Sawtooth-shaped greenhouse production shed

The design of the sawtooth-shaped greenhouse solves the problems of condensation dripping and rainwater backflow in high-temperature and high-humidity areas, achieving effective ventilation, drainage, and air conditioning, and improving the stability of the crop growth environment.

CN123100421APending Publication Date: 2026-11-17YUNNAN KAIWEI AGRICULTURAL TECHNOLOGY ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611624066.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When existing multi-span greenhouses are used in high-temperature and high-humidity areas, the temperature difference between the inside and outside of the greenhouse causes condensation to drip and damage crops. The ventilation window structure is limited and the problem of rainwater backflow is serious, which affects the health of crops.

Method used

The greenhouse adopts a sawtooth-shaped roof design, which combines bottom anchoring of the columns, sawtooth roof, ventilation mechanism and drainage components to achieve effective ventilation and drainage, and prevent condensation and rainwater from directly damaging the crops.

Benefits of technology

It effectively prevents condensation and rainwater from damaging crops, maintains air circulation inside the greenhouse, reduces the risk of disease, and improves the stability of the crop growth environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123100421A_ABST
    Figure CN123100421A_ABST
Patent Text Reader

Abstract

This invention relates to the field of agricultural facility technology and discloses a sawtooth-shaped greenhouse production shed, including a frame body, which comprises an anchoring structure, a skeleton assembly, and a roof assembly. The anchoring structure includes columns, with angle steel and concrete connected to the bottom of the columns. The skeleton assembly is arranged around the frame body, including door columns and auxiliary columns. Scissor braces are connected to the sides of the auxiliary columns, and horizontal tie rods and longitudinal tubes are connected to the columns. The roof assembly includes arched tubes that form a sawtooth roof outline. A ventilation mechanism and a drainage assembly are connected to the frame body, and a greenhouse film is laid on the outside of the frame body. This invention anchors the bottom angle steel of the columns to the concrete foundation, and uses arched tubes to construct the main skeleton of the sawtooth roof of the greenhouse. Pressure plates, wire clips, and clamps limit and fix each component. Through the combination of top windows, greenhouse film, and water troughs, ventilation can be maintained during rainy days while preventing rainwater backflow. Condensate flows along the greenhouse film supported by the arched tubes and flows into the water trough for discharge, avoiding damage to crops.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of agricultural facility technology, specifically, it relates to a production greenhouse with a serrated top. Background Technology

[0002] In facility agriculture, greenhouses are important production equipment. They form a closed planting space by using a steel structure frame and covering film. The opening mechanism allows for air circulation between the inside and outside of the greenhouse, enabling artificial control of temperature and humidity. They can also block external pests and provide a controllable growth environment for fruits, vegetables and flower seedlings. Therefore, they are widely used in large-scale and commercial crop cultivation.

[0003] However, when modern multi-span greenhouses are used in high-temperature and high-humidity areas, the temperature difference between the inside and outside of the greenhouse will cause condensation to continuously form on the inner wall of the greenhouse film. The condensation drips directly onto the crop leaves, which can easily cause leaf sunburn and various leaf diseases. In addition, the ventilation window structure is limited. When it rains, opening the vents will cause rainwater to flow back into the greenhouse, and closing the vents will prevent the hot and humid air inside the greenhouse from dissipating, further aggravating the risk of diseases.

[0004] In view of this, the present invention is proposed. Summary of the Invention

[0005] To solve the above-mentioned technical problems, the basic concept of the technical solution adopted by the present invention is as follows: A sawtooth-shaped greenhouse production shed includes a frame body, which includes an anchoring structure, a frame assembly, and a roof assembly. The anchoring structure includes a column, the bottom end of which is connected to an angle steel, and concrete is poured on the outside of the angle steel; The frame body is provided with a skeleton assembly around its perimeter. The skeleton assembly includes auxiliary columns and door columns. Door columns are connected to two sides of the skeleton assembly, and auxiliary columns are connected to the other two sides. Scissor braces are connected to the sides of the auxiliary columns. Horizontal tie rods and longitudinal tube rods are connected to the columns. The roofing assembly includes an arch tube connected above the columns and longitudinal tubes, and the arch tube forms a sawtooth roof profile. The canopy body is connected to a ventilation mechanism and a drainage component. A canopy film is laid on the outside of the canopy body. The frame component and the roof component are evenly connected with slots, and the edge of the canopy film is engaged in the slots.

[0006] In a preferred embodiment of the present invention, each of the columns is connected to a longitudinal beam bracket at its end, a longitudinal beam is connected to the longitudinal beam bracket, the arch pipe is connected between the longitudinal beam and the drainage component, a sealing pipe is connected to the end of the arch pipe, and a diagonal brace is connected between the arch pipe and the horizontal tie rod.

[0007] In a preferred embodiment of the present invention, the end of the horizontal tie rod is connected to a connector, and the horizontal tie rod is connected to the column through the connector.

[0008] In a preferred embodiment of the present invention, a pressure plate is installed on the arch tube, the pressure plate is pressed onto the arch tube, and steel wire clips are connected to both ends of the pressure plate. The pressure plate is connected to the longitudinal tube rod through the steel wire clips. Clamping rings are connected to the overlapping positions of each member of the frame body. The clamping rings are respectively installed at the overlapping positions of the scissor brace and the upright, the overlapping positions of the diagonal brace and the horizontal tie rod, and the overlapping positions of the diagonal brace and the longitudinal tube rod.

[0009] In a preferred embodiment of the present invention, the ventilation mechanism includes side windows and top windows. The side windows are opened on the four sides of the frame assembly of the canopy body, and the top windows are opened on the side of the roof assembly. Roller rods are installed at corresponding positions of the side windows and the top windows. The side windows are equipped with manual film rollers, and the top windows are equipped with electric film rollers.

[0010] In a preferred embodiment of the present invention, the drainage component includes a water trough and a downpipe. The water trough is arranged at the joint position of each span of the roof component, the downpipe is connected to the end of the water trough, the side wall of the column is connected to the water trough bracket, the water trough is supported by the water trough bracket, and the water trough bracket is connected to the reinforcing rib.

[0011] In a preferred embodiment of the present invention, a flat eight-braced support is connected between the column, the horizontal tie rod and the water tank bracket. The flat eight-braced support is arranged in the opening position of the shed frame. A clamping ring is connected to the column, and the flat eight-braced support is connected to the column through the clamping ring.

[0012] In a preferred embodiment of the present invention, insect-proof nets are installed at both the side-opening window and the top-opening window, and the insect-proof nets move synchronously with the side-opening window and the top-opening window. Doors are assembled between some of the doorposts.

[0013] In a preferred embodiment of the present invention, the lower ends of the auxiliary columns and door columns abut against the ground, and the auxiliary columns and door columns are connected to the columns by horizontal tie rods.

[0014] In a preferred embodiment of the present invention, fasteners are connected to the overlapping parts of each steel pipe component of the scaffold body, and the fasteners lock the overlapping parts of the steel pipe components.

[0015] Compared with the prior art, the present invention has the following advantages: This invention uses angle steel at the bottom of the columns to anchor to the concrete foundation, and arched pipes to construct the main frame of the greenhouse sawtooth roof. Pressure plates, wire clips, and clamps limit and fix each member, improving the assembly reliability of each connection node. Through the top opening window, greenhouse film, and water trough, ventilation can be maintained on rainy days while preventing rainwater backflow. Condensate flows along the greenhouse film supported by the arched pipes and flows into the water trough for discharge, avoiding direct dripping of condensate that could damage crops.

[0016] The specific embodiments of the present invention will now be described in further detail with reference to the accompanying drawings. Attached Figure Description

[0017] In the attached diagram: Figure 1 A schematic diagram of the overall structure of a sawtooth-shaped greenhouse production shed; Figure 2 For production greenhouses with serrated tops Figure 1 Enlarged view at point E in the middle; Figure 3 A schematic diagram of the column foundation for a production greenhouse with a sawtooth-shaped roof; Figure 4 This is a plan view of the flat-eight bracing and scissor bracing of a sawtooth-shaped greenhouse production shed. Figure 5 A schematic diagram of the connection of the flat eight supports of a production greenhouse with a sawtooth-shaped roof; Figure 6 A schematic diagram showing the connection between the roof components and the columns of a sawtooth-shaped greenhouse production shed; Figure 7 A schematic diagram of the roof components of a sawtooth-shaped greenhouse production shed; Figure 8 For production greenhouses with serrated tops Figure 7 Enlarged view of point A in the middle; Figure 9 For production greenhouses with serrated tops Figure 7 Enlarged view at point B in the middle; Figure 10 For production greenhouses with serrated tops Figure 7 Enlarged view at point C; Figure 11 For production greenhouses with serrated tops Figure 7 Enlarged view at point D; Figure 12 A schematic diagram of the connection of the scissor bracing for a production greenhouse with a sawtooth-shaped roof; Figure 13 This is a diagram showing the layout of the side windows of a production greenhouse with a sawtooth-shaped roof; Figure 14 This is a diagram showing the arrangement of side and top windows in a sawtooth-shaped greenhouse production shed.

[0018] In the diagram: 1. Upright column; 2. Auxiliary upright column; 3. Door upright column; 41. Arch pipe; 42. Pressure plate; 43. Wire clip; 44. Clamping ring; 51. Horizontal tie rod; 52. Connector; 6. Longitudinal pipe rod; 7. Diagonal brace; 8. Film rolling rod; 91. Longitudinal beam bracket; 92. Longitudinal beam; 10. Edge sealing pipe; 11. Flat eight-brace; 13. Scissor brace; 14. Card slot; 15. Greenhouse film; 16. Insect net; 17. Door; 181. Side window; 182. Manual film rolling device; 191. Top window; 192. Electric film rolling device; 21. Angle steel; 22. Concrete; 231. Water trough bracket; 232. Water trough; 233. Reinforcing rib; 24. Fastener; 26. Downpipe. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below with reference to the accompanying drawings. The following embodiments are used to illustrate the present invention.

[0020] like Figures 1 to 14 As shown, the serrated greenhouse production shed includes a frame body, which includes an anchoring structure, a skeleton assembly, and a roof assembly. The anchoring structure includes columns 1, with angle steel 21 connected to the bottom of the columns 1, and concrete 22 poured on the outside of the angle steel 21. The skeleton assembly is set around the frame body, and the skeleton assembly includes auxiliary columns 2 and door columns 3. The skeleton assembly has door columns 3 connected to two sides and auxiliary columns 2 connected to the other two sides. The auxiliary columns 2 are connected to scissor braces 13. Horizontal tie rods 51 and longitudinal tube rods 6 are connected to the columns 1. The roof assembly includes arched tubes 41, which are connected above the columns 1 and the longitudinal tube rods 6, forming a serrated roof outline. A ventilation mechanism and a drainage assembly are connected to the frame body. A greenhouse film 15 is laid on the outside of the frame body. The skeleton assembly and the roof assembly are evenly connected with slots 14, and the edges of the greenhouse film 15 are engaged in the slots 14. In this setup, concrete 22 encases angle steel 21 to anchor the bottom of column 1. Column 1, together with horizontal tie rod 51 and longitudinal tube rod 6, provides basic support for the skeleton components. Scissor bracing 13 is set on one side of auxiliary column 2 to constrain the lateral deformation of the skeleton components. Arch tube 41 is built to form a sawtooth roof outline. Greenhouse film 15 is inserted into slot 14 to complete the covering, enclosing and forming the planting space inside the greenhouse.

[0021] like Figures 1 to 14As shown, in a specific embodiment, each column 1 is connected to a longitudinal beam bracket 91 at one end, and a longitudinal beam 92 is connected to the longitudinal beam bracket 91. An arch pipe 41 connects the longitudinal beam 92 and the drainage component, and a sealing pipe 10 is connected to the end of the arch pipe 41. A diagonal brace 7 connects the arch pipe 41 and the horizontal tie rod 51. In this configuration, the longitudinal beam bracket 91 supports the longitudinal beam 92 on the upper end of the column 1, the longitudinal beam 92 supports the arch pipe 41, the diagonal brace 7 transmits force diagonally between the arch pipe 41 and the horizontal tie rod 51, and the sealing pipe 10 limits and seals the end of the arch pipe 41, thus maintaining the overall shape of the upper roof component.

[0022] like Figures 1 to 14 As shown, furthermore, a connector 52 is connected to the end of the horizontal tie rod 51, and the horizontal tie rod 51 is connected to the column 1 through the connector 52. In this configuration, the connector 52 realizes the docking assembly between the horizontal tie rod 51 and the column 1, and transfers the load borne by the horizontal tie rod 51 to the column 1, thereby realizing the transmission and dispersion of the lateral force of the frame assembly.

[0023] like Figures 1 to 14 As shown, a pressure plate 42 is further installed on the arch pipe 41, pressing the pressure plate 42 onto the arch pipe 41. Wire clips 43 are connected to both ends of the pressure plate 42, and the pressure plate 42 is connected to the longitudinal pipe rod 6 via the wire clips 43. Clamping rings 44 are connected to the overlapping positions of each member of the frame body. The clamping rings 44 are respectively installed at the overlapping positions of the scissor brace 13 and the column 1, the overlapping positions of the diagonal brace 7 and the horizontal tie rod 51, and the overlapping positions of the diagonal brace 7 and the longitudinal pipe rod 6. In this configuration, the wire clips 43 fix the pressure plate 42 between the arch pipe 41 and the longitudinal pipe rod 6, forming a compressive constraint on the arch pipe 41. The clamping rings 44 play a limiting and clamping role at the overlapping positions of each member, preventing relative slippage at the overlapping positions of each member.

[0024] like Figures 1 to 14 As shown, the ventilation mechanism further includes side windows 181 and top windows 191. The side windows 181 are located on the four sides of the frame assembly of the canopy body, and the top windows 191 are located on the side of the roof assembly. Roller rods 8 are installed at corresponding positions on both the side windows 181 and the top windows 191. The side windows 181 are equipped with a manual film roller 182, and the top windows 191 are equipped with an electric film roller 192. In this configuration, the manual film roller 182 and the electric film roller 192 drive the film rollers 8 to rotate, causing the film rollers 8 to roll up or lower the canopy film 15, thereby opening and closing the side windows 181 and the top windows 191, completing the air exchange between the inside and outside of the canopy.

[0025] like Figures 1 to 14As shown, the drainage assembly further includes a water trough 232 and a downpipe 26. The water trough 232 is arranged at the joint positions of each span of the roof assembly, and the downpipe 26 is connected to the end of the water trough 232. A water trough bracket 231 is connected to the side wall of the column 1, and the water trough 232 is supported by the water trough bracket 231. A reinforcing rib 233 is connected to the water trough bracket 231. In this configuration, the water trough bracket 231 and the reinforcing rib 233 jointly support the water trough 232. Condensate and rainwater flowing down from the roof are collected inside the water trough 232 and then discharged outwards to the greenhouse through the downpipe 26.

[0026] like Figures 1 to 14 As shown, furthermore, a horizontal brace 11 connects the column 1, the horizontal tie rod 51, and the water trough bracket 231. The horizontal brace 11 is arranged at the bay position of the canopy. A clamping ring 44 is connected to the column 1, and the horizontal brace 11 is connected to the column 1 through the clamping ring 44. In this configuration, the clamping ring 44 assembles the horizontal brace 11 onto the column 1, and the horizontal brace 11 transmits the force at the bay position, further improving the overall deformation resistance of the canopy.

[0027] like Figures 1 to 14 As shown, furthermore, insect-proof nets 16 are installed at the openings of the side windows 181 and the top windows 191. The insect-proof nets 16 move synchronously with the side windows 181 and the top windows 191. Doors 17 are installed between some of the door pillars 3. In this setup, when the windows are opened for ventilation, the insect-proof nets 16 open synchronously with the windows, ensuring air circulation while preventing external insects from entering the greenhouse. The doors 17 are located between the door pillars 3, allowing operators to enter and exit the greenhouse to carry out planting operations.

[0028] like Figures 1 to 14 As shown, furthermore, the lower ends of the auxiliary columns 2 and the door columns 3 rest against the ground, and the auxiliary columns 2 and the door columns 3 are connected to the column 1 by the horizontal tie rod 51. In this setup, the auxiliary columns 2 and the door columns 3 are connected to the column 1 as a whole by the horizontal tie rod 51, and the auxiliary columns 2 and the door columns 3 are restricted from shifting or tilting by the constraint of the overall scaffold.

[0029] like Figures 1 to 14 As shown, furthermore, fasteners 24 are connected to the overlapping parts of each steel pipe component of the scaffold body, and the fasteners 24 lock the overlapping parts of the steel pipe components. In this configuration, the fasteners 24 lock and fix each steel pipe overlapping position to prevent the assembled rods from loosening under external force, and ensure the firmness of the scaffold body assembly.

[0030] The implementation principle of the sawtooth-shaped greenhouse production shed in this embodiment is as follows: Before actual use, only the bottom of the column 1 is equipped with angle steel 21. The angle steel 21 is connected and fixed to the bottom of the column 1. The column 1 and the angle steel 21 are buried together in the foundation made of concrete 22. The concrete 22 wraps around the angle steel 21 to achieve anchoring. The concrete 22 transfers the entire load of the shed to the ground soil layer, completing the vertical positioning of the column 1. The auxiliary column 2 and the door column 3 are assembled with the shed frame as a whole. Their lower ends abut against the ground and their positions are constrained by the overall shed frame structure.

[0031] The arch pipe 41, longitudinal beam 92, horizontal tie rod 51, longitudinal tube rod 6, and edge sealing pipe 10 together form the main frame of the greenhouse roof and side walls. The longitudinal beam 92 is supported on the upper part of the column 1 through the longitudinal beam bracket 91. The horizontal tie rod 51 is connected to the column 1 through the connector 52. The external force borne by the horizontal tie rod 51 can be transmitted to the column 1 through the connector 52. The pressure plate 42 is pressed on the arch pipe 41, and the two ends of the pressure plate 42 are connected and fixed to the longitudinal tube rod 6 by the wire clip 43. The clamping ring 44 serves as a connecting structure between the members, respectively achieving assembly and positioning between the scissor brace 13 and the column 1, between the diagonal brace 7 and the horizontal tie rod 51, and between the diagonal brace 7 and the longitudinal tube rod 6. The diagonal brace 7 provides diagonal support to the arch tube 41. The horizontal brace 11 and the scissor brace 13 are arranged at the bays and between the columns of the canopy to resist the lateral thrust brought by the external wind. All overlapping parts of the steel pipe components are locked and fixed by fasteners 24 to prevent the members from shifting. The water trough bracket 231 and the reinforcing rib 233 jointly support the water trough 232. The water trough 232 is installed at the connection position of each span of the canopy, and the end of the water trough 232 is connected to the downpipe 26. The greenhouse film 15 is laid and covered on the outer surface of the greenhouse frame. The edge of the greenhouse film 15 is inserted into the slot 14 and locked with fasteners 24. Doors 17 are installed at the three door pillars. Operators can enter and exit the greenhouse through the doors 17 to carry out planting and management operations. Insect-proof nets 16 are pre-installed at the window positions of the side windows 181 and the top windows 191. The insect-proof nets 16 open and close synchronously with the windows.

[0032] When ventilation and temperature control are needed inside the greenhouse, the opening range of the side window 181 and the top window 191 is determined based on the temperature and humidity inside the greenhouse. When opening the side window 181, the operator operates the manual film roller 182. The output torque of the manual film roller 182 drives the film roller rod 8 to rotate slowly. The film roller rod 8 gradually winds the greenhouse film 15, and the greenhouse film 15 is rolled up along the side wall. The opening of the side window 181 gradually opens from small to large, exposing the insect-proof net 16 that was originally covered by the greenhouse film 15. Outdoor air passes through the insect-proof net 16, which intercepts insects and flying insects from the outside. The filtered clean and cold air flows into the greenhouse cavity through the side window 181. As the side window 181 opens, the electric film roller 192 is activated. The electric film roller 192 drives the film roller 8 to rotate, and the film roller 8 winds up the greenhouse film 15 at the top of the sawtooth roof. The top window 191 then gradually opens. The hot air inside the greenhouse, which has become less dense after being heated, gathers at the highest point of the greenhouse and continues to rise along the vertical ventilation channel formed by the sawtooth roof. It is then discharged to the outside of the greenhouse through the already opened top window 191. Cold air continues to enter the greenhouse from the lower side window 181, and hot air continues to flow out from the top window 191, forming a continuous chimney effect of natural convection, constantly replacing the hot and humid air inside the greenhouse, thereby regulating the temperature and humidity inside the greenhouse.

[0033] During the daily operation of the greenhouse, there is a temperature difference between the inside and outside. Condensation continuously forms on the inner surface of the greenhouse film 15. This condensation adheres to the inner wall of the film 15 and flows slowly downwards along its sloping surface, preventing it from dripping directly onto the crops below. The flowing condensate collects along the roof slope into the water trough 232. Even in rainy weather, the top window 191 remains partially open. Rainwater hits the surface of the film 15 at the sawtooth positions and flows downwards along the vertical sawtooth surface, directly into the water trough 232. The top window 191 continues to expel the accumulated hot and humid air from inside the greenhouse, ensuring continuous ventilation and dehumidification even in rainy conditions. The condensate and rainwater collected inside the water tank 232 will flow along the tank body to the end, and then be guided downward through the downpipe 26 to be discharged directly to the ground outside the greenhouse, thus preventing water from accumulating around the greenhouse.

[0034] Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A sawtooth-shaped greenhouse production shed, comprising a frame body, characterized in that, The canopy body includes an anchoring structure, a frame assembly, and a roof assembly; The anchoring structure includes a column (1), with an angle steel (21) connected to the bottom end of the column (1), and concrete (22) poured on the outside of the angle steel (21). The frame body is provided with a frame assembly around it. The frame assembly includes auxiliary columns (2) and door columns (3). The frame assembly is connected to door columns (3) on two sides and auxiliary columns (2) on the other two sides. The auxiliary columns (2) are connected to scissor braces (13) on one side. The columns (1) are connected to horizontal tie rods (51) and vertical tube rods (6). The roof assembly includes an arch tube (41) connected above the column (1) and the longitudinal tube (6), and the arch tube (41) forms a sawtooth roof profile. The canopy body is connected to a ventilation mechanism and a drainage component. A canopy film (15) is laid on the outside of the canopy body. The frame component and the roof component are evenly connected with slots (14). The edge of the canopy film (15) is engaged in the slots (14).

2. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, Each of the columns (1) is connected to a longitudinal beam bracket (91) at one end, and a longitudinal beam (92) is connected to the longitudinal beam bracket (91). The arch pipe (41) is connected between the longitudinal beam (92) and the drainage component. The end of the arch pipe (41) is connected to a sealing pipe (10). A diagonal brace (7) is connected between the arch pipe (41) and the horizontal tie rod (51).

3. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, The end of the horizontal tie rod (51) is connected to a connector (52), and the horizontal tie rod (51) is connected to the column (1) through the connector (52).

4. The sawtooth-shaped greenhouse production shed according to claim 2, characterized in that, A pressure plate (42) is installed on the arch pipe (41). The pressure plate (42) is pressed onto the arch pipe (41). Wire clips (43) are connected to both ends of the pressure plate (42). The pressure plate (42) is connected to the longitudinal pipe rod (6) through the wire clips (43). Clamping rings (44) are connected to the overlapping positions of each member of the frame body. The clamping rings (44) are respectively installed at the overlapping positions of the scissor brace (13) and the column (1), the overlapping positions of the diagonal brace (7) and the horizontal tie rod (51), and the overlapping positions of the diagonal brace (7) and the longitudinal pipe rod (6).

5. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, The ventilation mechanism includes a side window (181) and a top window (191). The side window (181) is located on the four sides of the frame assembly of the canopy body, and the top window (191) is located on the side of the roof assembly. A film rolling rod (8) is installed at the corresponding position of the side window (181) and the top window (191). The side window (181) is equipped with a manual film rolling device (182), and the top window (191) is equipped with an electric film rolling device (192).

6. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, The drainage assembly includes a water trough (232) and a downpipe (26). The water trough (232) is arranged at the joint position of each span of the roof assembly. The downpipe (26) is connected to the end of the water trough (232). A water trough bracket (231) is connected to the side wall of the column (1). The water trough (232) is supported by the water trough bracket (231). A reinforcing rib (233) is connected to the water trough bracket (231).

7. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, The column (1) is connected to the horizontal tie rod (51) and the water tank bracket (231) by a flat eight-brace (11), which is arranged in the opening position of the shed. A clamp (44) is connected to the column (1), and the flat eight-brace (11) is connected to the column (1) through the clamp (44).

8. The sawtooth-shaped greenhouse production shed according to claim 5, characterized in that, Insect-proof nets (16) are installed at the openings of the side windows (181) and the top windows (191). The insect-proof nets (16) move synchronously with the side windows (181) and the top windows (191). Doors (17) are installed between some of the door pillars (3).

9. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, The lower ends of the auxiliary column (2) and the door column (3) rest against the ground, and the auxiliary column (2) and the door column (3) are connected to the column (1) by a horizontal tie rod (51).

10. The sawtooth-shaped greenhouse production shed according to claim 1, characterized in that, The overlapping parts of each steel pipe component of the scaffold body are connected with fasteners (24), and the fasteners (24) lock the overlapping parts of the steel pipe components.