A high-altitude flexible membrane dome installation structure and installation method
By combining the high-altitude stretch membrane dome installation structure with a 3D laser scanner, the problems of structural stability and shape accuracy in the installation of high-altitude stretch membrane domes have been solved, achieving a high-precision ceiling installation effect.
Patent Information
- Application Number
- CN202611467750.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-21
- Publication Date
- 2026-11-17
AI Technical Summary
Existing high-altitude stretch membrane dome installation structures struggle to balance overall structural stability and shaping precision, easily leading to problems such as misalignment and gaps.
A high-altitude flexible membrane dome installation structure is adopted, including a ceiling foundation, a flexible membrane ceiling, and an aluminum panel ceiling. Through the combination of boundary skeleton, base plate skeleton, base plate, substrate, honeycomb grid and flexible membrane units, and combined with a 3D laser scanner for precise design and installation, the positioning and splicing accuracy of each component is ensured.
It improves the overall stability and shaping accuracy of high-altitude irregular-shaped integrated ceilings, reduces the positional deviation between ceiling outlines, decorative sections and adjacent areas, and enhances the visual quality.
Smart Images

Figure CN123109330A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of ceiling decoration technology, specifically to an installation structure and method for a high-altitude flexible membrane dome. Background Technology
[0002] In modern hospital architecture, the large, high-ceilinged spaces such as the outpatient lobby and inpatient atrium are core areas that reflect the hospital's image and quality. These spaces often feature stretch ceilings, which typically utilize a flexible, translucent membrane material to form a decorative surface and are combined with lighting fixtures to create an luminous effect. Not all ceiling areas are covered by stretch ceilings; areas not responsible for lighting are usually decorated with aluminum panels or other structural elements, forming a comprehensive ceiling system. Therefore, the stretch ceiling needs to connect seamlessly with rigid surfaces like aluminum panels, and often requires the use of irregular shapes such as ovals to delineate areas with unique structural forms.
[0003] High-altitude irregular-shaped integrated ceilings are typically characterized by a large installation range, multiple structural layers, and complex decorative zoning. There are differences between stretch film and aluminum panels in terms of material properties, installation methods, and finished surface control. Furthermore, each decorative area needs to maintain a continuous outline and accurate seam alignment, and corresponding installation positions need to be reserved for terminal equipment such as lighting fixtures, air vents, and sprinklers. This places high demands on the overall design and construction control of the integrated ceiling system.
[0004] Existing structures and installation methods are prone to deviations, and these deviations can easily be transmitted to each other and accumulate along irregular closed contours. It is difficult to ensure the smoothness of curves, and problems such as broken lines or wavy deformations, misalignment, and gaps can easily occur, affecting the overall aesthetics and the final visual quality.
[0005] Therefore, it is necessary to design an installation structure and method for high-altitude flexible membrane dome. Summary of the Invention
[0006] Therefore, the purpose of this invention is to provide an installation structure and method for high-altitude flexible membrane domes, which can effectively solve the problems of existing integrated ceiling structures and installation methods that are difficult to balance overall structural stability and shaping accuracy, and are prone to misalignment and gaps.
[0007] To achieve the above objectives, the technical solution adopted by the present invention is as follows: An installation structure for a high-altitude flexible membrane dome includes a ceiling foundation, a flexible membrane ceiling, and an aluminum panel ceiling. The stretch ceiling includes a boundary frame, a substrate frame, a base plate, a substrate, lighting fixtures, a honeycomb grid, and several stretch ceiling units; The top of the boundary skeleton is suspended from the ceiling base by a suspension rod assembly. The boundary skeleton has a ring structure and extends downward to define the range of the stretch ceiling. The substrate skeleton is fixedly connected to the middle of the boundary skeleton and is located inside the boundary skeleton; The base plate is continuously laid and fixed on the substrate frame, and the substrate is fixed on the lower surface of the base plate; The honeycomb grid is fixed to the lower surface of the substrate, and together with the boundary skeleton, it divides the soft film ceiling into several polygonal light source areas; The lamp is mounted on the lower surface of the substrate and located within the light source area; Edge-gathering grooves are installed on the inner surface of the boundary skeleton and the side wall of the honeycomb grid. The edges of the plurality of soft film units are respectively fixed in the edge-gathering grooves at corresponding positions to cover the corresponding light source areas. The aluminum panel ceiling is fixedly connected to the ceiling foundation through a suspension rod assembly, surrounds the boundary frame, and is fixedly connected to the outer surface of the boundary frame.
[0008] Furthermore, the ceiling foundation includes a support frame and a transition layer joists; The support frame is fixed to the dome foundation, and the boundary skeleton and aluminum ceiling are both fixedly connected to the support frame. The transition layer keel is fixed on the support frame and distributed within the boundary skeleton. The transition layer keel extends downward and is fixedly connected to the substrate skeleton.
[0009] Furthermore, the aluminum ceiling panel includes a main keel, a secondary keel, keel hangers, and aluminum panels; The main keel is horizontally suspended on the ceiling base by the hanger assembly. One end of the main keel faces the center of the stretch ceiling and is distributed at intervals along the boundary skeleton outline. Both ends of the main keel are fixed with keel hangers. The secondary keel is fixedly connected to the keel hangers on the two adjacent main keels to form a mesh skeleton structure; The aluminum panel is fixed to the lower surface of the secondary keel, and the aluminum panel is fixedly connected to the boundary frame.
[0010] Furthermore, the aluminum ceiling panel is in the shape of a ring. Multiple sets of aluminum panels are arranged at intervals around the center of the boundary skeleton, moving away from the boundary skeleton. A ring-shaped decorative gap is reserved between two adjacent sets of aluminum panels, and a decorative strip or light strip is installed in the ring-shaped decorative gap.
[0011] Furthermore, the light strip includes an inner ring plate, an outer ring plate, a base plate, and an annular soft film; The inner and outer ring plates are spaced apart and are fixedly connected to the ceiling foundation through a suspension rod assembly, and are also fixedly connected to two adjacent sets of aluminum panels, one inside and one outside. The base plate is fixed between the inner ring plate and the outer ring plate to form a light strip groove with a lower opening, and a light fixture is installed on the lower surface of the base plate. The lower ends of the inner ring plate and the outer ring plate are respectively equipped with edge-receiving grooves; The inner and outer edges of the annular soft film are respectively installed in the corresponding edge-sealing grooves to cover the light strip grooves.
[0012] Furthermore, the decorative strip is an annular plate-shaped structure adapted to the annular decorative gap, and the two sides of the decorative strip are respectively fixedly connected to the aluminum panels of two sets of aluminum ceiling panels.
[0013] Furthermore, the boom assembly includes a boom, an adapter bracket, and a C-shaped steel frame; The top of the boundary frame is fixed with an adapter bracket, which is threaded to the lower end of the hanger rod, and the upper end of the hanger rod is fixedly connected to the ceiling foundation. C-shaped steel frames are suspended on both sides of the main keel. The C-shaped steel frames are threaded to the lower end of the hanger rod, and the upper end of the hanger rod is fixedly connected to the ceiling foundation.
[0014] Furthermore, two sets of edge-gathering grooves are arranged vertically, and two layers of the soft film unit are arranged vertically in the same light source area.
[0015] A method for installing a high-altitude stretch membrane dome, applicable to the aforementioned high-altitude stretch membrane dome installation structure, includes the following steps: S100: Ceiling design; A 3D laser scanner was used to scan the dome foundation. Based on the obtained 3D point cloud model, the ceiling model was designed, the structural shape and positioning coordinates of each component were determined, the elevation of each suspension point and the length of the suspension rod were calculated, design drawings were generated, and each keel, each suspension rod and each grid component in the honeycomb grid were numbered. S200: Install ceiling base; According to the design drawings and numbers, install the support frame on the dome foundation, and fix the hangers and transition layer keel at the bottom of the support frame; S300: Pre-installed and fully suspended stretch ceiling frame; The boundary skeleton is pre-installed and laid out on the ground, and the base plate skeleton is spliced inside the boundary skeleton to form an integrated soft membrane ceiling skeleton; Then the stretch ceiling frame is hoisted and fixedly connected to the ceiling foundation; S400: Install baseboard and honeycomb grid; A base plate and a substrate are installed sequentially below the substrate frame, with mounting holes for the lamps pre-set on the substrate; According to the numbering and positioning coordinates of the grid components, the honeycomb grid is assembled piece by piece under the substrate to form several polygonal light source areas; S500: Scanning and retesting the light source area; A 3D laser scanner is used to scan the honeycomb grid to obtain the actual contour of each polygon light source area. The grid components that exceed the predetermined deviation are adjusted, and the corresponding soft film units are cut according to the adjusted contours. S600: Install light fixtures and edge trim; According to the design drawings and the preset mounting holes, install the lamps in the light source area, and install edge grooves on the inner surface of the boundary skeleton and the side wall of the honeycomb grid. S700: Install soft membrane unit; First, the soft film unit is temporarily fixed on the upper light source area. Then, the soft film is heated evenly to make it stretch evenly and gradually stretch from the center to the surrounding area. Finally, the edge of the soft film unit is fixed in the edge-gathering groove. S800: Install aluminum panel ceiling; Aluminum panels are installed sequentially from the boundary frame outwards to complete the overall ceiling installation.
[0016] Furthermore, before hoisting the stretch ceiling frame, install the hangers that match the position of the boundary frame on the support frame according to the design drawings and numbers, and install the corresponding transition brackets on the boundary frame. When hoisting the stretch ceiling frame, its horizontal position is determined by the adapter brackets and the suspension rods, and its height position is determined by the bonding of the base plate frame with the transition layer keel.
[0017] (1) The present invention defines the outer contour of the soft film ceiling by setting the boundary skeleton in a ring shape and extending downward, fixing the base skeleton in the middle of the boundary skeleton and distributing it inside it, so that the boundary skeleton and the base skeleton are connected to each other to form an overall support base covering the soft film ceiling area; the base plate and the substrate are fixed below the base skeleton in sequence to provide a unified installation base for the lamps, honeycomb grid and soft film unit. The honeycomb grid and the boundary skeleton together divide several corresponding polygonal light source areas, so that the lamps, edge grooves and soft film units can be set according to the same grid relationship. At the same time, the outer aluminum plate ceiling is connected to the boundary skeleton, which is conducive to maintaining the relative position between the soft film area and the outer decorative area.
[0018] (2) During the construction of this invention, the three-dimensional point cloud model of the dome foundation is first used to determine the positioning coordinates, lifting point elevation and hanging rod length of each component, so that the actual installation conditions of the upper part can be transformed into the basis for ceiling construction; then, the boundary skeleton and the base plate skeleton are pre-assembled into an integrated soft membrane ceiling skeleton on the ground according to the design outline, and then the whole is hoisted to the high altitude for fixation, which can transfer the splicing and correction work of the irregular closed outline to the ground, reducing the outline deviation and error accumulation caused by the high-altitude segmented assembly; after the honeycomb grid is installed piece by piece according to the number and positioning coordinates, the actual outline of each polygon light source area is obtained by scanning, the grid components with out-of-tolerance are adjusted and the soft membrane unit is cut accordingly, which is conducive to making the soft membrane unit match the actual grid.
[0019] Therefore, the combination of structural layout and construction methods can improve the overall stability and shaping accuracy of high-altitude irregular-shaped integrated ceilings, and reduce the possibility of positional deviations between ceiling outlines, decorative sections and adjacent decorative areas. Attached Figure Description
[0020] Figure 1 This is a bottom view of the flexible membrane dome of the present invention; Figure 2 for Figure 1 Detailed view of the node section along the vertical centerline; Figure 3 for Figure 2 Enlarged view of point A in the middle; Figure 4 for Figure 2 Enlarged view of point B in the middle; Figure 5 A detailed side section view of another embodiment; Figure 6 This is another implementation method for LED strip lights.
[0021] Attached reference numerals: 1. Stretch ceiling; 2. Aluminum panel ceiling; 3. Hanger assembly; 4. Edge trim; 5. Support frame; 6. Transition layer keel; 7. Decorative strip; 8. LED strip; 101. Boundary skeleton; 102. Substrate skeleton; 103. Base plate; 104. Substrate; 105. Lamp fixture; 106. Honeycomb grid; 107. Flexible film unit; 201. Main keel; 202. Secondary keel; 203. Keel hanger; 204. Aluminum panel; 301. Hanger rod; 302. Adapter angle bracket; 303. C-shaped steel frame; 801. Inner ring plate; 802. Outer ring plate; 803. Base plate; 804. Annular soft membrane. Detailed Implementation
[0022] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments: Example
[0023] This embodiment aims to provide an installation structure and method for a high-altitude stretch membrane dome, which is mainly used for the decoration of the high-altitude dome in the outpatient hall. It addresses the problem that existing integrated ceiling structures cannot simultaneously accommodate the reasonable setting and installation accuracy of different finishes such as stretch membranes and aluminum panels.
[0024] A high-altitude flexible membrane dome installation structure, such as Figure 1In this embodiment, the ceiling structure includes a stretch ceiling 1 and an aluminum panel ceiling 2. The aluminum panel ceiling 2 forms a single base, while the stretch ceiling 1 is distributed in the central area of the ceiling structure and has an elliptical shape. The stretch ceiling 1 contains terminal equipment such as light fixtures 105 and is covered with a stretch membrane to create a central lighting and decorative effect.
[0025] like Figure 2 The stretch ceiling 1 includes a boundary frame 101, a substrate frame 102, a base plate 103, a substrate 104, a light fixture 105, a honeycomb grid 106, and several stretch ceiling units 107.
[0026] The boundary frame 101 is mainly used to divide the stretch ceiling 1 and the aluminum panel ceiling 2, and to provide an installation base for the stretch ceiling 1. The boundary frame 101 uses 15mm thick UBEAT board, which can be used in two layers, spliced together to form an elliptical ring structure. The top of the boundary frame 101 is suspended from the ceiling base via the hanger assembly 3. The ceiling base can be an existing dome foundation, such as the bottom of a floor slab or beam. The boundary frame 101 extends downwards to define the area of the stretch ceiling 1.
[0027] The substrate frame 102 is fixedly connected to the middle of the boundary frame 101 and is located inside the boundary frame 101. The substrate frame 102 is made of CS50×20 light steel profile spliced into a grid structure to provide an installation foundation for the base plate 103.
[0028] The base plate 103 is continuously laid and fixed on the lower surface of the base frame 102. The base plate 103 is made of 15mm thick Ubest board and can also be used in two layers. It mainly provides the installation base for terminal equipment such as lamps 105, air outlets and sprinklers. The edge of the base plate 103 is attached to the middle of the boundary frame 101 to form an elliptical mounting groove with a lower opening.
[0029] The substrate 104 is made of 2mm thick white galvanized iron sheet. The substrate 104 is continuously laid and fixed on the lower surface of the base plate 103, and continuously laid in the area of the boundary skeleton 101 in the mounting groove to cover the entire mounting groove and the exposed surface of the Ubette board, thereby covering the base color and splicing seams of the Ubette board and playing a decorative role.
[0030] The honeycomb grid 106 is fixed to the lower surface of the substrate 104, and together with the boundary skeleton 101, it divides the soft film ceiling 1 into several polygonal light source areas; the honeycomb grid 106 is formed by splicing several grid units, and the lower surface of the grid unit is at the same elevation as the lower surface of the boundary skeleton 101.
[0031] The lamp 105 is mounted on the lower surface of the substrate 104 and located within the light source area. Regarding the end devices, this embodiment mainly describes the installation of the lamp 105. In fact, the light source area can be used not only for mounting the lamp 105, but also for mounting all the end devices involved.
[0032] Edge-receiving grooves 4 are installed on the inner surface of the boundary skeleton 101 and the side wall of the honeycomb grid 106. The edge-receiving grooves 4 adopt the existing edge-receiving structure. The attached figure is only for illustration. The specific structure follows the existing technology. It is mainly used to fix the edge of the soft film unit 107, so that the edges of several soft film units 107 are respectively fixed in the edge-receiving grooves 4 at the corresponding positions to cover the corresponding light source area.
[0033] The aluminum panel ceiling 2 is fixedly connected to the ceiling base via the suspension rod assembly 3, surrounds the boundary frame 101, and is fixedly connected to the outer surface of the boundary frame 101. For example... Figure 3 The aluminum ceiling panel 2 includes a main keel 201, a secondary keel 202, keel hangers 203, and an aluminum panel 204.
[0034] The main keel 201 uses CS50×20 light steel profiles. It is horizontally suspended from the ceiling base via hanger assemblies 3. One end of the main keel 201 faces the center of the stretch ceiling 1 and is spaced along the outline of the boundary frame 101. Both ends of the main keel 201 are fixed with keel hangers 203. The secondary keel 202 is fixedly connected to the keel hangers 203 on the adjacent two main keels 201. The secondary keel 202 adopts a Z-shaped structure, forming a ring-shaped grid structure together with the main keel 201. Aluminum panels 204 are suspended and fixed to the lower surface of the secondary keels 202. The sidewalls of the aluminum panels 204 adjacent to the boundary frame 101 are fixedly connected to the boundary frame 101 to complete the connection between the aluminum panel ceiling 2 and the stretch ceiling 1. The aluminum panels 204 are made of 1mm thick white corrugated aluminum sheets.
[0035] In this embodiment, as Figure 1 and Figure 2 The aluminum panel ceiling 2 is in the shape of a ring, with multiple sets arranged around the geometric center of the boundary frame 101 and in a direction away from the boundary frame 101. A ring-shaped decorative gap is formed between two adjacent sets of aluminum panels 204, and a decorative strip 7 or a light strip 8 is installed in the ring-shaped decorative gap. In essence, in order to achieve a rich decorative effect, two additional elliptical ring-shaped decorative structures are set around the perimeter of the soft film ceiling 1, thereby dividing the aluminum panel ceiling 2 into several ring-shaped areas.
[0036] The structure of the light strip 8 is similar to that of the stretch ceiling 1, such as... Figure 4 The light strip 8 includes an inner ring plate 801, an outer ring plate 802, a base plate 803, and an annular soft film 804. The inner ring plate 801, the outer ring plate 802, and the base plate 803 are all made of 15mm thick Ubette board. The inner ring plate 801 and the outer ring plate 802 are distributed at intervals between the inner and outer rings and are fixedly connected to the ceiling foundation through the hanging rod assembly 3. They are also fixedly connected to two adjacent sets of aluminum panels 204, one inside and one outside.
[0037] The base plate 803 is fixed between the inner ring plate 801 and the outer ring plate 802, located in the middle of the inner ring plate 801 and the outer ring plate 802, forming a light strip groove with a downward opening. A 2mm thick white galvanized iron sheet is continuously fixed on the inner wall of the light strip groove, and a light fixture 105 is installed at the bottom of the light strip groove. The lower ends of the inner ring plate 801 and the outer ring plate 802 are respectively installed with edge trimming grooves 4. The inner and outer edges of the annular soft membrane 804 are respectively installed in the corresponding edge trimming grooves 4 to cover the light strip groove 8. The installation method of the annular soft membrane 804 can refer to the soft membrane ceiling 1. The annular soft membrane 804 can be formed by splicing several sections of soft membrane. The inner ring plate 801, the outer ring plate 802 and the base plate 803 are pre-laid out and assembled into a whole on the ground. Before the aluminum plate ceiling 2 is installed, the whole is lifted and fixed.
[0038] The decorative strip 7 is a ring-shaped plate structure adapted to the annular decorative gap. Specifically, it uses a 2mm thick black brushed stainless steel finish. The two sides of the decorative strip are fixedly connected to the aluminum panels 204 of the two sets of aluminum ceiling panels 2. The installation of the decorative strip is different from that of the light strip 8. In this case, gaps are reserved in advance when installing the aluminum ceiling panels 2, and the decorative surface is installed segment by segment to form a continuous annular decorative strip 7.
[0039] The suspension rod assembly 3 includes a suspension rod 301, a transition bracket 302, and a C-shaped steel frame 303. The installation of the stretch ceiling 1 and the light strip 8 uses the transition bracket 302 and the suspension rod 301. The top of the boundary frame 101 is fixed with a right-angled transition bracket 302, which is threaded to the lower end of the suspension rod 301. The upper end of the suspension rod 301 is fixedly connected to the ceiling foundation. The installation structure of the inner ring plate 801 and the outer ring plate 802 in the light strip 8 is the same.
[0040] The installation of the aluminum panel ceiling 2 uses a C-shaped steel frame 303 and a hanger 301. The C-shaped steel frame 303 is suspended on both sides of the main keel 201. The lower end of the C-shaped steel frame 303 is threaded to the hanger 301, and the upper end of the hanger 301 is fixedly connected to the ceiling foundation. Example
[0041] This embodiment is basically the same as Embodiment 1, but in this embodiment, such as Figure 5 Considering that in some cases the dome foundation is not suitable as a direct fixed foundation, such as when it is impossible to drill a large number of anchor holes on the bottom of the floor slab and beam for the use of the hanger 301, or when there are pipes or other structures under the dome that interfere with the position of the hanger assembly 3, in this embodiment, the ceiling foundation includes a support frame 5 and a transition layer keel 6. The support frame 5 is fixed to the dome foundation and is in the form of a grid. Its middle part can avoid pipes and other structures, and its bottom can be cantilevered downwards to allow for the installation of the hanger 301, so that the boundary frame 101 and the aluminum panel ceiling 2 are both fixedly connected to the support frame 5 through the hanger assembly 3.
[0042] The transition layer keel 6 is fixed on the support frame 5 and distributed within the boundary skeleton 101. The transition layer keel 6 extends downward and is fixedly connected to the substrate skeleton 102 to directly reinforce the substrate skeleton 102 and prevent the large span of the soft membrane ceiling 1 from causing a lack of support in the center. Example
[0043] This embodiment is basically the same as Embodiment 1, but in this embodiment, the flexible membrane unit 107 of the flexible membrane ceiling 1 and the annular flexible membrane 804 of the light strip 8 are both provided with two layers, one above the other. Figure 6 Taking the light strip 8 as an example, there are two sets of edge grooves 4 arranged vertically, and two sets of annular soft film 804 arranged vertically at intervals. Similarly, the soft film unit 107 is arranged in two layers vertically in the same light source area to block mosquitoes from entering.
[0044] A method for installing a high-altitude stretch membrane dome, applicable to the high-altitude stretch membrane dome installation structure in Example 2, includes the following steps: S100: Ceiling design; A 3D laser scanner was used to perform a full-coverage scan of the high-space construction site with a floor height of ≥8m, with a focus on the dome foundation. The 3D laser scanner used was a Leica RTC360 scanner with a scanning speed of 2 million points / second, a point accuracy of up to 1.9mm@10m, a distance measurement accuracy of 1mm+10ppm, and a range noise as low as 0.4mm@10m.
[0045] Before scanning, clean the site and plan the station locations to ensure comprehensive field of view. Enable VIS visual tracking mode for fully automatic stitching between stations without the need for targets. Activate HDR panoramic photography to impart realistic textures to the point cloud, facilitating component identification later.
[0046] A single-station scan plus 360° panoramic image acquisition takes only 2 minutes, and can be combined with Cyclone FIELD 360 for real-time on-site preview and pre-stitching.
[0047] After scanning, "Cyclone REGISTER 360" was used to complete the final stitching and optimization of the point cloud, generating a high-precision 3D point cloud model that includes the main structure, electromechanical pipelines and their spatial relationships, in order to obtain the true situation of the dome foundation.
[0048] Then import the point cloud into "Revit" and use "CloudWorx" to extract the coordinates and elevations of key structures (such as the bottom of floor slabs and beams).
[0049] Based on the obtained 3D point cloud model, the ceiling structure is designed. A parametric surface model is created using Rhino software to determine the structural shape and positioning coordinates of each component. The elevation of each suspension point and the length of suspension rod 301 are calculated, completing the detailed ceiling design. Collision checks and precise drawing generation are performed to guide factory-scale numbering and processing, generating design drawings. Special attention needs to be paid to numbering each keel, each suspension rod 301, and each grid component in the honeycomb grid 106.
[0050] S200: Install ceiling base; According to the design drawings and numbering, support frame 5 was installed on the dome foundation to provide a fixed installation base for other components. Aerial work platforms were used during construction, and operators were certified. A warning line was set up in the work area. Installation personnel used tablets (running CycloneFIELD360 or Navisworks) to view the point cloud model of the area in real time and compare it with the design model for installation.
[0051] Then, the lower part of the support frame 5 is fixedly installed with the hanger 301 and the transition layer keel 6. The transition layer keel 6 can be laid out and spliced on the ground, and then lifted to the designated position by the reverse hoisting method and fixed. Alignment marks can be drawn on the corresponding support frame 5 in advance.
[0052] Before installation, mounting holes can be pre-drilled on the corresponding support frame 5, and then the corresponding numbered hanger 301 can be fixedly connected to it to ensure that the length of the specified hanger 301 is consistent with the design drawings, so as to meet the needs of different elevations in different areas of the ceiling.
[0053] S300: Pre-installed and fully suspended stretch ceiling frame; First, lay out and pre-assemble the boundary frame 101 on the ground, and then splice the base plate frame 102 inside the boundary frame 101 to form an integrated soft membrane ceiling 1 frame. This can transfer the splicing and correction work of irregular closed contours to the ground, reducing contour deviation and error accumulation caused by high-altitude segmented assembly. At this time, the corresponding adapter bracket 302 needs to be installed on the boundary frame 101.
[0054] Then, the frame of the stretch ceiling 1 is hoisted and fixedly connected to the ceiling foundation by the reverse hoisting method. When hoisting the frame of the stretch ceiling 1, its horizontal position is determined by the adapter angle bracket 302 and the hanging rod 301, and its height position is determined by the bonding of the base plate frame 102 with the conversion layer keel 6.
[0055] Meanwhile, the inner ring plate 801, outer ring plate 802 and base plate 803 are laid out on the ground and pre-installed, and then installed as a whole on the ceiling foundation.
[0056] S400: Install base plate 103 and honeycomb grid 106; A base plate 103 and a substrate 104 are installed sequentially below the substrate frame 102. Mounting holes for the lamp 105 are pre-set on the substrate 104 to facilitate rapid positioning later.
[0057] According to the numbering and positioning coordinates of the grid components, the honeycomb grid 106 is assembled piece by piece under the substrate 104 to form several polygonal light source areas.
[0058] S500: Scanning and retesting the light source area; A 3D laser scanner is used to scan the honeycomb grid 106, and a re-inspection is performed to obtain the actual contour of each polygon light source area. The grid components that exceed the predetermined deviation are adjusted, and the corresponding soft film units 107 are cut according to the adjusted contours. For specific scanning methods, please refer to step S100.
[0059] S600: Install light fixture 105 and edge groove 4; According to the design drawings and the preset mounting holes, the lamps 105 are installed in the light source area and the lamp strip 8 slots, and the edge grooves 4 are installed on the inner surface of the boundary skeleton 101 and the side wall of the honeycomb grid 106.
[0060] S700: Install soft membrane unit 107; Before installation, unfold the membrane unit 107 on the ground and check for any damage or stains to ensure the material is intact.
[0061] Temporarily fix the soft film unit 107 to the upper light source area or the light strip 8 groove. A special clamping tool or magnetic system can be used to temporarily fix the soft film to the light source area. Then, use a hot air gun to heat the soft film evenly, so that it is stretched evenly and gradually stretched from the center to the surrounding area. Finally, use a special scraper to embed the soft film into the edge-gathering groove 4.
[0062] During the tensioning process, the flatness and smoothness of the curves are constantly checked to ensure there are no wrinkles or looseness.
[0063] S800: Install aluminum ceiling panels 2; Because the light strip 8 and the decorative strip are installed in several groups, the aluminum panel ceiling 2 is installed in groups from the boundary keel outwards. First, the main keel 201 is installed, then the keel hangers 203 and the secondary keel 202 are installed in sequence, and finally the aluminum panel 204 is installed. Since the main keel 201 and the secondary keel 202 are of different lengths and the aluminum panel 204 is irregular in shape, it is necessary to pay attention to the numbering and corresponding coordinates.
[0064] When installing the aluminum ceiling panel 2, be sure to leave a circular decorative gap, and install the decorative strip after the aluminum ceiling panel 2 is installed. When the aluminum ceiling panel 2 is installed on both sides of the light strip 8, be sure to ensure that it fits snugly with the inner ring plate 801 and the outer ring plate 802 to avoid misalignment or gaps.
[0065] During final commissioning and acceptance, turn on illuminator 105 and check for uniform illumination, absence of shadows, and no light leakage. Adjust the angle and position of illuminator 105 to ensure the visual effect matches the design. Check that the surface of the membrane is flat, free of dirt, and scratches. Check that all end devices are perfectly aligned with the membrane, without misalignment or gaps. Use a total station or 3D scanner to verify the finished surface, ensuring that the installation accuracy meets design requirements (e.g., elevation deviation ≤ ±3mm).
Claims
1. A high-altitude flexible membrane dome installation structure, characterized in that: Including ceiling base, stretch ceiling (1) and aluminum plate ceiling (2); The stretch ceiling (1) includes a boundary frame (101), a substrate frame (102), a base plate (103), a substrate (104), a lamp (105), a honeycomb grid (106), and several stretch ceiling units (107). The top of the boundary skeleton (101) is suspended on the ceiling base by the suspension rod assembly (3). The boundary skeleton (101) has a ring structure and extends downward to define the range of the stretch ceiling (1). The substrate skeleton (102) is fixedly connected to the middle of the boundary skeleton (101) and is located inside the boundary skeleton (101); The base plate (103) is continuously laid and fixed on the substrate frame (102), and the substrate (104) is fixed on the lower surface of the base plate (103); The honeycomb grid (106) is fixed on the lower surface of the substrate (104) and together with the boundary skeleton (101), divides the soft film ceiling (1) into several polygonal light source areas. The lamp (105) is mounted on the lower surface of the substrate (104) and located within the light source area; Edge grooves (4) are installed on the inner surface of the boundary skeleton (101) and the side wall of the honeycomb grid (106). The edges of the plurality of soft film units (107) are respectively fixed in the edge grooves (4) at the corresponding positions to cover the corresponding light source areas. The aluminum ceiling panel (2) is fixedly connected to the ceiling base through the hanging rod assembly (3), surrounds the boundary frame (101) and is fixedly connected to the outer surface of the boundary frame (101).
2. The high-altitude flexible membrane dome installation structure according to claim 1, characterized in that: The ceiling foundation includes a support frame (5) and a transition layer keel (6); The support frame (5) is fixed on the dome foundation, and the boundary skeleton (101) and the aluminum plate ceiling (2) are both fixedly connected to the support frame (5); The transition layer keel (6) is fixed on the support frame (5) and distributed within the boundary skeleton (101). The transition layer keel (6) extends downward and is fixedly connected to the substrate skeleton (102).
3. The high-altitude flexible membrane dome installation structure according to claim 2, characterized in that: The aluminum ceiling (2) includes a main keel (201), a secondary keel (202), keel hangers (203), and an aluminum panel (204). The main keel (201) is horizontally suspended on the ceiling base by the hanger assembly (3). One end of the main keel (201) faces the center of the soft membrane ceiling (1) and is distributed at intervals along the outline of the boundary skeleton (101). Both ends of the main keel (201) are fixed with keel hangers (203). The secondary keel (202) is fixedly connected to the keel hangers (203) on the two adjacent main keels (201) to form a mesh skeleton structure; The aluminum panel (204) is fixed to the lower surface of the secondary keel (202), and the aluminum panel (204) is fixedly connected to the boundary frame (101).
4. The high-altitude flexible membrane dome installation structure according to claim 3, characterized in that: The aluminum ceiling panel (2) is in the shape of a ring. Multiple sets of aluminum panels are arranged around the center of the boundary skeleton (101) at intervals in the direction away from the boundary skeleton (101). A ring-shaped decorative gap is reserved between two adjacent sets of aluminum panels (204), and a decorative strip (7) or a light strip (8) is installed in the ring-shaped decorative gap.
5. The high-altitude flexible membrane dome installation structure according to claim 4, characterized in that: The light strip (8) includes an inner ring plate (801), an outer ring plate (802), a base plate (803), and an annular soft film (804). The inner ring plate (801) and outer ring plate (802) are distributed at intervals, and are fixedly connected to the ceiling foundation through the hanger assembly (3), and are respectively fixedly connected to the two adjacent sets of aluminum panels (204); The base plate (803) is fixed between the inner ring plate (801) and the outer ring plate (802) to form a lower opening groove for the light strip (8). A lamp (105) is installed on the lower surface of the base plate (803). The lower ends of the inner ring plate (801) and the outer ring plate (802) are respectively equipped with edge-receiving grooves (4); The inner and outer edges of the annular soft film (804) are respectively installed in the corresponding edge-gathering groove (4) to cover the groove of the light strip (8).
6. The high-altitude flexible membrane dome installation structure according to claim 4, characterized in that: The decorative strip (7) is an annular plate structure adapted to the annular decorative gap, and the two sides of the decorative strip are fixedly connected to the aluminum panels (204) of the two sets of aluminum ceiling panels (2).
7. A high-altitude flexible membrane dome installation structure according to any one of claims 2-6, characterized in that: The boom assembly (3) includes a boom (301), a transition bracket (302), and a C-shaped steel frame (303). The top of the boundary frame (101) is fixed with a transition bracket (302), the transition bracket (302) is threaded to the lower end of the hanger (301), and the upper end of the hanger (301) is fixedly connected to the ceiling foundation. C-shaped steel frames (303) are suspended on both sides of the main keel (201). The C-shaped steel frames (303) are threadedly connected to the lower end of the hanger (301), and the upper end of the hanger (301) is fixedly connected to the ceiling foundation.
8. A high-altitude flexible membrane dome installation structure according to any one of claims 1-6, characterized in that: The edge-gathering groove (4) is provided in two sets, one above the other, and the soft film unit (107) is provided in two layers, one above the other, in the same light source area.
9. A method for installing a high-altitude stretch membrane dome, applicable to the high-altitude stretch membrane dome installation structure described in claim 7, characterized in that: Includes the following steps: S100: Ceiling design; A three-dimensional laser scanner was used to scan the dome foundation. Based on the obtained three-dimensional point cloud model, the ceiling model was designed, the structural shape and positioning coordinates of each component were determined, the elevation of each suspension point and the length of the suspension rod (301) were calculated, design drawings were generated, and each keel, each suspension rod (301) and each grid component in the honeycomb grid (106) were numbered. S200: Install ceiling base; According to the design drawings and numbers, install the support frame (5) on the dome foundation, and fix the hanger (301) and the transition layer keel (6) at the lower part of the support frame (5). S300: Pre-installed and overall suspended soft membrane ceiling (1) frame; The boundary frame (101) is pre-installed on the ground and the base plate frame (102) is spliced inside the boundary frame (101) to form an integrated soft membrane ceiling (1) frame; Then the stretch ceiling (1) frame is hoisted and fixedly connected to the ceiling foundation; S400: Install base plate (103) and honeycomb grid (106); A base plate (103) and a substrate (104) are installed sequentially below the substrate frame (102), and mounting holes for the lamps (105) are pre-set on the substrate (104); According to the numbering and positioning coordinates of the grid components, the honeycomb grid (106) is assembled piece by piece under the substrate (104) to form several polygonal light source areas; S500: Scanning and retesting the light source area; A three-dimensional laser scanner is used to scan the honeycomb grid (106) to obtain the actual contour of each polygon light source area, the grid components exceeding the predetermined deviation are adjusted, and the corresponding soft film unit (107) is cut according to the adjusted contour. S600: Install light fixtures (105) and edge trim (4); According to the design drawings and the preset mounting holes, the lamps (105) are installed in the light source area, and the edge grooves (4) are installed on the inner surface of the boundary skeleton (101) and the side wall of the honeycomb grid (106). S700: Install soft membrane unit (107); First, the soft film unit (107) is temporarily fixed on the upper light source area. Then, the soft film is heated evenly to make it stretch evenly and gradually stretch from the center to the surrounding area. Finally, the edge of the soft film unit (107) is fixed in the edge-gathering groove (4). S800: Install aluminum ceiling panels (2); Aluminum ceiling panels (2) are installed sequentially from the boundary frame (101) outwards to complete the overall installation of the ceiling.
10. The method for installing a high-altitude flexible membrane dome according to claim 9, characterized in that: Before hoisting the frame of the stretch ceiling (1), install the hanger (301) that matches the position of the boundary frame (101) on the support frame (5) according to the design drawings and number, and install the corresponding adapter (302) on the boundary frame (101). When hoisting the frame of the stretch ceiling (1), its horizontal position is determined by the adapter bracket (302) and the hanger (301), and its height position is determined by the bonding of the base plate frame (102) and the transition layer keel (6).