evaluation method for corrosion defect contained submarine pipeline structure

The invention discloses a bending failure evaluation method for a corrosion defect contained submarine pipeline structure. The method specifically comprises the following steps: detecting the positionand size of the maximum size corrosion defect of a pipeline; calculating the wave and current load borne by the pipeline according to pipeline detection data, working conditions and environmental conditions, and determining the maximum bending moment position and the maximum bending moment value borne by the tested pipeline finally; deducing the formula of plastic ultimate bending moment for thecorrosion defect contained submarine pipeline, and calculating the plastic ultimate bearing bending moment of the tested pipeline according to the formula; comparing the calculated maximum bending moment with the plastic limit bending moment, and judging whether the tested pipeline fails on the premise of taking into account the safety factor. The method has the beneficial effects that overall bending strength calculation and evaluation can be performed on the pipeline containing the small-range long-axis corrosion defect at any position, the finite element modeling and analysis process is omitted, the calculation difficulty is reduced, calculation efficiency is improved, and the requirement of result precision is also met.
Owner:CHINA PETROLEUM & CHEM CORP +1

Safety coefficient calculation method for seabed slope stability

The invention discloses a safety factor calculation method for seabed slope stability. The safety factor calculation method comprises the steps of acquiring and calculating wave characteristic parameters and seabed soil mass strength parameters of a sea area; establishing a numerical model based on the wave power characteristics and the soil body strength parameters; analyzing the wave field dynamic model and the seabed slope numerical model based on numerical wave generation and a finite element strength reduction method to obtain a slope stability safety coefficient; and acquiring stabilitychange analysis and estimation under a certain slope rate based on different relative positions of waves and slopes. The stability coefficient of the underwater side slope under the wave load can be estimated, and convenience is provided for selection of the construction slope rate of the underwater temporary side slope. The optimized design slope rate is obtained on the basis of different designparameters and calculation working conditions by utilizing the convenience of numerical simulation calculation. When certain safety requirements are met, the earth excavation and backfill amount of the whole foundation trench is reduced, and damage to the seabed natural ecological environment is reduced to a certain extent.
Owner:NANJING UNIV OF TECH

Large-span bridge safety performance real-time monitoring system based on big data

ActiveCN111486902AGrasp the dynamic development trend of securityImprove the level of management technologyGeometric CADMeasurement devicesMonitoring systemWater flow
The invention discloses a large-span bridge safety performance real-time monitoring system based on big data. The large-span bridge safety performance real-time monitoring system comprises a detectionarea division module, a bearing pressure detection module, a wind power parameter acquisition module, a deformation displacement monitoring module, a water flow impact parameter detection module, a modeling analysis module, a parameter database, a central server, an early warning module and a display terminal. According to the large-span bridge safety performance real-time monitoring system basedon big data, by integrating the influence factors of bearing pressure, longitudinal wind power, deformation displacement and water flow impact force borne by the bridge, and combining a modeling analysis module to quantify the influence result of the influence factors on the bridge safety performance, the comprehensive safety factor of the bridge is counted, and the health condition of the bridgecan be comprehensively reflected; and by counting and evaluating the comprehensive safety coefficient of the bridge regularly, the related workers can master the safety dynamic development trend of the bridge, the reliable reference bases are provided for the maintenance of the bridge, and the service life of the bridge is prolonged.
Owner:山东省公路桥梁检测中心有限公司

Intelligent Warehousing Management Method, Apparatus, System and Unmanned Intelligent Warehousing Device

ActiveUS20190050794A1Reducing business inventoryReducing enterprise management costMathematical modelsAutonomous decision making processFactor of safetyComputer science
This invention has disclosed an intelligent warehousing management method, apparatus, system, an unmanned intelligent warehousing device management method and an unmanned intelligent warehousing device. Wherein the intelligent warehousing management method manages the materials required by products production based on an unmanned intelligent warehousing device with function of connecting to Internet of Things and comprises: an obtaining step, to obtain production plan data of the products and safety factor of the materials; a prediction step, to predict the usage of the materials based on the production plan data and the safety factor; a sending step, to send production data based on the production plan data and the predicted usage to the unmanned intelligent warehousing device; an updating step, to update the production data in real time based on usage of the materials stored in the unmanned intelligent warehousing device; an adjusting step, to adjust usage of the materials utilizing the unmanned intelligent warehousing device based on the updated production data; a calculating step, to calculate the materials needed to be replenished in the unmanned intelligent warehousing device based on the updated production data.
Owner:ZKH IND SUPERMARKET SHANGHAI

Stability calculation method for position of trailing edge slip crack surface of Xigeda stratum rock slope

The invention discloses a stability calculation method for the position of a trailing edge slip crack surface of a Xigeda stratum rock slope, which belongs to the technical field of rock slope stability analysis. The method comprises the steps that using the Xigeda stratum rock slope as a research object; taking the slope safety factor as a target function; taking the position coordinates of the trailing edge slip crack surface as decision variables; establishing a limit balance equation of the slip mass, and simultaneously considering the yields of the bottom slip surface and the trailing edge slip crack surface to simultaneously solve the safety factor of the slope and the position coordinates of the trailing edge slip crack surface control points; and meanwhile, solving the position ofthe trailing edge slip crack surface of the slope through the nonlinear programming theory. Programming is simple, and the calculation precision is high; the whole method is rigorous in theory and simple and convenient in engineering application, can be applied to the design of the rock slope of the Xigeda stratum, and can provide a basis for the design of a slope supporting structure.
Owner:KUNMING PROSPECTING DESIGN INST OF CHINA NONFERROUS METALS IND +1

Foundation pile-anchor supporting system for close existing underground structure and construction method of system

ActiveCN106759376AIncrease the number ofIncrease anchor lengthExcavationsSupporting systemPre stress
The invention discloses a foundation pile-anchor supporting system for a close existing underground structure and a construction method of the system. The supporting system comprises front-row steel pipe piles, rear-row steel pipe piles, rear-row vertical prestressed anchors, a front-row pile top beam, a rear-row pile top beam, transverse connecting reinforcements, front-row anchorages, rear-row anchorages, cushion blocks, tapered iron pieces, front-row prestressed anchors and wales. Through the vertical prestressed anchors arranged in the rear-row steel pipe piles, occupancy in underground space can be reduced greatly, and limited ground surface and space within building lines are fully utilized. The vertical prestressed anchors are anchored to the good ground, usage of the rear-row steel pipe piles can be reduced greatly, good anchorage force is provided, the front-row prestressed anchors are used for anchoring and stabilizing the rock stratum, and overturning resistance of the overall structure is improved. By the aid of the rear-row vertical prestressed anchors and the prestressed anchors arranged in the front-row steel pipe piles, factor of safety against overturning of the supporting system is enhanced effectively, construction cost is lowered, and construction period is shortened.
Owner:DALIAN JIAOTONG UNIVERSITY

Numerical simulation and limit equilibrium calculation-based landslide hazard assessment method

The invention relates to a numerical simulation and limit equilibrium calculation-based landslide hazard assessment method. The assessment method comprises the steps of building a corresponding numerical model by adopting a large deformation numerical simulation method in combination with field survey data and related modeling methods, and determining landslide body form contour lines and key position coordinates of different positions in a landslide path; based on a ring shear or direct shear test, determining residual shear strength of a landslide body-slope surface boundary plane; analyzingand calculating landslide body factors-of-safety of different positions and landslide body forms in the landslide path by utilizing a limit equilibrium method, namely, performing FOS calculation; determining FOS specifications of specification requirements, wherein indexes needed to be considered for determination of the specific FOS include a sliding distance, a landslide speed, the number of people in a hazard range, and a land resource type of a hazard-bearing body; and establishing a landslide hazard degree calculation formula and determining landslide hazard level judgment standards. Themethod is suitable for hazard assessment of all types of soil landslides, and has good application prospects.
Owner:HEBEI UNIV OF TECH

Intelligent mine helmet control method based on human body information and environment information fusion

The invention discloses an intelligent mine helmet control method based on human body information and environment information fusion. The method includes acquisition of original brain wave signals; preprocessing of original brain waves; wavelet decomposition and reconstruction of the original brain wave signals; extraction of brain wave signal characteristics; optimization of a BP neural network through an artificial fish swarm algorithm to identify fatigue characteristics; identification of miner fatigue, monitoring of miner environmental information and alarm operation for dangerous situations. According to method, the energy of four sub-bands, ApEn approximate entropy, KC complexity and C0 complexity in the high-precision brain wave signals obtained by preprocessing (filtering and denoising) of the original brain wave signals are extracted as an artificial fish swarm algorithm to optimize an input layer of the BP neural network. The artificial fish swarm algorithm is trained to optimize the BP neural network to identify the miner fatigue, and the identification accuracy is high. An intelligent wearable bracelet worn on the wrist of a miner is adopted to give triple alarm of sound, light and vibration on the safety states of different dangerous levels to improve the underground operation safety coefficient.
Owner:XIAN UNIV OF SCI & TECH

Anti-rollover control method and device of construction machinery and construction machinery

ActiveCN110673653ASignificant predictabilitySignificant universal correctnessControl without using feedbackControl safety arrangementsRolloverControl engineering
The invention relates to the field of construction machinery, and discloses an anti-rollover control method and device for construction machinery and the construction machinery. The anti-rollover control method includes the steps that a cantilever crane reference inclined angle value of each cantilever crane of the construction machinery is obtained; a function relationship between a vehicle safety factor and the cantilever crane reference angle values is established, a partial derivative value is obtained by calculating the partial derivative of the vehicle safety factor from the cantilever crane reference inclined angle value of the currently moving cantilever crane, wherein the vehicle safety factor is used for indicating the stability of the vehicle anti-rollover; and it is determinedwhether to limit the movement of the cantilever crane based on the partial derivative value and the change trend of the cantilever crane reference inclined angle value of the currently moving cantilever crane affected by the movement. According to the anti-rollover control method and device for construction machinery and the construction machinery, "the partial derivative value of the vehicle safety factor with respect to the cantilever crane reference inclined angle values" and "change trend of the cantilever crane reference inclined angle values " are combined to be used for rollover judgment, the movement of the cantilever cranes before the movement of any cantilever crane is performed is limited, and significant foresight and universal correctness are achieved.
Owner:ZOOMLION HEAVY IND CO LTD

Distribution equipment operation efficiency evaluation method involving reliability and economy

The invention relates to a distribution equipment operation efficiency evaluation method involving reliability and economy, comprising the steps of: (1) determining upper and lower limits P2 and P1 of an economical operation interval; (2) rearranging distribution equipment time sequence load curves in order of size to obtain a load duration curve; (3) determining the supplied electric quantity S1 exceeding the upper limit P2 of the economical operation interval, the supplied electric quantity S2 in the economical operation interval, and the electric quantity S3 below the lower limit P1 of the economical operation interval; (4) determining the equipment lacked electric quantity S4 and equipment loss electric quantity S5; (5) determining the correction factor alpha of the GDP generated by each kilowatt-hour according to the GDP of the area where equipment is located, social electricity consumption per year and average retail price; and (6) determining equipment operation efficiency according to an equipment operation efficiency evaluation model. The method involves the factors of safety, reliability, economic operation, utilization rate and duration, and can more comprehensively evaluate the operation efficiency of distribution equipment in a full time domain.
Owner:STATE GRID CORP OF CHINA +3

Intelligent communication iron tower with high safety factor and protection function

The invention relates to an intelligent communication iron tower with a high safety factor and a protection function. The communication iron tower includes a tower body, a platform, a lightning rod, four communication mechanisms, four protection mechanisms and a plurality of tower feet. Each communication mechanism includes an antenna, a ring, an arc plate, two fixed assemblies and a plurality ofdriving assemblies correspondingly; each driving assembly includes a first motor and a gear; each fixed assembly includes a direction adjusting unit, an air cylinder, an air pump and a piston; and each protection mechanism includes a hinge joint assembly, a protection plate, an overturning assembly and a fixed assembly, wherein the transition assembly includes a second motor, a second driving shaft, a wire coil and a stay wire. According to the intelligent communication iron tower with the high safety factor and the protection function, arc plates are rotated at a proper angle by the communication mechanisms, the phenomenon that wind blows to the antenna is prevented, the condition that workers fall down during the construction is prevented, the safe construction of the workers is guaranteed and the safety factor and practicability of equipment are improved.
Owner:上海网程通信科技发展有限公司

Quick well wall and wall back nondestructive detecting system based on transient electromagnetic method and detection method of the detection system

InactiveCN104714256ATo achieve the purpose of defect detectionNo coupling medium requiredElectric/magnetic detection for well-loggingInterference (communication)Factor of safety
The invention discloses a quick well wall and wall back nondestructive detecting system based on a transient electromagnetic method and a detection method of the detection system, in particular to a detecting system, and a detecting method and a construction process which are matched with the detecting system. The detecting system and the detecting method aim at detecting common defects such as well wall fractures, wall internal cavities, wall thickness issues and wall back holes in the shaft construction or use process, providing bases for subsequent improving schemes or remedial measures, and preventing hazards. Compared with the two common detecting technologies of a ground penetrating radar method and an ultrasonic method, the detecting system and the detecting method are remarkable in benefit and have the advantages that non-contact type measurement is achieved, and construction is easy, convenient and flexible; a three-component receiving probe is adopted, and the space resolving power of detection is ensured; fast scanning type detection can be achieved through a tackle gear and wireless communication; a non-metal structure and wall-attaching type arrangement are adopted, peripheral interference sources can be effectively distanced or avoided, and thus the signal to noise ratio can be increased; the dustproof and waterproof design is adopted for instrument equipment, and thus the continuous and stable work under harsh conditions can be ensured; the shaft construction condition is taken into consideration, and the safety factor is high.
Owner:ANHUI HUIZHOU GEOLOGY SECURITY INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products