A gas lift drainage system and method for an oil reservoir-type gas storage facility
By employing a stratified gas injection and planar distribution scheme for the gas lift and drainage system of an oil reservoir-type gas storage facility, the problem of low injection and production control accuracy has been solved, thereby optimizing the injection and production process and improving safety. This scheme is suitable for injection and production management under complex geological conditions.
Patent Information
- Application Number
- CN202510625201.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-15
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, the injection and production control precision of oil reservoir-type gas storage facilities is low, and the gas injection volume allocation is inaccurate, which makes it difficult to optimize the injection and production operation and poses high safety risks. In particular, under complex geological conditions, it is easy to cause problems such as geological structural instability and well control failure.
A gas lift and fluid discharge system for oil reservoir-type gas storage is adopted, including a geological analysis subsystem, a single-well injection and production analysis subsystem, and a surface adjustment subsystem. By using well group injection and production data, the stratified gas injection volume and planar distribution coefficient are determined, a well section injection plan is generated, and the gas injection volume and fluid production volume are dynamically adjusted to adapt to changes in formation parameters, thereby achieving precise stratified gas injection and planar distribution.
It improves the matching degree of injection and production, optimizes the injection and production process, reduces safety risks, and improves injection and production efficiency and fluid production efficiency. It is suitable for injection and production environments with fractured tectonics and strong heterogeneity.
Smart Images

Figure CN123109601A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of petroleum engineering technology, and in particular to a gas lift drainage system and method for an oil reservoir-type gas storage facility. Background Technology
[0002] Oil reservoir-type gas storage facilities are low-level gas storage facilities built using the geological structures of depleted oil and gas reservoirs. During the off-season, excess natural gas from gathering and transmission pipelines is injected into these low-level storage facilities, and then extracted during peak demand periods to supplement pipeline supply. As an oil reservoir-type gas storage facility, the Jidong Oilfield faces challenges such as complex geological conditions, fractured structures, burial depths generally exceeding 2500 meters, high-pressure blocks, and heterogeneous reservoirs. These geological characteristics result in significant and difficult-to-predict variations in injection and production capacity across multiple cycles.
[0003] Given the complex geological conditions of the Jidong Oilfield, existing injection and production equipment faces significant challenges in control and management, making it difficult to achieve precise management of the injection and production process. This directly leads to difficulties in optimizing injection and production operations and increases the risks to safe operation. In particular, during the alternating injection and production of large volumes of gas, the cyclical changes in pressure can easily trigger serious problems such as geological instability, well control failure, and surface equipment malfunction. Summary of the Invention
[0004] This application provides a gas lift drainage system and method for oil reservoir-type gas storage to solve the problems of low injection-production control accuracy and inaccurate gas injection volume distribution in the prior art.
[0005] To address the aforementioned issues, this application discloses a gas lift drainage system for an oil reservoir-type gas storage facility, the system comprising a geological analysis subsystem, a single-well injection and production analysis subsystem, and a surface adjustment subsystem;
[0006] The geological analysis subsystem is used to determine the stratified gas injection volume and planar allocation coefficient of each gas injection well in the same well group based on the well group injection and production data, and to determine the initial injection allocation scheme based on the planar allocation coefficient and the stratified gas injection volume. The well group injection and production data represents the geological data of each gas injection well and each associated producing well in the same well group. The planar allocation coefficient represents the weight ratio of the gas injection volume allocation of each gas injection well to each associated producing well. The initial injection allocation scheme represents the sum of the stratified gas injection volumes of all gas injection wells in the same well group to each associated producing well.
[0007] The single-well injection-production analysis subsystem is used to determine the actual total production and stratified injection-production ratio of each associated producing well in the same well group based on the well group injection-production data, determine the total stratified gas injection of each associated producing well based on the initial injection allocation scheme, calculate the theoretical total stratified production of each associated producing well based on the total stratified gas injection and the stratified injection-production ratio, determine the correction coefficient based on the actual total production and the theoretical total stratified production, and correct the initial injection allocation scheme based on the correction coefficient and the preset injection allocation principle to generate a well section injection allocation scheme.
[0008] The surface adjustment subsystem is used to regulate the gas source allocation for each injection well according to the well section allocation plan.
[0009] In some embodiments, the well group injection and production data includes at least gas intake profile data, which includes the stratified gas intake and stratified start-up pressure of each injection well.
[0010] The initial injection allocation scheme is modified according to the correction coefficient and the preset injection allocation principle to generate a well section injection allocation scheme, including:
[0011] Based on the correction coefficient, calculate the actual stratified gas injection volume of each injection well within the same well group;
[0012] The maximum number of segments that the current gas injection well can achieve is taken as the upper limit of the number of segments. The clamping distance allowed by the current process is taken as the physical limitation. The principle of minimizing the range coefficient and the permeability variation coefficient within the segment is used to determine the total actual gas injection volume of each segment of the current gas injection well.
[0013] The injection scheme for the well section is determined based on the stratified gas intake and the stratified start-up pressure.
[0014] In some embodiments, determining the stratified gas injection volume and planar distribution coefficient of each gas injection well within the same well group based on well group injection and production data, and determining the initial injection allocation scheme based on the planar distribution coefficient and the stratified gas injection volume, includes:
[0015] Based on the injection and production data of the well group, determine the stratified gas injection volume of each gas injection well within the same well group;
[0016] The planar allocation coefficient is calculated according to the following formula:
[0017]
[0018] Where, α i,j P represents the planar distribution coefficient from the i-th gas injection well to the j-th associated production well. i P represents the bottom hole pressure of the i-th gas injection well. i,jR represents the bottomhole flowing pressure of the j-th associated producing well corresponding to the i-th gas injection well. v The coefficient of resistance to seepage is given by M, which represents the total number of associated producing wells connected around the injection well.
[0019] Based on the stratified gas injection volume of each injection well within the same well group and the planar distribution coefficient, the initial injection scheme is determined according to the following formula:
[0020]
[0021] in, This represents the total amount of gas injected into the k-th layer of the associated producing well j. The value represents the amount of gas injected by the i-th injection well into the k-th layer of the j-th associated producing well, and n represents the total number of injection wells associated with the j-th associated producing well.
[0022] In some embodiments, determining the actual total production and stratified injection-production ratio of each associated producing well within the same well group based on the well group injection-production data includes:
[0023] Based on the injection and production data of the well group, determine the actual total production, stratified production, and stratified water cut of each associated producing well within the same well group;
[0024] Based on the stratified fluid production and the stratified water cut, the stratified oil production and stratified water production of each associated producing well within the same well group are determined according to the following formula:
[0025]
[0026] in, This represents the stratified oil production of the k-th layer in the j-th associated producing well. This represents the stratified production rate of the k-th layer in the j-th associated producing well. f represents the stratified water production of the k-th layer in the j-th associated producing well. j,k , represents the layer water cut of the k-th layer in the j-th associated producing well;
[0027] Based on the stratified oil production and the stratified water production, the stratified injection-production ratio of each associated producing well within the same well group is determined using the following formula:
[0028]
[0029] Among them, R j,k This represents the injection-production ratio of the k-th layer in the j-th associated producing well. α represents the volume of water equivalent to the gas injection volume of the i-th gas injection well in the k-th layer. i,j B represents the planar distribution coefficient from the i-th gas injection well to the j-th associated production well.油 ρ represents the system coefficient of oil. 油 Indicates the density of oil, The total gas injection volume of the k-th layer of the associated producing well j is represented by R, which represents the dissolved gas-oil ratio. 207 is a constant representing the amount of gas volume converted into a volume equivalent to liquid volume.
[0030] In some embodiments, calculating the theoretical total production of each associated producing well based on the total stratified gas injection and the stratified injection-production ratio includes:
[0031] The theoretical stratified production rate of each associated producing well is determined according to the following formula:
[0032]
[0033] Among them, R j,k This represents the injection-production ratio of the k-th layer in the j-th associated producing well. This represents the total amount of gas injected into the k-th layer of the associated producing well j. This represents the theoretical stratified production rate of each associated producing well;
[0034] The correction factor for each associated producing well is determined according to the following formula:
[0035]
[0036] Among them, A j This represents the correction factor for the j-th associated producing well. This represents the actual total production of the j-th associated producing well in the well group's injection and production data. This represents the total theoretical stratified production of the j-th associated producing well.
[0037] In some embodiments, determining the stratified gas injection volume of each injection well within the same well group based on well group injection and production data includes:
[0038] When the well group injection and production data includes gas intake profile data, the stratified gas injection volume of each gas injection well in the same well group is determined based on the total gas injection volume and stratified gas intake percentage of each gas injection well in the same well group injection and production data.
[0039] When the injection and production data of the well group does not include gas intake profile data, the seepage resistance coefficient is determined according to the following formula:
[0040]
[0041] Among them, R i,k μ represents the seepage resistance coefficient of the k-th layer in the i-th gas injection well. i,kLet M represent the area coefficient of the k-th layer of the i-th gas injection well, L represent the distance from the i-th gas injection well to the k-th layer, and M represent the area coefficient of the k-th layer of the i-th gas injection well. i,k H represents the stratification and stimulation coefficient of the k-th layer in the i-th gas injection well. i,k K represents the effective thickness of the k-th layer in the i-th gas injection well. i,k This represents the layered permeability of the k-th layer in the i-th gas injection well;
[0042] The vertical splitting coefficient is determined according to the following formula:
[0043]
[0044] Where, C i,k denoted by , where represents the vertical splitting coefficient of the k-th layer in the i-th gas injection well, and n represents the total number of layers in the i-th gas injection well.
[0045] Based on the total gas injection volume and vertical splitting coefficient of each gas injection well in the same well group from the injection and production data of the well group, the stratified gas injection volume of each gas injection well in the same well group is determined.
[0046] In some embodiments, determining the stratified production volume of each associated producing well within the same well group based on the well group injection and production data includes:
[0047] When the well group injection and production data includes production profile data, the stratified production volume of each associated production well in the same well group is determined based on the actual total production volume and stratified production percentage of each associated production well in the same well group in the production profile data.
[0048] If the injection-production data of the well group does not include production profile data, the stratified production rate of each associated producing well within the same well group shall be determined according to the following formula:
[0049]
[0050] in, This represents the stratified production rate of the k-th layer in the j-th associated producing well. H represents the actual total production of the j-th associated producing well. j,k K represents the effective thickness of the k-th layer in the j-th associated producing well. j,k denoted by , where represents the layered permeability of the k-th layer in the j-th associated producing well, and m represents the total number of layers in the j-th associated producing well.
[0051] In some embodiments, determining the stratified water cut of each associated producing well within the same well group based on the well group injection and production data includes:
[0052] If the well group injection and production data includes production profile data, the water cut of the strata is determined based on the production profile data.
[0053] If the well group injection and production data includes stratified water saturation, the stratified water cut is calculated using the following formula:
[0054]
[0055] Among them, f j,k Let k represent the water cut of the k-th layer in the j-th associated producing well. ro Let k represent the relative permeability of the oil in the k-th layer of the j-th associated producing well. rw B represents the relative permeability of water in the k-th layer of the j-th associated producing well. o B represents the volume factor of the oil in the k-th layer of the j-th associated producing well. w This represents the volume factor of the water in the k-th layer of the j-th associated producing well.
[0056] In some embodiments, the ground adjustment subsystem includes at least:
[0057] A pneumatic shut-off valve, wherein the pneumatic shut-off valve is connected to a pneumatic source;
[0058] At least one shut-off valve, each shut-off valve being connected between each injection well and the pneumatic shut-off valve;
[0059] The pneumatic shut-off valve is sequentially connected to each of the gas injection wells by a first ball valve, a pneumatic regulating valve, a flow meter, and a second ball valve.
[0060] To address the aforementioned problems, this application discloses a gas lift drainage method for oil reservoir-type gas storage facilities, applicable to any of the gas lift drainage systems described in the preceding claims, comprising the following steps:
[0061] Based on the injection and production data of the well group, the stratified gas injection volume and planar allocation coefficient of each gas injection well in the same well group are determined. Based on the planar allocation coefficient and the stratified gas injection volume, the initial injection scheme is determined. The injection and production data of the well group represents the geological data of each gas injection well and each associated producing well in the same well group. The planar allocation coefficient represents the weight ratio of the gas injection volume allocation of each gas injection well to each associated producing well. The initial injection scheme represents the sum of the stratified gas injection volumes of all gas injection wells in the same well group to each associated producing well.
[0062] Based on the injection and production data of the well group, determine the actual total production and stratified injection-production ratio of each associated producing well in the same well group. Based on the initial injection allocation plan, determine the total stratified gas injection of each associated producing well. After calculating the sum of the theoretical stratified production of each associated producing well based on the total stratified gas injection and the stratified injection-production ratio, determine the correction coefficient based on the actual total production and the sum of the theoretical stratified production. Then, correct the initial injection allocation plan based on the correction coefficient and the preset injection allocation principle to generate the well section injection allocation plan.
[0063] The gas source allocation for each injection well is adjusted according to the well section allocation plan.
[0064] Compared with the prior art, this application has the following advantages:
[0065] By integrating a geological analysis subsystem, a single-well injection-production analysis subsystem, and a surface adjustment subsystem, the geological analysis subsystem determines the stratified gas injection volume and planar distribution coefficient of each gas injection well within the same well group based on well group injection-production data. It then determines the sum of stratified gas injection volumes of each associated producing well based on the planar distribution coefficient and stratified gas injection volume. The single-well injection-production analysis subsystem determines the actual total production volume and stratified injection-production ratio of each associated producing well within the same well group based on well group injection-production data. It also determines the total stratified gas injection volume of each associated producing well based on the initial injection allocation plan, calculates the theoretical total stratified production volume of each associated producing well based on the total stratified gas injection volume and stratified injection-production ratio, determines the correction coefficient, and corrects the initial injection allocation plan based on the correction coefficient and preset injection principles to generate a well section injection allocation plan. The surface adjustment subsystem then regulates the gas source allocation of each gas injection well according to the well section injection allocation plan, achieving the technical effect of expanding the drainage capacity of associated producing wells. By considering the geological characteristics and injection-production requirements of different strata, precise stratified gas injection and planar allocation are carried out, avoiding the problems of excessive gas injection in high-permeability layers and insufficient gas injection in low-permeability layers. Dynamic adjustment of gas injection and production volume can adapt to changes in formation parameters, improve the matching degree of injection and production, and realize a complete technical closed loop from geological parameter analysis to dynamic adjustment of gas injection volume. It is suitable for optimizing the injection and production process in structurally fractured and highly heterogeneous areas, improving injection and production efficiency and production efficiency, as well as reducing safety risks caused by injection-production imbalance. Attached Figure Description
[0066] Figure 1 A schematic diagram of the structure of a gas lift drainage system for an oil reservoir-type gas storage facility according to an embodiment of this application is shown;
[0067] Figure 2 A schematic diagram of a well group provided in an embodiment of this application is shown;
[0068] Figure 3 A schematic diagram of the structure of a ground adjustment subsystem provided in an embodiment of this application is shown;
[0069] Figure 4 A schematic flowchart of a gas lift liquid discharge method for an oil reservoir-type gas storage facility according to an embodiment of this application is shown;
[0070] In the diagram, 10 is a pneumatic shut-off valve; 20 is a stop valve; 30 is a first ball valve; 40 is a pneumatic regulating valve; 50 is a flow meter; and 60 is a second ball valve. Detailed Implementation
[0071] To make the above-mentioned objectives, features and advantages of this application more apparent and understandable, the application will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0072] Oil reservoir-type gas storage facilities are low-level gas storage facilities built using the geological structures of depleted oil and gas reservoirs. Excess natural gas from gathering and transmission pipelines is injected into these low-level storage facilities during the off-season and extracted during peak demand periods to supplement insufficient pipeline supply.
[0073] As an oil reservoir-type gas storage facility, Jidong Oilfield faces challenges such as complex geological conditions, fractured structures, burial depths generally exceeding 2500 meters, high-pressure blocks, and heterogeneous reservoirs. These geological characteristics lead to significant and difficult-to-predict variations in injection and production capacity over multiple cycles. Compared to gas reservoirs, the multi-cycle variations in injection and production capacity are greater and more difficult to predict. The blocks where the storage facility is built have high pressure and complex produced material composition, making the selection of core high-pressure injection and production equipment and its stable operation during operation extremely challenging. Optimizing the injection and production operation of the gas storage facility is difficult and carries significant safety risks. Alternating large-volume injection and production, along with cyclical pressure changes, can easily cause geological instability, well control failure, and surface equipment malfunctions.
[0074] To address the aforementioned technical problems, this application provides a gas lift drainage system for an oil reservoir-type gas storage facility.
[0075] Figure 1 This invention provides a schematic diagram of the structure of a gas lift drainage system for an oil reservoir-type gas storage facility according to an embodiment of this application. Figure 2 A schematic diagram of a well group according to an embodiment of this application is shown. (Refer to...) Figure 1 and Figure 2 This application provides a gas lift drainage system for an oil reservoir-type gas storage facility. The system includes a geological analysis subsystem, a single-well injection and production analysis subsystem, and a surface adjustment subsystem.
[0076] The geological analysis subsystem is used to determine the stratified gas injection volume and planar distribution coefficient of each gas injection well in the same well group based on the well group injection and production data. Based on the planar distribution coefficient and stratified gas injection volume, the initial injection scheme is determined. The well group injection and production data characterizes the geological data of each gas injection well and each associated producing well in the same well group. The planar distribution coefficient characterizes the weight ratio of the gas injection volume allocation of each gas injection well to each associated producing well. The initial injection scheme characterizes the sum of the stratified gas injection volumes of all gas injection wells in the same well group to each associated producing well.
[0077] Specifically, a well group represents a collection of gas injection wells and fluid discharge wells located within the same oil sand body. By collecting dynamic pressure changes and tracer results from each gas injection well and each fluid discharge well, it can be determined that adjacent gas injection wells and fluid discharge wells are located within the same oil sand body. Stratified gas injection volume represents the specific value of distributing the total gas injection volume of the gas injection wells according to different formations. This can be determined using the total gas injection volume in the well group injection-production data and the percentage of gas absorption in each formation in the gas absorption profile data, or by using the seepage resistance coefficient or formation permeability and effective thickness values. The planar allocation coefficient refers to the weighted proportion of gas injection volume from the gas injection wells to each associated production well. This can be calculated using the bottomhole pressure difference between the gas injection wells and the production wells and the seepage resistance coefficient, and is used to characterize the contribution of the gas injection wells to the production wells in different directions of the plane. The initial injection scheme represents the sum of the stratified gas injection volumes from all gas injection wells within the same well group to each associated production well. This can be achieved by superimposing the gas injection volumes from each gas injection well to each layer of the production wells.
[0078] In this embodiment, the geological analysis subsystem determines the stratified gas injection volume and planar allocation coefficient of each gas injection well in the same well group based on the injection and production data, determines the single-layer gas injection volume of each gas injection well and the weight ratio of the gas injection volume allocated to each associated producing well, calculates the gas injection volume of each associated producing well obtained by a single layer of the gas injection well, and thus determines the gas injection volume of each gas injection well obtained by each layer of each associated producing well, thereby obtaining the initial injection allocation scheme.
[0079] In this embodiment of the application, the geological analysis subsystem calculates the stratified gas injection volume and planar distribution coefficient of each gas injection well based on the geological characteristics of different strata, and reasonably allocates the gas injection volume of each gas injection well to the associated production well, so as to avoid the problem of uneven injection and production caused by complex geological conditions. By determining the initial injection scheme, it provides a basis for generating the well section injection scheme, effectively improving the gas injection efficiency and production efficiency.
[0080] The single-well injection-production analysis subsystem is used to determine the actual total production and stratified injection-production ratio of each associated producing well within the same well group based on the well group's injection-production data. It determines the total stratified gas injection amount of each associated producing well based on the initial injection allocation plan. After calculating the theoretical total stratified production amount of each associated producing well based on the total stratified gas injection amount and the stratified injection-production ratio, it determines the correction coefficient based on the actual total production amount and the theoretical total stratified production amount. Based on the correction coefficient and the preset injection allocation principle, it corrects the initial injection allocation plan and generates the well section injection allocation plan.
[0081] Specifically, the stratified injection-production ratio refers to the proportional relationship between the gas injection volume and the production volume of each sub-layer in the associated producing well. It is used to quantitatively evaluate the injection-production balance of the associated producing well and characterize the degree of matching between gas injection efficiency and production efficiency. The correction coefficient refers to the ratio of the actual production volume to the theoretical production volume, which is used to dynamically correct the deviation of the initial injection scheme. The well section injection scheme refers to the optimized stratified gas injection execution parameters of the gas injection well. Specifically, it is generated by reorganizing the gas injection volume under the constraints of the range coefficient and permeability variation coefficient within the section to ensure that the division of the gas injection section meets the process constraints.
[0082] In this embodiment, the well group injection and production data includes at least the actual total production and stratified injection-production ratio of each associated producing well within the same well group. This allows the single-well injection and production analysis subsystem to calculate the theoretical total stratified production of each associated producing well based on the total stratified gas injection and stratified injection-production ratio. The subsystem then determines a correction coefficient based on the actual total production and the theoretical total stratified production, and corrects the initial injection allocation scheme based on the correction coefficient and a preset injection allocation principle to generate a well section injection allocation scheme.
[0083] In this embodiment, the single-well injection-production analysis subsystem dynamically optimizes the initial injection allocation scheme using stratified injection-production ratios and correction coefficients. By real-time monitoring of the actual production volume and the sum of the theoretical stratified production volume of associated producing wells, the injection-production balance is determined, and the initial injection allocation scheme is adjusted according to the correction coefficients. This not only improves gas injection efficiency and production efficiency but also effectively reduces safety risks caused by injection-production imbalance.
[0084] The surface adjustment subsystem is used to regulate the gas supply allocation for each injection well according to the well section allocation plan.
[0085] Specifically, the surface adjustment subsystem regulates the gas source allocation for each injection well according to the well section allocation plan, so as to achieve the discharge of liquid from the associated production wells.
[0086] For example, refer to Figure 2 Within the same well group, there are producing wells A, B, C, D, and E, as well as gas injection wells X, Y, and Z. For gas injection wells X, Y, and Z, the associated producing well is producing well A. Before determining the initial injection allocation scheme for producing well A, the stratified gas injection volume and planar distribution coefficient of gas injection wells X, Y, and Z are first determined. This yields the gas injection volume received by each layer of producing well A from gas injection wells X, Y, and Z. The gas injection volume received by each layer of producing well A from gas injection wells X, Y, and Z are then added together to obtain the initial injection allocation scheme for producing well A.
[0087] After obtaining the initial injection plan for producing well A, the actual total production, stratified injection-production ratio, and total stratified gas injection volume of producing well A can be determined based on the well group injection-production data. The theoretical stratified production volume of producing well A is calculated based on the stratified injection-production ratio and the total stratified gas injection volume. After summing the theoretical stratified production volumes to obtain the total theoretical stratified production volume, the correction coefficient for producing well A is determined. The initial injection plan is then proportionally corrected using the correction coefficient to obtain the stratified gas injection volumes for gas injection wells X, Y, and Z. This leads to the well section injection plan for gas injection wells X, Y, and Z.
[0088] Figure 3 A schematic diagram of the structure of a ground adjustment subsystem provided in an embodiment of this application is shown. (Refer to...) Figure 3 The ground adjustment subsystem includes at least:
[0089] Pneumatic shut-off valve 10 is connected to an air source.
[0090] At least one shut-off valve 20, each shut-off valve 20 being connected between each injection well and the pneumatic shut-off valve 10.
[0091] The pneumatic shut-off valve 10 is connected in sequence to each injection well via a first ball valve 30, a pneumatic regulating valve 40, a flow meter 50, and a second ball valve 60.
[0092] In this embodiment, the gas source enters the compressor booster unit, increasing the gas pressure to the injection pressure required by the injection well. After boosting, the gas source enters the surface adjustment subsystem through a high-pressure pipeline. The pneumatic shut-off valve 10 serves as the first safety barrier of the surface adjustment subsystem. On one hand, it connects to the surface emergency shutdown system; on the other hand, it connects to multiple injection well branches via branch pipelines. Each injection well branch is equipped with an independently controlled shut-off valve 20, a first ball valve 30, a pneumatic regulating valve 40, a flow meter 50, and a second ball valve 60. When an emergency such as overpressure or fire is detected, the surface emergency shutdown system triggers the pneumatic shut-off valve 10 to close, completely cutting off the gas source. The pneumatic regulating valve 40 is connected to the distributed control system in the central control room, allowing the distributed control system to automatically set the opening degree of the pneumatic regulating valve 40 according to the well section configuration plan, meeting the flow requirements in the well section configuration plan and achieving real-time flow regulation control. In addition, the first ball valve 30 is located between the pneumatic shut-off valve 10 and the pneumatic regulating valve 40, used for segmented isolation during maintenance of the surface adjustment subsystem, and supports rapid switching operation. The second ball valve 60 serves as a backup isolation point, closing when the flow meter 50 needs to be calibrated or the pneumatic regulating valve 40 needs to be replaced. The flow meter 50 continuously monitors the actual gas injection volume, triggering the regulating valve compensation action when the deviation between the detected value and the well section injection plan exceeds a threshold; the shut-off valve 20 closes independently when an anomaly is detected in the corresponding gas injection well. By setting up a multi-stage valve combination, the dynamic adjustment accuracy of the gas injection volume under the well section injection plan is ensured, avoiding the risk of well control failure and the probability of chain reactions of equipment abnormalities in emergency situations, providing physical safety assurance for the equipment maintenance of the surface adjustment subsystem.
[0093] The gas lift drainage system for oil reservoir-type gas storage provided in this application integrates a geological analysis subsystem, a single-well injection-production analysis subsystem, and a surface adjustment subsystem. The geological analysis subsystem determines the stratified gas injection volume and planar distribution coefficient for each injection well within the same well group based on well group injection-production data, and determines the sum of stratified gas injection volumes for each associated producing well based on the planar distribution coefficient and stratified gas injection volume. The single-well injection-production analysis subsystem determines the actual total production volume and stratified injection-production ratio for each associated producing well within the same well group based on well group injection-production data, and determines the total stratified gas injection volume for each associated producing well based on the initial injection allocation plan. It then calculates the theoretical total stratified production volume of each associated producing well based on the total stratified gas injection volume and stratified injection-production ratio, thereby determining a correction coefficient. Based on the correction coefficient and a preset injection principle, the initial injection allocation plan is corrected to generate a well section injection allocation plan. The surface adjustment subsystem then regulates the gas source allocation for each injection well according to the well section injection allocation plan, achieving the technical effect of drainage and capacity expansion of associated producing wells. By considering the geological characteristics and injection-production requirements of different strata, precise stratified gas injection and planar allocation are carried out, avoiding the problems of excessive gas injection in high-permeability layers and insufficient gas injection in low-permeability layers. Dynamic adjustment of gas injection and production volume can adapt to changes in formation parameters, improve the matching degree of injection and production, and realize a complete technical closed loop from geological parameter analysis to dynamic adjustment of gas injection volume. It is suitable for optimizing the injection and production process in structurally fractured and highly heterogeneous areas, improving injection and production efficiency and production efficiency, as well as reducing safety risks caused by injection-production imbalance.
[0094] In some embodiments, the well group injection and production data includes at least gas intake profile data, which includes the stratified gas intake and stratified start-up pressure of each injection well.
[0095] The initial injection allocation scheme is revised based on the correction coefficient and the preset injection allocation principle to generate the well section injection allocation scheme, including:
[0096] Based on the correction factor, calculate the actual stratified gas injection volume of each injection well within the same well group.
[0097] The maximum number of segments that the current injection well can achieve is taken as the upper limit of the number of segments. The current process allows the card distance as the physical constraint. The principle is to minimize the range coefficient and the permeability variation coefficient within the segment. The total actual gas injection volume of each segment of the current injection well is determined.
[0098] The injection plan for each well section is determined based on the stratified gas intake and stratified start-up pressure.
[0099] Specifically, the gas intake profile data reflects the gas intake situation of each layer in the injection well, including the layer gas intake volume and the layer start-up pressure. The layer gas intake volume refers to the volume of gas taken in by a specific formation in the injection well per unit time, which characterizes the gas intake capacity of that specific formation. The layer start-up pressure is the minimum pressure required for a specific formation to start gas intake, which is an important indicator reflecting the difficulty of gas intake in each layer of the injection well. The preset injection principle characterizes the principle for generating the well section injection plan, which specifically refers to using the maximum number of sections that the current injection well can achieve as the upper limit of the number of sections, using the current process-allowed caliper distance as the physical constraint, and using the minimum range coefficient and the minimum permeability variation coefficient within the section as the principle. The maximum number of injection sections achievable in a current gas injection well represents the maximum number of sections that a gas injection well can technically and technologically accomplish, used to determine the maximum number of injection sections within the well. The chuck distance refers to the minimum distance between adjacent injection sections within the well, used to ensure effective isolation between injection sections, prevent gas cross-flow between different sections, and improve injection efficiency. The intra-section range coefficient is the ratio of the maximum difference in gas injection volume between each injection section within the well to the average gas injection volume, reflecting the non-uniformity of gas injection volume across different injection sections. The smaller the intra-section range coefficient, the more uniform the gas injection volume across different injection sections within the well. Minimizing the permeability coefficient can avoid uneven formation pressure caused by uneven gas injection volume distribution. The permeability coefficient of variation refers to the ratio of the standard deviation to the average value of formation permeability, reflecting the degree of formation heterogeneity. Minimizing the permeability coefficient of variation ensures that the gas injection volume distribution matches the formation characteristics and improves gas injection efficiency. Specifically, for formations with high permeability coefficient of variation, appropriately increasing the gas injection volume can fully utilize the formation's permeability capacity. For formations with low permeability, appropriately reducing the gas injection volume can avoid excessive formation pressure caused by excessive gas injection volume.
[0100] When generating a well interval injection plan, firstly, the gas injection volume distribution of each layer in the producing well is adjusted by a correction coefficient. For example, if the initial configuration plan for a certain layer of a producing well is 5000 m³ / d, and the correction coefficient is 0.8, the actual total gas injection volume is corrected to 4000 m³ / d. Based on the actual total gas injection volume, the gas injection volume of each gas injection well connected to the associated producing well in that layer can be obtained, thereby determining the single-layer gas injection volume of each gas injection well. Next, preliminary segmentation is performed according to the maximum number of segments constraint. When the maximum number of segments for the current gas injection well is 3, the gas injection well is divided into 3 segments. If the spacing between each layer is greater than the spacing allowed by the current process, the range coefficient and permeability variation coefficient within the segment are calculated according to existing technology. The current gas injection well is segmented based on the principle of minimizing the range coefficient, the permeability variation coefficient, and the pressure difference between layers within the segment. The total actual gas injection volume of each segment is calculated to generate the well interval injection plan.
[0101] This application's embodiments use a correction factor to proportionally modify the initial injection scheme, making the well section injection scheme more consistent with the actual production needs of associated producing wells. The maximum number of sections achievable by the current injection well is used as the upper limit for the number of sections, and the perforation distance allowed by the current process is used as the physical constraint. The principles of minimizing the range coefficient and permeability variation coefficient within sections ensure that the division of injection sections in the injection well meets the process constraints, maximizing the uniform distribution of gas injection volume in each section within the same injection well and improving injection efficiency. By considering the stratified gas intake and stratified start-up pressure, the injection volume can be rationally allocated, ensuring a balanced distribution of injection volume between layers and reducing the risk of interference between high-permeability and low-permeability layers. By optimizing the division logic of injection sections, the gas injection allocation satisfies both geological characteristics and the actual operational constraints of surface processes.
[0102] In some embodiments, the stratified gas injection volume and planar distribution coefficient of each gas injection well within the same well group are determined based on well group injection and production data, and an initial injection allocation scheme is determined based on the planar distribution coefficient and stratified gas injection volume, including:
[0103] Based on the injection and production data of the well group, the stratified gas injection volume of each injection well in the same well group is determined.
[0104] The plane distribution coefficient is calculated using the following formula:
[0105]
[0106] Where, α i,j P represents the planar distribution coefficient from the i-th gas injection well to the j-th associated production well. i P represents the bottom hole pressure of the i-th gas injection well. i,j R represents the bottomhole flowing pressure of the j-th associated producing well corresponding to the i-th gas injection well. v The value represents the seepage resistance coefficient, and M represents the total number of associated producing wells connected around the injection well.
[0107] Based on the stratified gas injection volume and planar distribution coefficient of each injection well within the same well group, the initial injection scheme is determined according to the following formula:
[0108]
[0109] in, This represents the total amount of gas injected into the k-th layer of the associated producing well j. The value represents the amount of gas injected by the i-th gas injection well into the k-th layer of the j-th associated producing well, and n represents the total number of gas injection wells associated with the j-th associated producing well.
[0110] In this embodiment, the well group injection and production data includes at least the bottom hole pressure of the injection well, the bottom hole flowing pressure from the injection well to the associated producing well, the seepage resistance coefficient, and the total number of associated producing wells. After determining the stratified gas injection volume of each injection well within the same well group based on the well group injection and production data, the planar distribution coefficient from each injection well to the associated producing well is calculated based on the planar distribution coefficient. Based on the stratified gas injection volume and the planar distribution coefficient, the gas injection volume from each injection well to a certain layer of the associated producing well can be obtained, thus obtaining the total gas injection volume of a certain layer of the associated producing well. By dividing the stratified gas injection volume of each injection well and using the planar distribution coefficient to determine the gas injection volume allocation ratio to the associated producing well, a dual allocation of gas injection volume in both the planar and vertical directions is achieved. This ensures that the gas injection volume of each layer of each producing well originates from the cumulative contribution of injection wells within the same well group, avoiding allocation deviations from a single injection well. This allows the initial injection scheme to adapt to changes in reservoir heterogeneity, improving the accuracy of the correction coefficient and consequently improving the accuracy of the well interval injection scheme.
[0111] In some embodiments, determining the actual total production and stratified injection-production ratio of each associated producing well within the same well group based on well group injection-production data includes:
[0112] Based on the injection and production data of the well group, the actual total production, stratified production, and stratified water cut of each associated producing well within the same well group are determined.
[0113] Based on the stratified fluid production and stratified water cut, the stratified oil production and stratified water production of each associated producing well in the same well group are determined according to the following formula:
[0114]
[0115] in, This represents the stratified oil production of the k-th layer in the j-th associated producing well. This represents the stratified production rate of the k-th layer in the j-th associated producing well. f represents the stratified water production of the k-th layer in the j-th associated producing well. j,k , represents the layer water cut of the k-th layer in the j-th associated producing well;
[0116] Based on the stratified oil production and stratified water production, the stratified injection-production ratio of each associated producing well within the same well group is determined using the following formula:
[0117]
[0118] Among them, R j,k This represents the injection-production ratio of the k-th layer in the j-th associated producing well. α represents the volume of water equivalent to the gas injection volume of the i-th gas injection well in the k-th layer. i,j B represents the planar distribution coefficient from the i-th gas injection well to the j-th associated production well. 油ρ represents the system coefficient of oil. 油 Indicates the density of oil, Let R represent the total gas injection volume of the k-th layer of the j-th associated producing well, R represent the dissolved gas-oil ratio, and 207 is a constant representing the amount of gas volume converted into a volume equivalent to liquid volume.
[0119] In this embodiment, the stratified injection-production ratio reflects the dynamic relationship between gas injection and fluid production in a specific formation. By determining the actual total fluid production, stratified fluid production, and stratified water cut based on the well group injection-production data, the stratified oil production and stratified water production of the associated fluid-producing wells can be obtained. The stratified injection-production ratio is determined based on the stratified oil production and stratified water production, which can accurately reflect the matching degree between gas injection and fluid production in each layer, generate a low-error correction coefficient, and improve the adjustment accuracy of the well section injection scheme.
[0120] In some embodiments, the theoretical total production of each associated producing well is calculated based on the total stratified gas injection volume and the stratified injection-production ratio, including:
[0121] The theoretical stratified production rate of each associated producing well is determined according to the following formula:
[0122]
[0123] Among them, R j,k This represents the injection-production ratio of the k-th layer in the j-th associated producing well. This represents the total amount of gas injected into the k-th layer of the associated producing well j. This represents the theoretical stratified production rate of each associated producing well;
[0124] The correction factor for each associated producing well is determined according to the following formula:
[0125]
[0126] Among them, A j This represents the correction factor for the j-th associated producing well. This represents the actual total production of the j-th associated producing well in the well group injection-production data. This represents the total theoretical stratified production of the j-th associated producing well.
[0127] In this embodiment, the theoretical stratified production volume refers to how much liquid a producing well can produce under the initial injection scheme. By superimposing the theoretical stratified production volume and comparing it with the actual total production volume, a correction coefficient can be obtained. The initial injection scheme can be dynamically adjusted to make the well section injection scheme more consistent with the actual production data, improve the injection and production accuracy of the gas lift drainage system of the reservoir-type gas storage, and enable the gas lift drainage system of the reservoir-type gas storage to adapt to changes in production under complex geological conditions.
[0128] In some embodiments, determining the stratified gas injection volume of each injection well within the same well group based on well group injection and production data includes:
[0129] When the well group injection and production data includes gas intake profile data, the stratified gas injection volume of each gas injection well in the same well group is determined based on the total gas injection volume and stratified gas intake percentage of each gas injection well in the same well group injection and production data.
[0130] When the well group injection and production data do not include gas intake profile data, the seepage resistance coefficient is determined according to the following formula:
[0131]
[0132] Among them, R i,k μ represents the seepage resistance coefficient of the k-th layer in the i-th gas injection well. i,k Let M represent the area coefficient of the k-th layer of the i-th gas injection well, L represent the distance from the i-th gas injection well to the k-th layer, and M represent the area coefficient of the k-th layer of the i-th gas injection well. i,k H represents the stratification and stimulation coefficient of the k-th layer in the i-th gas injection well. i,k K represents the effective thickness of the k-th layer in the i-th gas injection well. i,k This represents the layered permeability of the k-th layer in the i-th gas injection well;
[0133] The vertical splitting coefficient is determined according to the following formula:
[0134]
[0135] Where, C i,k denoted by , where represents the vertical splitting coefficient of the k-th layer in the i-th gas injection well, and n represents the total number of layers in the i-th gas injection well.
[0136] Based on the total gas injection volume and vertical splitting coefficient of each gas injection well in the same well group, the stratified gas injection volume of each gas injection well in the same well group is determined.
[0137] In this embodiment, when the well group injection and production data includes gas intake profile data, the stratified gas injection volume of each gas injection well is determined based on the total gas injection volume and stratified gas intake percentage of each gas injection well within the same well group in the well group injection and production data; when the well group injection and production data does not include gas intake profile data, the stratified gas injection volume is determined by the seepage resistance coefficient and the vertical splitting coefficient.
[0138] Specifically, when well group injection and production data do not include gas intake profile data, the wellbore structural parameters and formation properties of each injection well are first collected. By calculating the seepage resistance coefficient, the product of the area coefficient and the well-layer distance is used as a branch box, and the product of the layered stimulation coefficient, effective thickness, and permeability is used as the denominator to quantify the degree of obstruction of the gas injection process by different formations. Then, a vertical splitting coefficient is generated based on the reciprocal proportion of the resistance coefficient of each layer. Finally, the total gas injection volume is multiplied by the vertical splitting coefficient to generate the layered gas injection volume. Determining the layered gas injection volume through the seepage resistance coefficient ensures the matching degree between the layered gas injection volume and the gas intake capacity of the injection well formation even under data shortage conditions, ensuring the accuracy of the correction coefficient and improving the synergistic adaptability between the well section injection plan and the surface adjustment subsystem.
[0139] In some embodiments, determining the stratified production rates of each associated producing well within the same well group based on well group injection and production data includes:
[0140] When the injection and production data of a well group includes production profile data, the stratified production volume of each associated production well in the same well group is determined based on the actual total production volume and stratified production percentage of each associated production well in the same well group in the production profile data.
[0141] When the injection and production data of a well group does not include production profile data, the stratified production volume of each associated producing well within the same well group is determined according to the following formula:
[0142]
[0143] in, This represents the stratified production rate of the k-th layer in the j-th associated producing well. H represents the actual total production of the j-th associated producing well. j,k K represents the effective thickness of the k-th layer in the j-th associated producing well. j,k denoted by , where represents the layered permeability of the k-th layer in the j-th associated producing well, and m represents the total number of layers in the j-th associated producing well.
[0144] In this embodiment, when the well group injection-production data does not include production profile data, the actual production volume, effective thickness of each layer, and layer permeability data of each associated production well are first obtained. Then, for each associated production well, the sum of the products of the effective thickness of each layer and the layer permeability is calculated. Based on this formula, the layered production volume of each associated production well within the same well group is determined. By introducing effective thickness and layer permeability, a formula for calculating layered production volume is constructed. This not only considers the influence of formation heterogeneity but also ensures the conservation of total production volume, providing layered production volume estimation results that conform to geological laws and ensuring the accuracy of well interval injection schemes.
[0145] In some embodiments, determining the stratified water cut of each associated producing well within the same well group based on well group injection and production data includes:
[0146] When the well group injection and production data includes production profile data, the water cut of each layer is determined based on the production profile data.
[0147] When the well group injection and production data includes stratified water saturation, the stratified water cut is calculated using the following formula:
[0148]
[0149] Among them, f j,k Let k represent the water cut of the k-th layer in the j-th associated producing well. ro Let k represent the relative permeability of the oil in the k-th layer of the j-th associated producing well. rw B represents the relative permeability of water in the k-th layer of the j-th associated producing well. o B represents the volume factor of the oil in the k-th layer of the j-th associated producing well. w This represents the volume factor of the water in the k-th layer of the j-th associated producing well.
[0150] In this embodiment, when the well group injection-production data includes production profile data, the stratified water cut is determined based on the production profile data; when the well group injection-production data includes stratified water saturation, the stratified water saturation data of the associated production wells are first obtained; then, the relative permeability of the stratified oil phase and the relative permeability of the stratified water phase are called to calculate the stratified crude oil volume factor and formation water volume factor, thereby determining the stratified water cut. This solves the technical problem that traditional methods cannot accurately calculate the stratified water cut when production profile data is missing, ensuring the adaptability of water cut calculation under different geological conditions, and thus ensuring the accuracy of the well section injection plan.
[0151] Figure 4 A schematic flowchart of a gas lift drainage method for an oil reservoir-type gas storage facility, as provided in an embodiment of this application, is shown. (Refer to...) Figure 4 This application provides a gas lift drainage method for oil reservoir-type gas storage, applicable to any of the gas lift drainage systems for oil reservoir-type gas storage, comprising the following steps:
[0152] S10. Determine the stratified gas injection volume and planar distribution coefficient of each gas injection well in the same well group based on the well group injection and production data. Determine the initial injection scheme based on the planar distribution coefficient and stratified gas injection volume. The well group injection and production data represent the geological data of each gas injection well and each associated producing well in the same well group. The planar distribution coefficient represents the weight ratio of the gas injection volume allocation of each gas injection well to each associated producing well. The initial injection scheme represents the sum of the stratified gas injection volumes of all gas injection wells in the same well group to each associated producing well.
[0153] S20. Based on the injection and production data of the well group, determine the actual total production and stratified injection-production ratio of each associated producing well in the same well group. Based on the initial injection allocation plan, determine the total stratified gas injection of each associated producing well. After calculating the theoretical total stratified production of each associated producing well based on the total stratified gas injection and the stratified injection-production ratio, determine the correction coefficient based on the actual total production and the theoretical total stratified production. Based on the correction coefficient and the preset injection allocation principle, revise the initial injection allocation plan and generate the well section injection allocation plan.
[0154] S30. Adjust the gas source allocation for each injection well according to the well section allocation plan.
[0155] As the method embodiments are basically similar to the system embodiments, the description is relatively simple, and relevant parts can be found in the description of the method embodiments.
[0156] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
[0157] The above provides a detailed description of the gas lift drainage system and method for an oil reservoir-type gas storage facility. Specific examples have been used to illustrate the principles and implementation methods of this application. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this application. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scope based on the ideas of this application. Therefore, the content of this specification should not be construed as a limitation of this application.
Claims
1. A gas lift drainage system for an oil reservoir-type gas storage facility, characterized in that, The system includes a geological analysis subsystem, a single-well injection and production analysis subsystem, and a surface adjustment subsystem. The geological analysis subsystem is used to determine the stratified gas injection volume and planar allocation coefficient of each gas injection well in the same well group based on the well group injection and production data, and to determine the initial injection allocation scheme based on the planar allocation coefficient and the stratified gas injection volume. The well group injection and production data represents the geological data of each gas injection well and each associated producing well in the same well group. The planar allocation coefficient represents the weight ratio of the gas injection volume allocation of each gas injection well to each associated producing well. The initial injection allocation scheme represents the sum of the stratified gas injection volumes of all gas injection wells in the same well group to each associated producing well. The single-well injection-production analysis subsystem is used to determine the actual total production and stratified injection-production ratio of each associated producing well in the same well group based on the well group injection-production data, determine the total stratified gas injection of each associated producing well based on the initial injection allocation scheme, calculate the theoretical total stratified production of each associated producing well based on the total stratified gas injection and the stratified injection-production ratio, determine the correction coefficient based on the actual total production and the theoretical total stratified production, and correct the initial injection allocation scheme based on the correction coefficient and the preset injection allocation principle to generate a well section injection allocation scheme. The surface adjustment subsystem is used to regulate the gas source allocation for each injection well according to the well section allocation plan.
2. The method as described in claim 1, characterized in that, The system as described in claim 1, wherein the well group injection and production data includes at least gas intake profile data, and the gas intake profile data includes the stratified gas intake and stratified start-up pressure of each injection well; The initial injection allocation scheme is modified according to the correction coefficient and the preset injection allocation principle to generate a well section injection allocation scheme, including: Based on the correction coefficient, calculate the actual stratified gas injection volume of each injection well within the same well group; The maximum number of segments that the current gas injection well can achieve is taken as the upper limit of the number of segments. The clamping distance allowed by the current process is taken as the physical limitation. The principle of minimizing the range coefficient and the permeability variation coefficient within the segment is used to determine the total actual gas injection volume of each segment of the current gas injection well. The injection scheme for the well section is determined based on the stratified gas intake and the stratified start-up pressure.
3. The system as described in claim 1 or 2, characterized in that, The step of determining the stratified gas injection volume and planar distribution coefficient of each gas injection well within the same well group based on well group injection and production data, and determining the initial injection allocation scheme based on the planar distribution coefficient and the stratified gas injection volume, includes: Based on the injection and production data of the well group, determine the stratified gas injection volume of each gas injection well within the same well group; The plane allocation coefficient is calculated according to the following formula: Where, α i,j P represents the planar distribution coefficient from the i-th gas injection well to the j-th associated production well. i P represents the bottom hole pressure of the i-th gas injection well. i,j R represents the bottomhole flowing pressure of the j-th associated producing well corresponding to the i-th gas injection well. v The coefficient of resistance to seepage is given by M, which represents the total number of associated producing wells connected around the injection well. Based on the stratified gas injection volume of each injection well within the same well group and the planar distribution coefficient, the initial injection scheme is determined according to the following formula: in, This represents the total amount of gas injected into the k-th layer of the associated producing well j. The value represents the amount of gas injected by the i-th injection well into the k-th layer of the j-th associated producing well, and n represents the total number of injection wells associated with the j-th associated producing well.
4. The system as described in claim 1 or 2, characterized in that, The step of determining the actual total production and stratified injection-production ratio of each associated producing well within the same well group based on the well group injection-production data includes: Based on the injection and production data of the well group, determine the actual total production, stratified production, and stratified water cut of each associated producing well within the same well group; Based on the stratified fluid production and the stratified water cut, the stratified oil production and stratified water production of each associated producing well within the same well group are determined according to the following formula: in, This represents the stratified oil production of the k-th layer in the j-th associated producing well. This represents the stratified production rate of the k-th layer in the j-th associated producing well. f represents the stratified water production of the k-th layer in the j-th associated producing well. j,k, This represents the layer water cut of the k-th layer in the j-th associated producing well; Based on the stratified oil production and the stratified water production, the stratified injection-production ratio of each associated producing well within the same well group is determined using the following formula: Among them, R j,k This represents the injection-production ratio of the k-th layer in the j-th associated producing well. α represents the volume of water equivalent to the gas injection volume of the i-th gas injection well in the k-th layer. i,j B represents the planar distribution coefficient from the i-th gas injection well to the j-th associated production well. 油 ρ represents the system coefficient of oil. 油 Indicates the density of oil, The total gas injection volume of the k-th layer of the associated producing well j is represented by R, which represents the dissolved gas-oil ratio. 207 is a constant representing the amount of gas volume converted into a volume equivalent to liquid volume.
5. The system as described in claim 1 or 2, characterized in that, The calculation of the theoretical total production of each associated producing well based on the total gas injection volume and the injection-production ratio includes: The theoretical stratified production rate of each associated producing well is determined according to the following formula: Among them, R j,k This represents the injection-production ratio of the k-th layer in the j-th associated producing well. This represents the total amount of gas injected into the k-th layer of the associated producing well j. This represents the theoretical stratified production rate of each associated producing well; The correction factor for each associated producing well is determined according to the following formula: Among them, A j This represents the correction factor for the j-th associated producing well. This represents the actual total production of the j-th associated producing well in the well group's injection-production data. This represents the total theoretical stratified production of the j-th associated producing well.
6. The system as described in claim 1, characterized in that, The determination of the stratified gas injection volume for each injection well within the same well group based on well group injection and production data includes: When the well group injection and production data includes gas intake profile data, the stratified gas injection volume of each gas injection well in the same well group is determined based on the total gas injection volume and stratified gas intake percentage of each gas injection well in the same well group injection and production data. When the injection and production data of the well group does not include gas intake profile data, the seepage resistance coefficient is determined according to the following formula: Among them, R i,k μ represents the seepage resistance coefficient of the k-th layer in the i-th gas injection well. i,k Let M represent the area coefficient of the k-th layer of the i-th gas injection well, L represent the distance from the i-th gas injection well to the k-th layer, and M represent the area coefficient of the k-th layer of the i-th gas injection well. i,k H represents the stratification and stimulation coefficient of the k-th layer in the i-th gas injection well. i,k K represents the effective thickness of the k-th layer in the i-th gas injection well. i,k This represents the layered permeability of the k-th layer in the i-th gas injection well; The vertical splitting coefficient is determined according to the following formula: Among them, C i,k denoted by , where represents the vertical splitting coefficient of the k-th layer in the i-th gas injection well, and n represents the total number of layers in the i-th gas injection well. Based on the total gas injection volume and vertical splitting coefficient of each gas injection well in the same well group from the injection and production data of the well group, the stratified gas injection volume of each gas injection well in the same well group is determined.
7. The system as described in claim 3, characterized in that, The step of determining the stratified production volume of each associated producing well within the same well group based on the injection and production data of the well group includes: When the well group injection and production data includes production profile data, the stratified production volume of each associated production well in the same well group is determined based on the actual total production volume and stratified production percentage of each associated production well in the same well group in the production profile data. If the injection-production data of the well group does not include production profile data, the stratified production rate of each associated producing well within the same well group shall be determined according to the following formula: in, This represents the stratified production rate of the k-th layer in the j-th associated producing well. H represents the actual total production of the j-th associated producing well. j,k K represents the effective thickness of the k-th layer in the j-th associated producing well. j,k denoted by , where represents the layered permeability of the k-th layer in the j-th associated producing well, and m represents the total number of layers in the j-th associated producing well.
8. The system as described in claim 4, characterized in that, The step of determining the stratified water cut of each associated producing well within the same well group based on the injection and production data of the well group includes: If the well group injection and production data includes production profile data, the water cut of the strata is determined based on the production profile data. If the well group injection and production data includes stratified water saturation, the stratified water cut is calculated using the following formula: Among them, f j,k Let k represent the water cut of the k-th layer in the j-th associated producing well. ro Let k represent the relative permeability of the oil in the k-th layer of the j-th associated producing well. rw B represents the relative permeability of water in the k-th layer of the j-th associated producing well. o B represents the volume factor of the oil in the k-th layer of the j-th associated producing well. w This represents the volume factor of the water in the k-th layer of the j-th associated producing well.
9. The system as described in claim 1, characterized in that, The ground adjustment subsystem includes at least: A pneumatic shut-off valve (10) is connected to a pneumatic source; At least one shut-off valve (20), each shut-off valve (20) being connected between each injection well and the pneumatic shut-off valve (10); The pneumatic shut-off valve (10) is sequentially connected to each injection well via a first ball valve (30), a pneumatic regulating valve (40), a flow meter (50), and a second ball valve (60).
10. A gas lift liquid drainage method for an oil reservoir-type gas storage facility, characterized in that, The gas lift liquid drainage system for an oil reservoir-type gas storage facility as described in any one of claims 1-9 includes the following steps: Based on the injection and production data of the well group, the stratified gas injection volume and planar allocation coefficient of each gas injection well in the same well group are determined. Based on the planar allocation coefficient and the stratified gas injection volume, the initial injection scheme is determined. The injection and production data of the well group represents the geological data of each gas injection well and each associated producing well in the same well group. The planar allocation coefficient represents the weight ratio of the gas injection volume allocation of each gas injection well to each associated producing well. The initial injection scheme represents the sum of the stratified gas injection volumes of all gas injection wells in the same well group to each associated producing well. Based on the injection and production data of the well group, determine the actual total production and stratified injection-production ratio of each associated producing well in the same well group. Based on the initial injection allocation plan, determine the total stratified gas injection of each associated producing well. After calculating the sum of the theoretical stratified production of each associated producing well based on the total stratified gas injection and the stratified injection-production ratio, determine the correction coefficient based on the actual total production and the sum of the theoretical stratified production. Then, correct the initial injection allocation plan based on the correction coefficient and the preset injection allocation principle to generate the well section injection allocation plan. The gas source allocation for each injection well is adjusted according to the well section allocation plan.
