A mechanical ventilation-structural heat exchange-refrigeration composite cooling system and its cooling method for power utility tunnels

By using a combined system of mechanical ventilation, structural heat exchange, and refrigeration, and by utilizing pre-embedded heat exchange pipes and water-cooled units, the problem of efficient waste heat removal and temperature control in long-distance cable tunnels has been solved, reducing equipment investment and energy consumption, and improving operational stability and maintenance comfort.

CN123109752APending Publication Date: 2026-11-17CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611169687.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-04
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Under the conditions of construction through mountains, rivers, and seas, long-distance ultra-high voltage power cable tunnels face problems such as large capacity and high energy consumption of ventilation equipment, equipment occupying tunnel space, poor comfort of maintenance personnel, and risk of equipment vibration and falling off. In addition, the existing air conditioning system has a large capacity of refrigeration equipment and high operating energy consumption.

Method used

The system employs a composite system of mechanical ventilation, structural heat exchange, and refrigeration. It utilizes pre-embedded heat exchange pipes to enhance convective heat exchange, combines water-cooled units and mechanical ventilation, and adjusts the equipment frequency through an intelligent control platform to achieve efficient removal of cable waste heat and precise temperature control. The equipment is arranged on both sides of the tunnel without occupying additional space.

Benefits of technology

This achieves efficient removal of residual heat from the cable, reduces initial equipment investment and operating energy consumption, improves equipment stability and maintenance personnel comfort, and ensures safe cable operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109752A_ABST
    Figure CN123109752A_ABST
Patent Text Reader

Abstract

This invention belongs to the technical field of temperature control for power utility tunnels, and discloses a mechanical ventilation-structural heat exchange-refrigeration composite cooling system and its cooling method for power utility tunnels. It includes auxiliary machine rooms located on both sides of the power utility tunnel. Heat exchange pipes are pre-embedded in the lining structure of the tunnel, with one end connected to the main water supply pipe and the other end connected to the main return water pipe. The heat exchange pipes, main water supply pipe, and main return water pipe are filled with flowing heat exchange medium. The auxiliary machine rooms contain a main pump unit connected between the main water supply pipe and the main return water pipe, and a chiller connected in parallel to the main return water pipe. The main water supply pipe, main return water pipe, and the main pump unit and chiller in the auxiliary machine rooms form a circulation loop. This invention intelligently and energy-efficiently controls the equipment operation based on the real-time temperature status inside the tunnel. The mechanical ventilation and water-cooled units are arranged on both sides of the tunnel, without occupying additional tunnel space. The equipment configuration has a small capacity, low initial investment, and low energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of temperature control for power utility tunnels, and particularly relates to a mechanical ventilation-structural heat exchange-refrigeration composite cooling system for power utility tunnels and its cooling method. Background Technology

[0002] my country's energy and electricity load exhibit a typical inverse distribution pattern. The western region is rich in wind, solar, and coal energy resources and is the country's main energy export base; the eastern region is economically developed and has a dense electricity load, but lacks local energy resources, resulting in a significant gap between electricity supply and demand. To coordinate national energy allocation and alleviate power supply pressure in the east, my country has vigorously promoted the national strategy of transmitting electricity from the west to the east. Against the backdrop of green and low-carbon development and energy low-carbon transformation, relying on ultra-high-voltage direct current (UHVDC) projects to achieve large-scale, long-distance inter-regional transmission of clean energy has become a core measure for optimizing energy layout, ensuring power supply, and building a new power system.

[0003] Ultra-high voltage direct current (UHVDC) projects must overcome complex and diverse terrains, often requiring the construction of power utility tunnels when entering cities. Due to the constraints of construction conditions involving mountains, rivers, and seas, power utility tunnel projects have seen a peak in construction in recent years, with single-tunnel lengths continuously increasing. As a key control project in UHVDC projects, the stability and uniformity of the internal temperature field of power utility tunnels directly determine transmission safety, equipment lifespan, and transmission efficiency. Because UHV cables generate significant heat during continuous high-load operation, long-distance power utility tunnels require dedicated temperature control systems to ensure the air temperature inside the tunnel meets the stable operation requirements of transmission equipment and cables. During tunnel construction, mechanical ventilation is a widely used temperature control method. Its main working principle involves fixing fans to ground-level exhaust shafts and removing residual heat and harmful gases generated in the pipelines based on the load pressure in the exhaust shafts. For long-distance UHV cable power utility tunnels constructed under conditions of mountains, rivers, and seas, the heat generation of the power lines increases linearly with tunnel length, requiring a huge amount of heat removal ventilation. Actual operation presents the following problems: ① Long-distance high-volume air delivery requires large-capacity ventilation equipment, high initial investment, and high energy consumption and cost of equipment operation; ② Under the confined cross-section of the tunnel, the ventilation velocity is high, the work comfort of the pipe gallery maintenance personnel is poor, and the pipeline fasteners are subjected to airflow for a long time, which poses a risk of vibration and falling off; ③ Heat accumulates along the ventilation flow, resulting in higher temperatures in the latter half of the tunnel.

[0004] Chinese Patent Publication No. CN121184169A discloses a cooling system and design method for a cable tunnel in the seawall section of a DC transmission cable for offshore wind power. The invention proposes installing a localized air-conditioning system or mechanical ventilation device at one end of the cable tunnel, with multiple air supply holes on the surface of the air supply duct, and an exhaust duct at the other end, with multiple exhaust holes on its surface. This invention can ensure that the current carrying capacity of the DC cable from the offshore wind farm meets the transmission capacity requirements when it lands. For long-distance ultra-high voltage cable tunnels, the amount of heat to be discharged is enormous. Although air conditioning can reduce the air supply volume, it also presents problems such as large cooling equipment capacity and high operating energy consumption. Therefore, further new solutions for waste heat removal in power tunnels are needed to address the existing problems in the field of temperature control technology for power tunnels. Summary of the Invention

[0005] To address the shortcomings of the existing technology, the present invention aims to provide a mechanical ventilation-structural heat exchange-refrigeration composite cooling system and method for power utility tunnels. This system utilizes heat exchange pipes pre-embedded inside the power utility tunnel to enhance convective heat transfer, allowing the tunnel to dissipate heat to the surrounding soil and rock. Simultaneously, mechanical ventilation and water-cooled units supplement the heat dissipation. The goal is to achieve efficient removal of residual heat from cables within the power utility tunnel and precise temperature control within the tunnel. Furthermore, the system intelligently and energy-efficiently controls equipment operation based on real-time tunnel temperature conditions. The mechanical ventilation and water-cooled units are arranged on both sides of the tunnel, without occupying additional tunnel space. The system features small equipment capacity, low initial investment, and low energy consumption during operation.

[0006] To achieve the above objectives, the present invention employs the following technical measures: The mechanical ventilation-structural heat exchange-refrigeration composite cooling system for power utility tunnels of the present invention includes auxiliary machine rooms located on both sides of the power utility tunnel. Heat exchange pipes are pre-embedded in the lining structure of the power utility tunnel. One end of each heat exchange pipe is connected to a main water supply pipe, and the other end is connected to a main return water pipe. The heat exchange pipes, main water supply pipe, and main return water pipe are filled with a flowing heat exchange medium. The auxiliary machine rooms are equipped with a main pump unit connected between the main water supply pipe and the main return water pipe, and a chiller connected in parallel to the main return water pipe. The main water supply pipe and the main return water pipe are connected to the main pump unit and the chiller in the auxiliary machine rooms. The system forms a loop. The inlet and outlet of the chiller are equipped with a first solenoid valve with an electric switch function. A second solenoid valve is installed on the main return water pipe connected in parallel with the chiller. Heating cables are installed in the cable compartment of the power utility tunnel, and temperature sensors are installed at certain intervals. A centralized air supply outlet is provided at the entrance of the power utility tunnel, and a centralized air exhaust outlet is provided at the exit of the power utility tunnel. The centralized air supply outlet and the centralized air exhaust outlet are connected to the tunnel fans in the two auxiliary machine rooms on both sides of the power utility tunnel through air ducts. The air ducts lead to the outdoor ventilation shafts.

[0007] Preferably, auxiliary pumps are installed at certain intervals on the main return water pipe.

[0008] Furthermore, the main water supply pipe, main return water pipe, and auxiliary pump are arranged within the spare space of the power utility tunnel.

[0009] Furthermore, a maintenance cover is provided between the cable compartment and the spare space to facilitate operation and maintenance management by operators.

[0010] Preferably, a temperature sensor is also installed at the outdoor ventilation shaft.

[0011] Furthermore, the auxiliary machine room is equipped with a centralized control platform that is electrically connected to the main pump group, tunnel fan, chiller, auxiliary pump and temperature sensor.

[0012] Accordingly, the cooling method of the mechanical ventilation-structural heat exchange-refrigeration composite power tunnel cooling system of the present invention includes the following steps: Step 1: When the structural heat exchange mode is executed, the tunnel fan, centralized exhaust port, centralized air supply port, chiller, and the first solenoid valve of the chiller inlet and outlet are closed, while the second solenoid valve on the main return water pipe, the auxiliary pump, and the main pump group are opened. The heat exchange medium circulates in the heat exchange tube and enhances heat exchange. The residual heat of the heating cable continuously enters the lining structure of the power tunnel through heat conduction, convection, and radiation, and is eventually dissipated into the soil. Step 2: When implementing the mechanical ventilation + structural heat exchange mode, the first solenoid valves of the chiller and chiller inlet and outlet are closed, while the second solenoid valves on the tunnel fan, centralized exhaust vent, centralized air supply vent, main return water pipe, auxiliary pump, and main pump group are opened. The heat exchange medium circulates in the heat exchange tube and enhances heat exchange. The outdoor air with a lower temperature is sent into the entrance of the power utility tunnel through the outdoor ventilation shaft, tunnel fan, air duct, and centralized air supply vent, and flows along the tunnel. After being heated, it is discharged through the centralized exhaust vent, air duct, tunnel fan, and outdoor ventilation shaft. Some of the cable waste heat continuously enters the lining structure of the power utility tunnel through heat conduction, convection, and radiation, and is eventually dissipated into the soil. Some of the cable waste heat is discharged outdoors through the mechanical ventilation airflow. Step 3: When executing the structural heat exchange + cooling mode, the second solenoid valve on the main return water pipe, the tunnel fan, the centralized exhaust port, and the centralized supply air port are closed. The chiller, the first solenoid valves at the chiller's inlet and outlet, the auxiliary pump, and the main pump group are opened. The heat exchange medium circulates in the heat exchange pipe and enhances heat exchange. After the heat exchange medium in the main return water pipe is heated, it flows through the chiller to be cooled down and then is transported to the main supply water pipe. A portion of the cable waste heat continuously enters the lining structure of the power tunnel through heat conduction, convection, and radiation, and is eventually dissipated into the soil. A portion of the cable waste heat is exchanged with the chiller through the heat exchange medium and is eventually dissipated into the chiller's cold source. Step 4: When executing the mechanical ventilation + structural heat exchange + cooling mode, the second solenoid valve on the main return water pipe is closed, and the chiller, the first solenoid valves at the chiller inlet and outlet, the tunnel fan, the centralized exhaust vent, the centralized air supply vent, the auxiliary pump, and the main pump group are opened. The heat exchange medium circulates in the heat exchange pipe and enhances heat exchange. The outdoor air with a lower temperature is sent into the entrance of the power utility tunnel through the outdoor ventilation shaft, the tunnel fan, the air duct, and the centralized air supply vent, and flows along the tunnel. After being heated, it is discharged through the centralized exhaust vent, the air duct, the tunnel fan, and the outdoor ventilation shaft. The heat exchange medium in the main return water pipe, after being heated by heat exchange, flows through the chiller to be cooled down, and then is transported to the main water supply pipe. Some of the cable waste heat continuously enters the lining structure of the power utility tunnel through heat conduction, convection, and radiation, and is eventually dissipated into the soil. Some of the cable waste heat is discharged outdoors through the mechanical ventilation airflow, and some of the cable waste heat is exchanged with the chiller through the heat exchange medium and is eventually dissipated into the chiller's cold source.

[0013] Furthermore, the centralized control platform intelligently executes the operating mode by combining the monitored values ​​of the tunnel temperature, the outdoor air temperature, and the power supply load, and adjusts the operating frequency of the tunnel fans, chillers, auxiliary pumps, and main pump sets. The control process is as follows: S1. After the mechanical ventilation-structural heat exchange-refrigeration composite power tunnel cooling system equipment and pipeline layout is completed, the structural heat exchange mode is activated. S2. Temperature sensors and power meters installed inside the power utility tunnel collect data on the temperature inside the cable compartment, the outdoor temperature, and the cable load. The temperature sensors inside the cable compartment have a measurement range of 0~60℃ and a measurement accuracy of ±0.5℃; the outdoor temperature sensors have a measurement range of -20~50℃ and a measurement accuracy of ±0.5℃; the cable load monitoring module monitors 0~120% of the cable's rated load, and the data sampling period is 1 second. S3. Real-time data collection of cable compartment temperature, outdoor temperature, and cable load is transmitted to the centralized control platform; S4. The centralized control platform comprehensively judges whether the operating mode needs to be switched based on the temperature inside the cable compartment, the outdoor temperature, and the cable load. At the same time, it performs dynamic frequency adjustment of all frequency converters while completing the operation mode switch in combination with preset thresholds.

[0014] Compared with existing technologies, the mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system and its cooling method of the present invention have the following advantages and effects: (1) By utilizing the surrounding soil and rock, outdoor air and the cold source of the chiller to dissipate the heat of the high-voltage cable, the temperature inside the power tunnel is kept within the safe operating threshold range of the cable, thus ensuring the safe operation of the long-distance high-voltage DC project.

[0015] (2) The heat dissipation of the cable is mainly dissipated into the soil and rock through the heat exchange pipes embedded in the lining structure. It mainly consumes the energy of the hydraulic system and has significant advantages such as high efficiency, energy saving, excellent environmental performance and strong operational stability.

[0016] (3) Both ventilation and refrigeration systems are auxiliary cooling systems, which greatly reduces the installed capacity of the system and the initial investment in the power supply and distribution system.

[0017] (4) By relying on temperature monitoring and controller linkage, the variable frequency main pump group, chiller and fan can be automatically switched and the equipment frequency can be intelligently controlled. Attached Figure Description

[0018] To more clearly illustrate the technical solution of the present invention, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a structural schematic diagram of the mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system of the present invention. Figure 2 for Figure 1 Cross-sectional layout of the power utility tunnel at point AA; Figure 3 for Figure 1 Cross-sectional layout of the power utility tunnel at point BB; Figure 4 This is a control flowchart of the centralized control platform of the present invention.

[0020] In the diagram: 1-Power utility tunnel; 101-Lined structure; 102-Cable compartment; 103-Spare space; 104-Maintenance cover; 105-Entrance; 106-Exit; 109-Heating cable; 2-Auxiliary machine room; 3-Heat exchange pipe; 4-Main water supply pipe; 5-Main return water pipe; 6-Auxiliary pump; 7-Temperature sensor; 8-Centralized air supply outlet; 9-Centralized exhaust outlet; 10-Air duct; 11-Tunnel fan; 12-Outdoor ventilation shaft; 13-Main pump group; 14-Centralized control platform; 15-Heat exchange medium; 16-Chiller; 17-First solenoid valve. Detailed Implementation

[0021] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0022] like Figures 1 to 4 As shown, the mechanical ventilation-structural heat exchange-refrigeration composite cooling system for power utility tunnels of the present invention includes auxiliary machine rooms 2 located on both sides of the power utility tunnel 1. Heat exchange pipes 3 are pre-embedded in the lining structure 101 of the power utility tunnel 1. One end of the heat exchange pipe 3 is connected to the main water supply pipe 4, and the other end is connected to the main return water pipe 5. The heat exchange pipes 3, the main water supply pipe 4, and the main return water pipe 5 are filled with flowing heat exchange medium 15. Auxiliary pumps 6 are installed at certain intervals on the main return water pipe 5. The main water supply pipe 4, the main return water pipe 5, and the auxiliary pumps 6 are arranged within the spare space 103 of the power utility tunnel 1. The auxiliary machine rooms 2 are equipped with a main pump group 13 connected between the main water supply pipe 4 and the main return water pipe 5, and a chiller 16 connected in parallel to the main return water pipe 5. The main water supply pipe 4, the main return water pipe 5, and the main pump group 13 and the chiller 16 in the auxiliary machine rooms 2 form a circulation loop. The chiller 16 is connected in parallel with the main return water pipe 5, and a first solenoid valve 17 with electric switching function is provided at its inlet and outlet. A second solenoid valve is installed on the main return water pipe 5, which is connected in parallel with the chiller 16.

[0023] The cable compartment 102 of the power utility tunnel 1 is equipped with heating cables 109 and temperature sensors 7 are installed at certain intervals. A maintenance cover 104 is provided between the cable compartment 102 and the spare space 103 to facilitate operation and maintenance management by operators.

[0024] A centralized air supply outlet 8 is located at the entrance 105 of the power utility tunnel 1, and a centralized exhaust outlet 9 is located at the exit 106 of the power utility tunnel 1. The centralized air supply outlet 8 and the centralized exhaust outlet 9 are connected to tunnel fans 11 in two auxiliary machine rooms 2 on both sides of the power utility tunnel 1 via air ducts 10. The air ducts 10 lead to outdoor ventilation shafts 12, and temperature sensors 7 are also installed in the outdoor ventilation shafts 12. A centralized control platform 14 is located in the auxiliary machine room 2.

[0025] The cooling system for power utility tunnels using the mechanical ventilation-structural heat exchange-refrigeration composite system of the present invention includes the following steps: 1) When the structural heat exchange mode is executed, the tunnel fan 11, the centralized exhaust port 9, the centralized air supply port 8, the chiller 16, and the first solenoid valve 17 of the chiller inlet and outlet are closed. The second solenoid valve on the main return water pipe 5, the auxiliary pump 6, and the main pump group 13 are opened. The heat exchange medium 15 circulates in the heat exchange pipe 3 and enhances heat exchange (enhancing convective heat exchange, enhancing the absorption of heat from the air by the tunnel wall, and reducing the temperature of the cable compartment 102). The residual heat of the heating cable 109 continuously enters the lining structure 101 of the power corridor tunnel 1 through heat conduction, convection, and radiation, and is eventually dissipated into the soil.

[0026] 2) When the mechanical ventilation + structural heat exchange mode is implemented, the first solenoid valve 17 of the chiller 16 and the chiller inlet and outlet is closed, and the second solenoid valve on the tunnel fan 11, the centralized exhaust port 9, the centralized air supply port 8, the main return water pipe 5, the auxiliary pump 6, and the main pump group 13 are opened. The heat exchange medium 15 circulates in the heat exchange pipe 3 and enhances heat exchange. The outdoor air with a lower temperature is sent into the entrance 105 of the power tunnel 1 through the outdoor ventilation shaft 12, the tunnel fan 11, the air duct 10 and the centralized air supply port 8, and flows along the tunnel. After being heated, it is discharged through the centralized exhaust port 9, the air duct 10, the tunnel fan 11 and the outdoor ventilation shaft 12. A portion of the cable waste heat continuously enters the lining structure 101 of the power tunnel 1 through heat conduction, convection and radiation, and is eventually dissipated into the soil. A portion of the cable waste heat is discharged outdoors through the mechanical ventilation airflow.

[0027] 3) When executing the structural heat exchange + cooling mode, the second solenoid valve on the main return water pipe 5, the tunnel fan 11, the centralized exhaust port 9, and the centralized air supply port 8 are closed. The chiller 16, the first solenoid valves 17 at the inlet and outlet of the chiller, the auxiliary pump 6, and the main pump group 13 are opened. The heat exchange medium 15 circulates in the heat exchange pipe 3 and enhances heat exchange. After the heat exchange medium 15 in the main return water pipe 5 is heated, it flows through the chiller 16 and is cooled down. Then it is transported to the main water supply pipe 4. A portion of the cable waste heat continuously enters the lining structure 101 of the power tunnel 1 through heat conduction, convection, and radiation, and is eventually dissipated into the soil. A portion of the cable waste heat is exchanged with the chiller 16 through the heat exchange medium 15 and is eventually dissipated into the cold source of the chiller 16.

[0028] 4) When executing the mechanical ventilation + structural heat exchange + cooling mode, the second solenoid valve on the main return water pipe 5 is closed, and the chiller 16, the first solenoid valves 17 at the chiller inlet and outlet, the tunnel fan 11, the centralized exhaust vent 9, the centralized air supply vent 8, the auxiliary pump 6, and the main pump group 13 are opened. The heat exchange medium 15 circulates in the heat exchange tube 3 and enhances heat exchange. The outdoor air with a lower temperature is sent into the entrance 105 of the power utility tunnel 1 through the outdoor ventilation shaft 12, the tunnel fan 11, the air duct 10, and the centralized air supply vent 8, and flows along the tunnel. After being heated, it passes through the centralized exhaust vent. 9. The heat exchange medium 15 in the main return water pipe 5, after being heated by heat exchange, flows through the chiller 16 to be cooled down and then is transported to the main water supply pipe 4. Some of the cable waste heat continuously enters the lining structure 101 of the power tunnel 1 through heat conduction, convection and radiation, and is eventually dissipated into the soil. Some of the cable waste heat is discharged outdoors through mechanical ventilation airflow, and some of the cable waste heat is exchanged with the chiller 16 through the heat exchange medium 15 and is eventually dissipated into the cold source of the chiller 16.

[0029] Considering the peak load fluctuations of the heating cable 109 and the peak heat fluctuations of the cable, the tunnel fan 11, chiller 16, auxiliary pump 6, and main pump group 13, which are the main equipment, all have variable frequency operation capabilities. The centralized control platform 14 is electrically connected to the main pump group 13, tunnel fan 11, chiller 16, auxiliary pump 6, and temperature sensor 7. It can intelligently execute the operation mode based on the monitored temperature value inside the power corridor tunnel 1, the outdoor air temperature, and the power supply load, and adjust the operating frequency of the tunnel fan 11, chiller 16, auxiliary pump 6, and main pump group 13. The control process is as follows: S1. After the mechanical ventilation-structural heat exchange-refrigeration composite power tunnel cooling system equipment and pipeline layout is completed, the structural heat exchange mode is activated. S2. Temperature sensor 7 and power meters installed in the power utility tunnel 1 are used to collect data on the temperature inside the cable compartment 102, the outdoor temperature, and the cable load. The temperature sensor 7 inside the cable compartment 102 has a measurement range of 0~60℃ and a measurement accuracy of ±0.5℃. The outdoor temperature sensor 7 has a measurement range of -20~50℃ and a measurement accuracy of ±0.5℃. The cable load monitoring module has a monitoring range of 0~120% of the cable's rated load and a data sampling period of 1 second.

[0030] S3. The temperature inside the cable compartment 102, the outdoor temperature, and the cable load are collected in real time and transmitted to the centralized control platform 14.

[0031] S4. The centralized control platform 14 comprehensively judges whether it is necessary to switch the operating mode based on the temperature inside the cable compartment 102, the outdoor temperature, and the cable load. At the same time, it performs dynamic frequency adjustment of all frequency converters while completing the operation mode switch in combination with preset thresholds.

[0032] The system has preset judgment thresholds: the warning temperature of cable compartment 102 is 38℃, the outdoor ambient temperature is 28℃, and the cable load threshold is 70% of the rated load. The operating mode switching logic is as follows: 1) When the cable load is ≤70% of the rated load, the internal temperature is ≤38℃, and the outdoor temperature is unlimited, the system operates in structural heat exchange mode; 2) When the cable load is ≤70% of the rated load, the internal temperature is >38℃, and the external temperature is <28℃, the system operates in mechanical ventilation + structural heat exchange mode; 3) When the cable load is greater than 70% of the rated load, the internal temperature is greater than 38℃, and the outdoor temperature is greater than or equal to 28℃, the system operates in mechanical ventilation + structural heat exchange mode. 4) When the cable load is greater than 70% of the rated load, the internal temperature is greater than 38℃, and the external temperature is greater than 28℃, the system will implement mechanical ventilation + structural heat exchange + cooling mode.

[0033] This control logic can match the equipment's operating power with the dynamic fluctuations of the cable's residual heat, avoiding long-term full-load no-load operation of the equipment and effectively reducing the overall energy consumption of the system.

[0034] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any transformations or substitutions that can be understood by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of the present invention.

Claims

1. A mechanical ventilation-structural heat exchange-refrigeration composite cooling system for power utility tunnels, characterized in that, Includes auxiliary machine rooms (2) located on both sides of the power utility tunnel (1). Heat exchange pipes (3) are pre-embedded in the lining structure (101) of the power utility tunnel (1). One end of the heat exchange pipe (3) is connected to the main water supply pipe (4), and the other end of the heat exchange pipe (3) is connected to the main return water pipe (5). The heat exchange pipe (3), the main water supply pipe (4), and the main return water pipe (5) are filled with flowing heat exchange medium (15). The auxiliary machine room (2) is equipped with a main pump group (13) connected between the main water supply pipe (4) and the main return water pipe (5), and a chiller (16) connected in parallel to the main return water pipe (5). The main water supply pipe (4), the main return water pipe (5) are connected to the main pump group (13) and the chiller (16) in the auxiliary machine room (2) to form a circulation loop. The inlet and outlet of the chiller (16) are equipped with a first solenoid valve (17) with electric switch function. A second solenoid valve is installed on the pipeline connected in parallel with the chiller (16) on the main return water pipe (5). Heating cables (109) are installed in the cable compartment (102) of the power utility tunnel (1), and temperature sensors (7) are installed at certain intervals. A centralized air supply outlet (8) is provided at the entrance (105) of the power utility tunnel (1), and a centralized exhaust outlet (9) is provided at the exit (106) of the power utility tunnel (1). The centralized air supply outlet (8) and the centralized exhaust outlet (9) are connected to the tunnel fans (11) in the two auxiliary machine rooms (2) on both sides of the power utility tunnel (1) through the air duct (10). The air duct (10) leads to the outdoor ventilation shaft (12).

2. The mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system according to claim 1, characterized in that: An auxiliary pump (6) is installed at certain intervals on the main return water pipe (5).

3. The mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system according to claim 1, characterized in that: The main water supply pipe (4), the main return water pipe (5), and the auxiliary pump (6) are arranged in the spare space (103) of the power utility tunnel (1).

4. The mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system according to claim 3, characterized in that: A maintenance cover (104) is provided between the cable compartment (102) and the spare space (103) to facilitate operation and maintenance management by operators.

5. The mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system according to claim 1, characterized in that: Temperature sensors (7) are also installed at the outdoor ventilation shaft (12).

6. The mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system according to claim 5, characterized in that: The auxiliary machine room (2) is equipped with a centralized control platform (14) that is electrically connected to the main pump group (13), tunnel fan (11), chiller (16), auxiliary pump (6) and temperature sensor (7).

7. A cooling method for a mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel cooling system as described in any one of claims 1 to 6, characterized in that: Includes the following steps: Step 1: When the structural heat exchange mode is executed, the tunnel fan (11), the central exhaust port (9), the central air supply port (8), the chiller (16), and the first solenoid valve (17) of the chiller inlet and outlet are closed. The second solenoid valve on the main return water pipe (5), the auxiliary pump (6), and the main pump group (13) are opened. The heat exchange medium (15) circulates in the heat exchange pipe (3) and enhances heat exchange. The residual heat of the heating cable (109) continuously enters the lining structure (101) of the power tunnel tunnel (1) through heat conduction, convection and radiation, and is eventually dissipated into the soil. Step 2: When the mechanical ventilation + structural heat exchange mode is executed, the first solenoid valve (17) of the chiller (16) and the chiller inlet and outlet is closed, and the second solenoid valve, auxiliary pump (6) and main pump group (13) on the tunnel fan (11), the centralized exhaust port (9), the centralized air supply port (8), the main return water pipe (5) are opened, and the heat exchange medium (15) circulates in the heat exchange tube (3) and enhances heat exchange; the outdoor air with a lower temperature is sent into the entrance (105) of the power tunnel (1) through the outdoor ventilation tower (12), the tunnel fan (11), the air duct (10) and the centralized air supply port (8), and flows along the tunnel. After being heated, it is discharged through the centralized exhaust port (9), the air duct (10), the tunnel fan (11) and the outdoor ventilation tower (12). A portion of the cable waste heat continuously enters the lining structure (101) of the power tunnel (1) through heat conduction, convection and radiation, and is eventually dissipated into the soil. A portion of the cable waste heat is discharged outdoors through the mechanical ventilation airflow. Step 3: When executing the structural heat exchange + cooling mode, the second solenoid valve on the main return water pipe (5), the tunnel fan (11), the centralized exhaust port (9), and the centralized air supply port (8) are closed. The chiller (16), the first solenoid valves (17) at the inlet and outlet of the chiller, the auxiliary pump (6), and the main pump group (13) are opened. The heat exchange medium (15) circulates in the heat exchange pipe (3) and enhances heat exchange. After the heat exchange and heating, the heat exchange medium (15) in the main return water pipe (5) flows through the chiller (16) and is cooled down. Then it is transported to the main water supply pipe (4). A portion of the cable waste heat continuously enters the lining structure (101) of the power tunnel (1) through heat conduction, convection, and radiation, and is eventually dissipated into the soil. A portion of the cable waste heat is heat exchanged to the chiller (16) through the heat exchange medium (15) and is eventually dissipated into the cold source of the chiller (16). Step 4: When executing the mechanical ventilation + structural heat exchange + cooling mode, the second solenoid valve on the main return water pipe (5) is closed, and the chiller (16), the first solenoid valves (17) of the chiller inlet and outlet, the tunnel fan (11), the centralized exhaust port (9), the centralized air supply port (8), the auxiliary pump (6), and the main pump group (13) are turned on. The heat exchange medium (15) circulates in the heat exchange tube (3) and enhances heat exchange. The outdoor air with a lower temperature is sent into the entrance (105) of the power pipe gallery tunnel (1) through the outdoor ventilation tower (12), the tunnel fan (11), the air duct (10), and the centralized air supply port (8), and flows along the tunnel. After being heated, it passes through the centralized exhaust port (8). The exhaust vent (9), air duct (10), tunnel fan (11) and outdoor ventilation shaft (12) are discharged. The heat exchange medium (15) in the main return water pipe (5) after heat exchange and heating flows through the chiller (16) to be cooled down, and then is transported to the main water supply pipe (4). A portion of the cable waste heat continuously enters the lining structure (101) of the power tunnel (1) through heat conduction, convection and radiation, and is eventually dissipated into the soil. A portion of the cable waste heat is discharged outdoors through mechanical ventilation airflow, and a portion of the cable waste heat is exchanged with the chiller (16) through the heat exchange medium (15), and is eventually dissipated into the cold source of the chiller (16).

8. The cooling method for a mechanical ventilation-structural heat exchange-refrigeration composite power utility tunnel according to claim 7, characterized in that: The centralized control platform (14) combines the monitoring value of the temperature inside the power utility tunnel (1), the outdoor air temperature, and the power supply load to intelligently execute the operation mode and adjust the operating frequency of the tunnel fan (11), chiller (16), auxiliary pump (6), and main pump group (13). The control process is as follows: S1. After the mechanical ventilation-structural heat exchange-refrigeration composite power tunnel cooling system equipment and pipeline layout is completed, the structural heat exchange mode is activated. S2. The temperature inside the cable compartment (102), the outdoor temperature, and the cable load are collected by temperature sensors (7) and power meters installed in the power utility tunnel (1). The temperature range of the temperature sensor (7) inside the cable compartment (102) is 0~60℃, and the measurement accuracy is ±0.5℃. The temperature range of the outdoor temperature sensor (7) is -20~50℃, and the measurement accuracy is ±0.5℃. The cable load monitoring module monitors 0~120% of the rated cable load, and the data sampling period is 1s. S3. The temperature inside the cable compartment (102), the outdoor temperature, and the cable load collected in real time are transmitted to the centralized control platform (14). S4. The centralized control platform (14) comprehensively judges whether the operation mode needs to be switched based on the temperature inside the cable compartment (102), the outdoor temperature, and the cable load. At the same time, it performs dynamic frequency adjustment on all frequency converters while completing the operation mode switch in combination with the preset threshold.