A prefabricated rigid frame thin-walled hollow straight pier

By adopting a prefabricated assembled bridge pier structure that combines thin-walled ring plates and rigid frames, the problems of long construction cycles and material waste in traditional bridge piers have been solved, achieving efficient and economical bridge pier construction and load-bearing performance.

CN123109048APending Publication Date: 2026-11-17BEIJING GUOTIE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611594754.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional bridge piers have long construction cycles, are greatly affected by construction sites and weather, have insufficient positioning and force transmission capacity at connection interfaces, and have complex internal component transportation and connection. Existing prefabricated bridge piers are costly and use materials uneconomically.

Method used

The prefabricated assembled bridge pier structure, which combines thin-walled ring plates and rigid frames, includes segmented prefabricated round-ended hollow piers, continuous closed ring tenon and mortise structures, shear column systems, and longitudinal and transverse tie rod systems, forming a rigid framework consisting of an outer pier body and an internal spatial frame.

Benefits of technology

It reduced the construction period and cost, improved the overall load-bearing performance and construction efficiency of the bridge piers, saved concrete materials, simplified the formwork structure, and reduced equipment usage costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109048A_ABST
    Figure CN123109048A_ABST
Patent Text Reader

Abstract

This invention discloses a prefabricated, assembled rigid frame thin-walled hollow straight pier, belonging to the field of bridge engineering, and applicable to piers of ordinary heights of 9-15m. The pier consists of a pier base, pier body, pier cap, clamping plate, shear columns, and longitudinal and transverse tie rods. The pier base is a hollow ring with a larger lower section and a smaller upper section, clamped by the clamping plate. The pier body adopts a rigid frame thin-walled hollow structure, composed of standard rings and height-adjusting rings, with all rings connected by shear keys. The pier cap has the same cross-sectional dimensions as the pier body, and includes a cross beam and a reinforcing beam below the support. A pad stone is placed on the pier cap. Shear columns are provided on the inner wall of the pier body, supporting the longitudinal and transverse cross beams and standing on the pier cap. The shear columns are connected by longitudinal and transverse tie rods, and the plate, column, and rod assembly forms an integral rigid frame. This invention features a scientific design, reasonable structure, high prefabrication quality, low material consumption, convenient assembly, and material and labor savings. Compared with the currently widely used cast-in-place solid piers of the same specifications, it can save 3 / 4 of concrete materials and 3 / 4 of the construction period, resulting in significant socio-economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of prefabricated structure technology for bridge engineering, specifically relating to a prefabricated rigid frame thin-walled hollow straight pier, particularly a 9-15m high ordinary height pier that meets the requirements of railway-highway interchanges. Background Technology

[0002] High-speed railway bridges are characterized by a high degree of structural standardization, high construction precision requirements, tight schedules, and complex construction environments. Traditional bridge piers typically employ cast-in-place construction methods, including on-site formwork erection, rebar tying, and concrete pouring. The construction of cast-in-place bridge piers requires completing rebar installation, formwork erection, concrete pouring, and curing on-site, resulting in a long construction period and significant impact from site conditions, weather, and the overall working environment.

[0003] With the development of prefabricated construction technology in railway engineering, dividing bridge piers into multiple prefabricated components and assembling them on-site can reduce on-site work and improve the construction efficiency of bridge substructures. However, traditional prefabricated bridge piers still have some problems.

[0004] On the one hand, after the bridge piers are assembled in segments, the connection between adjacent segments mainly relies on connecting steel bars, sleeves, grouting connections, or other local connection structures. The positioning and force transmission capacity of the connection interface are greatly affected by the form of the connection structure. When the bridge pier is subjected to multiple loads such as vertical loads, horizontal loads, and train braking forces, it is necessary to ensure that the adjacent precast segments have reliable overall load-bearing performance.

[0005] On the other hand, hollow bridge piers have a large internal space. If the entire structural force is to be borne solely by the external hollow wall, the pier body and the segmental connection points need to be reinforced. At the same time, for taller piers, the transportation and installation of internal components, as well as their connection with precast segments, also need to be comprehensively considered.

[0006] Therefore, it is necessary to propose a prefabricated bridge pier structure that is structurally reasonable, highly prefabricated in the factory, easy to install on site, has reliable segmental connections, and can form an integral rigid frame to meet the construction needs of high-speed railway bridges.

[0007] This invention breaks with traditional design concepts and is the first to... Thin-walled ring plates and rigid frames By combining them into thin-walled bridge piers, this innovative composite structure technology can significantly reduce production costs. Compared with traditionally designed and widely used cast-in-place solid piers of the same size, it can save 3 / 4 of the concrete material; compared with existing but not widely adopted 700mm thick hollow piers, it can save 1 / 2 of the concrete material, resulting in significant socio-economic benefits.

[0008] This prefabricated assembled rigid frame thin-walled hollow straight pier innovatively adopts patented technology. Thin-walled pier body + rigid frameHollow piers are designed to reduce costs and replace traditional, widely used solid piers and newly developed thick-walled hollow piers (without internal framework).

[0009] Note: The savings in concrete material costs due to the 700mm thick hollow pier cannot offset the increased costs of fabrication, transportation, and erection. It was expensive and therefore not widely adopted. Summary of the Invention

[0010] 1. Purpose of the invention

[0011] The purpose of this invention is to provide a prefabricated rigid frame thin-walled hollow straight pier, which forms a rigid structure composed of an outer pier body and an internal spatial frame by adopting a segmented prefabricated round-ended hollow pier body, a continuous closed ring tenon structure set between adjacent prefabricated segments, a shear column system set inside the pier body, and a longitudinal and transverse tie rod system connecting each shear column.

[0012] 2. Core Technology Solution

[0013] To achieve the above objectives, the present invention adopts the following technical solution:

[0014] A prefabricated rigid frame thin-walled hollow straight pier includes a pier base, a pier body, a pier cap, a shear column system installed inside the pier body, and a longitudinal and transverse tie rod system connecting the shear column system.

[0015] The pier base, located at the lowest part of the pier body, bears the load transmitted from the pier body and transfers it to the abutment. The lower region near the abutment has a thickened wall to improve the bearing capacity and stress performance of the pier base section. The pier base is a hollow structure, wider at the bottom and narrower at the top, with the top having the same thickness as the standard ring and incorporating shear grooves. A pier base plate extends circumferentially from the inner edge of the pier base, with evenly distributed anchor bolt holes. To prevent bolt corrosion, the top of the mounting holes is a recessed enlarged hole. Anchor bolts are used to anchor the pier to the abutment, preventing pier overturning and limiting horizontal displacement. After anchoring, the holes are sealed with cement mortar.

[0016] The pier body adopts a hollow thin-walled structure with a wall thickness of 300 mm. Under the condition of meeting the requirements of pier bearing capacity, stiffness and stability, the amount of solid concrete used in the pier is reduced by adopting a hollow section and thin-walled pier body, thereby reducing material consumption.

[0017] The pier body consists of a standard ring and an adjustable ring. The splicing interface of adjacent precast segments is provided with a continuous closed annular tenon and mortise structure along the circumference of the pier body. The annular tenon and mortise structure consists of mutually fitting shear tenons and shear grooves, forming a shear key. A resin-based adhesive material is applied to the contact surface of the shear groove to achieve positioning and load transfer between adjacent precast segments.

[0018] The pier adopts a straight pier structure, and the main cross-sectional dimensions of each segment of the pier body remain basically consistent, so that all precast segments can be produced using a unified formwork. Compared with piers whose pier body is inclined along the height direction or has variable cross-sections, the present invention does not need to arrange complex variable cross-section formwork that changes with height, which is beneficial to simplifying the formwork structure and improving the production efficiency of components.

[0019] The shear column system is arranged inside the pier body, close to the inner wall of the pier body, and is arranged at the half of the length of each of the four sides. Each of the four shear columns is a single whole piece without the need for butt joint. The tops of the four shear columns are supported on the bottom surface of the cross beam of the pier cap, and the bottoms are erected on the bearing platform. The shear columns are connected to the pier body through pre-embedded connectors arranged on the inner wall of the pier body. The transverse and longitudinal tie rod system includes transverse tie rods and longitudinal tie rods arranged along the transverse and longitudinal directions of the pier, and is connected to the shear columns through column-rod connectors arranged on the shear columns. The shear columns, the transverse and longitudinal tie rods and the pier body jointly form a rigid frame to resist the vertical force and transverse force borne by the pier.

[0020] The pier cap is arranged on the top of the pier body. The pier cap adopts a pallet-free structure, and its planar outer contour dimension is basically consistent with the outer contour dimension of the main part of the pier body, and the pier cap does not form an obvious overhanging or enlarged section to the outer side of the pier body. The pier cap includes an inverted trapezoidal ring, a Chinese-character-feng shaped beam and an upper top panel. The inverted trapezoidal ring is provided with shear tenons that match the precast segments at the top of the pier body, so that a reliable positioning and force transmission connection is formed between the pier cap and the height adjusting ring. The pier cap is internally provided with a Chinese-character-feng shaped beam composed of a cross beam and two reinforcing beams under the supports. The four ends of the cross beam are located at the midpoints of the four sides of the pier cap; the reinforcing beams under the supports are arranged along the longitudinal direction of the bridge, and their axes respectively coincide with the longitudinal centerlines of the two sets of support bearing stones on the pier cap. The Chinese-character-feng shaped beams have the same height to form an integral Chinese-character-feng shaped structure, which transmits loads to the pier body and the shear columns. The top of the pier cap is provided with a combined support member. The combined support member includes a support cushion stone and a support bearing stone, which are fixedly installed on the top of the pier cap and fixedly connected with the pier cap through anchor bolts.

[0021] 3. Technical Advantages

[0022] Compared with the prior art, the present invention has the following significant beneficial effects:

[0023] Precast segment assembly replaces traditional cast-in-place construction. The present invention adopts a plurality of precast segments to assemble to form the pier body of the pier, which can transform the on-site construction of pier components into factory production and standardized prefabrication, reduce the workload of traditional on-site pouring of piers, thereby ensuring the pier quality, reducing the production cost, shortening the pier construction period, and improving the construction efficiency.

[0024] The structure is a rigid frame, lightweight and stable. This invention incorporates a shear column system within the hollow pier body, connecting multiple shear columns via longitudinal and transverse tie rods to form a spatial frame. This provides the internal structure with a clear longitudinal force transmission path and lateral connections. The internal spatial frame and the outer hollow pier body share the load, forming a rigid structure that improves the overall compressive, shear, and bending resistance of the pier.

[0025] Using thin-walled hollow piers can save materials. This invention uses round-ended thin-walled hollow piers with a wall thickness of 300 mm. Compared with conventional hollow or solid piers with a wall thickness of 700 mm, while meeting the requirements for pier bearing capacity, stiffness, and stability, the use of hollow sections and thin-walled structures significantly reduces the amount of concrete used, lowers production costs, and helps reduce the weight of components during transportation and hoisting, thus reducing equipment operating costs.

[0026] The pier cap has a uniform diameter and a reasonable structure. The pier cap of this invention adopts a trayless structure, and the cross-sectional dimensions of the pier cap are consistent with the dimensions of the pier body. It eliminates the cantilever structure of traditional bridge pier caps, and can reduce manufacturing costs while meeting the requirements of superstructure support and load transfer.

[0027] The present invention will now be described in further detail with reference to the accompanying drawings: Attached Figure Description

[0028] Figure 1 This is an overall structural diagram of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0029] Figure 2 This is a structural diagram of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0030] Figure 3 This is a structural diagram of the pier bottom of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0031] Figure 4 This is a cross-sectional view of the anchorage at the bottom of the prefabricated rigid frame thin-walled hollow straight pier described in this invention.

[0032] Figure 5 This is a diagram showing the tenon and mortise connection of the prefabricated assembled rigid thin-walled hollow straight pier described in this invention.

[0033] Figure 6 This is a diagram of the prefabricated assembled rigid frame thin-walled hollow straight pier with embedded slab and column connectors as described in this invention.

[0034] Figure 7 This is a structural diagram of the tie rod embedded connection component of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0035] Figure 8 This is a column connection diagram of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0036] Figure 9 This is a structural diagram of the pier cap of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0037] Figure 10 This is a diagram of the inverted trapezoidal ring structure of the pier cap of the prefabricated assembled rigid thin-walled hollow straight pier described in this invention.

[0038] Figure 11 This is a structural diagram of the pier cap beam of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0039] Figure 12 This is a cross-sectional view of the pad stone fixing of the prefabricated assembled rigid frame thin-walled hollow straight pier described in this invention.

[0040] The components include: 1. Pier base; 2. Standard ring; 3. Shear column; 4. Height adjustment ring; 5. Pier cap; 6. Support pad stone; 7. Bearing pad stone; 8. Manhole; 9. Horizontal tie rod; 10. Longitudinal tie rod; 11. Pier anchor bolt; 12. Shear groove; 13. Shear tenon; 14. Embedded steel plate in pier body; 15. Anchor bar; 16. Portal-shaped square hoop; 17. Portal-shaped square hoop connecting ear plate; 18. Embedded steel plate in tie rod; 19. Tie rod connecting ear plate; 20. High-strength bolt for column connection; 21. Inverted trapezoidal ring; 22. Top panel; 23. Feng-shaped beam; 24. Pad stone fixing bolt. Detailed Implementation

[0041] The present invention will now be described in further detail and in complete detail with reference to the accompanying drawings. The practicality, novelty and inventiveness of this hollow bridge pier design are all demonstrated by this embodiment.

[0042] This embodiment uses a 14-meter prefabricated rigid frame thin-walled hollow straight pier for a 31.5-meter double-track box girder, a common feature of high-speed railways at 350 km / h, with typical speed, beam span, beam type, and conventional pier height. Figures 1-12 As shown, the structure includes: 1. Pier base; 2. Standard ring; 3. Shear column; 4. Height adjustment ring; 5. Pier cap; 6. Support pad stone; 7. Bearing pad stone; 8. Manhole; 9. Horizontal tie rod; 10. Longitudinal tie rod; 11. Pier anchor bolt; 12. Shear groove; 13. Shear tenon; 14. Embedded steel plate in pier body; 15. Anchor bar; 16. Door-shaped square hoop; 17. Door-shaped square hoop connecting ear plate; 18. Embedded steel plate in tie rod; 19. Tie rod connecting ear plate; 20. High-strength bolt for column connection; 21. Inverted trapezoidal ring; 22. Top panel; 23. Feng-shaped beam; 24. Pad stone fixing bolt.

[0043] The bridge pier in this embodiment adopts a straight pier structure, with the main cross-sectional dimensions of the pier body remaining basically the same along the height direction. It adopts a round-ended thin-walled hollow cross-section. The outer contour dimensions of the pier body are 8m × 4m, the wall thickness of the pier body is 300 mm, and the total height of the pier is 14 m.

[0044] Unlike traditional bridge piers that use variable cross-sections along their height, this embodiment uses a straight pier design, ensuring that the main cross-section of the standard ring 2 remains essentially consistent, allowing for prefabrication using templates of uniform specifications. The standard ring 2 and the height adjustment ring 4 are combined according to the designed pier height to form a pier body that meets the 14 m pier height requirement.

[0045] Pier base structure

[0046] like Figure 1 and Figure 3 As shown, pier bottom 1 is located at the lowest part of the pier and is used to bear the vertical and horizontal loads transmitted by the upper pier body, and further transmit the loads to the abutment and bridge foundation.

[0047] In this embodiment, the pier base 1 adopts a round-ended hollow cross section, and the lower part of the pier base near the abutment is locally thickened, with the bottom wall thickness increased from 300 mm to 500 mm to improve the bearing capacity and stress performance of the pier base area.

[0048] like Figure 1 and Figure 3 As shown in this embodiment, a 200mm wide pier base plate extends from the inner side of the bottom of pier base 1 to achieve the connection between the pier and the abutment.

[0049] Pier base 1 is a hollow trapezoidal structure with a larger bottom and a smaller top. A total of 20 Φ40 mm anchor bolt holes are arranged on the pier base plate, with 10 holes spaced 1m apart on both sides along a straight line, and 5 holes on each of the two curved sections, for a total of 10 holes across the two curved sections, used to install pier anchor bolts 11. The anchor bolt holes are prefabricated using embedded PVC pipes to form the channels. The top of the installation hole is a Φ100mm hole recessed 90mm to enlarge it, with a spare nut for preventing loosening. To prevent the concrete from being crushed, a Φ98mm steel washer is placed under the nut to diffuse pressure. After anchoring, cement mortar is used to seal the holes to prevent corrosion of the bolt nuts and ensure a protective layer thickness of no less than 30mm. Pier base 1 has a pre-reserved 200×200mm shear column installation groove for shear column 3 insertion. After pier base 1 is hoisted to the pier cap, it is anchored to the pier cap using pier anchor bolts 11, achieving a fixed connection between the pier and the pier cap.

[0050] Standard ring and height adjustment ring structure

[0051] like Figure 1 As shown, the pier body in this embodiment consists of a standard ring 2 and a height adjustment ring 4.

[0052] The main body of Standard Ring 2 has an outer contour dimension of 8m × 4m, a basic wall thickness of 300 mm, and a height of 2m for a single Standard Ring 2. Standard Ring 2 adopts a thin-walled hollow structure, which reduces the amount of solid concrete used. Because Standard Ring 2 uses a uniform main body cross-sectional size, it can be prefabricated in batches using a uniform template, thereby reducing template adjustment work.

[0053] The height adjustment ring 4 is located on the upper part of the pier and is used to adjust the final height of the pier. By combining the standard ring 2 and the height adjustment ring 4, the overall height of the pier can be adjusted, ensuring the standardization of the main components while meeting different pier height requirements.

[0054] Connection structure between adjacent rings

[0055] like Figure 5 As shown, adjacent standard rings 2, standard ring 2 and height adjustment ring 4, and height adjustment ring 4 and pier cap 5 are all connected by shear keys.

[0056] The top surface of the ring is provided with shear groove 12 and the bottom surface is provided with shear tenon 13. Both shear tenon 13 and shear groove 12 are continuously provided along the circumference of the pier body.

[0057] Before the ring body is formally assembled, the contact surface of the shear groove 12 is cleaned and coated with a resin-based adhesive. After the adjacent ring bodies are hoisted and positioned, the shear tenon 13 and the shear groove 12 are interlocked, and the integrity of the splicing interface is improved by the resin-based adhesive.

[0058] Internal shear column system of pier body

[0059] like Figure 1 and Figure 2 As shown, in this embodiment, shear columns 3 are installed inside the hollow pier. Four shear columns 3 are installed, positioned at half the length of each of the four sides of the pier's inner wall. Each of the four shear columns is a single, continuous column and does not require splicing. The tops of the four shear columns are supported on the bottom surface of the pier cap cross beam, and the bottoms stand on the foundation. In this embodiment, the shear columns 3 are reinforced concrete members with a 200 mm × 200 mm cross section, and the reinforcing bars are configured with 4Φ20.

[0060] During installation, the shear column 3 is connected to the inner wall of the pier body through a pre-embedded steel plate 14 and a portal-shaped square hoop 16. After welding the portal-shaped square hoop 16 to the pre-embedded steel plate 14, the shear column 3 is inserted through the portal-shaped square hoop 16, thus forming a connection between the shear column 3 and the outer pier body.

[0061] Horizontal and longitudinal tie rod structure

[0062] like Figure 1 and Figure 2As shown, in this embodiment, horizontal tie rods 9 and longitudinal tie rods 10 are installed between the four shear columns 3. The horizontal tie rods 9 are installed along the transverse direction of the bridge, and the longitudinal tie rods 10 are installed along the longitudinal direction of the bridge. The horizontal tie rods 9 and longitudinal tie rods 10 are respectively connected to the shear columns 3, so that the four shear columns 3 form an interconnected internal spatial structure.

[0063] Plate-column connection structure

[0064] like Figure 6 , Figure 7 , Figure 8 As shown, a steel plate 14 is pre-embedded inside the pier body on the inner side of the pier, and four anchor bars 15 are installed behind the pre-embedded steel plate 14. A prefabricated portal-shaped square hoop 16 is welded in front of the pre-embedded steel plate 14, and a portal-shaped square hoop connecting ear plate 17 is welded in front of the portal-shaped square hoop 16. After the portal-shaped square hoop 16 is welded and fixed to the pre-embedded steel plate 14 inside the pier body, the shear column 3 is inserted into the portal-shaped square hoop 16 to realize the connection between the shear column 3 and the pier body.

[0065] The ends of the horizontal tie rod 9 and the longitudinal tie rod 10 are equipped with embedded steel plates 18. The embedded steel plates 18 are welded to the four structural reinforcement bars of the rod body without additional anchor bars. A tie rod connecting lug 19 is welded to the exposed end of the embedded steel plate 18. After the tie rod connecting lug 19 is inserted into the U-shaped square hoop connecting lug 17, it is fastened by the column connecting high-strength bolts 20. In this structure, the plate and the column are connected by U-shaped square hoop 16 welded to the embedded steel plate 14 in the pier body; the members adopt the lug insertion + high-strength bolt connection form, thereby completing the connection between the plate, column and rod.

[0066] Pier cap structure

[0067] like Figure 1 and Figure 9 As shown, the pier cap 5 is set on the top of the pier body and adopts a trayless structure. The pier cap 5 is equipped with an inverted trapezoidal ring 21, a top panel 22 and a Feng-shaped beam 23.

[0068] In this embodiment, the main cross-sectional dimensions of the pier cap 5 are basically the same as those of the main cross-sectional dimensions of the pier body. The pier cap does not have the cantilever structure of the traditional outward-spreading pier cap, and the outer contour of the main body of the pier cap is consistent with the pier body below.

[0069] An inverted trapezoidal ring 21 is positioned at the lower part of the pier cap 5, and a shear tenon 13 is provided corresponding to the shear groove 12 on the top surface of the height adjustment ring. The inner wall of the inverted trapezoidal ring is provided with shear column mounting grooves for the shear columns to pass through. When the pier cap 5 is hoisted to the top of the pier body, the shear columns support the truncated beam 23 through these mounting grooves. The pier cap 5 is connected to the height adjustment ring 4 via the inverted trapezoidal ring 21, achieving positioning and load transfer between the pier cap 5 and the pier body.

[0070] The top panel 22 is located on the upper part of the pier cap 5 to support the bearing pad 6 and the bearing pad 7, and to transfer the load of the upper bridge structure to the lower structure.

[0071] The Feng-shaped beam 23 is located inside the pier cap 5. The pier cap contains a Feng-shaped beam composed of a cross beam and two reinforcing beams below the supports. The four ends of the cross beam are located at the midpoints of the four sides of the pier cap. The reinforcing beams below the supports are arranged longitudinally along the bridge, with their axes coinciding with the longitudinal centerlines of the two sets of support pads on the pier cap. The Feng-shaped beams are at the same height. Located directly below the support pads, the Feng-shaped beam acts as an internal force-transferring component, diffusing and transferring the concentrated support reaction force at the pad to the height adjustment ring and shear column to reduce the downward deflection of the top surface below the supports.

[0072] Manhole Structure

[0073] like Figure 1 and Figure 9 As shown, an access hole 8 is provided at the center of the pier cap 5, and the access hole 8 is connected to the internal cavity of the pier body.

[0074] In this embodiment, the access hole 8 has a diameter of 1.5m, providing a passage for personnel to enter the interior of the pier. After the pier is completed and put into operation, maintenance personnel can enter the pier cavity through the access hole 8 to inspect and maintain the shear column 3, the horizontal tie rod 9, the longitudinal tie rod 10, and all connecting nodes.

[0075] Support pads, bearing pads and connecting structures

[0076] like Figure 1 and Figure 12 As shown, the top of the pier cap 5 is provided with a support pad stone 6 and a bearing pad stone 7.

[0077] The support pad 6 is set on the top of the pier cap 5 to support the bearing pad 7, which is located above the support pad 6. The support pad 6 and the bearing pad 7 are prefabricated and installed on the top of the pier cap 5 during on-site installation.

[0078] The support pad 6 and the bearing pad 7 are connected to the pier cap 5 by pad fixing bolts 24, which are M24 high-strength bolts. The bearing pads have pre-drilled holes for anchoring the bearing anchor bolts with sulfur mortar for subsequent bearing installation. The hole positions, diameters, and number of holes are determined according to the design dimensions of different bearing models and specifications.

[0079] This prefabricated, assembled, rigid-frame, thin-walled, hollow, straight pier transforms pier components from on-site construction to factory production and standardized prefabrication. This reduces the workload of traditional on-site pier casting, ensures pier quality, lowers production costs, and improves construction efficiency. Therefore, it brings significant economic and social benefits.

[0080] The above description is only a preferred and most practical embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structural transformations made based on the content of the present invention specification and drawings, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of the present invention.

Claims

1. A prefabricated, assembled rigid frame thin-walled hollow straight pier, comprising a pier base, pier body, pier cap, shear columns, and longitudinal and transverse tie rods, wherein the pier body, shear columns, and longitudinal and transverse tie rods together form a rigid frame; the pier base is a hollow structure with a trapezoidal cross-section, wider at the bottom and narrower at the top, and is anchored to the pier cap using pier anchor bolts; the pier body is a round-ended hollow thin-walled straight pier structure; shear tenons and shear grooves are provided between adjacent prefabricated segments to achieve positioning and connection of adjacent segments; a shear tenon is provided at the bottom edge of the pier cap, connecting to the annular shear groove at the top of the pier body; the pier cap contains a cross beam and a reinforcing beam below the support forming a shaped beam to bear the bridge and train loads; and a top is provided with... Support pad stone and Support pad stone Shear columns are arranged close to the inner wall of the pier at the midpoint of the four sides. The shear columns are connected to the pier body and longitudinal and transverse tie rods using connectors, forming an integral rigid structure. The top of the shear columns is supported by the bottom of the longitudinal and transverse cross beams, and their bases stand on the pier cap. The longitudinal and transverse tie rods are arranged alternately in the longitudinal and transverse directions of the bridge. The structure includes the pier base, pier body, pier cap, shear columns, longitudinal tie rods, and transverse tie rods. Support pad stone , Support pad stone All bridge piers are constructed using precast high-strength reinforced concrete components, which are then assembled on-site.

2. The prefabricated assembled rigid frame thin-walled hollow straight pier according to claim 1, characterized in that: The pier base is a hollow structure that is larger at the bottom and smaller at the top. A pier base plate extends from the inner edge of the bottom, with anchor bolt installation holes evenly distributed on the plate. The pier base is anchored to the abutment using pier anchor bolts. The top wall thickness of the pier base is equal to that of the standard ring, and it is provided with shear grooves that are connected to the standard ring shear tenons.

3. The prefabricated assembled rigid frame thin-walled hollow straight pier according to claim 1, characterized in that: The pier body adopts a round-ended hollow cross section and is composed of several standard rings of a certain height assembled vertically and a height adjustment ring connected by mortise and tenon joints. The height adjustment ring is set at the top of the pier body and is used to adjust the total height of the pier. The standard ring and the height adjustment ring are equipped with shear tenons on the bottom surface and shear grooves on the top surface. The shear tenons and shear grooves are interlocked to form a tenon and mortise structure. Resin-based adhesive material is applied to the inside of the shear groove to eliminate installation gaps.

4. The prefabricated assembled rigid frame thin-walled hollow straight pier according to claim 1, characterized in that: The pier cap is a hollow pier cap without a tray; the pier cap consists of an inverted trapezoidal ring, a shaped beam, a top panel, and an access hole; a shear tenon is set at the lower edge of the pier cap, which is connected to the annular shear groove at the top of the height adjustment ring by tenon and tenon. The pier cap is equipped with a shaped beam consisting of a cross beam and two reinforcing beams under the supports. The four ends of the cross beam are located at the midpoint of the four sides of the pier cap; the reinforcing beams under the supports are arranged along the longitudinal direction of the bridge, and their axes coincide with the longitudinal center lines of the two sets of support pad stones on the pier cap. The shaped beams are at the same height and transfer the load to the shear columns and the pier body.

5. The prefabricated assembled rigid frame thin-walled hollow straight pier according to claim 1, characterized in that: The slab-column connection has a shear column with a square cross-section, composed of high-strength reinforced concrete. A connecting steel plate is pre-embedded in the inner wall of the pier, and a prefabricated U-shaped square hoop is welded onto the pre-embedded steel plate. The shear column passes through the U-shaped square hoop, and the gap between the shear column and the U-shaped square hoop is filled with self-leveling mortar to achieve the slab-column connection. The column connection uses high-strength bolts to bolt the connecting lugs on the pre-embedded steel plate at the end of the column to the connecting lugs on the U-shaped square hoop. The area around the slab-column connection node is encased in concrete for corrosion protection.

6. The prefabricated assembled rigid frame thin-walled hollow straight pier according to claim 1, characterized in that: Both the support pad stone and the bearing pad stone are precast reinforced concrete components, installed on the top surface of the pier cap. The support pad stone and the bearing pad stone are fixed to the pier cap by means of high-strength bolts in a recessed bolting manner, and the recessed installation holes are sealed to prevent rust.

7. The prefabricated assembled rigid frame thin-walled hollow straight pier according to claim 1, characterized in that: The bridge piers are commonly prefabricated, assembled, rigid, thin-walled, hollow, straight piers with a height of 9–15 m, suitable for railway bridges and highway bridge projects.