A method for installing a turret module in a floating storage unit
By employing modular testing, overall hoisting, and three-dimensional precision positioning, the installation error problem of the inner turret module under the influence of the marine environment was solved, achieving precise installation and welding deformation control of the inner turret module, and ensuring the smooth progress of subsequent processes.
Patent Information
- Application Number
- CN202611569884.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-12
- Publication Date
- 2026-11-17
AI Technical Summary
During the installation of the internal turret module of the floating oil storage unit, the marine environment makes it difficult to maintain the posture during hoisting and alignment, and the error caused by welding deformation is difficult to control, affecting subsequent docking and equipment operation.
The method employs modular testing and dock preparation, overall hoisting and rough positioning, three-dimensional fine positioning, full-process monitoring, and closure welding. It uses the same set of installation benchmarks and measurement data, controls accuracy through three-dimensional adjustment machines and rigid deformation reinforcement fixtures, and performs segmented and layered welding to reduce errors.
The precise installation of the internal turret module within the dry dock reduces the impact of the marine environment, avoids error accumulation, and ensures the smooth progress of subsequent processes and the accuracy of equipment operation.
Smart Images

Figure CN123104880A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of construction and assembly technology of floating marine structures, specifically to a dock installation method for a single-point mooring module of a turret within a floating oil storage device. Background Technology
[0002] Floating storage and offloading (FSO) units are responsible for receiving, storing, and exporting oil and gas at sea. The internal turret single-point mooring system, located within the turret moon pool, is used to transfer mooring loads and provides a structural foundation for subsequent underwater buoy docking, installation of rotating components, and media transport equipment. The centeredness and verticality of the internal turret, as well as the flatness and accuracy of the top flange, directly affect subsequent docking and equipment operation.
[0003] In current construction projects, some projects complete the overall hoisting of the inner turret at sea or at the dock. Affected by wind, waves, tides, and changes in the ship's buoyancy, the module is prone to swaying during hoisting and alignment, and the already adjusted posture is not easy to maintain. Other projects assemble the inner turret components piece by piece in the dock, but this method involves more procedures, with hoisting, assembly, and measurement intertwined, and dimensional and positional errors can easily accumulate gradually.
[0004] The inner turret cylinder also needs to be connected to the surrounding hull structure of the turret moon pool via multiple layers of horizontal and vertical closure plates. The closure welds are distributed along the circumference and height; uneven heat input at different points may cause changes in the cylinder's roundness, axial misalignment, or localized deformation. Measuring only once at the end of hoisting cannot guarantee that the posture will remain under control throughout subsequent assembly and welding. Therefore, it is necessary to integrate overall prefabrication, rough positioning in the dock, three-dimensional fine positioning, process re-measurement, and welding deformation control into a complete installation method. Summary of the Invention
[0005] The problem this invention aims to solve is to minimize the impact of the marine environment while keeping the inner turret module within the allowable installation accuracy range throughout the entire process from hoisting and positioning to the completion of welding, and to reduce secondary adjustments and rework caused by welding deformation.
[0006] This application proposes a dock installation method for a single-point mooring module of an internal turret in a floating oil storage unit. The method is implemented in the following sequence: module testing and dock preparation, overall hoisting and rough positioning, three-dimensional fine positioning, full-process monitoring, assembly welding, and post-weld acceptance. Each stage uses the same set of installation benchmarks and measurement data for seamless integration, as detailed below: Step 1: Complete module testing and prepare the dock space.
[0007] First, the upper and lower sections of the inner turret, along with the rotating and fixed parts of the supporting underwater pontoon, are prefabricated, their dimensions are checked, and welds are inspected in the indoor area. The rotating and fixed parts of the underwater pontoon are then assembled for the first rotation test. Next, using the upper and lower matching test supports to create a test height, the lower section of the inner turret is hoisted to the matching position, the interface is aligned, and a second rotation test is conducted. During the test, the bearing fit, smooth rotation, accurate interface position, and any assembly interference are checked. After passing the test, the underwater pontoon is transported to the offshore installation site, and the upper and lower sections of the inner turret are assembled as a whole, forming the inner turret module ready for hoisting.
[0008] The dock preparation proceeds concurrently with the above work. Structural construction and necessary reinforcement of the turret moon pool area are completed; the installation reference surface is ground, leveled, and its accuracy is rechecked; the center axis, elevation control lines, azimuth reference lines, and assembly boundaries of the assembled bulk plates are laid out within the moon pool. Four sets of three-dimensional adjustment machines are arranged at circumferential intervals along the predetermined positions of the inner turret, with multiple sets of supporting dock piers placed between adjacent three-dimensional adjustment machines. Measurement targets or monitoring points are set at the top flange, the outer periphery of the cylinder, and the bottom elevation control positions. The hoisting equipment, three-dimensional adjustment machines, and measuring equipment are inspected and calibrated before use.
[0009] Step 2: Overall hoisting and rough positioning.
[0010] Using floating crane 7 as the hoisting equipment, the inner turret module was lowered entirely into the turret moon pool. As the module approached the supporting dock pier, the lowering speed was slowed. While floating crane 7 maintained its load, the module's center position, installation elevation, and circumferential orientation were adjusted according to the center axis, elevation control line, and azimuth baseline. Once it was confirmed that the module could stably land on the supporting dock pier and that all three deviations were within the project's specified coarse adjustment range, temporary limit switches were first set, and then floating crane 7 was gradually unloaded and removed. The temporary limit switches were used to prevent lateral movement or circumferential deflection before fine adjustment began.
[0011] Step 3: Perform precise positioning using a 3D adjustment machine
[0012] Before fine-tuning, release or appropriately relax the temporary limit switches on the adjustment direction. The three-dimensional adjustment machine makes small adjustments to the inner turret module along the X-axis (ship width direction), Y-axis (ship length direction), and Z-axis (height direction). The total station or equivalent precision measuring equipment provides the deviation direction and deviation amount in real time, and the operator adjusts each group of three-dimensional adjustment machines alternately accordingly. After each round of adjustment, the center coaxiality, cylinder verticality, top flange flatness, and overall elevation are remeasured; after all parameters meet the positioning tolerances specified in the project design documents, the three-dimensional adjustment machine is locked, and the measurement results are used as the initial benchmark for subsequent process monitoring.
[0013] Step 4: Integrate precision monitoring throughout the assembly and welding process.
[0014] The completion of precise positioning does not signify the end of the measurement work. Before, during, and after the assembly of the bulk panels, re-measurements must be conducted according to the construction plan. During the assembly phase, checks should be performed at the set frequency. Once the welding phase begins, measurements should be intensified, and the center coaxiality and cylinder verticality should be re-measured at least after each predetermined welding section is completed. If necessary, the flatness and elevation of the top flange should also be checked. If the measurement results are close to the allowable limits, subsequent symmetrical welding stations and the construction rhythm can be adjusted. If the results exceed the allowable range specified in the project design documents, assembly or welding should be suspended, and the module posture should be corrected using a three-dimensional adjustment machine before construction continues.
[0015] Step 5: Assemble and close the bulk plates and control welding deformation.
[0016] Based on the actual clearance between the inner turret cylinder and the surrounding hull structure of the moon pool, the horizontal and vertical assembly plates are repaired, assembled, and positioned. The horizontal assembly plates connect the hull platform plates to the inner turret cylinder, while the vertical assembly plates connect the hull frame plates to the inner turret cylinder. Transverse support beams, struts, or rigid deformation reinforcement fixtures with the same constraint function are installed at the bottom of the cylinder or other easily deformable locations to limit changes in the cylinder's roundness and local displacement.
[0017] The hull layers along the height of the inner turret are designated as layers A, B, C, D, E, F, and G. Welding is performed first in layers A, C, E, and G, followed by layers B, D, and F. For each layer, the horizontal weld between the hull platform plate and the inner turret cylinder is welded first, followed by the vertical weld between the hull frame plate and the inner turret cylinder. The circumference is divided into multiple symmetrical welding stations, with multiple welders working simultaneously. A combination of segmented, layered, staggered, and back-and-forth welding methods is used to ensure heat is distributed as evenly as possible around the cylinder. The length of a single weld segment, welding heat input, and interpass temperature follow the approved welding procedure specifications, and the welding heat input at symmetrical stations is kept close. The welding process is paused and the module attitude is re-measured after each predetermined welding segment is completed.
[0018] Step Six: Complete post-weld inspection and finishing touches.
[0019] After all welds are completed, allow the welded area to cool naturally to ambient temperature before removing the rigid deformation reinforcement fixtures. Re-measure the center coaxiality of the inner turret module, the verticality of the cylinder, the flatness of the top flange, and the elevation of the top flange. Inspect the appearance of the welds and perform non-destructive testing on the butt welds and load-bearing fillet welds. Once all results meet the project's technical documents, remove the three-dimensional adjustment machine, temporary limiters, and other temporary auxiliary fixtures. Compile the matching test, rotation test, hoisting measurement, precision positioning, welding parameters, process re-measurement, and non-destructive testing data, and complete the dock installation acceptance.
[0020] The beneficial effects of this invention are as follows: 1. The internal turret module has been prefabricated as a whole and has undergone matching and rotation tests with the underwater pontoon before entering the dry dock. Problems such as bearing fit, interface deviation and assembly interference can be detected in advance, and the amount of rework in the dry dock is reduced accordingly.
[0021] 2. The overall hoisting is carried out in the dry dock, and two-stage adjustments are made using coarse positioning and three-dimensional fine positioning. This not only shortens the continuous occupation time of the hoisting equipment, but also makes the adjustment of the center, elevation and orientation more stable.
[0022] 3. Precise positioning data is directly used as a monitoring benchmark for subsequent assembly and welding. If a deviation is detected, the operation can be paused and corrected in time, which can prevent the error from continuing to accumulate in subsequent processes.
[0023] 4. The combined effect of circumferential symmetry, segmented and layered construction, staggered back welding, and rigid tooling constraints, along with segmented retesting, can reduce the changes in cylinder roundness and axial offset caused by uneven heat input. Attached Figure Description
[0024] To facilitate understanding of the technical solution of this invention, the accompanying drawings are briefly described below.
[0025] Figure 1 A schematic diagram showing the matching and rotation test of the inner turret and its supporting underwater pontoon; Figure 2 This is a schematic diagram of the overall hoisting and rough positioning of the inner turret module in the dock. Figure 3 A schematic diagram showing the three-dimensional precision positioning and assembly of bulk plates for the inner turret module; Figure 4 A schematic diagram showing the arrangement of the three-dimensional adjustment machine and the support dock piers along the circumference of the inner turret; Figure 5 A schematic diagram showing the sequence of welding for assembling bulk plate layers and circumferential symmetry.
[0026] In the diagram: 1. Inner turret module; 2. Upper section of matching test support; 3. Lower section of matching test support; 4. Matching underwater pontoon; 5. Tracked crane; 6. Hull of floating oil storage device; 7. Floating crane; 8. Horizontal assembly bulk plate; 9. Vertical assembly bulk plate; 10. Rigid deformation reinforcement tooling; 11. Three-dimensional adjustment machine; 12. Support dock pier. Detailed Implementation
[0027] The present invention will be further described below with reference to the accompanying drawings and embodiments. The following embodiments are used to illustrate the construction organization and operation relationship of the present invention. The specific dimensions, loads, positioning tolerances, welding parameters and inspection levels are determined according to the design documents of the corresponding project and the evaluated construction process.
[0028] The "internal turret module" referred to in this invention refers to the internal turret structure that has been fully assembled and can be used as an independent hoisting unit to enter the turret moon pool of a floating oil storage device; the "assembled bulk plate" refers to the on-site assembled plate used for the final connection between the internal turret cylinder and the hull platform plate or frame plate around the turret moon pool; the "three-dimensional adjustment machine" refers to the construction equipment that can perform slight lateral, longitudinal and vertical displacement adjustments on the load-bearing object and lock it after adjustment.
[0029] Example 1: Module Prefabrication and Matching Test This embodiment uses the single-point mooring system of an inner turret in a 150,000-ton floating oil storage facility as an example. The system includes an inner turret located within the turret moon pool of the ship's hull, and a matching underwater buoy that subsequently docks with the inner turret at sea. Specific dimensions, loads, positioning tolerances, welding parameters, and inspection levels are all determined according to the project design documents and the evaluated construction process.
[0030] Reference Appendix Figure 1 Welding, dimensional verification, and non-destructive testing of key welds were completed for the upper and lower sections of the inner turret, the rotating part of the underwater pontoon, and the fixed part of the underwater pontoon in the indoor field. First, the rotating and fixed parts of the underwater pontoon were assembled and a first rotation test was conducted. Then, using crawler crane 5, upper matching test support 2, and lower matching test support 3, the lower section of the inner turret module 1 was adjusted to its designed matching position with the matching underwater pontoon 4, and a second rotation test was conducted. During the test, the rotational continuity, bearing fit, interface position, and assembly interference were checked.
[0031] After two successful rotation tests and interface matching, the matching underwater pontoon 4 was transported to the offshore installation site. The upper and lower sections of the inner turret were then assembled and their final dimensions were verified, forming an inner turret module that could be lifted into the dry dock as a single unit.
[0032] Example 2: Dockwork Layout and Coarse Positioning Reference Appendix Figure 4 Structural reinforcement and datum surface adjustment were completed in the turret moon pool area of the floating oil storage unit hull 6. Based on the hull design coordinate system, the central axis, elevation control line and bearing datum line were laid out in the moon pool, and the assembly boundaries of the horizontally assembled bulk plate 8 and the vertically assembled bulk plate 9 were marked.
[0033] Four sets of three-dimensional adjustment machines 11 are arranged at predetermined intervals along the outer circumference of the inner turret, and supporting dock piers 12 are arranged between adjacent three-dimensional adjustment machines 11. The load-bearing capacity of the three-dimensional adjustment machines 11 and the supporting dock piers 12 are selected according to the weight of the inner turret module and construction safety requirements, and their arrangement avoids the subsequent main welding areas. Measurement targets are set at the top flange, the outer circumference of the cylinder, and the bottom elevation control position, respectively.
[0034] Reference Appendix Figure 2The inner turret module was hoisted into the turret moon pool using floating crane 7. As the module approached the supporting dock pier 12, the lowering speed was reduced, and the center position, installation elevation, and circumferential orientation were adjusted while maintaining load on floating crane 7. After the module was stably placed and the rough adjustment was satisfactory, temporary limits were set to restrict lateral movement and rotation. Then, the hoisting load was gradually released, and floating crane 7 was removed.
[0035] Example 3: Three-dimensional precision positioning and process monitoring Reference Appendix Figure 3 and attached Figure 4 After coarse positioning is completed, the temporary limit on the adjustment direction is released or relaxed, and the four sets of three-dimensional adjustment machines 11 are activated. Each set of three-dimensional adjustment machines 11 can generate minute displacements in the ship's width, length, and height directions, thereby changing the center position, tilt state, and elevation of the inner turret module.
[0036] A total station was used to collect data from the top flange, the outer perimeter of the cylinder, and the bottom elevation control points. The cylinder's axis and verticality were determined based on the measuring points at different heights, and then compared with the ship's central axis to obtain the coaxiality. The flange's flatness and elevation were determined based on multiple measuring points on the top flange. The surveyors fed back the direction and amount of deviation to the operators of the three-dimensional adjustment machine. Each group of three-dimensional adjustment machines 11 adjusted alternately in small displacements and in rounds, with re-measurement after each round of adjustment.
[0037] When the center coaxiality, cylinder verticality, top flange flatness, and overall elevation all meet the project positioning tolerances, the three-dimensional adjustment machine 11 is locked and an initial precision positioning record is generated. During the assembly of the assembled bulk plates, measurements are repeated at a set frequency; after welding begins, each predetermined welding section serves as a basic re-measurement node. If the measurement results exceed the allowable range, assembly or welding is immediately suspended, and the three-dimensional adjustment machine 11 is used for recalibration. Construction resumes after the re-measurement is deemed satisfactory.
[0038] Example 4: Control of Welding Deformation of Closing Bulk Plates Reference Appendix Figure 3 Horizontal assembly plates 8 are installed along the height of the inner turret on each hull platform layer to connect the hull platform plates and the inner turret cylinder; vertical assembly plates 9 are installed at the corresponding hull frame positions to connect the hull frame plates and the inner turret cylinder. Each assembly plate is fitted and positioned according to the gaps on site to ensure that the edges to be welded meet the welding process requirements.
[0039] A rigid deformation reinforcement fixture 10 is installed at the bottom of the inner turret cylinder. The rigid deformation reinforcement fixture 10 can be a transverse support beam, or a strut or combination fixture that can provide the same constraint effect, to maintain the roundness of the cylinder and limit local displacement. Other locations prone to displacement can be equipped with additional constraint components according to the site structure.
[0040] Reference Appendix Figure 5The layers are divided into layers A to G along the height direction. Construction of layers A, C, E, and G is organized first, followed by layers B, D, and F. For each layer, the horizontal welds corresponding to the horizontally joined bulk plates 8 are completed first, followed by the vertical welds corresponding to the vertically joined bulk plates 9. The circumference is divided into multiple welding stations, with welders arranged symmetrically for simultaneous construction. Each welding segment employs a combination of segmented, layered, staggered, and back-welding methods to avoid heat concentration on one side of the cylinder.
[0041] During construction, the length of each weld segment, welding heat input, and interpass temperature are controlled according to the welding process specifications, and welding parameters are kept as close as possible for symmetrical workstations. After each predetermined weld segment is completed, welding is stopped and the attitude of the inner turret module is re-measured. If the measured value shows a deviation trend but has not yet exceeded the tolerance, the subsequent symmetrical workstations and welding rhythm are adjusted; if the measured value exceeds the tolerance, welding is suspended and the measurement is corrected using the three-dimensional adjustment machine 11.
[0042] Example 5: Post-weld acceptance After all horizontal and vertical welds are completed, allow the welded area to cool naturally to ambient temperature before removing the rigid deformation reinforcement fixture 10. Re-measure the center coaxiality of the inner turret module, the verticality of the cylinder, the flatness of the top flange, and the elevation of the top flange, and check for any obvious local deformation in the closure area.
[0043] Visual inspection and non-destructive testing as required by the project's technical documents are conducted on the butt welds and load-bearing fillet welds. After passing the inspection, the three-dimensional adjustment machine 11, temporary limiters, and other temporary auxiliary tooling are removed; whether the supporting dock pier 12 is removed can be determined according to the subsequent hull construction procedures. Finally, the matching test, rotation test, hoisting measurement, precision positioning, welding parameters, process re-measurement, and non-destructive testing data are compiled to form the dock installation acceptance document for the inner turret module.
[0044] In the above embodiments, the steps are sequentially connected as follows: module prefabrication and matching test, dock preparation, overall hoisting and rough positioning, three-dimensional fine positioning, full-process accuracy monitoring, assembly and welding of bulk plates, and post-weld acceptance. For similar floating oil storage devices, the hoisting equipment model, the number of supporting dock piers, and the measurement frequency can be adjusted according to the turret moon pool structure, internal turret size, and on-site lifting conditions, but the technical coordination between overall module hoisting, three-dimensional fine adjustment, process re-measurement, and symmetrical segmented welding should still be maintained.
[0045] The above description is merely an embodiment of the present invention. For those skilled in the art, any equivalent substitutions made to the specific model of the three-dimensional adjustment machine, the type of measuring equipment, the form of rigid deformation reinforcement tooling, or the number of symmetrical welding sections without departing from the technical concept of the present invention shall fall within the protection scope of the present invention.
Claims
1. A dock installation method for a single-point mooring module of a floating oil storage and offloading (FSO) turret, characterized in that, Includes the following steps: S1. Module and dock preparation: Complete the prefabrication and quality inspection of the inner turret module (1), and complete the matching test and rotation test of the inner turret module (1) and the matching underwater pontoon (4); complete the structural construction and installation reference surface verification of the turret moon pool area of the floating oil storage device hull (6), mark the center axis, elevation control line, azimuth reference line and assembly boundary of the assembled bulk plates (8, 9) in the turret moon pool, and arrange the supporting dock piers (12), three-dimensional adjustment machine (11), measurement target and monitoring point; S2. Lifting and rough positioning: The inner turret module (1) is hoisted into the turret moon pool and placed on the supporting dock pier (12) using hoisting equipment. The center position, installation elevation and circumferential position of the inner turret module (1) are roughly adjusted according to the central axis, elevation control line and azimuth baseline. After the rough adjustment is qualified, a temporary limit is set and the hoisting equipment is removed. S3. Three-dimensional fine positioning: Release or relax the temporary limit on the adjustment direction, use the three-dimensional adjustment machine (11) to make minor adjustments to the inner turret module (1) in the width, length and height directions, and check the center coaxiality, cylinder verticality, top flange flatness and overall elevation of the inner turret module (1) with the help of measuring equipment until all parameters meet the positioning tolerance specified in the project design documents and then lock the three-dimensional adjustment machine (11). S4. Full-process accuracy monitoring: Using the measurement results when the three-dimensional precision positioning is completed as the initial benchmark, the attitude parameters, including at least the center coaxiality and the verticality of the cylinder, are continuously monitored during the assembly and welding of the assembled bulk plates (8, 9). When the detection results exceed the allowable range specified in the project design documents, subsequent operations are suspended, and the inner turret module (1) is corrected through the three-dimensional adjustment machine (11). S5. Assembly and welding of the bulk plates: Assemble the circumferential bulk plates (8, 9) between the inner turret module (1) and the hull structure around the turret moon pool. Set rigid deformation reinforcement fixtures (10) in easily deformable parts. Weld in a circumferential symmetrical, segmented and layered and staggered welding manner. After completing the predetermined welding section, remeasure the attitude parameters. S6. Post-weld acceptance: After the welded area has cooled down, remove the rigid deformation reinforcement fixture (10), and re-inspect the shape, position and dimensions and weld of the inner turret module (1). After the re-inspection is qualified, remove the three-dimensional adjustment machine (11), the temporary limit and other temporary auxiliary fixtures.
2. The dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, The matching test and rotation test include: completing the prefabrication and testing of the upper and lower sections of the inner turret module (1) and the rotating and fixed parts of the matching underwater pontoon (4); assembling the rotating and fixed parts of the matching underwater pontoon (4) and conducting the first rotation test; using a crawler crane (5), the upper section (2) of the matching test support and the lower section (3) of the matching test support, hoisting the lower section of the inner turret module (1) to the matching test position, so that it can be matched with the matching underwater pontoon (4) and a second rotation test is conducted to check the bearing fit, rotation performance, interface accuracy and assembly interference; after the test is qualified, the matching underwater pontoon (4) is transported to the offshore installation location, and the inner turret module (1) that has been fully assembled is left for dock hoisting.
3. The dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, The module and dock preparation also include: structural reinforcement of the turret moon pool area, grinding, leveling and precision re-inspection of the installation reference surface; arranging four sets of the three-dimensional adjustment machines (11) at circumferential intervals along the inner turret module (1), and arranging multiple sets of the supporting dock piers (12) between adjacent three-dimensional adjustment machines (11); setting the measuring target and the monitoring point at positions that can characterize the top flange plane, cylinder axis and bottom elevation.
4. The dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, In the rough positioning of the hoisting, the hoisting equipment is a floating crane (7), and the inner turret module (1) completes the initial alignment under the condition that the floating crane (7) is under force. After the inner turret module (1) is stably placed on the support dock (12) and the center position, installation elevation and circumferential position are all within the allowable range of the rough adjustment, the temporary limit is set and the floating crane (7) is removed. The temporary limit is used to restrict the inner turret module (1) from lateral movement and circumferential deflection.
5. The dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, In the three-dimensional precision positioning, according to the deviation direction fed back by the measuring equipment, the three-dimensional adjustment machine (11) of each group is adjusted alternately in the width direction, length direction and height direction of the ship, and the center coaxiality, the verticality of the cylinder, the flatness of the top flange and the overall elevation are remeasured after each round of adjustment until all parameters meet the positioning tolerance.
6. The dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, The whole process accuracy monitoring includes: recording the initial measurement data after the three-dimensional precision positioning is completed; performing retesting at a set frequency during the assembly stage of the assembled bulk plates (8, 9); increasing the retesting frequency during the welding stage, and performing retesting at least after each predetermined welding segment is completed; stopping the assembly or welding when the retesting result exceeds the allowable range, and correcting the posture of the inner turret module (1) through the three-dimensional adjustment machine (11).
7. The dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, The circumferentially assembled bulk plate includes a horizontally assembled bulk plate (8) connecting the hull platform plate and the inner turret module (1) cylinder, and a vertically assembled bulk plate (9) connecting the hull frame plate and the inner turret module (1) cylinder. The corresponding hull layers are sequentially marked as layer A, layer B, layer C, layer D, layer E, layer F and layer G along the height direction of the inner turret module (1). Layers A, C, E and G are welded first, and then layers B, D and F are welded. In each layer, the horizontal weld corresponding to the horizontally assembled bulk plate (8) is welded first, and then the vertical weld corresponding to the vertically assembled bulk plate (9) is welded.
8. The dock installation method for a single-point mooring module of a floating oil storage device with an internal turret according to claim 7, characterized in that, During the assembly and welding of the assembled bulk plates (8, 9), symmetrical welding stations are set up in the circumferential direction and multiple welders are arranged to work simultaneously. The length of a single weld segment is limited, and a combination of layered, staggered, and back-welding methods is adopted. The length of the single weld segment, the welding heat input, and the interpass temperature are determined according to the evaluated welding process specifications, and the symmetrical welding stations have similar welding heat inputs.
9. A dock installation method for a single-point mooring module of a floating oil storage device's internal turret according to claim 1, characterized in that, The post-weld acceptance includes: after the circumferentially assembled bulk plates (8, 9) have cooled naturally to the ambient temperature, re-measure the center coaxiality, cylinder verticality, top flange flatness and top flange elevation of the inner turret module (1); conduct visual inspection and non-destructive testing on the butt welds and load-bearing fillet welds; and summarize the matching test records, rotation test records, hoisting measurement data, precision positioning records, welding parameter records, process re-measurement records and non-destructive testing reports as acceptance data for the dock installation of the inner turret module (1).