By employing roller and chain conveyor routes in opposite directions within the pallet conveying network and controlling pallet movement using transfer nodes, the problem of pallets failing to reach the target work area is solved, achieving a balance between throughput capacity and network flow.
Patent Information
- Application Number
- CN202611341504.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-01
- Publication Date
- 2026-11-17
AI Technical Summary
In multiple interconnected conveyor routes, pallets may not be able to reach the target work port in the preset direction, which can easily lead to local congestion and excessively long conveyor paths. Existing control methods are complex and difficult to adapt to changes in the state of the conveyor network.
A pallet circulation path is formed by using a first roller conveyor route and a second roller conveyor route in opposite directions, as well as a chain conveyor route connecting the two. The pallet action is dynamically determined based on the real-time status of the target work port and the next conveying position, with the transfer node as the control reference.
It enables the transfer of pallets when the target work port cannot be received temporarily, avoiding local congestion, balancing the rigid requirements of warehousing operations with the fluidity of the overall conveying network, and simplifying the control logic.
Smart Images

Figure CN123105124A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of automated warehousing and logistics conveying technology, specifically to a pallet conveying control method and system based on transfer nodes, and more particularly to a method and system for dynamically scheduling mixed-flow pallets in a pallet conveying network with a circulating conveying path, based on the target work port and the real-time occupancy status of each transfer node. Background Technology
[0002] Automated storage and retrieval systems (AS / RS) typically use stacker cranes to transfer pallets between the AS / RS storage locations and external conveying systems. They also use conveying equipment to transport pallets from the AS / RS to manual sorting locations, or to transport sorted pallets that still need to be stored back to the AS / RS.
[0003] To improve the utilization rate of conveying equipment, roller conveyors, chain conveyors, and transfer equipment can be used to form an interconnected pallet conveying network, allowing pallets carrying different logistics tasks to be transported in a mixed manner within the same conveying network.
[0004] When multiple pallets are performing different conveying tasks simultaneously, the occupancy status of the target work port and various conveying positions in the conveying network will continuously change. When the target work port corresponding to a pallet is already occupied by other pallets, if the current pallet directly stops at a conveying position close to the target work port to wait, it is easy to occupy the corresponding conveying node and hinder the continued passage of other pallets, causing the local congestion at the target work port to spread to the upstream conveying route.
[0005] Meanwhile, in a conveyor network with multiple interconnected conveyor routes, there may be different conveyor paths for a pallet to reach the target work port from its current location. If the path determination process does not take into account the actual allowed conveyor direction of each conveyor route and the corresponding conveyor distance for different paths, problems may arise such as the pallet failing to reach the target work port according to the equipment's preset running direction or the conveyor path being too long.
[0006] Even if the target work port is idle, the next transport position that the pallet is about to enter may still be occupied by other pallets. If the control system only controls the pallet operation according to the predetermined complete path, without making real-time judgments on the next transport position as the pallet passes through different transfer nodes, multiple pallets are likely to form mutual waiting or transport conflicts near the transfer nodes.
[0007] The existing control method that uses loops for logistics scheduling is prone to binding the control logic to the specific loop structure. When the delivery task and the on-site occupancy status change, it is necessary to determine the loop where the pallet is located and the switching relationship between loops, making the control logic relatively complex.
[0008] Therefore, there is a need for a conveying control method that can dynamically determine the subsequent actions of the pallet based on the current transfer node of the pallet, the status of the target work port, the node connection relationship, the conveying direction, and the status of the next conveying position, while ensuring that the pallet has the ability to circulate. Summary of the Invention
[0009] The purpose of this invention is to provide a pallet conveying control method and system based on transfer nodes. The method forms a physical conveying path for pallets to circulate by a first roller conveying route and a second roller conveying route with opposite conveying directions and a chain conveying route connecting the two. The pallet's current transfer node is used as the control reference, and the pallet conveying action is determined according to the real-time occupancy status of the target work port and the next conveying position.
[0010] To achieve the above objectives, the present invention adopts the following technical solution.
[0011] This invention provides a pallet conveying control method based on transfer nodes, applicable to pallet conveying networks.
[0012] The pallet conveying network includes a first roller conveying route and a second roller conveying route with opposite conveying directions, multiple chain conveying routes connecting the first roller conveying route and the second roller conveying route, and a transfer node set at the intersection of the roller conveying route and the chain conveying route. The first roller conveying route, the second roller conveying route and at least two chain conveying routes form a conveying path for pallet circulation.
[0013] Obtain the target work port information corresponding to the pallet to be transported; when the pallet arrives at the current transfer node, detect the occupancy status of the corresponding target work port based on the target work port information.
[0014] When the target work port is occupied, determine the type of the target work port; If the target work port is an inlet, the pallet is controlled to move from the current transfer node to a transfer node located upstream of the inlet and adjacent to it to wait. The occupancy status of the inlet is continuously monitored, and the pallet is controlled to enter the inlet after the inlet switches to an idle state. If the waiting time of the pallet at the transfer node reaches a preset threshold and the inlet is still not idle, the pallet is controlled to exit the transfer node and continue to be transported along the circulating conveyor path. If the target sorting port is a manual sorting port, the pallet is controlled to continue to be transported along the circulating conveyor path, and the occupancy status of the target sorting port is re-detected when the pallet reaches the subsequent transfer node.
[0015] When the target work port is idle, at least one reachable conveying path to the target work port is determined based on the current transfer node, the connection relationship between each transfer node, and the preset conveying direction of each conveying route, and the target conveying path is determined based on the conveying distance corresponding to the reachable conveying path.
[0016] Determine the next conveying position on the target conveying path that is connected to the current transfer node and detect its occupancy status. When the next conveying position is in an idle state, control the pallet to enter the next conveying position. When the next conveying position is the next transfer node, take it as the new current transfer node and continue to determine and detect the next conveying position until the pallet reaches the target operation port.
[0017] Furthermore, the first roller conveyor route and the second roller conveyor route extend along the first direction and are spaced apart along the second direction, and multiple chain conveyor routes extend along the second direction.
[0018] Each chain conveyor route connects to the first roller conveyor route and the second roller conveyor route respectively, and forms two intersection points with the first roller conveyor route and the second roller conveyor route respectively. Lifting and transfer nodes are set at the two intersection points respectively.
[0019] Furthermore, the first roller conveyor route and the second roller conveyor route have opposite preset conveying directions, and each chain conveyor route has a corresponding preset conveying direction.
[0020] When determining the reachable transport path, only the path that can reach the target work port from the current lifting and transfer node according to the preset transport direction of each transport route constituting the path is determined as the reachable transport path.
[0021] When there are two or more reachable transport paths, the transport distance from the current position of the pallet to the target work port via each reachable transport path is compared, and the reachable transport path with the shorter transport distance is determined as the target transport path.
[0022] Furthermore, when the target work port is idle and the next transfer node on the target conveying path is occupied, the current pallet waits at the current transfer node, and it is detected whether there is a subsequent pallet with passage requirement on the material receiving side of the current transfer node.
[0023] If there are no subsequent pallets, the current pallet continues to wait, and the current pallet is controlled to enter when the next transfer node is free; if there are subsequent pallets, the current pallet exits the waiting and continues to run along the circular flow conveyor path, and the target operation port judgment is re-executed at the subsequent transfer node.
[0024] Furthermore, each lifting transfer node includes a transfer roller conveyor unit that can be raised and lowered and is capable of driving pallet conveying.
[0025] When the transfer roller conveyor unit is in the lifting position, it carries the pallet and forms a roller conveying path with the corresponding roller conveyor mechanism; when the transfer roller conveyor unit is in the lowering position, the pallet is carried by the chain conveyor mechanism and conveyed along the chain conveying route.
[0026] Furthermore, each pallet has an identification identifier. The PLC control unit obtains and binds the target work port information and task number corresponding to the pallet based on the identification identifier, and keeps the pallet data tracked when the pallet passes through different transfer nodes.
[0027] The PLC control unit determines the pallet conveying action at each transfer node based on the target work port status, the connection relationship between transfer nodes, the preset conveying direction of the conveying route, and the occupancy status of the transfer nodes.
[0028] Furthermore, each chain conveyor route has a manual sorting port at one end and an inlet or outlet at the other end. The manual sorting port is located on one side of the pallet conveyor network, while the inlet and outlet are located on the other side.
[0029] The chain conveyor route connected to the inlet and the chain conveyor route connected to the outlet have opposite preset conveying directions.
[0030] Each stacker crane corresponds to one inlet and one outlet.
[0031] When the target work port is the inlet and is occupied, the transfer node upstream of the inlet and adjacent to the inlet serves as a waiting position; the pallet waits at the transfer node for the corresponding stacker crane to release the inlet; when the waiting time expires, the pallet is controlled to exit the transfer node and re-enter the circulating conveying path.
[0032] The present invention also provides a pallet conveying system based on transfer nodes, including a first roller conveyor mechanism, a second roller conveyor mechanism, multiple chain conveyor mechanisms, multiple transfer nodes, a status detection unit, a pallet data management unit, and a PLC control unit.
[0033] The first roller conveyor and the second roller conveyor form a first roller conveyor route and a second roller conveyor route in opposite directions. Multiple chain conveyor mechanisms form a chain conveyor route connecting the first roller conveyor route and the second roller conveyor route, and together with the first roller conveyor route and the second roller conveyor route, they form a conveyor path for the pallet to circulate.
[0034] The status detection unit is used to detect the occupancy status of the target work port and the corresponding conveying position of the transfer node. The pallet data management unit is used to establish the correspondence between pallet identity information and target work port information. The PLC control unit is used to execute the above pallet conveying control.
[0035] Furthermore, the transfer node is a lifting transfer node, and each lifting transfer node includes a transfer roller conveyor unit that can be raised and lowered.
[0036] When the transfer roller conveyor unit is in the lifting position, it forms a roller conveying path with the corresponding roller conveyor mechanism; when the transfer roller conveyor unit is in the lowering position, the pallet is carried by the corresponding chain conveyor mechanism.
[0037] Furthermore, each chain conveyor route intersects with the first roller conveyor route and the second roller conveyor route, and lifting and transfer nodes are set at the two intersection points respectively.
[0038] Each chain conveyor route has a manual sorting port at one end and an inlet or outlet at the other end. The manual sorting port is located on one side of the pallet conveyor system, while the inlet and outlet are located on the other side. The chain conveyor routes connected to the inlet and the chain conveyor routes connected to the outlet have opposite preset conveying directions, and each stacker crane corresponds to one inlet and one outlet.
[0039] Beneficial effects Compared with the prior art, the present invention has the following main improvements: This invention enables pallets to continue circulating even when the target work port cannot be received temporarily, through a first roller conveying route and a second roller conveying route in opposite directions, as well as a chain conveying route connecting the two, and allows the status of the target work port to be reassessed after reaching the subsequent transfer node.
[0040] The present invention further differentiates the processing based on the type of the target work port: when the target work port is a manual sorting port and is occupied, the pallet is controlled to continue circulating in the conveying network to avoid local congestion; when the target work port is an inbound port and is occupied, the pallet is controlled to queue at the adjacent transfer node upstream of the inbound port to avoid ineffective circulation, and is released back to the circulation path after the timeout, thus taking into account both the rigid requirements of the inbound operation and the fluidity of the overall conveying network.
[0041] This invention uses the transfer node as an independent judgment unit at the control level, and can determine the pallet action based on the current position of the pallet, the target working port, and the real-time status of the next conveying position.
[0042] This invention first determines the reachable conveying path based on the fixed direction of the conveying route, then determines the target conveying path based on the conveying distance, and detects the next conveying position node by node during the pallet operation, so that the path selection can take into account both physical accessibility and conveying distance. Attached Figure Description
[0043] Figure 1 This is a flowchart of the pallet conveying control method based on transfer nodes according to the present invention; Figure 2 This is a schematic diagram of the pallet conveying network of the present invention.
[0044] The following detailed description, in conjunction with the accompanying drawings, will further illustrate the present invention. Detailed Implementation
[0045] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings. The following embodiments are used to illustrate the technical concept and specific implementation process of the present invention, and should not be construed as limiting the scope of protection of the present invention.
[0046] Example like Figure 1 As shown, the present invention provides a pallet conveying control method based on transfer nodes, which is applied to pallet conveying networks.
[0047] The pallet conveying network includes a first roller conveying route and a second roller conveying route with opposite conveying directions, multiple chain conveying routes connecting the first roller conveying route and the second roller conveying route, and a transfer node set at the intersection of the roller conveying route and the chain conveying route. The first roller conveying route, the second roller conveying route and at least two chain conveying routes form a conveying path for pallet circulation.
[0048] Obtain the target work port information corresponding to the pallet to be transported; when the pallet arrives at the current transfer node, detect the occupancy status of the corresponding target work port based on the target work port information.
[0049] When the target port is occupied, the PLC control unit first determines the type of the target port.
[0050] If the target work area is an inlet, since the release of the inlet depends on the completion status of the corresponding stacker crane, the pallet should not blindly circulate in the conveyor network. Otherwise, it will easily increase the burden on the conveyor network and make it difficult to guarantee that it will reach the inlet immediately upon release. Therefore, the current pallet is controlled to move directly from the current transfer node to the transfer node located upstream of the inlet (i.e., the lifting transfer node at the front end of the inlet) to queue and wait, continuously monitoring the occupancy status of the inlet. Once the inlet is detected to be released (i.e., switched to an idle state), the pallet is immediately controlled to enter the inlet. If the time the pallet stays at the transfer node reaches a preset threshold (e.g., set according to the average working cycle of the stacker crane) and the inlet is still not released, the pallet is controlled to exit the transfer node, re-enter the circulating conveyor path, and re-initiate the occupancy status judgment for the inlet or other new target work areas when it reaches the subsequent transfer node.
[0051] If the target work port is a manual sorting port or other non-warehousing port, the pallet will continue to run along the current circulating conveyor path, and the target work port will be checked again after reaching the subsequent lifting and transfer node to avoid the current pallet occupying the transfer node for a long time and obstructing the passage of subsequent pallets.
[0052] When the target work port is idle, at least one reachable conveying path to the target work port is determined based on the current transfer node, the connection relationship between each transfer node, and the preset conveying direction of each conveying route, and the target conveying path is determined based on the conveying distance corresponding to the reachable conveying path.
[0053] Determine the next conveying position on the target conveying path that is connected to the current transfer node and detect its occupancy status. When the next conveying position is in an idle state, control the pallet to enter the next conveying position. When the next conveying position is the next transfer node, take it as the new current transfer node and continue to determine and detect the next conveying position until the pallet reaches the target operation port.
[0054] Specifically: Pallet delivery network like Figure 2 As shown, the pallet conveying network of this embodiment includes a first roller conveying route, a second roller conveying route, and multiple chain conveying routes connecting the first roller conveying route and the second roller conveying route.
[0055] The first and second roller conveyor routes are spaced apart and have opposite preset conveying directions. Multiple chain conveyor routes are arranged between the first and second roller conveyor routes, with each chain conveyor route intersecting with both the first and second roller conveyor routes.
[0056] Each chain conveyor route intersects with the first roller conveyor route to form a lifting and transfer node, and intersects with the second roller conveyor route to form another lifting and transfer node. Therefore, in the actual conveying structure of this embodiment, one chain conveyor route corresponds to two lifting and transfer nodes located on its two sides respectively.
[0057] The first roller conveyor route and the second roller conveyor route perform conveying functions in opposite directions, and are connected to each other by at least two chain conveyor routes, so that the first roller conveyor route, the second roller conveyor route and the corresponding chain conveyor routes can form a closed conveying path for the circulation of pallets.
[0058] For example, if the first chain conveyor route connects the first roller conveyor route and the second roller conveyor route, and the second chain conveyor route connects the first roller conveyor route and the second roller conveyor route again at a position spaced apart from the first chain conveyor route, then the pallet can form a cycle flow according to the preset conveying direction of the first roller conveyor route, the first chain conveyor route, the second roller conveyor route, and the second chain conveyor route.
[0059] The term "circulating conveyor path" is used here to describe the physical conveying capacity of the conveyor network, enabling the PLC to directly control the pallet based on its current node location.
[0060] Conveying direction The conveying directions of the first roller conveyor route and the second roller conveyor route are fixed and opposite.
[0061] Each chain conveyor route also has a predetermined conveying direction, and the corresponding conveying direction is determined according to the type of work port it is connected to.
[0062] When one end of the chain conveyor route is connected to the inlet, the chain conveyor route transports pallets that need to enter the automated warehouse in the direction of the inlet; when one end of the chain conveyor route is connected to the outlet, the chain conveyor route transports pallets output from the automated warehouse in the direction of the outlet towards the inside of the pallet conveyor network. Therefore, the chain conveyor route connected to the inlet and the chain conveyor route connected to the outlet form conveyor channels in opposite directions.
[0063] During normal transport, each conveyor route does not temporarily reverse its direction to shorten the transport distance of a particular pallet. Therefore, in this embodiment, the "shorter path" is determined by comparing accessible paths that conform to the fixed transport direction of each conveyor route, rather than by directly determining the straight-line distance between the target work port and the pallet.
[0064] Work port and stacker crane Each chain conveyor route has a manual sorting port at one end and an inbound or outbound port at the other end, depending on the corresponding logistics task.
[0065] Multiple manual sorting points are located on one side of the pallet conveyor network, while multiple inbound and outbound points are located on the other side.
[0066] The inbound and outbound ports are configured according to the corresponding stacker cranes, with each stacker crane having one inbound port and one outbound port.
[0067] The inlet is used to receive pallets that need to enter the automated warehouse, and the corresponding stacker crane will transfer the pallets to the corresponding storage location in the automated warehouse.
[0068] The outbound port is used to receive pallets taken out of the automated warehouse by the corresponding stacker crane and send the pallets into the circulating conveyor network through the corresponding chain conveyor route.
[0069] The manual sorting port is used by operators to retrieve the materials needed for a task from the pallet. After manual sorting is completed, if there are still remaining materials in the pallet that need to be stored, a return-to-warehouse task can be created for that pallet, and the corresponding return port can be used as the new target work port.
[0070] Lifting and transferring nodes The lifting and transfer node is located at the intersection of the roller conveyor route and the chain conveyor route.
[0071] Each lifting and transfer node includes a transfer roller conveyor unit that can be raised and lowered, and the transfer roller conveyor unit itself has rollers that drive the pallet conveyor.
[0072] The chain conveyor remains in its installed position, and the lifting mechanism drives the transfer roller conveyor unit, rather than driving the chain conveyor to rise and fall.
[0073] When the pallet needs to run along the first roller conveyor route or the second roller conveyor route, the transfer roller conveyor unit rises to the lifting position, so that its rollers carry the pallet and form a roller conveyor path with the corresponding roller conveyor mechanism, and the pallet runs along the corresponding roller conveyor route.
[0074] When a pallet needs to travel along the chain conveyor route, the transfer roller conveyor unit descends, allowing the pallet to be carried by the corresponding chain conveyor mechanism, and the pallet travels along the chain conveyor route.
[0075] Therefore, the lifting and lowering of the transfer roller conveyor unit switches the load-bearing and conveying direction of the pallet.
[0076] tray task data Each pallet has a unique identifier, which can be an RFID tag or a barcode.
[0077] After a pallet enters the pallet conveying network, the PLC control unit obtains the corresponding task information based on the pallet's identification. The task information includes at least the target work port information, and may also include material information and task number.
[0078] The PLC control unit continuously maintains the correspondence between pallet identity information, target work port information, and pallet current position as the pallet passes through different lifting and transfer nodes.
[0079] Level 1 Judgment: Status of the target work port When the pallet arrives at the current lifting and transfer node, the PLC control unit first reads the target work port information corresponding to the pallet and checks whether the target work port meets the conditions for receiving the current pallet.
[0080] When the target work port is idle, proceed to path determination and next conveying position judgment.
[0081] When the target port is occupied, the PLC control unit further distinguishes the target port type: If the target work area is an inbound port, it means that the corresponding stacker crane cannot currently receive the pallet. In this case, the pallet is not blindly circulated in the conveyor network, but instead directly enters the transfer node (i.e., the lifting transfer node at the front end of the inbound port) located upstream and adjacent to the inbound port to queue and wait. During this period, the PLC continuously monitors the occupancy status of the inbound port. Once the stacker crane completes the interaction with the inbound port, the occupancy status of the inbound port is released, and the waiting pallet is immediately sent in. Simultaneously, the PLC starts a waiting timer. If the timeout occurs (e.g., exceeding the preset average stacker crane retrieval cycle), it is determined that the current inbound port cannot restore its receiving capacity in a short time. The PLC controls the pallet to exit the transfer node and re-enter the circular flow path, avoiding the pallet's long-term occupation of the transfer node and affecting the subsequent inbound scheduling of other pallets.
[0082] If the target work port is a manual sorting port (or other non-warehousing work port), since manual sorting usually takes a long time and the release time is relatively random, the current pallet is controlled not to wait at the current lifting and transfer node, but to continue running along the current circulating conveyor path, and the target work port is checked again after reaching the subsequent lifting and transfer node.
[0083] Accessible transport path and target transport path When the target work port is idle, the PLC control unit determines the reachable conveying path to the target work port based on the current lifting and transfer node of the pallet, the connection relationship between each lifting and transfer node, and the preset conveying direction of each roller conveyor route and chain conveyor route.
[0084] Whether a path is reachable is primarily determined by the conveying direction. A candidate path can only be considered a reachable conveying path if the pallet can continuously travel to the target work port in the preset conveying direction of each conveying route that constitutes the path.
[0085] If an reachable transport path exists, it is designated as the target transport path.
[0086] When there are two or more reachable transport paths, the transport distances of each path are compared, and the reachable transport path with the shorter distance is determined as the target transport path.
[0087] The conveying distance can be determined based on the actual conveying length, or based on the number of conveying sections or lifting and transferring nodes along the route.
[0088] Second-level judgment: Status of the next conveying position Once the target conveying path is determined, the PLC control unit determines the next conveying position the pallet will enter along the target conveying path.
[0089] The next conveying position can be the next lifting and transfer node, or it can be the target work port that is directly connected to the current lifting and transfer node through the corresponding chain conveying route.
[0090] The PLC control unit detects whether the next delivery position is occupied.
[0091] When the next conveying position is idle, control the current pallet to be conveyed to the next conveying position.
[0092] When the next conveying position is the next lifting and transfer node, after the pallet arrives at that node, it is taken as the new current lifting and transfer node, and the same node judgment continues to be performed.
[0093] Therefore, this embodiment does not require all nodes on the entire path to be detected at once before the pallet enters the target conveying path. Instead, it only determines the next position that the pallet is about to enter and makes judgments node by node as the pallet moves.
[0094] Level 3 assessment: Rear tray status When the target work port is free, but the next lifting and transfer node on the target conveying path is occupied, the current pallet waits at the current lifting and transfer node.
[0095] The PLC control unit further detects whether there are subsequent pallets with passage requirements on the material receiving side of the current lifting and transfer node.
[0096] If there are no subsequent pallets, the current pallet continues to wait and will enter the next lifting and transfer node after it is released.
[0097] When there are subsequent pallets behind, in order to avoid the current pallet occupying the lifting and transfer node for a long time and blocking the subsequent pallets, the PLC control unit controls the current pallet to abandon the action of entering the target conveying path this time, and continue to run along the circulating conveying path.
[0098] Once the current pallet reaches the subsequent lifting and transfer node, the first-level judgment will be re-executed.
[0099] Multi-pallet conveying scenarios with the same target work port Taking the example where both the first and second pallets need to enter the same manual sorting port.
[0100] The first pallet arrives at a certain lifting and transfer node. After the PLC detects that the target manual sorting port is empty, it determines the corresponding target conveying path and controls the first pallet to enter the manual sorting port node by node.
[0101] The second pallet then arrives at the lifting and transfer node. At this time, the first pallet is still at the target manual sorting port. The PLC detects that the target manual sorting port is occupied, so it controls the second pallet to continue running along the circulating conveyor path.
[0102] When the second pallet arrives at the subsequent lifting and transfer node, the target manual sorting port is checked again.
[0103] If the first pallet has been sorted and released from the target manual sorting port, the target conveying path is redefined based on the new current position of the second pallet, and the second pallet is controlled to be conveyed to the target manual sorting port.
[0104] Return to warehouse after manual sorting After the pallet enters the manual sorting port, the operator takes out the materials needed for the current task from the pallet.
[0105] When there are still remaining materials in the pallet, generate a return-to-warehouse task for the pallet and determine the corresponding entry point.
[0106] The PLC control unit updates the target work port information of the pallet, causing the pallet to re-enter the above-mentioned node-type control process and be transported to the target inlet.
[0107] If empty pallets are generated after manual sorting, they can be collected, stacked, or re-entered into the warehouse according to the warehousing business rules. The specific handling method does not affect the above-mentioned node-type conveying control.
[0108] Warehouse entry waiting and timeout handling As described in the first-level judgment, when the target work port is an inlet and is occupied, the pallet will directly enter the transfer node (i.e., the lifting transfer node at the front end of the inlet) located upstream and adjacent to the inlet to wait. The PLC control unit continuously monitors the occupancy status of the inlet. Once the stacker crane completes the interaction with the inlet, the occupancy status of the inlet is released, and the pallet is controlled to enter the inlet from the transfer node. If the waiting time reaches a preset threshold, it is determined that the current pallet cannot be stored within a reasonable time. The PLC control unit controls the pallet to exit the transfer node and controls the corresponding lifting transfer node or roller conveyor mechanism to rejoin the circulating conveyor path.
[0109] PLC control relationship The PLC control unit communicates or is electrically connected to the status detection unit, roller conveyor mechanism, chain conveyor mechanism, and lifting and transfer node.
[0110] The status detection unit may include photoelectric sensors, proximity sensors, or other detection devices used to detect the presence status of the tray.
[0111] The PLC control unit stores or retrieves the connection relationships between each lifting and transfer node, the preset conveying directions of each conveying route, and the connection relationships between the target work port and the conveying route.
[0112] The host computer provides the task information corresponding to the pallet. After obtaining the target work port information, the PLC control unit completes node-level judgment and control of the conveying equipment based on the real-time status of the site.
[0113] Therefore, the basic judgment object of the PLC control logic is the "current lifting and transfer node". The cyclic conveying path, as the underlying physical conveying structure, ensures that the pallet has the ability to continue to flow and approach the target work port again when it fails to enter the target work port. The node-type control logic is responsible for determining the specific actions of the pallet each time it reaches the lifting and transfer node.
[0114] Other implementation methods and terminology explanation It should be noted that this embodiment is based on the first roller conveying route and the second roller conveying route with opposite conveying directions, as well as the multiple chain conveying routes connecting the two, to form a circulating conveying path, without arbitrarily expanding the roller conveying routes to three or more.
[0115] The first roller conveyor route and the second roller conveyor route are connected by at least two chain conveyor routes, thereby enabling the pallet to form a closed loop flow path along the first roller conveyor route, one of the chain conveyor routes, the second roller conveyor route, and the other chain conveyor route.
[0116] The “circular flow conveyor path” in this specification describes the physical conveyor path through which a pallet can continue its journey from its current conveyor position and subsequently return to a transfer node that leads to its target work port.
[0117] The "current migration node" in this manual is not a fixed node, but rather the migration node currently in which the system is performing node determination at the time the system is in operation. After the system moves to the next migration node, that next migration node becomes the new current migration node.
[0118] In this manual, "reachable conveying path" refers to a conveying path that can reach the target work port from the current transfer node according to the preset conveying directions of the roller conveyor route and chain conveyor route that constitute the path.
[0119] The term "occupied status" in this specification includes not only the presence of other pallets at the corresponding location, but also the temporary inability of the location to receive pallets due to the corresponding device's inability to do so. Correspondingly, "idle status" indicates that the corresponding location currently meets the conditions for receiving pallets.
[0120] The use of terms such as "first" and "second" in this specification is mainly used to distinguish technical features of the same or similar types, and is not used to limit the importance or chronological order of the corresponding technical features.
[0121] The above description is merely a specific embodiment of the present invention, used to illustrate the technical principles and implementation process of the present invention, and is not intended to limit the scope of protection of the present invention. Those skilled in the art, without departing from the technical concept of the present invention, can adjust or equivalently replace the chain conveyor route and the number of corresponding lifting and transfer nodes, the status detection method, the conveying distance determination method, and the node control parameters according to the actual number of pallets, the number of manual sorting ports, the number of inbound and outbound ports, and the number of stacker cranes; all equivalent substitutions or improvements made based on the technical concept of the present invention should fall within the scope of protection of the present invention.
Claims
1. A pallet conveying control method based on transfer nodes, characterized in that, The method is applied to a pallet conveying network, which includes a first roller conveyor route and a second roller conveyor route with opposite conveying directions, multiple chain conveyor routes connecting the first roller conveyor route and the second roller conveyor route, and a transfer node located at the intersection of the roller conveyor route and the chain conveyor route. A conveying path for pallet circulation is formed between the first roller conveyor route, the second roller conveyor route, and at least two of the chain conveyor routes. Obtain the target work port information corresponding to the pallet to be transported; When the pallet arrives at the current transfer node, the occupancy status of the corresponding target work port is detected according to the target work port information; When the target work port is occupied, determine the type of the target work port; If the target work port is an inlet, the pallet is controlled to move from the current transfer node to a transfer node located upstream of the inlet and adjacent to it to wait. The occupancy status of the inlet is continuously monitored, and the pallet is controlled to enter the inlet after the inlet switches to an idle state. If the waiting time of the pallet at the transfer node reaches a preset threshold and the inlet is still not idle, the pallet is controlled to exit the transfer node and continue to be transported along the circulating conveyor path. If the target work port is a manual sorting port, the pallet is controlled to continue to be transported along the circulating conveyor path, and the occupancy status of the target work port is re-detected when the pallet reaches the subsequent transfer node. When the target work port is idle, at least one reachable conveying path from the current transfer node to the target work port is determined based on the current transfer node, the connection relationship between each transfer node, and the preset conveying direction of each roller conveying route and chain conveying route. The target conveying path is then determined based on the conveying distance corresponding to the reachable conveying path. Determine the next transport position on the target transport path that connects to the current transfer node, and detect the occupancy status of the next transport position; When the next conveying position is idle, control the pallet to be conveyed from the current transfer node to the next conveying position along the target conveying path; When the next conveying position is the next transfer node, the next transfer node is taken as the new current transfer node, and the next conveying position on the target conveying path is determined and detected until the pallet is conveyed to the target work port.
2. The pallet conveying control method based on transfer nodes according to claim 1, characterized in that, The first roller conveyor route and the second roller conveyor route extend along a first direction and are spaced apart along a second direction that intersects the first direction. Multiple chain conveyor routes extend along the second direction, and each chain conveyor route intersects with the first roller conveyor route and the second roller conveyor route, respectively. The transfer node is a lifting transfer node, and one lifting transfer node is set at the intersection of each chain conveyor route with the first roller conveyor route and the second roller conveyor route.
3. The pallet conveying control method based on transfer nodes according to claim 2, characterized in that, The first roller conveyor route and the second roller conveyor route have opposite preset conveying directions, and each chain conveyor route has a corresponding preset conveying direction. When determining the reachable conveying path, based on the connection relationship between each lifting and transferring node and the preset conveying directions of the corresponding roller conveyor route and chain conveyor route, a conveying path that can reach the target working port from the current lifting and transferring node according to the preset conveying direction of each conveying route is determined. When there are more than two reachable conveying paths, based on the conveying distance from the current position of the pallet to the target working port via each reachable conveying path, the path with the shorter conveying distance is determined as the target conveying path.
4. The pallet conveying control method based on transfer nodes according to claim 1, characterized in that, When the target work port is idle and the next transfer node on the target conveying path is occupied, the current pallet is controlled to wait at the current transfer node, and the system checks whether there is a subsequent pallet with passage requirements on the receiving side of the current transfer node. If there is no subsequent pallet, the current pallet remains in a waiting state, and the system controls the current pallet to be conveyed to the next transfer node after the next transfer node switches to an idle state. If there is a subsequent pallet, the system controls the current pallet to exit the waiting state for the next transfer node and continue conveying along the current circulating conveying path to release the current transfer node. When the current pallet reaches the subsequent transfer node, the system checks the occupancy status of the target work port again.
5. The pallet conveying control method based on transfer nodes according to claim 2, characterized in that, Each of the lifting and transfer nodes includes a transfer roller conveyor unit that can be raised and lowered and can drive the pallet conveying; when the pallet needs to be conveyed along the first roller conveyor route or the second roller conveyor route, the transfer roller conveyor unit is controlled to be in the lifting position, so that the transfer roller conveyor unit carries the pallet and forms a roller conveying path with the corresponding roller conveyor mechanism; when the pallet needs to be conveyed along the chain conveyor route, the transfer roller conveyor unit is controlled to be in the lowering position, so that the pallet is carried by the corresponding chain conveyor mechanism and conveyed along the chain conveyor route.
6. The pallet conveying control method based on transfer nodes according to claim 1, characterized in that, Each pallet has an identification identifier. The PLC control unit obtains and binds the target work port information and task number corresponding to the pallet based on the identification identifier, and keeps tracking the pallet as it passes through different transfer nodes. The PLC control unit determines the pallet's conveying action at each transfer node based on the target work port information corresponding to the pallet, the occupancy status of the target work port, the connection relationship between each transfer node, the preset conveying direction of each conveying route, and the occupancy status of the transfer node.
7. The pallet conveying control method based on transfer nodes according to claim 2, characterized in that, Each of the aforementioned chain conveyor routes has a manual sorting port at one end and an inlet or outlet at the other end. Multiple manual sorting ports are distributed on one side of the pallet conveyor network, and multiple inlet and outlet ports are distributed on the other side of the pallet conveyor network. The chain conveyor routes connected to the inlet and the chain conveyor routes connected to the outlet have opposite preset conveying directions. Each stacker crane corresponds to one inlet and one outlet. When the target work port is the inlet and is occupied, the transfer node upstream of the inlet and adjacent to the inlet serves as a waiting position; when the waiting time of the pallet at the transfer node reaches a preset threshold and the inlet still does not meet the pallet receiving conditions, the pallet is controlled to exit the transfer node and re-enter the circulating conveying path.
8. A pallet conveying system based on transfer nodes, characterized in that, The system includes a first roller conveyor mechanism, a second roller conveyor mechanism, multiple chain conveyor mechanisms, multiple transfer nodes, a status detection unit, a pallet data management unit, and a PLC control unit. The first and second roller conveyor mechanisms form a first roller conveyor route and a second roller conveyor route with opposite conveying directions, respectively. The multiple chain conveyor mechanisms form multiple chain conveyor routes connecting the first and second roller conveyor routes. The first roller conveyor route, the second roller conveyor route, and at least two chain conveyor routes form a conveying path for pallet circulation. The transfer nodes are respectively located at the intersection of the roller conveyor routes and the chain conveyor routes. The status detection unit is used to detect the occupancy status of the target work port and the corresponding conveying position of each transfer node. The pallet data management unit is used to establish the correspondence between pallet identity information and target work port information. The PLC control unit is used to execute the pallet conveying control method according to claim 1.
9. The pallet conveying system based on transfer nodes according to claim 8, characterized in that, The transfer node is a lifting transfer node, and each lifting transfer node includes a transfer roller conveyor unit that can be raised and lowered; when the transfer roller conveyor unit is in the lifting position, it forms a roller conveying path with the corresponding roller conveyor mechanism, so that the pallet is conveyed along the corresponding roller conveying path; when the transfer roller conveyor unit is in the lowering position, the pallet is carried by the corresponding chain conveyor mechanism and conveyed along the chain conveying path.
10. The pallet conveying system based on transfer nodes according to claim 8, characterized in that, Each of the chain conveyor routes intersects with the first roller conveyor route and the second roller conveyor route, and a lifting and transfer node is set at each of the two intersection points; a manual sorting port is set at one end of each chain conveyor route, and an inlet or outlet port is set at the other end; multiple manual sorting ports are located on one side of the pallet conveying system, and multiple inlet and outlet ports are located on the other side of the pallet conveying system, with the preset conveying directions of the chain conveyor route connected to the inlet port and the chain conveyor route connected to the outlet port being opposite; the pallet conveying system includes at least one stacker crane, and each stacker crane corresponds to an inlet port for receiving pallets to be stored and an outlet port for outputting pallets to the pallet conveying system.