A Data Analysis-Based Method for Monitoring Environmental Impacts of Territorial Spatial Planning
By constructing a three-level spatial monitoring hierarchy and dynamic evaluation model, the problems of spatial scale impact transmission and correlation assessment in traditional land spatial planning environmental impact monitoring methods have been solved, realizing multi-level collaborative monitoring and real-time early warning, and improving the stability and feedback capability of the monitoring system.
Patent Information
- Application Number
- CN202611149699.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-31
- Publication Date
- 2026-11-10
AI Technical Summary
Traditional methods for monitoring the environmental impact of territorial spatial planning are insufficient to reflect the transmission relationship of impacts between different spatial scales, lack assessment of the correlation between environmental impacts between adjacent areas, and fixed thresholds cannot reflect changes in actual monitoring data in a timely manner, making it difficult to form systematic feedback for planning implementation and cross-regional collaborative management based on monitoring results.
A three-tiered spatial monitoring hierarchy is constructed, consisting of basic monitoring units, regional monitoring units, and global monitoring units. The standard values of higher-level planning are used to limit the deviations of lower-level units to determine thresholds. A dynamic evaluation model is established through real-time data analysis, and a threshold recalibration mechanism is automatically triggered to generate real-time early warning information, thereby achieving real-time monitoring and regulation of environmental impacts.
It has enabled multi-level collaborative monitoring from plots to areas and then to the entire region, improving the stability and real-time performance of the monitoring system, enabling it to reflect environmental conditions in a timely manner and generate early warning information, thereby reducing environmental risks.
Smart Images

Figure CN123070754A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the technical field of environmental monitoring, and in particular to a data analysis-based method for monitoring the environmental impact of land and space planning. Background Technology
[0002] Territorial spatial planning is the core carrier of the national spatial governance system and a key basis for ensuring ecological security and promoting regional sustainable development. Environmental impact monitoring of territorial spatial planning is even more important to ensure the effective implementation of planning objectives and to provide important basis and support for achieving high-quality development of territorial space.
[0003] Currently, environmental impact monitoring technology for territorial spatial planning has made certain progress, providing important support for the supervision of planning implementation. Traditional environmental impact monitoring methods can establish monitoring networks for the planning implementation area. By deploying ground monitoring stations and utilizing remote sensing images, spatial management and visualization of monitoring data can be achieved, improving the spatial expressiveness and readability of monitoring results. Some technologies, by setting evaluation index systems and deviation thresholds, can identify areas or plots that significantly deviate from planning objectives, providing a basis for the supervision of planning implementation.
[0004] However, traditional technologies typically only conduct environmental impact assessments at a single spatial scale, making it difficult to reflect the transmission relationship of impacts between different spatial scales. Monitoring results at the plot level cannot effectively support the overall assessment of the ecological functions of the area, making it difficult to form a systematic feedback mechanism for planning implementation and failing to achieve multi-level collaborative monitoring from plot to area to the whole region.
[0005] Furthermore, traditional environmental impact monitoring typically uses fixed thresholds for deviation assessment, failing to dynamically update based on changes in actual monitoring data and adjustments to higher-level planning standards. When persistent anomalies occur in the actual monitoring data at lower-level monitoring stages, fixed thresholds cannot promptly reflect the degree of deviation. Existing monitoring methods primarily focus on whether environmental indicators in individual monitoring units meet planning requirements, lacking assessments of the environmental impact correlations between adjacent areas. This hinders the development of holistic ecological and environmental governance plans and cross-regional collaborative management. Summary of the Invention
[0006] The purpose of this invention is to provide a data analysis-based method for monitoring the environmental impact of land spatial planning, thereby solving at least one of the above-mentioned problems.
[0007] This invention provides a data analysis-based method for monitoring the environmental impact of land spatial planning, comprising: Step S1: Construct a three-level spatial monitoring hierarchy consisting of basic monitoring units, area monitoring units, and global monitoring units. Set evaluation indicators that match the spatial structure of each level according to the monitoring tasks corresponding to each level. The monitoring results of the lower level are used as input parameters for the upper level. The planning standard values of the upper level are used to limit the deviation judgment threshold of the lower level. Step S2: Real-time acquisition of dynamic data during the implementation of territorial spatial planning to establish a spatial planning dynamic evaluation model, outputting a comprehensive environmental impact score. When the comprehensive score is lower than a preset threshold or the deviation rate of a single indicator exceeds a preset warning value, real-time warning information is generated. The deviation judgment threshold is calculated based on the planning standard value and the role proportion coefficient. The actual monitoring value is compared with the deviation judgment threshold level by level to achieve real-time monitoring of environmental impact. When the actual monitoring value exceeds the deviation judgment threshold, the corresponding level of threshold recalibration mechanism is triggered. The adjustment range is limited and the adjustment target is determined based on the result of the threshold recalibration mechanism, and implementation deviation warning information is generated simultaneously. Step S3 involves integrating the spatial data from the three-level spatial monitoring hierarchy with the process data from the spatial planning dynamic evaluation model into the information platform, and outputting the environmental impact monitoring results of territorial spatial planning.
[0008] As a further technical solution, methods for constructing a three-level space monitoring hierarchy include: The national land space is divided into basic monitoring units, regional monitoring units, and whole-area monitoring units according to the planning implementation units; The basic monitoring unit consists of a single planned plot of land and is used to obtain the monitoring indicators of the basic monitoring unit; The area monitoring unit consists of multiple adjacent planned plots and is used to monitor the correlation of environmental impacts within the area. The entire monitoring unit consists of the entire national land space planning area and is used to monitor the environmental stability of the national land space planning area. The basic monitoring unit, the area monitoring unit, and the global monitoring unit are progressively correlated with each other; The monitoring results of the lower-level monitoring level serve as the input parameters of the upper-level monitoring level. The planning standard value of the upper-level monitoring level is used to limit the deviation judgment threshold of the lower-level monitoring level. The deviation judgment threshold serves as the basis for the threshold recalibration mechanism to determine the adjustment execution. The basic monitoring unit serves as a lower-level monitoring unit of the area monitoring unit, and the area monitoring unit serves as a higher-level monitoring unit of the basic monitoring unit; the area monitoring unit serves as a lower-level monitoring unit of the whole-area monitoring unit, and the whole-area monitoring unit serves as a higher-level monitoring unit of the area monitoring unit.
[0009] As a further technical solution, methods for limiting the deviation judgment threshold of lower-level monitoring levels include: First, extract the planning standard values corresponding to each higher-level monitoring level. The planning standard values are the allowable values of the monitoring indicators in the evaluation indicator set of the corresponding higher-level monitoring level. The deviation judgment threshold of each monitoring indicator in the lower-level monitoring level is calculated based on the proportion of the role of the lower-level monitoring level in the upper-level monitoring level and the allowable value; When the planned standard value changes or the monitoring data of the lower-level monitoring layer shows continuous anomalies, the deviation judgment threshold of the lower-level monitoring layer is updated synchronously.
[0010] As a further technical solution, the method for obtaining the deviation judgment threshold of the lower-level monitoring layer includes: Clearly define the role ratio of the lower-level monitoring level within the higher-level monitoring level; Based on the planning standard value and the role proportion coefficient, the deviation judgment threshold of the lower-level monitoring level on a certain monitoring indicator is initially calculated; When the same lower-level monitoring level is simultaneously controlled by multiple upper-level monitoring levels, the deviation judgment threshold of each upper-level monitoring level is calculated separately, and then a reasonable value among the deviation judgment thresholds is taken as the final deviation judgment threshold. The actual monitoring data of the lower-level monitoring layer is collected at a fixed period and the actual monitoring value is calculated. If the difference between the actual monitoring value and the final deviation judgment threshold is too large, the threshold recalibration mechanism is automatically triggered to obtain the target adjustment value of the lower-level monitoring layer.
[0011] As a further technical solution, methods for establishing a dynamic evaluation model for spatial planning include: Based on the monitoring data obtained from the three-level spatial monitoring hierarchy, the actual monitoring values of each evaluation indicator are extracted; The actual monitored values are compared with the preset planning target values at each level, and the deviation rate of each evaluation index is calculated. A dynamic evaluation model is constructed based on the deviation rate, the deviation rate is converted into an indicator score, and a comprehensive score of environmental impact is output based on the indicator score. When the overall score is lower than a preset threshold or the deviation rate of a single evaluation indicator exceeds a preset warning value, a real-time warning message is generated.
[0012] As a further technical solution, methods for monitoring the environmental impact correlation within the area include: Extract the real-time environmental monitoring data of the monitoring unit in the area; Calculate the environmental correlation assessment score between adjacent monitoring units in the area based on the real-time monitoring data; The environmental impact correlation level of the monitoring unit in the area is determined based on the environmental correlation assessment score, and the environmental correlation monitoring results of the area are generated.
[0013] As a further technical solution, methods for clarifying the contribution ratio coefficient include: The corresponding basic function coefficients are determined based on the planned land use nature of the lower-level monitoring level; The area proportion coefficient is calculated based on the proportion of land area used by the lower-level monitoring level in the higher-level monitoring level; Calculate the level coefficient based on the control level of the lower-level monitoring level in the higher-level monitoring level; The final role proportion coefficient is obtained based on the basic function coefficient, the area proportion coefficient, and the level coefficient. When the planned land use nature of the lower-level monitoring level or the control level of the higher level is adjusted, the role ratio coefficient is updated synchronously.
[0014] As a further technical solution, methods for automatically triggering the threshold recalibration mechanism include: Calculate the relative difference between the actual monitored value of the lower-level monitoring layer and the deviation judgment threshold; If the relative difference continuously exceeds the preset recalibration trigger threshold for a specified number of cycles, it is determined that the difference is too large. Acquire actual monitoring data within multiple preset periods and calculate the actual average monitoring value; Based on the average monitoring value and the preset safety factor, a calibration deviation judgment threshold is obtained, and a graded environmental impact adjustment strategy is triggered based on the calibration deviation judgment threshold. If the calibration deviation judgment threshold exceeds the planned standard value range of the upper-level monitoring level, then the planned standard value is used as the upper limit, and a threshold recalibration record is generated.
[0015] In summary, this application includes at least one of the following beneficial technical effects: 1. This invention establishes a three-level spatial monitoring hierarchy, creating a progressive data association and constraint relationship between basic monitoring units, regional monitoring units, and the three-level global monitoring level. It uses the planning standard value of the upper level to limit the deviation threshold of the lower level, forming a dynamic monitoring threshold system. When the monitoring data is continuously abnormal, the system automatically triggers the threshold recalibration mechanism and triggers the corresponding level adjustment strategy based on the actual average monitoring value, thus avoiding the one-sidedness of judging a single threshold.
[0016] 2. This invention automatically triggers threshold recalibration for non-conforming areas that exceed the deviation judgment threshold, and corrects the judgment criteria based on actual monitoring data, so that the judgment threshold always fits the actual state of the planned implementation, significantly improving the stability of the monitoring system.
[0017] 3. This invention can reflect the environmental status in a timely manner by acquiring dynamic data in real time and calculating a comprehensive score. When the comprehensive score is lower than the threshold or the deviation rate of a single indicator exceeds the standard, the system directly generates real-time early warning information, transforming the traditional "post-event remediation" into "in-process monitoring" and "pre-event early warning", allowing managers to intervene in time before the environmental impact deteriorates, effectively reducing the environmental risks in the implementation of land and space planning. Attached Figure Description
[0018] Figure 1 This is a flowchart of a data analysis-based method for monitoring the environmental impact of land spatial planning. Detailed Implementation
[0019] The embodiments of this application are described in detail below, and examples of the embodiments are shown in the accompanying drawings.
[0020] In the description of this specification, the references to "certain embodiments," "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples" refer to specific features, structures, materials, or characteristics described in connection with the described embodiment or example, which are included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0021] This application discloses a data analysis-based method for monitoring the environmental impact of territorial spatial planning. To better implement the dynamic monitoring requirements for the implementation of territorial spatial planning and to understand the changes in the ecological environment and the rationality of spatial utilization in the planning area, this application uses a territorial spatial planning area of a prefecture-level city as the implementation area. Please refer to... Figure 1 As shown, it includes: Step S1: Construct a three-level spatial monitoring hierarchy consisting of basic monitoring units, area monitoring units, and a three-level global monitoring level. Set evaluation indicators that match the spatial structure of each level based on the monitoring tasks corresponding to each level. The monitoring results of the lower-level monitoring level are used as input parameters for the upper-level monitoring level. The planning standard values of the upper-level monitoring level are used to limit the deviation judgment threshold of the lower-level monitoring level. The construction of the three-level hierarchy lays the foundation for subsequent hierarchical monitoring and hierarchical threshold calculation. In this embodiment, according to the spatial scale and functional positioning of the planning implementation unit, the land space of the prefecture-level city is divided into basic monitoring units, regional monitoring units and three-level whole-area monitoring levels. Each level of monitoring independently completes special monitoring, and at the same time, a complete monitoring system is formed through data progression and correlation. The method for constructing a three-level space monitoring hierarchy includes: The national land space is divided into basic monitoring units, regional monitoring units, and whole-area monitoring units according to the planning implementation units; The basic monitoring units are combined with the planned use of the land parcels, and the core monitoring content of each basic monitoring unit is clearly defined to ensure that the monitoring is accurate to the specific land parcels, providing basic data support for subsequent hierarchical monitoring. Based on the land boundaries defined in the prefecture-level city's territorial spatial planning, a total of 1000 basic monitoring units were established, each with an area of 0.05 km². 2 -2.5km 2 Among them, there are 300 urban construction land plots, 600 cultivated land plots, 100 forest land plots, and 100 wetland and other plots, each plot corresponding to a unique planning plot number; The evaluation index set of the basic monitoring unit may include indicators for urban construction land plots, cultivated land plots, forest land plots, and wetlands and other plots, as follows: Urban construction land parcels: parcel area, land use, and development intensity; Farmland plots: plot area, topsoil thickness, soil fertility; Forest land plots: forest coverage rate, timber volume, tree species structure, percentage of area affected by pests and diseases, and whether there is illegal logging; Wetlands and other areas: wetland area, water level changes, water quality level, biodiversity, and whether there are any acts of wetland destruction; The area monitoring unit is used to monitor the correlation of environmental impacts within the area, providing a basis for planning adjustments at the area scale; The 1,000 basic monitoring units are divided into 40 regional monitoring units. Each regional unit contains 10-50 adjacent basic monitoring units, covering urban comprehensive areas, agricultural production areas, ecological protection areas, and urban-rural transition areas. The boundaries of the areas are based on natural or artificial boundaries such as roads, rivers, and mountains to ensure the functional connection and spatial continuity of the plots within the area. The evaluation index set of the area monitoring unit may include: Regional ecological connectivity: The degree of correlation between ecological land use within a region, reflecting the synergy of ecological functions of different plots; Pollutant diffusion correlation: the diffusion distance and impact range of pollutants between industrial sites and surrounding farmland and residential sites; Resource utilization correlation: the efficiency of integrated utilization of water and land resources within the area; Ecosystem service interconnectivity: The superimposed impact of ecosystem service functions of different plots within the area, and the assessment of the overall ecological benefits of the area; The comprehensive monitoring unit is used to monitor the ecological stability of the land and space planning area, assess the overall effectiveness of the implementation of the land and space planning, and provide support for regional planning optimization. The comprehensive monitoring unit refers to the entire area designated in the territorial spatial planning of the prefecture-level city, encompassing 40 regional monitoring units and 1,000 basic monitoring units, achieving comprehensive monitoring without blind spots and with full coverage. The evaluation index set of the comprehensive monitoring unit may include: Overall ecosystem stability: the proportion and change rate of total ecological land area, the proportion of soil erosion area, and the proportion of desertification area; Land space development intensity: Whether the proportion of the total urban construction land area in the entire region meets the upper limit requirements of the plan; Ecological environment quality: the percentage of days with good or excellent air quality across the region, the compliance rate of surface water quality, and the percentage of plots with soil environmental quality that meet standards; Data is progressively correlated among the land area level, the patch area level, and the whole area monitoring level; the monitoring results of the lower level monitoring level serve as the core input parameters of the upper level monitoring level, and the planning standard value of the upper level monitoring level is used to limit the deviation judgment threshold of the lower level monitoring level. The basic monitoring unit serves as a lower-level monitoring unit of the area monitoring unit, and the area monitoring unit serves as a higher-level monitoring unit of the basic monitoring unit; the area monitoring unit serves as a lower-level monitoring unit of the whole-area monitoring unit, and the whole-area monitoring unit serves as a higher-level monitoring unit of the area monitoring unit.
[0022] The upper limit of 25% for the development intensity of urban construction land is set at the Level 3 full-area monitoring level. This is broken down into development intensity thresholds for each monitoring unit, such as 30% for urban comprehensive areas, 20% for urban-rural transition areas, and 5% for agricultural production areas. These are further broken down into deviation judgment thresholds for each basic monitoring unit. If the development intensity of a single urban construction land plot exceeds the threshold of the corresponding area, it is judged as a monitoring anomaly and is simultaneously fed back to the higher level for early warning.
[0023] Step S2: Real-time acquisition of dynamic data during the implementation of territorial spatial planning to establish a spatial planning dynamic evaluation model, outputting a comprehensive environmental impact score. When the comprehensive score is lower than a preset threshold or the deviation rate of a single indicator exceeds a preset warning value, real-time warning information is generated. The deviation judgment threshold is calculated based on the planning standard value of the higher level and the role ratio coefficient of the lower level monitoring level. The actual monitoring value is compared with the deviation judgment threshold level by level to achieve real-time environmental impact monitoring. The deviation judgment threshold is obtained for each level of monitoring. Based on the comparison between the monitoring data and the deviation judgment threshold, unqualified areas exceeding the threshold are identified. When the actual monitoring value exceeds the deviation judgment threshold, the corresponding level threshold recalibration mechanism is directly triggered based on the deviation judgment threshold. The threshold recalibration mechanism is performed for unqualified areas exceeding the deviation judgment threshold. The adjustment range is limited and the adjustment target is determined based on the result of the threshold recalibration mechanism. Then, the graded environmental impact adjustment strategy is executed based on the improvement target, and implementation deviation warning information is generated simultaneously. In this embodiment, the method for limiting the deviation judgment threshold of the lower-level monitoring level includes: First, the permissible limits of each indicator in the evaluation indicator set of each higher-level monitoring level are clearly defined as the benchmark for threshold calculation; For example, the core planning standard values for the Level 3 comprehensive monitoring level include: an upper limit of 25% for the development intensity of urban construction land, a total ecological land area of no less than 60%, a surface water quality compliance rate of no less than 90%, and a proportion of illegal land use plots of no more than 1%. At this point, based on this, the planning standard values for the monitoring units of the area are: an upper limit of 30% for the development intensity of the urban comprehensive area, an ecological land ratio of no less than 50% for the agricultural production area, and a surface water quality compliance rate of 100% for the ecological protection area; It is known that the urban comprehensive area comprises 20 basic monitoring units. The proportion of the planned land area of each monitoring unit to the total urban construction land area of the area determines its role. The 30% development intensity cap of the area is weighted and allocated according to the role proportion of each unit. Taking the calculation of the development intensity deviation judgment threshold for each basic monitoring unit as an example, it is as follows: When the planned standard value changes or the monitoring data of the lower-level monitoring level shows continuous anomalies, the deviation judgment threshold of the lower-level monitoring level is updated synchronously.
[0024] In this embodiment, the method for calculating the deviation judgment threshold of the lower-level monitoring layer includes: Clearly define the role ratio of the lower-level monitoring level within the higher-level monitoring level; Methods for determining the aforementioned percentage coefficient include: The corresponding basic function coefficients are determined based on the planned land use nature of the lower-level monitoring level; The area proportion coefficient is calculated based on the proportion of land area used by the lower-level monitoring level in the higher-level monitoring level; Calculate the level coefficient based on the control level of the lower-level monitoring level in the higher-level monitoring level; The final role proportion coefficient is obtained based on the basic function coefficient, the area proportion coefficient, and the level coefficient. When the planned land use nature of the lower-level monitoring level or the control level of the higher level is adjusted, the role ratio coefficient shall be updated synchronously. ,in, This is the percentage of effect. Based on the basic function coefficient, This is the area percentage coefficient. For the first The grade coefficient; The planning standard value for the monitoring unit is known to be 30% of the upper limit of the development intensity of the urban comprehensive area, and the area of the monitoring unit is 25 km². 2 The area of one of the basic monitoring units in this monitoring area is 1.5 km². 2 At this point, the area ratio coefficient is obtained as ; The pre-set development intensity contribution coefficient is 0.3, and the basic monitoring unit level coefficient is 1.2. The calculated contribution coefficient is... ; Based on the planning standard value of the higher-level monitoring level and the role ratio coefficient, the deviation judgment threshold of the lower-level monitoring level on a certain indicator is initially calculated; Methods for calculating the deviation judgment threshold include: ,in, For the first The deviation judgment threshold of the indicator. For the first The planning standard value for each indicator; Based on the above data, the deviation judgment threshold for development intensity can be obtained: P 开发强度 =0.216 x 30% = 6.5%; When the same lower-level monitoring level is simultaneously controlled by multiple upper-level monitoring levels, the deviation judgment threshold of each upper-level monitoring level is calculated separately, and then a reasonable value among the deviation judgment thresholds is taken as the final deviation judgment threshold. The actual monitoring data of the lower-level monitoring level is collected at a fixed period and the actual monitoring value is calculated. If the difference between the actual monitoring value and the final deviation judgment threshold is too large, the threshold recalibration mechanism is automatically triggered to obtain the target adjustment value of the monitoring level.
[0025] In this embodiment, the method for automatically triggering the threshold recalibration mechanism includes: Given that the planned development intensity standard for the area is 30%, and the current effective deviation judgment threshold for the basic monitoring unit is 6.5%, meaning the lower limit allowed for this unit is... 30% - 2.50% = 27.50%; Actual monitoring data from lower-level monitoring units is collected monthly, and the monitoring data for six consecutive months is shown in the table below:
[0026] The relative difference between the actual monitoring value and the allowable lower limit for each month is calculated using the following formula: in, The relative difference These are actual monitored values. This is the lower limit of the allowable value; The relative differences for each month are calculated as follows; January: -1.09%; February: -2.55%; March: -3.64%; April: -1.82%; May: -4.36%; June: -5.09%; If the relative difference continuously exceeds the preset recalibration trigger threshold of -2.50% for a specified number of cycles (2 months), it is determined that the difference is too large. If the preset recalibration trigger threshold is exceeded for two consecutive months in the second and third months, and for two consecutive months in the fifth and sixth months, the system will determine that the difference is "too large". The first-level basic monitoring unit is an unqualified area that exceeds the deviation judgment threshold, and the threshold recalibration process will be initiated. Acquire actual monitoring data within multiple preset periods and calculate the actual average monitoring value; The system automatically retrieves actual monitoring data from the past 8 periods, and pushes back two periods from month 1. The data is as follows:
[0027] The actual average monitoring value is calculated as follows: ; Based on the average monitoring value and the preset safety factor β=0.9, the calibration deviation judgment threshold is obtained; The formula for calculating the calibration deviation judgment threshold includes: in, To determine the threshold for calibration deviation, For safety factor; Substituting the data into the calculation, we can obtain the following: =2.92%; Set a threshold for determining calibration deviation. =2.92% is set as the improvement target for this non-compliant area, that is, the development intensity of this primary basic monitoring unit needs to be improved to a deviation of no more than 2.92%; Based on the above improvement targets, implement a tiered environmental impact mitigation strategy; The graded environmental impact strategy includes: With the calibration deviation judgment threshold of the basic monitoring unit as the core improvement target, precise control at the plot level is implemented; Using the calibration deviation judgment threshold of the monitoring unit in the area as the overall improvement target, and based on the environmental impact correlation of the monitoring unit in the area, joint rectification is implemented in highly correlated areas, and all unqualified plots in the area are coordinated and regulated in a coordinated manner. With the planning standard value of the three-level full-area monitoring level as the overall improvement goal, the non-compliant areas and plots in the whole area will be subject to graded adjustment measures, the planning control requirements of the whole area will be updated, and the calibration thresholds at all levels will be consistent with the standard values of the higher level. If the calibration deviation judgment threshold exceeds the planned standard value range of the upper-level monitoring level, then the planned standard value is used as the upper limit, and a threshold recalibration record is generated.
[0028] In this embodiment, the method for monitoring the correlation of environmental impacts within the monitoring area includes: Extract the relative deviations of each evaluation index of the monitoring unit in the area; The environmental correlation assessment score between adjacent monitoring units in the area is calculated based on the relative deviation. The method for calculating the environmental correlation assessment score includes: ,in, For environmental impact assessment score, For the area In the Relative deviation on the evaluation indicators area In the Relative deviation on the evaluation indicators The number of evaluation indicators; Taking three adjacent monitoring units as an example, monitoring unit A, monitoring unit B and monitoring unit C, the three monitoring units are linearly adjacent, monitoring unit A is adjacent to monitoring unit B, and monitoring unit B is adjacent to monitoring unit C. This embodiment selects three core evaluation indicators, such as vegetation coverage, soil organic matter content, and water quality. The planned target values and actual monitoring values for the three monitoring units are shown in the table below:
[0029] The calculated environmental impact assessment is divided into: , The environmental impact correlation level of the monitoring unit in the area is assessed based on the environmental correlation assessment score, and the assessment rules are as follows:
[0030] The environmental correlation monitoring results for the area were generated. The environmental correlation assessment score between monitoring unit A and monitoring unit B was much less than 40, and they were rated as having no correlation. The environmental correlation assessment score between monitoring unit B and monitoring unit C is greater than or equal to 80, therefore it is rated as high correlation.
[0031] The method for establishing a dynamic evaluation model for spatial planning includes: Based on the monitoring data obtained from the three-level spatial monitoring hierarchy, the actual monitoring values of each evaluation indicator are extracted; The actual monitored values are compared with the preset planning target values at each level, and the deviation rate of each evaluation index is calculated. ,in, The deviation rate, The preset planning target value; A dynamic evaluation model is constructed based on the deviation rate, and the deviation rate is converted into an indicator score. The dynamic evaluation model adopts a weighted algorithm, and sets the weight according to the importance of each evaluation indicator in the corresponding monitoring level. The weight allocation for basic monitoring units includes: vegetation coverage with a weight of 0.5, soil organic matter content with a weight of 0.3, and water quality with a weight of 0.2; the weight allocation for regional monitoring units includes the ecological correlation index with a weight of 0.6, and the output deviation rate is as follows: The deviation rate for vegetation coverage was -11.64%, the deviation rate for soil organic matter content was -15.56%, the deviation rate for water quality was 50.00%, and the deviation rate for the ecological correlation index was 24.0%. The baseline score is set at 100 points. No points are deducted within a deviation range of ±5%. For each 1% deviation exceeding ±5%, 2 points are deducted, with a minimum of 0 points. The scores obtained were as follows: vegetation coverage 86.72, soil organic matter content 78.88, water quality 10.0, and ecological correlation index 62.0. The calculated comprehensive score is ; When the overall score is lower than the preset threshold of 60 or the deviation rate of a single indicator exceeds the preset warning value of 30%, a real-time warning message is generated.
[0032] Step S3: The spatial data of the three-level spatial monitoring hierarchy and the process data of the spatial planning dynamic evaluation model are uniformly connected to and integrated into the national land space basic information platform, and the environmental impact monitoring results of national land space planning are output.
[0033] Although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of this application.
Claims
1. A data analysis-based method for monitoring the environmental impact of territorial spatial planning, characterized in that, Includes the following steps: Step S1: Construct a three-level spatial monitoring hierarchy consisting of basic monitoring units, area monitoring units, and global monitoring units. Set evaluation indicators that match the spatial structure of each level according to the monitoring tasks corresponding to each level. The monitoring results of the lower level are used as input parameters for the upper level. The planning standard values of the upper level are used to limit the deviation judgment threshold of the lower level. Step S2: Real-time acquisition of dynamic data during the implementation of territorial spatial planning to establish a spatial planning dynamic evaluation model, outputting a comprehensive environmental impact score. When the comprehensive score is lower than a preset threshold or the deviation rate of a single indicator exceeds a preset warning value, real-time warning information is generated. The deviation judgment threshold is calculated based on the planning standard value and the role proportion coefficient. The actual monitoring value is compared with the deviation judgment threshold level by level to achieve real-time monitoring of environmental impact. When the actual monitoring value exceeds the deviation judgment threshold, the corresponding level of threshold recalibration mechanism is triggered. The adjustment range is limited and the adjustment target is determined based on the result of the threshold recalibration mechanism, and implementation deviation warning information is generated simultaneously. Step S3: Integrate the spatial data of the three-level spatial monitoring hierarchy and the process data of the spatial planning dynamic evaluation model into the information platform, and output the environmental impact monitoring results of territorial spatial planning.
2. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 1, characterized in that, Methods for constructing a three-tiered space monitoring hierarchy include: The national land space is divided into basic monitoring units, regional monitoring units, and whole-area monitoring units according to the planning implementation units; The basic monitoring unit consists of a single planned plot of land and is used to obtain the monitoring indicators of the basic monitoring unit; The area monitoring unit consists of multiple adjacent planned plots and is used to monitor the correlation of environmental impacts within the area. The entire monitoring unit consists of the entire national land space planning area and is used to monitor the environmental stability of the national land space planning area. The basic monitoring unit, the area monitoring unit, and the global monitoring unit are progressively correlated with each other; The monitoring results of the lower-level monitoring level serve as the input parameters of the upper-level monitoring level. The planning standard value of the upper-level monitoring level is used to limit the deviation judgment threshold of the lower-level monitoring level. The deviation judgment threshold serves as the basis for the threshold recalibration mechanism to determine the adjustment execution. The basic monitoring unit serves as a lower-level monitoring unit of the area monitoring unit, and the area monitoring unit serves as a higher-level monitoring unit of the basic monitoring unit; the area monitoring unit serves as a lower-level monitoring unit of the whole-area monitoring unit, and the whole-area monitoring unit serves as a higher-level monitoring unit of the area monitoring unit.
3. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 2, characterized in that, Methods for limiting the deviation judgment threshold of lower-level monitoring levels include: First, extract the planning standard values corresponding to each higher-level monitoring level. The planning standard values are the allowable values of the monitoring indicators in the evaluation indicator set of the corresponding higher-level monitoring level. The deviation judgment threshold of each monitoring indicator in the lower-level monitoring level is calculated based on the proportion of the role of the lower-level monitoring level in the upper-level monitoring level and the allowable value; When the planned standard value changes or the monitoring data of the lower-level monitoring layer shows continuous abnormalities, the deviation judgment threshold of the lower-level monitoring layer is updated synchronously.
4. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 3, characterized in that, The method for obtaining the deviation judgment threshold of the lower-level monitoring level includes: Clearly define the role ratio of the lower-level monitoring level within the higher-level monitoring level; Based on the planning standard value and the role proportion coefficient, the deviation judgment threshold of the lower-level monitoring level on a certain monitoring indicator is initially calculated. When the same lower-level monitoring level is simultaneously controlled by multiple upper-level monitoring levels, the deviation judgment threshold of each upper-level monitoring level is calculated separately, and then a reasonable value among the deviation judgment thresholds is taken as the final deviation judgment threshold. The actual monitoring data of the lower-level monitoring layer is collected at a fixed period and the actual monitoring value is calculated. If the difference between the actual monitoring value and the final deviation judgment threshold is too large, the threshold recalibration mechanism is automatically triggered to obtain the target adjustment value of the lower-level monitoring layer.
5. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 1, characterized in that, Methods for establishing dynamic evaluation models for spatial planning include: Based on the monitoring data obtained from the three-level spatial monitoring hierarchy, the actual monitoring values of each evaluation indicator are extracted; The actual monitored values are compared with the preset planning target values at each level, and the deviation rate of each evaluation index is calculated. A dynamic evaluation model is constructed based on the deviation rate, the deviation rate is converted into an indicator score, and a comprehensive score of environmental impact is output based on the indicator score. When the overall score is lower than a preset threshold or the deviation rate of a single evaluation indicator exceeds a preset warning value, a real-time warning message is generated.
6. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 2, characterized in that, Methods for monitoring the environmental impact correlation within a designated area include: Extract the real-time environmental monitoring data of the monitoring unit in the area; Calculate the environmental correlation assessment score between adjacent monitoring units in the area based on the real-time monitoring data; The environmental impact correlation level of the monitoring unit in the area is determined based on the environmental correlation assessment score, and the environmental correlation monitoring results of the area are generated.
7. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 4, characterized in that, Methods for determining the proportion of effect include: The corresponding basic function coefficients are determined based on the planned land use nature of the lower-level monitoring level; The area proportion coefficient is calculated based on the proportion of land area used by the lower-level monitoring level in the higher-level monitoring level; Calculate the level coefficient based on the control level of the lower-level monitoring level in the higher-level monitoring level; The final function proportion coefficient is obtained based on the basic function coefficient, the area proportion coefficient, and the level coefficient. When the planned land use nature of the lower-level monitoring level or the control level of the higher level is adjusted, the role ratio coefficient is updated synchronously.
8. The method for monitoring the environmental impact of land spatial planning based on data analysis according to claim 4, characterized in that, Methods for automatically triggering threshold recalibration mechanisms include: Calculate the relative difference between the actual monitored value of the lower-level monitoring layer and the deviation judgment threshold; If the relative difference continuously exceeds the preset recalibration trigger threshold for a specified number of cycles, it is determined that the difference is too large. Acquire actual monitoring data within multiple preset periods and calculate the actual average monitoring value; Based on the average monitoring value and the preset safety factor, a calibration deviation judgment threshold is obtained, and a graded environmental impact adjustment strategy is triggered based on the calibration deviation judgment threshold. If the calibration deviation judgment threshold exceeds the planned standard value range of the upper-level monitoring level, then the planned standard value is used as the upper limit, and a threshold recalibration record is generated.