A method, equipment and medium for water pollution treatment and regulation based on a cascaded food chain
By establishing a cascade transfer spectrum and reverse linkage regulation, the problems of insufficient carbon load and insufficient edible biomass in the cascade biological treatment system were solved, achieving a match between material supply and demand, improving operating efficiency and reducing maintenance costs.
Patent Information
- Application Number
- CN202611455122.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-18
- Publication Date
- 2026-11-17
AI Technical Summary
Existing cascade biological treatment systems struggle to achieve effective material compensation when carbon load is insufficient during nitrogen conversion and the amount of edible biomass is insufficient during biological predation. This leads to reduced operating efficiency and increased maintenance costs, posing a risk of long-term operational failure.
By establishing a cascade transfer spectrum, identifying nitrogen conversion deficits and edible biomass deficits, and then using reverse linkage to regulate the water phase load and solid phase biomass, a dual deficit compensation relationship is formed. By optimizing the bypass water distribution and biomass return, the material supply and demand matching between the three biological cascades is achieved.
It improves the compensation accuracy of the cascade food chain, reduces operational fluctuations caused by insufficient or excessive carbon load compensation, maintains the stable degradation capacity of the upstream stage, enhances the material supply and demand matching capacity among the three biological cascade stages, improves operational efficiency, and reduces long-term operation and maintenance costs.
Smart Images

Figure CN123105840A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of wastewater treatment technology, and in particular to a water pollution treatment and control method, equipment and medium based on a cascaded biological chain. Background Technology
[0002] Existing cascade biological treatment systems typically adjust the aqueous phase load and solid phase biomass separately for each reaction zone based on its local operating conditions. This lacks a unified material compensation relationship that can simultaneously characterize the nitrogen conversion demand of intermediate stages and the feeding demand of later stages. When insufficient carbon load occurs during nitrogen conversion and insufficient edible biomass occurs during predation, the adjustment of aqueous phase organic load and solid phase biomass is constrained by the different states of the biological cascades. It is difficult to determine the appropriate compensation range based on the actual transfer relationships between the stages, leading to reduced operating efficiency, increased maintenance costs, and the risk of long-term operational failure. Summary of the Invention
[0003] This invention provides a water pollution treatment and regulation method based on a tiered food chain, comprising:
[0004] The continuous operation records of the three biological cascades are merged according to the water flow time sequence to form a cascade operation record. The cascade operation record is divided into transfer sections according to the water passage position of adjacent biological cascades. The water phase organic load and solid phase biomass in each transfer section are arranged according to the cascade flow sequence, and the load change of adjacent transfer sections is calculated to form a cascade transfer spectrum.
[0005] Intermediate transport segments are extracted from the cascade transport spectrum. The actual nitrogen conversion load is compared with the baseline nitrogen conversion load to form a nitrogen conversion deficit. The carbon load deficit is then calculated based on the carbon consumption relationship of the stable operating segment. Subsequent transport segments are extracted, and the stable biomass consumption is compared with the actual edible biomass to form an edible biomass deficit. The amount of biomass required for stable degradation is deducted from the attached biomass of the preceding biodegradation stage to obtain the attached biomass surplus. A dual deficit compensation relationship is established based on the nitrogen conversion deficit and carbon load deficit, and the edible biomass deficit and attached biomass surplus.
[0006] The carbon load deficit and nitrogen conversion deficit in the dual deficit compensation relationship are proportionally converted, and the bypass water allocation from the pre-biodegradation stage to the intermediate nitrogen conversion stage is back-calculated. The edible biomass deficit and the attached biomass surplus are compared. The biomass detachment of the pre-biodegradation stage is limited according to the minimum biomass, and the biomass detachment is converted into the biomass return of the subsequent biological predation stage, forming a reverse linkage regulation sequence.
[0007] The reverse linkage regulation sequence was rearranged according to the water passage position of the three-level biological cascade, and the execution order of water phase load distribution and solid phase biomass return was corrected to form cascade regulation parameters.
[0008] As a preferred embodiment of the water pollution treatment and regulation method based on the cascade biological chain described in this invention, the three-level biological cascade includes a pre-biological degradation cascade, a mid-level nitrogen transformation cascade, and a post-biological predation cascade.
[0009] The water passage position between adjacent biological stages is the boundary position of the stages through which the water to be treated passes from the previous biological stage to the next biological stage.
[0010] As a preferred embodiment of the water pollution treatment and control method based on a cascaded food chain described in this invention, the calculated carbon load deficit specifically refers to:
[0011] Along the flow sequence of the cascade, locate the transfer segment corresponding to the intermediate nitrogen conversion cascade in the cascade transfer spectrum, extract the continuously arranged nitrogen conversion load within the transfer segment to form the intermediate transfer segment, and screen the segments from the intermediate transfer segment where the nitrogen conversion load remains stable to form the stable operation segment;
[0012] The actual nitrogen conversion load in the intermediate transfer section is compared with the benchmark nitrogen conversion load in the stable operation section. The load difference between the benchmark nitrogen conversion load and the actual nitrogen conversion load is calculated, forming a nitrogen conversion deficit.
[0013] The carbon consumption relationship between nitrogen conversion load and carbon load is extracted from the stable operating section. Based on the carbon consumption relationship, the nitrogen conversion deficit is converted into a load, and the carbon load deficit is obtained.
[0014] As a preferred embodiment of the water pollution treatment and control method based on a tiered food chain described in this invention, wherein: obtaining the excess amount of attached biomass specifically refers to...
[0015] The solid biomass transfer position corresponding to the subsequent stage of predation by organisms is located along the order of the cascade flow, and the continuously arranged solid biomass is intercepted to form the subsequent stage transfer section.
[0016] Within the subsequent transfer section, a stable feeding interval is defined based on the changes in solid biomass during continuous and stable operation;
[0017] Compare the stable biomass consumption within the stable feeding range with the actual edible biomass, and record the difference between the actual edible biomass and the stable biomass consumption to form the edible biomass deficit.
[0018] Operational records showing a continuous and stable reduction of organic load in the aqueous phase within the preceding biodegradation stage were screened from the cascade transfer spectrum. The attached biomass in the operational records was collected, and the required retention amount for stable degradation was determined based on the continuous and stable range of attached biomass.
[0019] The retention benchmark for attached biomass in the preceding biodegradation stage is defined by the retention amount required for stable degradation, and the attached biomass exceeding the retention amount required for stable degradation is collected as the excess attached biomass.
[0020] As a preferred embodiment of the water pollution treatment and control method based on a tiered food chain described in this invention, the establishment of a dual deficit compensation relationship specifically involves:
[0021] Based on the carbon consumption relationship in the stable operation section, calibrate the compensation ratio between nitrogen conversion deficit and carbon load deficit;
[0022] The upper limit for solid biomass compensation is determined based on the deficit in edible biomass and the surplus in attached biomass.
[0023] The compensation ratio is used to quantify the water phase compensation range of nitrogen conversion deficit. The solid phase compensation range of edible biomass deficit is constrained by the upper limit of solid phase biomass compensation. The water phase compensation range and the solid phase compensation range are coordinated according to the same operating section to form a dual deficit compensation relationship. The dual deficit compensation relationship refers to nitrogen conversion deficit and edible biomass deficit.
[0024] As a preferred embodiment of the water pollution treatment and control method based on a cascaded biological chain described in this invention, the bypass water allocation for the reverse calculation of the distribution from the upstream biodegradation cascade to the intermediate nitrogen conversion cascade is specifically as follows:
[0025] Based on the compensation ratio in the dual deficit compensation relationship, the nitrogen conversion deficit is converted into the compensation amount for the carbon load deficit;
[0026] Continuous records of changes in bypass water distribution volume are selected from stable operating sections. Based on the changes in aqueous organic load before and after the changes in bypass water distribution volume, the response relationship between bypass water distribution adjustment volume and carbon load change volume is established.
[0027] The bypass water distribution adjustment amount is the change in water distribution before and after the adjustment of the existing bypass water distribution amount of the upstream biodegradation stage, and the carbon load change amount is the change in the aqueous organic load obtained by the intermediate nitrogen conversion stage before and after the change in the bypass water distribution amount.
[0028] Substitute the compensation amount for the carbon load deficit into the response relationship, trace the bypass water distribution adjustment amount along the direction in which the carbon load change meets the compensation requirements, and determine the bypass water distribution adjustment amount that meets the carbon load deficit compensation requirements.
[0029] The bypass water distribution adjustment is superimposed on the existing bypass water distribution of the upstream biodegradation stage to form a candidate bypass water distribution. The candidate bypass water distribution is then verified according to the water flow range within the stable operating section to obtain the bypass water distribution allocated from the upstream biodegradation stage to the intermediate nitrogen conversion stage.
[0030] As a preferred embodiment of the water pollution treatment and regulation method based on a tiered biological chain described in this invention, the formation of the reverse linkage regulation sequence specifically includes:
[0031] The amount of film detachment in the preceding biodegradation stage is defined by the minimum of the edible biomass deficit and the attached biomass surplus.
[0032] Graded air scouring shear stress is applied to the attached biofilm in the preceding biodegradation stage, and the actual amount of film detachment corresponding to each level of air scouring shear stress is obtained step by step to form a shear-detachment correspondence.
[0033] Map the amount of film removal to the shear film removal correspondence, select the lowest air scouring shear stress when the actual amount of film removal reaches the amount of film removal, and implement air scouring on the attached biofilm of the previous biodegradation stage according to the lowest air scouring shear stress.
[0034] Based on the transfer ratio of solid biomass from the previous biodegradation stage to the subsequent predation stage in the cascade transfer spectrum, the amount of molted membrane is converted into the amount of biomass returned.
[0035] Along the time sequence of changes in edible biomass deficit, the bypass water supply, film removal rate, minimum air scouring shear stress, and biomass return rate are arranged in order of execution to form a reverse linkage regulation sequence.
[0036] As a preferred embodiment of the water pollution treatment and regulation method based on a tiered food chain described in this invention, wherein: the formation of tiered regulation parameters specifically refers to...
[0037] The bypass water distribution, biofilm removal rate, minimum air scouring shear stress, and biomass return rate in the reverse linkage control sequence are arranged according to the water flow location of the three-level biological cascade. The water flow from the previous biodegradation cascade to the intermediate nitrogen conversion cascade is adjusted according to the bypass water distribution, and the organic load of the aqueous phase is allocated according to the adjusted water flow.
[0038] Based on the amount of biofilm detachment and the minimum air scouring shear stress, the attached biofilm of the previous biodegradation stage is detached to obtain the detached biomass. The detached biomass is then transported to the subsequent biological predation stage according to the amount of biomass returned. The order of execution of water phase load distribution and solid phase biomass return is corrected by the water flow position of the three biological stages.
[0039] The bypass water distribution, film removal rate, minimum air scouring shear stress, and biomass return rate are collected after the execution sequence correction to form cascade control parameters.
[0040] In a second aspect, the present invention provides a computer device, including a memory and a processor, wherein the memory stores a computer program, wherein: when the computer program is executed by the processor, it implements any step of the water pollution treatment and regulation method based on a cascaded biological chain as described in the first aspect of the present invention.
[0041] Thirdly, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein: when the computer program is executed by a processor, it implements any step of the water pollution treatment and regulation method based on a cascaded biological chain as described in the first aspect of the present invention.
[0042] The beneficial effects of this invention are as follows: This invention improves the accuracy of cascade biological chain compensation through dual-under-limit driven reverse linkage regulation. The bypass water distribution range is determined by the carbon load compensation demand corresponding to the nitrogen conversion deficit, ensuring that the organic load in the aqueous phase is supplemented according to the intermediate nitrogen conversion demand, reducing operational fluctuations caused by insufficient or excessive carbon load compensation. The amount of biofilm shedding is jointly limited by the deficit in edible biomass and the surplus in attached biomass, forming solid biomass that can be used for subsequent compensation while maintaining the attached biomass required for stable degradation in the preceding stages, avoiding excessive shedding that could affect the degradation capacity of the preceding stages. Linking the aqueous phase load compensation and solid biomass compensation according to the operational sequence enhances the material supply and demand matching capability among the three biological cascade stages, improving operational efficiency and reducing long-term operation and maintenance costs. Attached Figure Description
[0043] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0044] Figure 1 This is a flowchart of a water pollution treatment and control method based on a cascaded food chain.
[0045] Figure 2 This is a diagram showing the synergistic compensation between insufficient nitrogen conversion and insufficient edible biomass.
[0046] Figure 3 A calibration diagram for the arrangement and execution order of three-level biological cascade regulation parameters.
[0047] Figure 4 This diagram serves as a verification of the reverse linkage regulation effect in a tiered food chain. Detailed Implementation
[0048] To make the above-mentioned objects, features and advantages of the present invention more readily understood, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0049] Reference Figures 1-4 This is one embodiment of the present invention, which provides a water pollution treatment and regulation method based on a cascaded food chain, comprising the following steps:
[0050] S1. The continuous operation records of the three biological cascades are merged according to the water flow time sequence to form a cascade operation record. The cascade operation record is divided into transfer sections according to the water passage position of adjacent biological cascades. The water phase organic load and solid phase biomass in each transfer section are arranged according to the cascade flow sequence, and the load change of adjacent transfer sections is calculated to form a cascade transfer spectrum.
[0051] In this embodiment, the pre-biodegradation stage reduces the biodegradable organic matter in the water to be treated by the attached biofilm's organic community, thereby lowering the organic load in the aqueous phase during the pre-treatment and maintaining attached biomass on the carrier surface for continuous degradation. The intermediate nitrogen conversion stage treats nitrogenous pollutants entering from the pre-biodegradation stage by a biological community with nitrogenous pollutant bioconversion capabilities. The completed nitrogen conversion load is characterized by the reduction between the nitrogenous pollutant mass load at the inlet and outlet of the intermediate nitrogen conversion stage. The post-bio-predation stage feeds on the microbial solid biomass entering the post-bio-predation stage by a biological community with feeding capabilities. The microbial solid biomass includes edible biomass entering with the stage water flow and detached biomass sent in through the solid biomass transfer path after the pre-biodegradation stage detaches from the biofilm. Thus, the three-stage biological stages form a continuous treatment relationship of organic matter degradation, nitrogenous pollutant conversion, and solid biomass feeding.
[0052] The sampling time, water passage location, aquatic organic load, and solid biomass generated during the continuous operation of the pre-biodegradation stage, the intermediate nitrogen conversion stage, and the post-biological predation stage were correlated according to the order of water flow arrival. To enable the continuous water flow to be correlated across water passage locations according to the sampling sequence, the actual amount of water to be treated between two adjacent sampling times at a previous water passage location was divided into a water flow batch. The previous sampling time was used as the start time of the water flow batch, and the subsequent sampling time was used as the end boundary of the water flow batch. The continuous sampling times formed consecutive water flow batches. For the operation record generated at the subsequent water passage location, the sampling time was traced back according to the hydraulic transmission time from the previous water passage location to the subsequent water passage location. For corrected sampling times that fall within the start and end range of a certain water flow batch, the operation record is associated with the water flow batch corresponding to the previous water passage position. This establishes a continuous correspondence between the effluent records of the preceding biodegradation stage and the influent records of the intermediate nitrogen conversion stage, and a continuous correspondence between the effluent records of the intermediate nitrogen conversion stage and the influent records of the subsequent biological predation stage. Sampling locations with missing sampling times, those that still cannot complete batch correspondence after hydraulic transfer time correction, missing water phase organic load records, and missing solid phase biomass records retain their original sampling locations and write an anomaly mark. The anomaly mark is not used to correspond to the records to characterize the normal transfer state between adjacent biological stages, thus forming a stage operation record with water flow batch correspondence and stage operation sequence relationship.
[0053] The effective flow volume is determined by the actual liquid phase volume involved in continuous water flow between two adjacent biological flow stages. The effective flow volume is determined based on the volume calibration record of the corresponding treatment area and the current operating liquid level. First, the actual liquid phase volume corresponding to the current operating liquid level is obtained according to the volume calibration record. Then, the volume occupied by fixed components and not involved in water flow transmission, as well as the calibrated stagnant volume that is not involved in continuous water flow, are deducted to obtain the effective flow volume between the two flow stages that can participate in the transmission of the water to be treated. The synchronous average flow rate is determined based on the continuous flow rate record from the start time to the end boundary of the water flow batch. When the sampling interval is consistent, the average value of the effective flow rate record within this time range is taken. When the sampling interval is inconsistent, the time weighting is performed according to the duration corresponding to each flow rate record to obtain the synchronous average flow rate.
[0054] The hydraulic transfer time of the water to be treated from the previous water passage position to the next water passage position is determined by the aforementioned effective water passage volume and the average water flow rate during the same period. The expression is as follows:
[0055] ;
[0056] In the formula, This indicates the duration of hydraulic transmission between two adjacent water passage points. This indicates the effective water passage volume between two adjacent water passage locations. This indicates the average flow rate during the same period within the corresponding water flow batch.
[0057] The sampling time of the next water passage position is corrected according to the hydraulic transmission time, so that the operation record of the previous water passage position corresponds with the operation record of the next water passage position belonging to the same water flow batch, and the water phase organic load and solid phase biomass are arranged according to the corrected sampling time.
[0058] The boundary positions of the biological treatment water as it flows from one biological stage to the next are identified from the cascade operation records. The boundary positions from the preceding biodegradation stage to the intermediate nitrogen conversion stage and from the intermediate nitrogen conversion stage to the subsequent biological predation stage are designated as the water passage points between adjacent biological stages. Transfer zones are defined based on the continuous corresponding operation records between two adjacent water passage points. According to the cascade flow sequence of the preceding biodegradation stage, intermediate nitrogen conversion stage, and subsequent biological predation stage, the corresponding aqueous organic loading and solid biomass of each transfer zone are continuously arranged to ensure that the water flow under the same time sequence... Changes in aquatic organic load and solid biomass can be correlated segment by segment between adjacent transfer sections. The aquatic organic load at the same sampling time position in adjacent transfer sections is compared before and after, and the increase, decrease and unchanged state of aquatic organic load are recorded. At the same time, the solid biomass is compared before and after, and the increase, consumption and unchanged state of solid biomass are recorded. When there are abnormal markers, the corresponding transfer position is retained but not included in the normal load change calculation. Finally, the aquatic organic load, solid biomass and load changes of adjacent transfer sections of each transfer section are collected according to the order of flow through the cascade to form a cascade transfer spectrum.
[0059] The cascade transport spectrum is used to identify changes in nitrogen conversion load in the intermediate transport section and changes in solid biomass feeding in the subsequent transport section. The continuous operation record of the cascade is obtained from the sampling time record, water flow record, water quality test record, biomass measurement record and operation record formed during the operation of the three-stage biological cascade. The water phase organic load is determined according to the water flow and organic matter concentration corresponding to the same water flow location and the same sampling time. The water flow and the corresponding organic matter concentration are converted into mass load to obtain the water phase organic load at the sampling location. The solid biomass is first obtained from the biomass measurement record of the corresponding water flow location to obtain the solid biomass concentration per unit volume of water, and then compared with the actual water flow during the same sampling period to determine the solid biomass passing through the corresponding water flow location during the sampling period. The attached biomass of the previous biodegradation cascade is determined according to the biomass measurement record of the biofilm attached to the carrier surface, and a correspondence is established with the previous water phase organic load reduction state according to the same sampling time sequence, so that the water phase organic load, transported solid biomass and attached biomass all have clear measurement locations, sampling times and data sources.
[0060] S2. Extract the intermediate transfer segment from the cascade transfer spectrum, compare the actual nitrogen conversion load with the baseline nitrogen conversion load to form a nitrogen conversion deficit, and calculate the carbon load deficit according to the carbon consumption relationship of the stable operation segment. Then extract the subsequent transfer segment, compare the stable biomass consumption with the actual edible biomass to form an edible biomass deficit. Subtract the amount of biomass required for stable degradation from the attached biomass of the previous biodegradation stage to obtain the attached biomass surplus. Establish a dual deficit compensation relationship based on the nitrogen conversion deficit and carbon load deficit, and the edible biomass deficit and attached biomass surplus. The dual deficit compensation relationship refers to the nitrogen conversion deficit and the edible biomass deficit.
[0061] It should be noted that the concentrations of nitrogen-containing pollutants belonging to the same flow batch at the inlet and outlet locations of the intermediate nitrogen conversion stage are correlated with the corresponding flow rates. The nitrogen-containing pollutant mass load at the inlet location is subtracted from the nitrogen-containing pollutant mass load at the outlet location, and the reduction in nitrogen-containing pollutant mass load between the two locations represents the nitrogen conversion load at the corresponding sampling location. The nitrogen conversion loads are then continuously arranged according to the sampling time sequence, ensuring that the nitrogen conversion load at different sampling locations of the intermediate nitrogen conversion stage is recorded using the same nitrogen-containing pollutants and the same time scale. The concentrations of nitrogen-containing pollutants are obtained from the water quality monitoring records corresponding to the inlet and outlet locations of the intermediate nitrogen conversion stage.
[0062] S2.1. Locate the transfer segment corresponding to the intermediate nitrogen conversion step in the transfer spectrum along the flow sequence of the steps. Extract the continuously arranged nitrogen conversion loads within the transfer segment to form the intermediate transfer segment. Then, select segments from the intermediate transfer segments where the nitrogen conversion load remains stable to form the stable operating segment. Specifically,
[0063] The starting point of the intermediate transfer segment is defined as the water passage point from the preceding biodegradation stage to the intermediate nitrogen conversion stage in the cascade transfer spectrum, and the ending point is defined as the water passage point from the intermediate nitrogen conversion stage to the subsequent biological predation stage. The nitrogen conversion load corresponding to the two water passage points is extracted according to the sampling time sequence in the cascade transfer spectrum, and the original correspondence between nitrogen conversion load and sampling time and water passage point is maintained to form the intermediate transfer segment.
[0064] The variation of nitrogen conversion load in the intermediate transfer section is continuously tracked. From the historical operation records of the intermediate nitrogen conversion cascade, nitrogen conversion records that have not undergone operational parameter adjustments, lack abnormal markers, and have complete continuous records of inlet flow rate and inlet nitrogen-containing pollutant mass load are selected. Historical continuous sampling windows are sequentially divided according to the same sampling quantity as the current section to be judged. The coefficient of variation of nitrogen conversion load in each continuous sampling window is calculated, and the coefficients of variation are arranged from low to high. The coefficient of variation corresponding to the 95th percentile is determined as the upper limit of the coefficient of variation for historical stable operation sections. When screening the current intermediate transfer section, sections where the continuous change direction of nitrogen conversion load does not change abruptly and the coefficient of variation at the corresponding continuous sampling position is not higher than the upper limit of the coefficient of variation are retained. Transient load changes caused by short-term influent disturbances and abnormal sampling are excluded to form stable operation sections.
[0065] S2.2. Compare the actual nitrogen conversion load in the intermediate transfer section with the baseline nitrogen conversion load in the stable operation section within the same section, calculate the load difference between the baseline nitrogen conversion load and the actual nitrogen conversion load, and form a nitrogen conversion deficit. Specifically,
[0066] Using nitrogen conversion load records with the same water flow location within the stable operating section as candidate records, the current water flow rate and inlet nitrogen pollutant mass load of the intermediate transfer section are compared with the water flow rate and inlet nitrogen pollutant mass load corresponding to the candidate records. The two differences are normalized according to the difference between the maximum and minimum values of the corresponding parameters within the stable operating section. The nitrogen conversion load corresponding to the candidate record with the lowest sum of the two normalized differences is determined as the baseline nitrogen conversion load.
[0067] The nitrogen conversion load at the sampling location corresponding to the current intermediate transfer section is determined as the actual nitrogen conversion load, and corresponding points are made according to the same sampling time scale so that the benchmark nitrogen conversion load and the actual nitrogen conversion load have the same load statistical caliber.
[0068] Nitrogen conversion deficit is expressed by the following formula:
[0069] ;
[0070] In the formula, Indicates the first The nitrogen conversion deficit corresponding to each sampling location Indicates the first The baseline nitrogen conversion load corresponding to each sampling location Indicates the first The actual nitrogen conversion load corresponding to each sampling location Indicates load, This represents the nitrogen conversion object, where ref represents the baseline state and act represents the actual state.
[0071] When the baseline nitrogen conversion load is higher than the actual nitrogen conversion load, the positive load difference between the two is recorded as the nitrogen conversion deficit; when the actual nitrogen conversion load reaches or exceeds the baseline nitrogen conversion load, the nitrogen conversion deficit at the corresponding sampling location is recorded as zero, and the nitrogen conversion deficit corresponding to consecutive sampling locations is collected according to the sampling time sequence.
[0072] S2.3 Extract the carbon consumption relationship between nitrogen conversion load and carbon load from the stable operating section. Based on the carbon consumption relationship, calculate the load deficit of nitrogen conversion to obtain the carbon load deficit. Specifically,
[0073] Within the stable operating section, nitrogen conversion load, intermediate nitrogen conversion cascade inlet water phase organic load, and outlet water phase organic load corresponding to the same sampling location are selected. The carbon load consumption at the corresponding sampling location is determined by the reduction between the inlet water phase organic load and the outlet water phase organic load. The carbon load consumption is then paired with the nitrogen conversion load at the same sampling location according to the sampling time, and sampling locations with abnormal markers or zero nitrogen conversion load are excluded. To reduce the impact of load fluctuations at a single sampling location, the total carbon load consumption corresponding to consecutive effective sampling locations within the stable operating section is proportionally converted to the total nitrogen conversion load. This ratio represents the carbon load consumption level corresponding to a unit nitrogen conversion load during stable operation, forming a carbon consumption coefficient.
[0074] The carbon consumption coefficient is expressed by the following formula:
[0075] ;
[0076] In the formula, This represents the carbon consumption coefficient for the stable operating section. Indicates the first Carbon load consumption corresponding to each valid sampling location This indicates the nitrogen conversion load corresponding to the same valid sampling location. This indicates the number of valid sampling locations involved in determining the carbon consumption relationship;
[0077] It should be noted that this formula is the specific method for proportionally converting the aforementioned carbon load consumption and nitrogen conversion load.
[0078] The nitrogen conversion deficit is mapped to the carbon consumption coefficient, and the carbon load deficit is expressed by the following formula:
[0079] ;
[0080] In the formula, This represents the carbon load deficit corresponding to the t-th sampling position; the carbon load deficit at each sampling position is retained according to the sampling time sequence to obtain the carbon load deficit.
[0081] S2.4. Locate the solid biomass transfer position corresponding to the predation step of the subsequent biological stage along the cascade flow sequence, and extract the continuously arranged solid biomass to form the subsequent transfer section. Specifically,
[0082] Solid biomass records are located along the flow direction from the intermediate nitrogen conversion gradient to the subsequent biological predation gradient in the gradient transport spectrum. The solid biomass record entering the subsequent biological predation gradient is used as the starting record of the subsequent transport segment. The solid biomass record after the corresponding water passage position of the subsequent biological predation gradient is used as the continuous tracking position. The correspondence between solid biomass and sampling time and water passage position is maintained, and the records are arranged continuously according to the actual order in which solid biomass enters the subsequent biological predation gradient. Sampling positions with missing sampling time, water passage positions that cannot be determined after corresponding water flow batches, and missing solid biomass measurement records retain their original anomaly markers. The records corresponding to the anomaly markers are only used to save the original operating status and do not participate in the calculation of the solid biomass decrease between adjacent sampling positions, the delineation of stable feeding intervals, or the determination of insufficient edible biomass. The sampling position where the anomaly marker is located also serves as the end position of the previous continuous record. The first normal sampling position after the anomaly position is used as the new starting point for continuous tracking to avoid establishing a continuous change relationship of solid biomass across anomaly records and forming a subsequent transport segment.
[0083] S2.5. Within the subsequent transfer section, based on the changes in solid biomass during continuous and stable operation, a stable feeding interval is defined to maintain stable biomass feeding. Specifically,
[0084] The decrease in solid biomass before and after entering the next feeding cascade within the subsequent transfer section is used as a characterization of feeding status, and the decrease in solid biomass per unit sampling period is recorded according to the continuous sampling sequence. Continuous feeding records without abnormal markers, without interruption of solid biomass input and without abnormal increase are selected from the historical operation records of the next feeding cascade. Historical continuous sampling windows are divided according to the same sampling quantity as the current subsequent transfer section, and the coefficient of variation of the decrease in solid biomass in each window is calculated. The coefficients of variation are arranged from low to high, and the coefficient of variation corresponding to the 95th percentile is used as the upper limit of the stable feeding coefficient of variation.
[0085] The changes in solid biomass are continuously tracked along the current and subsequent transmission segments. The stable feeding interval is defined as the continuous sampling range where the solid biomass continuously decreases, the coefficient of variation of the decrease in solid biomass corresponding to the continuous sampling position is not higher than the upper limit of the stable feeding coefficient of variation, and there are no interruptions, abnormal increases, or abnormal markers in the solid biomass input during the period. The sampling position where the direction of solid biomass decrease is interrupted, the coefficient of variation exceeds the upper limit of the stable feeding coefficient of variation, or an abnormal marker appears is taken as the termination boundary of the current stable feeding interval, and the subsequent normal sampling positions start continuous screening again.
[0086] S2.6. Compare the stable biomass consumption with the actual edible biomass within the stable feeding range, and record the difference between the actual edible biomass and the stable biomass consumption, forming the edible biomass deficit. Specifically,
[0087] The solid biomass that continuously decreases within a unit sampling period during the stable feeding interval is collected according to the sampling time. The average value of the decrease in solid biomass per unit sampling period during the continuous stable feeding period is used to characterize the stable biomass consumption. The solid biomass at the inlet of the subsequent transfer section is determined as the actual edible biomass based on the actual solid biomass that enters the subsequent biological predation ladder and can participate in feeding according to the corresponding water flow batch. The stable biomass consumption and the actual edible biomass are matched item by item according to the same sampling time scale. The positive difference refers to the biomass difference that is greater than zero when the stable biomass consumption is higher than the actual edible biomass, which is the biomass difference formed by subtracting the actual edible biomass from the stable biomass consumption. Sampling positions where the actual edible biomass reaches or exceeds the stable biomass consumption do not form a edible biomass deficit, and the corresponding deficit is recorded as zero. The positive differences corresponding to each sampling position are collected according to the continuous sampling time sequence to form the edible biomass deficit.
[0088] S2.7. Screen operational records from the cascade transfer spectrum showing a continuous and stable reduction in the organic load of the aqueous phase within the preceding biodegradation cascade. Collect the attached biomass from these operational records and determine the required retention amount for stable degradation based on the continuous and stable range of attached biomass. Specifically,
[0089] In this embodiment, the same operating section refers to a continuous sampling range in which the water flow relationship between the preceding biodegradation stage and the subsequent biodegradation stage remains continuous during continuous sampling, the bypass water distribution status, air flushing status, and biomass return status are not adjusted, and there are no abnormal markers during the period. The sampling location where any of the above operating states changes or where an abnormal marker appears serves as the boundary between adjacent operating sections, so that the aquatic organic load, attached biomass, and subsequent under-quantity data formed within the same operating section have the same operating conditions.
[0090] The aqueous organic load at the inlet and outlet of the preceding biodegradation stage is extracted from the cascade transfer spectrum, and the reduction amount of aqueous organic load at the corresponding sampling location is determined by the difference between the inlet and outlet aqueous organic loads. Continuous records without abnormal markers and without membrane removal adjustment are selected from the historical normal operation records of the preceding biodegradation stage. Continuous sampling windows are divided according to the same number of samples as the current section, and the coefficient of variation of aqueous organic load reduction in each window is calculated. The 95th percentile of the coefficient of variation corresponding to the historical continuous stable reduction record is used as the upper limit of the stable reduction coefficient of variation. When the reduction amount of aqueous organic load in the current continuous sampling range is all greater than zero, the reduction direction is continuous and consistent, and the corresponding coefficient of variation is not higher than the upper limit of the stable reduction coefficient of variation, the continuous sampling range is determined as a stable reduction section.
[0091] The attached biomass corresponding to each stable reduction section was arranged according to the sampling time sequence, and tracked step by step along the direction of decreasing attached biomass. Within the range where the organic load in the aqueous phase still meets the aforementioned stable reduction conditions, the minimum attached biomass that can sustain stable reduction in each stable reduction section was determined. The minimum attached biomass corresponding to multiple stable reduction sections was obtained, and the maximum value among the minimum attached biomass was determined as the retention amount required for stable degradation. This retention amount can cover the lower limit of attached biomass required to maintain stable reduction of organic load in the aqueous phase under different stable reduction sections. The retention amount required for stable degradation is used to subsequently distinguish between the attached biomass that must be retained and the attached biomass that can perform detachment regulation.
[0092] S2.8. The retention baseline for attached biomass at the preceding biodegradation stage is defined by the retention amount required for stable degradation. Attached biomass exceeding the retention amount required for stable degradation is collected as excess attached biomass. Specifically,
[0093] Based on the quantitative relationship between the current attached biomass at the previous biodegradation stage and the retention amount required for stable degradation as determined in S2.7, the attached biomass that must be retained and the attached biomass capable of performing detachment regulation are divided. Attached biomass within the retention amount required for stable degradation is retained at the previous biodegradation stage, and the portion of the current attached biomass exceeding the retention amount required for stable degradation is continuously aggregated according to the corresponding sampling location as the excess attached biomass. The excess attached biomass is expressed by the following formula:
[0094] ;
[0095] In the formula, Indicates the first The excess amount of attached biomass corresponding to each sampling location Indicates the first The biomass of the pre-biodegradation cascade attached at each sampling location This indicates the amount of biomass required for stable degradation. When the current biomass does not reach the amount required for stable degradation, the excess biomass is recorded as zero, and the current biomass status is maintained.
[0096] S2.9. Based on the carbon consumption relationship in the stable operating section, calibrate the compensation ratio between the nitrogen conversion deficit and the carbon load deficit, specifically as follows:
[0097] The carbon load consumption and nitrogen conversion load corresponding to each effective sampling location are extracted from the stable operating section. Sampling locations without abnormal markers, with complete carbon load consumption records and nitrogen conversion load greater than zero are identified as effective sampling locations. The carbon load consumption and nitrogen conversion load of the same effective sampling location are proportionally converted to obtain the unit nitrogen conversion carbon consumption ratio. The unit nitrogen conversion carbon consumption ratios corresponding to each effective sampling location are arranged from low to high. The 5th percentile and 95th percentile are used as the lower and upper boundaries of the stable carbon consumption range, respectively. The unit nitrogen conversion carbon consumption ratios within the stable carbon consumption range are retained to exclude abnormal ratios caused by single load fluctuations.
[0098] The compensation ratio between nitrogen conversion deficit and carbon load deficit is expressed by the following formula:
[0099] ;
[0100] In the formula, Indicates the first The unit nitrogen-to-carbon conversion ratio corresponding to each valid sampling location Indicates the first Carbon load consumption corresponding to each valid sampling location This indicates the nitrogen conversion load corresponding to the same valid sampling location.
[0101] The median of the unit nitrogen conversion carbon consumption ratio retained within the stable carbon consumption range is taken, and the median is determined as the compensation ratio between the nitrogen conversion deficit and the carbon load deficit. The compensation ratio is expressed by the following formula:
[0102] ;
[0103] In the formula, This indicates the compensation ratio between the nitrogen conversion deficit and the carbon load deficit. This indicates the number of valid sampling locations involved in determining the compensation ratio.
[0104] If there are abnormal markers, missing carbon load consumption, zero nitrogen conversion load, or the carbon consumption per unit nitrogen conversion is outside the stable carbon consumption range, the original record will be retained, but it will not be included in the determination of the compensation ratio in this round.
[0105] S2.10. Based on the deficiency of edible biomass and the surplus of attached biomass, determine the upper limit for solid biomass compensation, specifically as follows:
[0106] The solid biomass transfer ratio is a pre-calibrated operating parameter based on historical molting records of the preceding biodegradation stage and actual solid biomass records of the subsequent predation stage. The specific calibration method follows the effective transfer batch calculation rules in S3.7, and the solid biomass transfer ratio participating in the compensation calculation must be greater than zero and not higher than one. The edible biomass deficit is expressed as the actual solid biomass required by the subsequent predation stage, and then converted back to the release scale of the preceding biodegradation stage based on the solid biomass transfer ratio to obtain the equivalent release requirement of the preceding stage.
[0107] The equivalent release requirement of the preceding stage is expressed by the following formula:
[0108] ;
[0109] In the formula, This indicates the equivalent release of demand from the preceding stage. This indicates a deficiency in edible biomass. This indicates the proportion of solid-phase biomass transfer.
[0110] The equivalent release requirement of the pre-stage is compared with the excess attached biomass on the same pre-stage release scale, and the lower of the two is used to determine the upper limit of solid biomass compensation that the pre-stage can perform:
[0111] ;
[0112] In the formula, This indicates the upper limit of solid biomass compensation at the pre-release scale; thus avoiding both the pre-release amount exceeding the surplus of attached biomass and the provision of solid biomass to the subsequent stage exceeding the actual edible biomass deficit after conversion according to the transfer ratio.
[0113] S2.11. The compensation ratio is used to quantify the aquatic phase compensation range for nitrogen conversion deficit. The upper limit of solid phase biomass compensation constrains the solid phase compensation range for edible biomass deficit. The aquatic phase compensation range and solid phase compensation range are coordinated according to the same operating section to form a dual deficit compensation relationship. Specifically,
[0114] The compensation ratio determined in S2.9 is correlated with the nitrogen conversion deficit at the same sampling location. The compensation ratio characterizes the carbon load that needs to be added to the intermediate nitrogen conversion stage per unit of nitrogen conversion deficit. The compensation ratio and nitrogen conversion deficit are then converted to determine the aqueous phase compensation range.
[0115] ;
[0116] In the formula, Indicates the first The aqueous phase compensation range corresponding to each sampling location is the amount of carbon load that needs to be added to the intermediate nitrogen conversion stage, calculated according to the compensation ratio for the nitrogen conversion deficit at the same sampling location. It is used to quantify the aqueous phase organic load replenishment demand corresponding to the current nitrogen conversion deficit and as the target carbon load change for subsequent reverse calculation of bypass water distribution adjustment.
[0117] The upper limit of solid biomass compensation at the pre-release scale determined in S2.10 is converted to the actual receiving scale of the subsequent biological predation cascade according to the solid biomass transfer ratio, and the solid biomass compensation range is determined:
[0118] ;
[0119] In the formula, Indicates the first The solid-phase compensation amplitude corresponding to each sampling location.
[0120] According to the sampling time sequence in the cascade transfer spectrum, the water phase compensation amplitude and solid phase compensation amplitude formed in the same operating section are established to correspond to each other, so that the water phase compensation relationship retains the correspondence between nitrogen conversion deficit and carbon load deficit, and the solid phase compensation relationship retains the correspondence between edible biomass deficit, attached biomass surplus and solid phase biomass transfer ratio, thus forming a dual deficit compensation relationship.
[0121] Among them, the dual deficit compensation relationship is used to subsequently back-calculate the bypass water allocation from the upstream biodegradation stage to the intermediate nitrogen conversion stage, and to limit the biomass scale that the upstream biodegradation stage can use for compensation of the downstream biological predation stage.
[0122] The baseline nitrogen conversion load and carbon consumption relationship were determined by nitrogen conversion load and carbon load records formed during the continuous and stable operation of the intermediate nitrogen conversion stage; the current actual edible biomass was obtained by solid biomass records at the inlet of the subsequent transfer section; and the attached biomass of the preceding biodegradation stage was obtained by attached biomass measurement records during the continuous operation of the preceding biodegradation stage.
[0123] S3. The carbon load deficit and nitrogen conversion deficit in the dual deficit compensation relationship are proportionally converted, and the bypass water allocation from the pre-stage biodegradation stage to the intermediate nitrogen conversion stage is back-calculated. The edible biomass deficit and the attached biomass surplus are compared. The amount of biofilm detachment in the pre-stage biodegradation stage is limited according to the minimum biomass, and the amount of biofilm detachment is converted into the amount of biomass return to the subsequent biological predation stage, forming a reverse linkage regulation sequence.
[0124] S3.1. Based on the compensation ratio in the dual deficit compensation relationship, the nitrogen conversion deficit is converted into a compensation amount for the carbon load deficit, specifically as follows:
[0125] In the dual deficit compensation relationship, a one-to-one correspondence is established between the nitrogen conversion deficit at the same sampling location and the compensation ratio. The compensation ratio is used to characterize the carbon load that needs to be added to the intermediate nitrogen conversion stage for each unit of nitrogen conversion deficit. The nitrogen conversion deficit is then converted to the carbon load scale according to the compensation ratio.
[0126] The compensation amount for the carbon load deficit corresponding to the continuous sampling locations is kept in the original sampling sequence, so that the compensation amount for the carbon load deficit can be directly used as the target load change amount for subsequent bypass water distribution adjustment, thus forming the compensation amount for the carbon load deficit.
[0127] S3.2. Select continuous records of changes in bypass water distribution from the stable operating section. Based on the changes in the organic load of the aqueous phase before and after the change in bypass water distribution, establish the response relationship between the bypass water distribution adjustment and the carbon load change. Specifically,
[0128] Continuous operation records were selected from the stable operation section where the existing bypass water distribution of the upstream biodegradation stage was adjusted, and complete records of the aqueous organic load were maintained before and after the adjustment. The difference in bypass water distribution before and after the adjustment was used as the bypass water distribution adjustment amount, and the difference in the aqueous organic load obtained by the intermediate nitrogen conversion stage within the same adjustment section before and after the adjustment was used as the carbon load change amount. The bypass water distribution adjustment amount and carbon load change amount corresponding to the same adjustment time were matched to form a response record. The response records were arranged from low to high according to the bypass water distribution adjustment amount. When the same bypass water distribution adjustment amount corresponds to multiple sets of carbon load change amounts, the median of the carbon load change amount was used to represent the corresponding response level. Piecewise linear interpolation was then used to connect adjacent bypass water distribution adjustment amounts and carbon load change amounts, so that any covered carbon load change amount within the stable operation section could be used to reverse locate the corresponding bypass water distribution adjustment amount, thus establishing the response relationship between bypass water distribution adjustment amount and carbon load change amount.
[0129] Among them, the bypass water distribution adjustment amount is the change in water distribution before and after the adjustment of the existing bypass water distribution amount of the upstream biodegradation stage, and the carbon load change amount is the change in the aqueous organic load obtained by the intermediate nitrogen conversion stage before and after the change in the bypass water distribution amount.
[0130] S3.3 Substitute the compensation amount for the carbon load deficit into the response relationship, trace the bypass water distribution adjustment amount along the direction in which the carbon load change meets the compensation requirement, and determine the bypass water distribution adjustment amount that meets the carbon load deficit compensation requirement. Specifically,
[0131] The compensation amount for the carbon load deficit is taken as the target carbon load change. The corresponding position of the target carbon load change is located in the response relationship between the bypass water distribution adjustment amount and the carbon load change amount. When the target carbon load change amount falls between two adjacent carbon load changes, the bypass water distribution adjustment amount is located in reverse along the piecewise linear response relationship between the two adjacent carbon load changes, so that the carbon load change amount corresponding to the located bypass water distribution adjustment amount is consistent with the compensation amount for the carbon load deficit. When the compensation amount for the carbon load deficit reaches the existing coverage boundary of the response relationship, the boundary bypass water distribution adjustment amount that can realize the corresponding carbon load change direction within the stable operation section is used as the back-calculation boundary to avoid the back-calculation result exceeding the existing stable operation response section, and to determine the bypass water distribution adjustment amount that meets the carbon load deficit compensation requirements.
[0132] S3.4. The bypass water distribution adjustment amount is superimposed on the existing bypass water distribution amount of the upstream biodegradation stage to form a candidate bypass water distribution amount. The candidate bypass water distribution amount is then verified according to the water flow range within the stable operating section to obtain the bypass water distribution amount allocated from the upstream biodegradation stage to the intermediate nitrogen conversion stage. Specifically,
[0133] Bypass water distribution records without abnormal markers, where the pre-biodegradation stage and the intermediate nitrogen conversion stage maintain continuous and stable water flow and the organic load of the aqueous phase are completely recorded, are extracted from the stable operation section. The effective bypass water distribution volumes are arranged from low to high. The lowest bypass water distribution volume is used to determine the lower boundary of the water flow range of the stable operation section, and the highest bypass water distribution volume is used to determine the upper boundary of the water flow range of the stable operation section. The upper and lower boundaries together form the water flow range that has been covered by the continuous and stable operation records.
[0134] The bypass water distribution adjustment is superimposed onto the existing bypass water distribution of the upstream biodegradation stage, according to the direction of increasing water distribution corresponding to positive adjustment and decreasing water distribution corresponding to reverse adjustment, to form a candidate bypass water distribution. The candidate bypass water distribution is retained when it falls within the stable operating range; when it falls below the lower boundary of the range, it is limited to the lower boundary; when it rises above the upper boundary, it is limited to the upper boundary. This ensures that the bypass water distribution adjustment remains within the range covered by existing continuous stable operating records, thus obtaining the bypass water distribution allocated from the upstream biodegradation stage to the intermediate nitrogen conversion stage.
[0135] S3.5. The amount of biofilm detachment in the preceding biodegradation stage is defined by the minimum of the edible biomass deficit and the attached biomass surplus. Graded air scouring shear stresses are applied to the attached biofilm in the preceding biodegradation stage, and the actual amount of biofilm detachment corresponding to each level of air scouring shear stress is obtained, establishing a shear-detachment correspondence. Specifically...
[0136] The equivalent release requirement of the pre-stage determined in S2.10 is compared with the excess amount of attached biomass, and the smaller of the two values is used to determine the amount of film removal that the pre-stage biodegradation cascade can perform, and this amount of film removal does not exceed the upper limit of solid biomass compensation under the pre-stage release scale.
[0137] The air outlet location, airflow direction, and duration of a single air flush are kept consistent across the pre-stage biodegradation process. The airflow adjustment range is determined based on the calibrated minimum effective airflow and maximum allowable airflow of the air flushing equipment. In this embodiment, the airflow adjustment range is divided into five air flushing levels at equal intervals from low to high airflow. The first air flushing level corresponds to the minimum effective airflow, the fifth air flushing level corresponds to the maximum allowable airflow, and the middle three levels are set at the same airflow interval, thus obtaining five progressively increasing air flushing levels.
[0138] During the air scouring calibration, the corresponding airflow was output according to five air scouring levels, and the tangential force borne by the attached biofilm at the point of action was measured. The air scouring shear stress corresponding to each air scouring level was determined based on the tangential force and the effective force-bearing area of the attached biofilm.
[0139] ;
[0140] In the formula, Indicates the first The air scour shear stress corresponding to each air scour level. This indicates the tangential force acting on the surface of the attached biofilm at this air scouring level. This indicates the effective force-bearing area of the attached biofilm. This indicates the air scour level number; thus, the calibration correspondence between airflow, air scour level, and air scour shear stress is established.
[0141] The attached biofilm was subjected to air scouring for the same duration according to the air scouring shear stress corresponding to each air scouring level. After each level of air scouring was completed, the corresponding detached biofilm was collected and the actual amount of detached biofilm was measured. The air scouring shear stress and the actual amount of detached biofilm were arranged in ascending order of air scouring shear stress to form a shear-detachment correspondence.
[0142] Among them, the air scouring shear stress calibration record is formed by synchronously recording the air flow rate and the tangential force per unit area on the surface of the attached biofilm during the air scouring process.
[0143] S3.6 Map the amount of biofilm removal to the shear-removal correspondence, select the lowest air scouring shear stress at which the actual amount of biofilm removal is reached, and perform air scouring on the attached biofilm of the preceding biodegradation stage according to the lowest air scouring shear stress. Specifically...
[0144] Map the target demolding amount determined in S3.5 to the shear demolding correspondence, and trace step by step along the direction of increasing actual demolding amount, starting from the position corresponding to the lowest air scouring shear stress. When the target demolding amount is consistent with a certain level of actual demolding amount, read the air scouring shear stress corresponding to that actual demolding amount. When the target demolding amount is between two adjacent actual demolding amounts, perform piecewise linear interpolation based on the two adjacent actual demolding amounts and their corresponding air scouring shear stresses. The air scouring shear stress corresponding to the target demolding amount is expressed by the following formula:
[0145] ;
[0146] In the formula, This represents the air scouring shear stress corresponding to the target amount of film removal. Indicates the target amount of film removal. and This indicates the actual amount of film removed corresponding to the air scouring levels adjacent to the target amount of film removal. and These represent the air scour shear stress corresponding to the air scour level.
[0147] The lowest value among the air scouring shear stresses required to meet the target demolding amount is determined as the minimum air scouring shear stress.
[0148] During the air rinsing execution phase, the air outlet position, air action direction, and duration of a single air rinsing are maintained the same as when the shear-deposition correspondence was established in S3.5. Based on the correspondence between air flow rate and air rinsing shear stress established in S3.5, the minimum air rinsing shear stress is reversed to determine the corresponding air flow rate. Air rinsing is then performed on the attached biofilm of the preceding biodegradation stage according to this air flow rate, so that the actual amount of defilm removal reaches the target amount of defilm removal, while retaining the amount of attached biofilm corresponding to the amount required for stable degradation.
[0149] Among them, the graded air scouring shear stress is determined based on the tangential force corresponding to each air scouring level and the effective force-bearing area of the attached biofilm. The air scouring duration is used as a condition to establish the correspondence between shear and detachment and to maintain consistency when performing air scouring, but it is not used as a parameter to determine the value of air scouring shear stress.
[0150] S3.7. Based on the proportion of solid biomass transferred from the preceding biodegradation stage to the subsequent predation stage in the cascade transport spectrum, the amount of shed membrane is converted into the amount of biomass returned. Specifically,
[0151] In this embodiment, the solid biomass transfer path refers to the continuous transport path taken by the detached biofilm from the detached biomass collection point of the preceding biodegradation stage to the solid biomass inlet of the subsequent predation stage after the preceding biodegradation stage has completed detachment. In this embodiment, it is formed by sequentially connecting the detached biomass collection point of the preceding stage, the solid transport pipeline, the solid transport pump, and the solid biomass inlet of the subsequent predation stage, and is used to directionally transport the detached biomass formed in the preceding stage to the subsequent predation stage.
[0152] The detached biomass generated by a single pre-stage detachment action and entering the solid biomass transfer path is classified as a solid biomass transfer batch. Based on the transfer time required for this batch to reach the subsequent predation stage along the solid biomass transfer path, a solid biomass record corresponding to this batch is obtained at the entrance of the subsequent stage. A transfer batch is determined to be valid if both the pre-stage detached biomass record and the subsequent actual received solid biomass record are complete, the transfer time corresponds to the same batch, there are no abnormal markers during the corresponding period, and no other external solid biomass simultaneously enters the subsequent predation stage. Transfer batches with missing records, mismatched batch times, abnormal markers, or other solid biomass input interference retain their original records but are not included in the determination of the solid biomass transfer ratio.
[0153] The inlet solid biomass before the effective transfer batch reaches the subsequent biological predation cascade is taken as the background biomass, and the increase in inlet solid biomass after the arrival of the same transfer batch is taken as the actual received solid biomass of the subsequent stage. A pairing relationship is established between the actual received solid biomass of the subsequent stage and the shed biomass of the preceding stage corresponding to the same effective transfer batch.
[0154] The proportion of solid-phase biomass transfer is expressed by the following formula:
[0155] ;
[0156] In the formula, Indicates the proportion of solid-phase biomass transfer. Indicates the first The amount of solid biomass actually received by the subsequent predation cascade in an effective transfer batch. This refers to the amount of detached biomass that enters the solid biomass transfer pathway from the preceding biodegradation stages within the same valid transfer batch. Indicates the number of valid batches.
[0157] The amount of shed membrane determined in S3.5 is converted into the actual amount of solid biomass that the subsequent biological predation cascade can receive according to the solid biomass transfer ratio. The biomass return amount is expressed by the following formula:
[0158] ;
[0159] In the formula, This indicates the amount of biomass returned. This indicates the amount of film removed.
[0160] S3.8. Following the temporal sequence of changes in insufficient edible biomass, the bypass water supply, film detachment rate, minimum air scour shear stress, and biomass return rate are arranged in order of execution to form a reverse-linked regulatory sequence, specifically as follows:
[0161] Using the sampling time sequence corresponding to the deficiency of edible biomass as the basis for arranging the reverse linkage control sequence, the bypass water distribution volume formed in the same operating section is configured at the water phase load adjustment position of the upstream biodegradation stage to the intermediate nitrogen conversion stage. The amount of molting and the minimum air scouring shear stress are configured at the attached biomass release position of the upstream biodegradation stage, and the amount of biomass return is configured at the solid phase biomass compensation position of the downstream biological predation stage after the upstream biodegradation stage has completed molting.
[0162] Based on the sequential dependence of aqueous phase load regulation, attached biomass release, and solid phase biomass transfer, the bypass water distribution volume, biofilm removal volume, minimum air scour shear stress, and biomass return volume are arranged continuously to ensure that aqueous phase compensation and solid phase compensation within the same operating section maintain a clear execution order, forming a reverse linkage control sequence.
[0163] S4. The reverse linkage control sequence is rearranged according to the water passage position of the three-level biological cascade, and the execution order of water phase load distribution and solid phase biomass return is corrected to form the cascade control parameters.
[0164] S4.1. Arrange the bypass water distribution, biofilm removal rate, minimum air scouring shear stress, and biomass return rate in the reverse linkage control sequence according to the water flow location of the three-stage biological degradation cascade. Adjust the water flow from the upstream biodegradation cascade to the intermediate nitrogen conversion cascade based on the bypass water distribution, and allocate the organic load of the aqueous phase according to the adjusted water flow. Specifically,
[0165] The bypass water distribution, biofilm shearing, minimum air scour shear stress, and biomass return in the reverse linkage control sequence are re-aligned according to the actual positions of the pre-biodegradation stage, the intermediate nitrogen conversion stage, and the post-biological predation stage. The bypass water distribution is configured at the bypass water passage position where the pre-biodegradation stage enters the intermediate nitrogen conversion stage. The biofilm shearing and minimum air scour shear stress are configured at the biofilm attachment position of the pre-biodegradation stage. The biomass return is configured at the solid biomass input position corresponding to the post-biological predation stage.
[0166] A flow detection device is installed in the bypass water distribution path from the pre-biodegradation stage to the intermediate nitrogen conversion stage. The actual bypass water flow is adjusted by an adjustable water distribution valve and a variable frequency delivery pump that can change the delivery flow rate. Based on the correspondence between the water distribution valve opening, the delivery pump operating frequency and the actual bypass water flow in the historical bypass water distribution calibration record, the bypass water distribution volume calculated in reverse is converted into the corresponding water distribution valve opening and delivery pump operating frequency. The actual bypass water flow is then checked against the actual bypass water flow returned by the flow detection device to ensure that the actual bypass water flow reaches the bypass water distribution volume corresponding to the reverse linkage control sequence.
[0167] The actual bypass water distribution volume after execution is correlated with the organic matter concentration at the inlet of the preceding biodegradation stage bypass at the same sampling location. The organic load of the aqueous phase entering the intermediate nitrogen conversion stage is determined based on the actual bypass water flow and the corresponding organic matter concentration. The data is recorded according to the water flow location and sampling sequence, so that the bypass water distribution volume derived from it is realized as the actual organic load of the aqueous phase obtained by the intermediate nitrogen conversion stage, thus forming the aqueous phase load allocation result of the completed location arrangement and actual water distribution execution.
[0168] S4.2. Based on the amount of biofilm detachment and the minimum air scouring shear stress, the attached biofilm in the preceding biodegradation stage is detached to obtain detached biomass. The detached biomass is then transported to the subsequent biological predation stage according to the biomass return rate. The order of execution of aqueous phase load distribution and solid phase biomass return is adjusted by the water passage positions of the three-stage biological degradation stages. Specifically,
[0169] After completing the positional arrangement, the amount of biofilm removed and the minimum air scouring shear stress are applied to the attached biofilm in the preceding biodegradation stage. Based on the correspondence between airflow and air scouring shear stress established in S3.5, the minimum air scouring shear stress is reversed to determine the target airflow. When the minimum air scouring shear stress is consistent with the shear stress corresponding to a certain air scouring level, the airflow corresponding to that level is used. When the minimum air scouring shear stress is between the shear stresses corresponding to two adjacent air scouring levels, interpolation is performed based on the calibration relationship between adjacent airflow and air scouring shear stress to determine the target airflow. Then, based on the airflow calibration record of the air supply equipment, the target airflow is mapped to the operating frequency of the air supply equipment and the opening of the air regulating valve, and the actual airflow feedback is used for verification to ensure that the actual airflow reaches the target airflow corresponding to the minimum air scouring shear stress.
[0170] Under the conditions of maintaining the same air outlet position, air action direction and single air flushing duration during the S3.5 calibration period, the attached biofilm of the previous biodegradation stage is subjected to air flushing, and the actual amount of attached biofilm released is limited by the amount of biofilm detachment to obtain the amount of detached biofilm.
[0171] The detached biomass formed by the membrane removal in the preceding biodegradation stage is transported to the subsequent predation stage along the solid biomass transfer path. The amount of biomass returned is used as the actual amount of solid biomass that the inlet position of the subsequent predation stage needs to receive. The detached biomass in the preceding biodegradation stage is corresponding to the solid biomass transfer ratio, so that the detached biomass released by the preceding biodegradation stage reaches the amount of biomass returned after passing through the solid biomass transfer.
[0172] The timing of the distribution of aqueous organic load generated by bypass water distribution and the timing of solid biomass input generated by biomass return are corrected by using the water flow location and corresponding sampling time sequence of the three-stage biological cascade. This ensures that the aqueous organic load is first distributed according to the bypass water distribution volume, then the attached biomass is released according to the detachment amount and the minimum air scouring shear stress, and finally the biomass return is performed, thus forming the execution sequence correction result.
[0173] like Figure 4 As shown, the pre-biological degradation stage, the intermediate nitrogen conversion stage, and the post-biological predation stage are connected sequentially according to the flow direction of the water to be treated. The water to be treated enters the intermediate nitrogen conversion stage from the pre-biological degradation stage, and then enters the post-biological predation stage. The pre-biological degradation stage distributes bypass water to the intermediate nitrogen conversion stage through a bypass water distribution path to adjust the organic load of the water phase entering the intermediate nitrogen conversion stage. At the same time, the pre-biological degradation stage releases attached biomass according to a determined amount of biofilm detachment, and converts the corresponding detached biomass into biomass return amount according to the solid phase biomass transfer ratio and transports it to the post-biological predation stage to supplement the edible biomass of the post-biological predation stage. Thus, a water phase load compensation relationship for the intermediate nitrogen conversion stage and a solid phase biomass compensation relationship for the post-biological predation stage are formed between the three biological stages, respectively.
[0174] Figure 4 The lower left section uses the operating cycle as the horizontal axis and the nitrogen conversion deficit as the vertical axis to continuously represent the changes in nitrogen conversion deficit before and after regulation. Before regulation, the nitrogen conversion deficit only shows a gradual decreasing trend with the increase of the operating cycle, and still maintains a certain deficit in subsequent operating cycles. After regulation, the nitrogen conversion deficit continues to decrease with the increase of the operating cycle, and the decrease is significantly greater than that before regulation. This relationship corresponds to the aqueous phase load compensation implemented by this invention for the intermediate nitrogen conversion stage. That is, the corresponding carbon load compensation requirement is determined according to the nitrogen conversion deficit, and the bypass water distribution volume is determined according to the response relationship between the bypass water distribution adjustment volume and the carbon load change volume, so that the aqueous phase organic load transported from the upstream biodegradation stage to the intermediate nitrogen conversion stage is adjusted with the change of nitrogen conversion deficit.
[0175] Figure 4The lower right section also uses the operating cycle as the horizontal axis and the inedible biomass deficit as the vertical axis to continuously represent the changes in inedible biomass deficit before and after regulation. Before regulation, the inedible biomass deficit decreases slowly with the increase of the operating cycle and remains relatively stable in subsequent operating cycles; after regulation, the inedible biomass deficit decreases rapidly in the early operating cycles and then enters a lower and relatively stable range of change. This relationship corresponds to the solid biomass compensation implemented by this invention for the subsequent biological predation cascade, that is, the amount of shed film in the preceding biodegradation cascade is limited based on the inedible biomass deficit and the excess attached biomass, and the amount of shed film is converted into the amount of biomass return based on the transfer ratio of solid biomass from the preceding biodegradation cascade to the subsequent biological predation cascade, so that the subsequent biological predation cascade receives solid biomass replenishment corresponding to the inedible biomass deficit.
[0176] Furthermore, Figure 4 The two sets of deficit changes shown correspond to the nitrogen conversion deficit and the forage biomass deficit in the dual deficit compensation relationship, respectively. Specifically, the change in nitrogen conversion deficit on the left corresponds to the compensating effect of bypass water supply on the organic load of the aqueous phase in the intermediate nitrogen conversion stage, while the change in forage biomass deficit on the right corresponds to the compensating effect of molting and biomass return on the solid phase biomass of the subsequent biological predation stage. As can be seen from the diagram, during continuous operation, after adjusting the bypass water supply, molting, and biomass return according to the dual deficit compensation relationship, both types of deficits can change in a decreasing direction and act on their respective biological stages. This allows the aqueous phase load compensation and solid phase biomass compensation to form a mutually corresponding cascade regulation relationship according to the connection relationship between the three biological stages.
[0177] S4.3. Collect the bypass water distribution, film removal rate, minimum air scouring shear stress, and biomass return rate after execution sequence correction to form cascade control parameters.
[0178] The bypass water distribution, biofilm shearing, minimum air scour shear stress, and biomass return volume, which correspond to specific water flow locations and execution times in the execution sequence correction results, are collected according to the actual execution sequence of the three-stage biological cascade. The water flow locations from the pre-stage biodegradation cascade to the intermediate nitrogen conversion cascade corresponding to the bypass water distribution volume, the biofilm shearing and minimum air scour shear stress corresponding to the biofilm attachment locations in the pre-stage biodegradation cascade, and the solid biomass input locations in the subsequent biological predation cascade corresponding to the biomass return volume are retained. This ensures that the four control quantities have clear locations of action, execution order, and corresponding targets within the same operating section, forming cascade control parameters.
[0179] This embodiment also provides a computer device applicable to the water pollution treatment and control method based on a tiered food chain, comprising: a memory and a processor; the memory is used to store computer-executable instructions, and the processor is used to execute the computer-executable instructions to realize the water pollution treatment and control method based on a tiered food chain as proposed in the above embodiment.
[0180] The computer device can be a terminal, comprising a processor, memory, communication interface, display screen, and input devices connected via a system bus. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, carrier networks, NFC (Near Field Communication), or other technologies. The display screen can be an LCD screen or an e-ink screen. The input devices can be a touch layer covering the display screen, buttons, a trackball, or a touchpad on the computer device's casing, or an external keyboard, touchpad, or mouse.
[0181] This embodiment also provides a storage medium storing a computer program, which, when executed by a processor, implements the water pollution treatment and control method based on a tiered food chain as proposed in the above embodiments. The storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as Static Random Access Memory (SRAM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Erasable Programmable Read Only Memory (EPROM), Programmable Red-Only Memory (PROM), Read-Only Memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk.
[0182] In summary, this invention improves the continuous regulation capability of the three-stage biological cascade in water pollution treatment by constructing a cascade transmission relationship and synergistic compensation for dual deficits. By uniformly characterizing the cascade transmission state of aquatic organic load and solid biomass using water flow timing and flow location, the correspondence of operational data from different biological cascades can be enhanced. Establishing compensation relationships based on nitrogen conversion deficit, carbon load deficit, edible biomass deficit, and excess attached biomass can improve the matching accuracy between aquatic load and solid biomass requirements. By reverse-engineering the bypass water distribution and limiting the amount of biofilm removal, the intensity of biofilm removal, biomass release, and subsequent return are interconnected, taking into account the stable degradation of upstream stages, nitrogen conversion in the intermediate stages, and the feeding needs of downstream organisms. By combining flow location and sampling timing to correct the execution order of each regulation quantity, the cascade regulation parameters have clear positions and execution relationships, improving the synergy, stability, and regulation accuracy of water pollution treatment.
[0183] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.
Claims
1. A water pollution treatment and control method based on a tiered food chain, characterized in that: include: The continuous operation records of the three biological cascades are merged according to the water flow time sequence to form a cascade operation record. The cascade operation record is divided into transfer sections according to the water passage position of adjacent biological cascades. The water phase organic load and solid phase biomass in each transfer section are arranged according to the cascade flow sequence, and the load change of adjacent transfer sections is calculated to form a cascade transfer spectrum. Intermediate transport segments are extracted from the cascade transport spectrum. The actual nitrogen conversion load is compared with the baseline nitrogen conversion load to form a nitrogen conversion deficit. The carbon load deficit is then calculated based on the carbon consumption relationship of the stable operating segment. Subsequent transport segments are extracted, and the stable biomass consumption is compared with the actual edible biomass to form an edible biomass deficit. The amount of biomass required for stable degradation is deducted from the attached biomass of the preceding biodegradation stage to obtain the attached biomass surplus. A dual deficit compensation relationship is established based on the nitrogen conversion deficit and carbon load deficit, and the edible biomass deficit and attached biomass surplus. The carbon load deficit and nitrogen conversion deficit in the dual deficit compensation relationship are proportionally converted, and the bypass water allocation from the pre-biodegradation stage to the intermediate nitrogen conversion stage is back-calculated. The edible biomass deficit and the attached biomass surplus are compared. The biomass detachment of the pre-biodegradation stage is limited according to the minimum biomass, and the biomass detachment is converted into the biomass return of the subsequent biological predation stage, forming a reverse linkage regulation sequence. The reverse linkage regulation sequence was rearranged according to the water passage position of the three-level biological cascade, and the execution order of water phase load distribution and solid phase biomass return was corrected to form cascade regulation parameters.
2. The step-wise biotic chain based water pollution treatment regulation method according to claim 1, characterized in that: The three-level biological cascade includes a pre-biological degradation cascade, a mid-level nitrogen transformation cascade, and a post-biological predation cascade. The water passage position between adjacent biological stages is the boundary position of the stages through which the water to be treated passes from the previous biological stage to the next biological stage.
3. The step-wise biotic chain based water pollution treatment regulation method according to claim 2, characterized in that: The aforementioned calculated carbon load deficit specifically refers to... Along the flow sequence of the cascade, locate the transfer segment corresponding to the intermediate nitrogen conversion cascade in the cascade transfer spectrum, extract the continuously arranged nitrogen conversion load within the transfer segment to form the intermediate transfer segment, and screen the segments from the intermediate transfer segment where the nitrogen conversion load remains stable to form the stable operation segment; The actual nitrogen conversion load in the intermediate transfer section is compared with the benchmark nitrogen conversion load in the stable operation section. The load difference between the benchmark nitrogen conversion load and the actual nitrogen conversion load is calculated, forming a nitrogen conversion deficit. The carbon consumption relationship between nitrogen conversion load and carbon load is extracted from the stable operating section. Based on the carbon consumption relationship, the nitrogen conversion deficit is converted into a load, and the carbon load deficit is obtained.
4. The step-wise biotic chain based water pollution treatment regulation method according to claim 3, characterized in that: The obtained excess amount of attached biomass is specifically as follows: The solid biomass transfer position corresponding to the subsequent stage of predation by organisms is located along the order of the cascade flow, and the continuously arranged solid biomass is intercepted to form the subsequent stage transfer section. Within the subsequent transfer section, a stable feeding interval is defined based on the changes in solid biomass during continuous and stable operation; Compare the stable biomass consumption within the stable feeding range with the actual edible biomass, and record the difference between the actual edible biomass and the stable biomass consumption to form the edible biomass deficit. Operational records showing a continuous and stable reduction of organic load in the aqueous phase within the preceding biodegradation stage were screened from the cascade transfer spectrum. The attached biomass in the operational records was collected, and the required retention amount for stable degradation was determined based on the continuous and stable range of attached biomass. The retention benchmark for attached biomass in the preceding biodegradation stage is defined by the retention amount required for stable degradation, and the attached biomass exceeding the retention amount required for stable degradation is collected as the excess attached biomass.
5. The step-wise biotic chain based water pollution treatment regulation method according to claim 4, characterized in that: The establishment of the dual deficit compensation relationship specifically involves... Based on the carbon consumption relationship in the stable operation section, the compensation ratio between nitrogen conversion deficit and carbon load deficit is calibrated. The upper limit for solid biomass compensation is determined based on the deficit in edible biomass and the surplus in attached biomass. The compensation ratio is used to quantify the water phase compensation range of nitrogen conversion deficit. The solid phase compensation range of edible biomass deficit is constrained by the upper limit of solid phase biomass compensation. The water phase compensation range and the solid phase compensation range are coordinated according to the same operating section to form a dual deficit compensation relationship. The dual deficit compensation relationship refers to nitrogen conversion deficit and edible biomass deficit.
6. The step-wise biotic chain based water pollution treatment regulation method according to claim 5, characterized in that: The bypass water allocation for the reverse calculation of the pre-biological degradation stage to the intermediate nitrogen conversion stage is specifically as follows: Based on the compensation ratio in the dual deficit compensation relationship, the nitrogen conversion deficit is converted into the compensation amount for the carbon load deficit; Continuous records of changes in bypass water distribution volume are selected from stable operating sections. Based on the changes in aqueous organic load before and after the changes in bypass water distribution volume, the response relationship between bypass water distribution adjustment volume and carbon load change volume is established. The bypass water distribution adjustment amount is the change in water distribution before and after the adjustment of the existing bypass water distribution amount of the upstream biodegradation stage, and the carbon load change amount is the change in the aqueous organic load obtained by the intermediate nitrogen conversion stage before and after the change in the bypass water distribution amount. Substitute the compensation amount for the carbon load deficit into the response relationship, trace the bypass water distribution adjustment amount along the direction in which the carbon load change meets the compensation requirements, and determine the bypass water distribution adjustment amount that meets the carbon load deficit compensation requirements. The bypass water distribution adjustment is superimposed on the existing bypass water distribution of the upstream biodegradation stage to form a candidate bypass water distribution. The candidate bypass water distribution is then verified according to the water flow range within the stable operating section to obtain the bypass water distribution allocated from the upstream biodegradation stage to the intermediate nitrogen conversion stage.
7. The step-wise biotic chain based water pollution treatment regulation method according to claim 6, characterized in that: The formation of the reverse linkage control sequence specifically refers to... The amount of film detachment in the preceding biodegradation stage is defined by the minimum of the edible biomass deficit and the attached biomass surplus. Graded air scouring shear stress is applied to the attached biofilm in the preceding biodegradation stage, and the actual amount of film detachment corresponding to each level of air scouring shear stress is obtained step by step to form a shear-detachment correspondence. Map the amount of film removal to the shear film removal correspondence, select the lowest air scouring shear stress when the actual amount of film removal reaches the amount of film removal, and implement air scouring on the attached biofilm of the previous biodegradation stage according to the lowest air scouring shear stress. Based on the transfer ratio of solid biomass from the previous biodegradation stage to the subsequent predation stage in the cascade transfer spectrum, the amount of molted membrane is converted into the amount of biomass returned. Along the time sequence of changes in edible biomass deficit, the bypass water supply, film removal rate, minimum air scouring shear stress, and biomass return rate are arranged in order of execution to form a reverse linkage regulation sequence.
8. The step-wise biotic chain based water pollution treatment regulation method according to claim 7, characterized in that: The formation of the tiered control parameters is specifically as follows: The bypass water distribution, biofilm removal rate, minimum air scouring shear stress, and biomass return rate in the reverse linkage control sequence are arranged according to the water flow location of the three-level biological cascade. The water flow from the previous biodegradation cascade to the intermediate nitrogen conversion cascade is adjusted according to the bypass water distribution, and the organic load of the aqueous phase is allocated according to the adjusted water flow. Based on the amount of biofilm detachment and the minimum air scouring shear stress, the attached biofilm of the previous biodegradation stage is detached to obtain the detached biomass. The detached biomass is then transported to the subsequent biological predation stage according to the amount of biomass returned. The order of execution of water phase load distribution and solid phase biomass return is corrected by the water flow position of the three biological stages. The bypass water distribution, film removal rate, minimum air scouring shear stress, and biomass return rate are collected after the execution sequence correction to form cascade control parameters. 9.A computer device, comprising a memory and a processor, wherein the memory stores a computer program, and the computer device is characterized in that: When the processor executes the computer program, it implements the steps of the water pollution treatment and control method based on any one of claims 1 to 8.
10. A computer readable storage medium having stored thereon a computer program, characterized in that: When the computer program is executed by the processor, it implements the steps of the water pollution treatment and control method based on any one of claims 1 to 8.