A method for constructing a cross-river elevation control network with dynamic maintenance capabilities

By employing a dual-line closed-loop verification network and a dynamic maintenance mechanism, the problems of high precision and stability in ultra-long cross-river elevation transfer were solved, thus achieving the long-term effectiveness of the elevation control network.

CN123111188APending Publication Date: 2026-11-17CHINA RAILWAY TUNNEL GROUP CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611082600.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies lack effective verification conditions for ultra-long-distance cross-river elevation transfer, making it impossible to detect systematic errors in a timely manner. Furthermore, they lack long-term maintenance mechanisms to address dynamic settlement of control points, making it difficult to achieve high precision and stability.

Method used

A closed-loop calibration network with dual survey lines is adopted, combined with synchronous observations from multiple GNSS receivers and leveling measurements. The elevation benchmark is dynamically updated through two-step calculation and periodic re-measurement, forming a closed-loop dynamic maintenance mechanism.

Benefits of technology

It achieves high precision and reliability of ultra-long cross-river elevation transfer, improves stability, extends effective life to 3-5 years, and solves the systematic error problem caused by construction settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123111188A_ABST
    Figure CN123111188A_ABST
Patent Text Reader

Abstract

A method for constructing a cross-river elevation control network with dynamic maintenance capabilities, relating to the field of engineering surveying technology, includes: constructing a closed check network by symmetrically deploying two parallel survey lines on both banks of the river, limiting the vertical distance of non-cross-river auxiliary points to ≤ 1 / 50 of the total cross-river length; combining Class B GNSS observations and first-order leveling measurements, employing a two-step method of "ground calibration—cross-river application" to calculate the cross-river elevation difference, checking for a difference in elevation anomaly rate between banks of <13mm / km and between opposite banks of <18mm / km; re-measuring every 4–6 months, and updating the benchmark and recalculating when the differential settlement exceeds 3mm + 1mm / km × D using the relative increment method. This invention achieved a stable closure error of ≤12.21mm in a 10.2km project, reaching second-order accuracy, extending the control network lifespan from 3–6 months to 3–5 years, and is suitable for long-distance cross-river and cross-sea projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of engineering surveying technology, and in particular to a method for constructing a cross-river elevation control network with dynamic maintenance capabilities. Background Technology

[0002] High-speed railways, large-scale cross-river bridges, and tunnel projects require extremely high accuracy in elevation control, making cross-river elevation transfer a key technical challenge. Current national leveling standards only cover cross-river measurements within 3.5km. For situations like the 10.2km cross-river section of a Yangtze River tunnel, there is no mature operational system or accuracy evaluation standard. Traditional cross-river trigonometric leveling is greatly affected by atmospheric refraction and plumb line deviation, often failing to consistently achieve second-order leveling accuracy over distances of 10km. Existing elevation transfer methods based on the Global Navigation Satellite System (GNSS) are based on "GNSS geodetic height measurement + leveling normal height measurement + fitting of geoid anomalies." However, when facing ultra-long distances of 10km, simply applying this paradigm presents numerous problems.

[0003] The single-line observation mode lacks effective verification conditions, resulting in low reliability of measurement results and an inability to detect systematic errors that occur during the observation process in a timely manner. Secondly, it lacks a systematic optimization plan for the entire process of point layout, observation duration, and data processing, leading to significant differences in implementation effects across different projects and making it difficult to form a standardized operating procedure.

[0004] Chinese patent (publication number CN117367367A) discloses a method for ultra-long-distance cross-river and cross-sea elevation transfer measurement based on BeiDou / GNSS. While the control points remain stable during construction, in actual major engineering projects, construction disturbances (such as foundation pit excavation, tunnel boring machine advancement, and dewatering) can cause continuous and significant differential settlement at the control points on both sides of the river. This settlement disrupts the original linear variation pattern of the calibrated elevation, introducing systematic errors that amplify with the progress of construction, and provides no means of quantitative monitoring or dynamic correction.

[0005] To clearly identify the shortcomings of existing mainstream technologies, a quantitative comparison of three mainstream technical solutions—traditional trigonometric leveling, conventional GNSS single-point fitting, and existing static cross-river patents—is conducted from four dimensions: network configuration, elevation anomaly handling, ultra-long-distance accuracy, and settlement adaptability. The results show that traditional trigonometric leveling uses a single survey line network, does not involve elevation anomaly handling, and struggles to meet second-order accuracy requirements at distances exceeding 10km, lacking settlement adaptability. Conventional GNSS single-point fitting uses a single-point network, handling elevation anomalies through simple fitting, resulting in low reliability of ultra-long-distance accuracy and lacking settlement adaptability. While existing static cross-river patents employ dual survey line network construction and linear extrapolation to handle elevation anomalies, aiming to achieve second-order accuracy, they are still based on static assumptions and lack settlement adaptability.

[0006] In summary, existing technologies face two major unresolved challenges when dealing with ultra-long-distance cross-river elevation transfer of 10km or more: first, the lack of independent verification in single-line network construction makes it difficult to validate the effectiveness of elevation anomaly fitting models; second, the absence of a long-term maintenance mechanism to address dynamic settlement of control points, a fundamental deficiency that existing static methods cannot overcome. Therefore, a systematic solution is urgently needed that can achieve both initial high-precision elevation transfer and long-term self-maintenance capabilities. Summary of the Invention

[0007] To overcome the shortcomings of the prior art, this invention discloses a method for constructing a cross-river elevation control network with dynamic maintenance capabilities.

[0008] To achieve the above-mentioned objectives, the present invention adopts the following technical solution:

[0009] A method for constructing a cross-river elevation control network with dynamic maintenance capabilities includes the following steps:

[0010] Step S1: In the areas selected through geological surveys on both sides of the river where the impact of construction disturbance is relatively small, at least two pairs of core cross-river static observation points are symmetrically arranged along the cross-river direction. Several pairs of non-cross-river auxiliary points are then arranged outward along each survey line to form two independent survey lines with an angle of less than 3° between their extension directions, thus forming a two-way closed verification network. The location of the non-cross-river auxiliary points must meet the following requirement: their vertical distance d from the direction of their survey line is not greater than 1 / 50 of the total cross-river distance D of the survey line, i.e., d / D≤1 / 50.

[0011] Step S2: Conduct multi-time-segment long-distance static GNSS observations simultaneously with multiple receivers, and simultaneously perform leveling measurements on the land section across both banks of the river;

[0012] Step S3: A two-step solution is used to calculate the normal elevation difference across the river based on a linear extrapolation model. Accuracy is verified by using the elevation closure loop of independent results from the two survey lines and the threshold difference between the elevation anomaly change rates on the same bank and the opposite bank. Specifically, the maximum difference in the elevation anomaly change rate α between each survey section on the same bank must be less than 13 mm / km, and the average elevation anomaly change rate α calibrated on the opposite bank must be... The maximum mutual difference is less than 18 mm / km; if the mutual difference on the same bank or on opposite banks exceeds the limit, the measurement period is increased, the measurement points are optimized, or gross errors are eliminated and the measurement is recalibrated until the limit requirement is met.

[0013] Step S4: Perform multiple remeasurements within a predetermined period, with an interval of 4 to 6 months between each remeasurement. When the cumulative differential settlement Δδ between the core control points on both sides of the river exceeds a preset threshold, perform a dynamic update of the benchmark. The preset threshold is 3mm + 1mm / km × D, where D is the distance across the river in km. Based on this updated elevation value, recalibrate the new elevation anomaly rate α on both sides of the river according to the method in Step S3. ’ And recalculate the normal elevation difference across the river.

[0014] Preferably, in step S1, all points are constructed as forced centrifugal observation piers that penetrate deep into the stable bearing layer.

[0015] Preferably, in step S1, the entire network forms at least two independent elevation closed loops.

[0016] Preferably, in step S2, the number of receivers for synchronous observation is not less than 12; the requirements for geodetic control network observation include: a continuous observation duration of not less than 23 hours in a single time period, a number of observation time periods of not less than 3, a sampling interval of 15 seconds, a satellite cutoff elevation angle of 15°, and baseline calculation and network adjustment using IGS precise ephemeris.

[0017] Preferably, in step S2, the forward and backward measurements are performed in a symmetrical observation sequence of "back-forward-forward-back"; the line-of-sight length is controlled to be ≤30m, the difference between forward and backward sight distances is ≤0.5m, the cumulative difference between forward and backward sight distances is ≤1.5m, and the minimum height of the line of sight above the ground is ≥0.5m; the difference in elevation between the forward and backward measurements of the measurement segment meets the tolerance requirement of ±1.8√K mm, where K is the length of the measurement segment in km; the loop closure error meets the tolerance requirement of ±2√F mm, where F is the length of the loop in km.

[0018] Preferably, the two-step solution includes:

[0019] S3.1 Ground Calibration: The geodetic height of each point is calculated from GNSS observation data. Combined with the normal height measured by first-order leveling, the elevation anomaly rate α of each land section across the river is calculated using the formula α=(ΔH-Δh) / S, where ΔH is the difference in geodetic height between the two points, Δh is the difference in the normal height measured by leveling, and S is the horizontal distance between the two points. The average value of α is obtained by taking the average value of multiple sections and multiple time periods on the same bank. ;

[0020] S3.2 Cross-river application: This involves marking the two banks of the river. Extrapolating the value, according to the formula Δh_crossing_the_river = ΔH_crossing_the_river ×S crosses the river to calculate the normal elevation difference of the cross-river section, where ΔH crosses the river is the elevation difference between the two points across the river, and S crosses the river is the distance across the river.

[0021] Preferably, in step S4, the benchmark dynamic update includes: updating the elevation results of each control point to H using the relative incremental method. new(Point) =H init(Point) +Δh acc(Point) H init(Point) The initial elevation value Δh is determined when the network is constructed at this point. acc(Point) This represents the cumulative settlement of the measured normal elevation at this point relative to the initial normal elevation at the beginning of the network construction. Subsidence is negative, and rise is positive.

[0022] Preferably, in step S4, after performing the benchmark dynamic update, the step further includes recalculating the closure error of the cross-river closed loop to verify that the updated system error has been eliminated.

[0023] By employing the technical solution described above, the present invention has the following beneficial effects:

[0024] (1) This invention significantly improves the initial accuracy and reliability of ultra-long cross-river elevation transfer. By symmetrically deploying double parallel survey lines on both banks of the river and constructing a two-way closed check network, independent verification conditions are provided for the measurement results, effectively avoiding the problem of not being able to detect systematic errors under the single survey line mode. At the same time, by quantitatively limiting the deviation of non-cross-river auxiliary points from the survey line to no more than 1 / 50 of the total cross-river length, the fitting error introduced by the lateral gradient of elevation anomaly is controlled to the sub-millimeter level in principle. In the 10.2km engineering measurement, the maximum difference in the elevation anomaly change rate α value on the same bank is only 6.15mm / km, and the maximum difference in the α value on the opposite bank is 11.56mm / km, both of which are far below the preset limit. The closure error of the cross-river closed loop reaches -10.5mm, which is far better than the limit requirement of 19mm for second-order leveling, and the second-order leveling accuracy transfer over a distance of 10km is stably achieved.

[0025] (2) This invention determines a series of key quantitative parameters, such as the 1 / 50 vertical distance control threshold, the 13mm / km same-bank α difference threshold, the 18mm / km opposite-bank α difference threshold, and the 3mm+1mm / km×D differential settlement triggering threshold, by combining theoretical derivation and engineering verification. Each parameter has a clear theoretical basis and engineering verification support, avoiding the drawbacks of relying on empirical qualitative judgment in the prior art.

[0026] (3) This invention realizes a closed-loop dynamic maintenance mechanism for differential settlement of control points, fundamentally solving the benchmark drift problem that existing static methods cannot overcome. By introducing systematic errors that accumulate over time, and through periodic retesting, quantified differential settlement trigger thresholds, and relative incremental benchmark update technology, a complete closed loop of "monitoring-discrimination-compensation-backtracking calculation" is formed. After adopting the dynamic update mechanism of this invention, the systematic errors caused by construction settlement are successfully eliminated, extending the effective life of the elevation control network from the conventional 3-6 months to 3-5 years, solving the industry pain point of unstable elevation benchmarks during the construction period of major projects. Attached Figure Description

[0027] Figure 1 This is a schematic diagram of the dual-surveyline cross-river control network layout according to an embodiment of the present invention;

[0028] Figure 2 This is a multi-stage cumulative settlement curve of the core leveling point in an embodiment of the present invention. Detailed Implementation

[0029] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0030] In the description of this invention, it should be noted that the terms "upper" and "lower" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product of this invention is usually placed when in use. They are only used to facilitate the description of this invention and to simplify the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this invention.

[0031] Example 1:

[0032] Combined with appendix Figures 1-2 This paper presents a method for establishing a cross-river elevation control network with dynamic maintenance capabilities. This embodiment is applied to a Yangtze River tunnel project. The tunnel to be built crosses the river with a width of approximately 10.2 km. The survey area is a flat alluvial plain of the Yangtze River. The project requires the establishment of an elevation control network that meets the second-order leveling accuracy for high-speed railways, and the control network needs to remain stable and effective during the 3-5 year construction period. A schematic diagram of the double-line cross-river control network layout in this embodiment is shown below. Figure 1 As shown, the cumulative settlement curves of the core leveling points over multiple periods are as follows: Figure 2 As shown.

[0033] In areas selected through geological surveys on both sides of the river where the impact of construction disturbance is relatively small, two pairs of core cross-river static observation points, YJ05 and YJ06, and YJ07 and YJ08, are symmetrically arranged along the cross-river direction. In addition, non-cross-river auxiliary points, such as YJ01 to YJ04 and YJ09 to YJ12, are arranged outward along each survey line, forming two independent survey lines with basically consistent spacing and an angle of less than 3° between their extension directions. This constitutes a two-way closed verification network, and the entire network forms two independent elevation closed loops.

[0034] The locations of all non-cross-river auxiliary points meet the following condition: their vertical distance *d* from the direction of their respective survey line is no greater than 1 / 50 of the total cross-river distance *D* of that survey line, i.e., d / D ≤ 1 / 50. The vertical distance *d* is the perpendicular distance from the non-cross-river auxiliary point to the line connecting the core cross-river static observation points at both ends of the survey line. In this embodiment, the total cross-river distance *D* is 10.2 km. Therefore, the vertical distance of all non-cross-river auxiliary points from the main survey line is strictly controlled within 204 m. The measured correlation between each auxiliary point and the main survey line reaches 0.9997, with a fitting error at the sub-millimeter level. All 12 points are constructed as forced-center observation piers that penetrate deep into the stable bearing layer. Forced-center observation piers can control the instrument centering error to within 0.1 mm, and penetrating deep into the stable bearing layer can effectively reduce the uneven settlement of the points themselves, providing a long-term stable benchmark foundation for the control network.

[0035] The technical principle behind the aforementioned 1 / 50 vertical distance control threshold is as follows: Let the horizontal distance of the cross-river survey line be D, the maximum vertical distance of the non-cross-river auxiliary point from the survey line be d, and the lateral gradient of the elevation anomaly caused by the change in the gravity field in this area be denoted as d. The elevation anomaly fitting model error Δζ introduced by the lateral deviation of the point position satisfies Δζ≈ ×d. In the Yangtze alluvial plain region, the lateral gradient of elevation anomalies... Typically, the error is no greater than 0.5 mm / km. When d / D ≤ 1 / 50, d ≤ D / 50. For the case of D = 10.2 km, d ≤ 204 m. At this time, Δζ ≤ 0.5 mm / km × 0.204 km ≈ 0.102 mm. This error level is negligible compared to the accuracy requirement of 1 mm / km for second-order leveling.

[0036] In this embodiment, a control experiment was conducted simultaneously. Except for widening the vertical distance of the non-cross-river auxiliary points to d / D≈1 / 25, the other conditions were exactly the same. The actual measurement results of the control network showed that the maximum mutual difference of α on the same bank reached 22.73 mm / km (exceeding the limit), and the closure error of the cross-river closed loop was -28.70 mm (exceeding the limit by 47.9%), which could not meet the high-speed railway elevation control requirements. When further tightened to d / D≤1 / 100, due to the limitations of on-site land acquisition conditions, riverside structures, and the distribution of soft soil layers, it was impossible to select a site in the entire survey area to construct a forced centering observation pier that met the burial depth requirements. The scheme did not meet the conditions for engineering implementation. This proves that 1 / 50 is the optimal balance threshold between ensuring the upper limit of theoretical accuracy and the lower limit of engineering implementation.

[0037] During periods of stable weather, 12 GNSS receivers with an accuracy of 3mm+1ppm were used to conduct synchronous static observations of all points across the network for three time periods. Each observation period lasted at least 23 hours, with a sampling interval of 15 seconds and a satellite cutoff elevation angle of 15°. All indicators met the requirements for Class B geodetic control network observations in the current valid Global Navigation Satellite System (GNSS) measurement specifications. Baseline calculations and network adjustment were performed using IGS precise ephemeris. The 23-hour long observation period effectively averaged systematic errors such as satellite orbit errors and atmospheric refraction errors. The 15-second sampling interval provided sufficient observation data to improve the reliability of the calculations. The 15° cutoff elevation angle effectively reduced the multipath effect of low-elevation-angle satellites and the influence of atmospheric refraction. Using IGS precise ephemeris improved satellite orbit accuracy to the centimeter level, thereby significantly improving the accuracy of baseline calculations. Simultaneously, leveling measurements were conducted on the land sections spanning both banks of the river, in accordance with the requirements of the first-order leveling standards in the current valid national first- and second-order leveling measurement specifications.

[0038] Specifically, a DSZ05 or higher precision digital level is used, equipped with an Inva barcode leveling rod, with complete systematic error corrections such as per-meter true length correction and temperature correction; i-angle verification is performed before departure and after return, and the absolute value of i-angle is always controlled within 15″; forward and backward measurements are performed in a symmetrical observation sequence of "back-forward-forward-back," which effectively eliminates systematic errors caused by instrument and rod sinking; the line-of-sight length is controlled to ≤30m, the difference between foresight and backsight distances is ≤0.5m, the cumulative difference between foresight and backsight distances is ≤1.5m, and the minimum height of the line of sight above the ground is ≥0.5m. These parameters can minimize the influence of atmospheric refraction and i-angle errors; the difference in elevation between forward and backward measurements of the section strictly meets the tolerance requirement of ±1.8√K mm (K is the length of the section, in km), and the loop closure error meets the tolerance requirement of ±2√F mm (F is the length of the loop, in km).

[0039] In this embodiment, the maximum loop closure error of the closed loop formed by the eight leveling points BM11-BM18 on the ground is only 4.04 mm, which is far better than the above-mentioned standard limit. This proves that the establishment of the normal ground height benchmark has reached the first-order leveling accuracy standard, and provides a reliable starting basis for the subsequent calibration of the elevation anomaly change rate α.

[0040] A two-step solution method of "ground calibration - cross-river application" was used to calculate the normal elevation difference across the river based on a linear extrapolation model. Accuracy was verified by using the elevation closure loop of independent results from two survey lines and the threshold difference between the elevation anomaly change rates on the same bank and opposite banks. Specifically, the maximum difference in the elevation anomaly change rate α value of each survey segment on the same bank was required to be less than 13 mm / km, and the average elevation anomaly change rate of the calibrated opposite banks was required to be... The maximum difference is less than 18 mm / km.

[0041] The specific process of the above two-step solution is as follows: First, ground calibration is performed, and the geodetic height of each point is calculated from GNSS observation data. Combined with the normal height measured by first-order leveling, the elevation anomaly rate α of each land section across the river is calculated according to the formula α=(ΔH-Δh) / S, where ΔH is the difference in geodetic height between the two points, Δh is the difference in the normal height measured by leveling, and S is the horizontal distance between the two points. The average value of α is taken for multiple sections and multiple time periods on the same bank to obtain the average elevation anomaly rate of each bank. Then, cross-river applications are implemented, marking the points on both sides of the river. Extrapolating the value, according to the formula Δh_crossing_the_river = ΔH_crossing_the_river ×S crosses the river to calculate the normal elevation difference of the cross-river section, where ΔH crosses the river is the elevation difference between the two points across the river, and S crosses the river is the distance across the river.

[0042] Within a small area of ​​10km, the change in the Earth's gravitational field can be approximated as linear in this two-step method. Therefore, the rate of change α of the elevation anomaly is consistent in the land section and the cross-river section. By calibrating α with the high-precision first-order leveling results of the land section, and then extrapolating it to the cross-river section where leveling cannot be directly performed, high-precision cross-river elevation transfer can be achieved.

[0043] The basis for setting the threshold of 13 mm / km for the mutual difference of α between the two banks is as follows: According to the law of error propagation, when the accidental mean error per kilometer of second-order leveling is 1 mm / km, the mutual difference of the elevation anomaly change rate α between the two ends of the land section on the same bank should theoretically be controlled within 13 mm / km in order to ensure the reliability of linear extrapolation.

[0044] The basis for setting the threshold of 18 mm / km for the α difference between the two banks is as follows: considering the influence of systematic errors such as the difference in gravity field and atmospheric refraction between the two banks of the river, the allowable value of the α difference between the two banks should be appropriately relaxed. Theoretical derivation shows that the limit of 18 mm / km can ensure that the closure error of the cross-river closed loop does not exceed the second-order leveling limit.

[0045] In this embodiment, the ground calibration verification results are as follows: the maximum standard deviation of α values ​​for each measurement segment on the same bank of the south bank is 0.62 mm / km, and for the north bank it is 0.63 mm / km; the maximum mutual difference of α values ​​on the same bank is 6.15 mm / km, which is much less than the limit of 13 mm / km; the maximum mutual difference of α values ​​on opposite banks is 11.56 mm / km, which is also less than the limit of 18 mm / km. The results of the cross-river elevation difference calculation are as follows: taking the average value of α for the land measurement segments on both sides of the river, the elevation difference of the two pairs of core cross-river measurement segments is calculated, and the maximum mutual difference of the elevation difference results at different time periods is only 5.4 mm; the closure error of the cross-river closed loop formed by the four points is -10.5 mm, which is much better than the limit of 19 mm for second-order leveling, proving that the initial network construction results have met and exceeded the accuracy requirements of the high-speed railway project.

[0046] Multiple remeasurements are performed within the required observation period, with intervals of 4 to 6 months between remeasurements. In this embodiment, a total of 7 periodic remeasurements are performed. This remeasurement interval is based on the construction settlement rate of the survey area and the error propagation law of second-order leveling, and is set to ensure the validity of the elevation anomaly change rate α before the update. This interval is the maximum time interval required to ensure that the elevation anomaly change rate α remains valid before the update. Periodic remeasurements are not based on arbitrary management needs, but rather are set to resolve the technical contradiction between "construction settlement rate and maintaining measurement accuracy."

[0047] The average settlement rate in the project area caused by tunnel boring machine (TBM) advancement and foundation pit dewatering is approximately 0.5–2 mm / month. Too short a remeasurement interval would result in redundant observations and a waste of human and material resources; too long an interval might lead to accumulated differential settlement causing the cross-river elevation difference calculation error to exceed the limit, rendering dynamic maintenance technically meaningless. Therefore, during the construction of major projects such as cross-river tunnels and bridges, the control points on both banks of the river are not statically stable, but rather experience continuous and uneven differential settlement due to construction activities such as foundation pit excavation, TBM advancement, and dewatering. This differential settlement introduces a systematic measurement error that accumulates over time, undermining the effectiveness of the initially calibrated elevation anomaly rate α. Without compensation, the measurement results of the cross-river elevation difference calculation will gradually become invalid. Each remeasurement repeats the GNSS observation and leveling measurement steps described above, obtaining the current geodetic height and normal height of each control point. The current data is compared with the initial baseline data to calculate the cumulative differential settlement Δδ between the core control points on both sides of the river. The cumulative differential settlement Δδ is defined as the absolute value of the difference between the maximum and minimum elevation settlement among all core static observation points across the river on both sides. When the cumulative differential settlement Δδ between the core control points on both sides of the river exceeds a preset threshold, a dynamic baseline update is performed. The preset threshold is 3mm + 1mm / km × D, where D is the distance across the river in km. This threshold is set to technically connect and differentiate the systematic error introduced by construction settlement with the discrepancy limit of the forward and backward measurements in second-order leveling. Its setting is based on a comprehensive balance of the following two objective technical constraints: firstly, technical connection with national surveying standards. According to the currently effective national first and second-order leveling standards, the discrepancy limit for forward and backward measurements in second-order leveling sections is ±4√K mm (K is the section length in km). Substituting the cross-river distance D = 10.2 km into K, the discrepancy limit for the forward and reverse measurements in this section is approximately ±12.8 mm. This limit represents the permissible random error boundary of second-order leveling itself. The systematic error introduced by differential settlement must be effectively distinguished from this random error to avoid error accumulation. Secondly, there is the engineering optimization of error allocation. The constant term 3 mm reflects the starting error of the first-order leveling joint measurement across the river, and the linear term 1 mm / km × D represents the conservative tolerance after considering the random error of geodetic height measurement over the cross-river distance. When the cumulative differential settlement Δδ is below this threshold, its impact on the final cross-river elevation difference is masked by the random noise of second-order leveling and requires no intervention. Once it exceeds this threshold, the systematic error begins to appear, and dynamic updates must be triggered, thus achieving the optimal technical balance between "measurement accuracy assurance" and "update and maintenance costs".

[0048] In this embodiment, the re-measurement data showed significant uneven settlement at the core points: the cumulative settlement of the near-river point YJ07 on the north bank was -50.9 mm, and the settlement of the far-river point YJ06 on the south bank was -15.5 mm. The maximum differential settlement Δδ across the river reached 35.4 mm, exceeding the preset threshold of 3 mm + 1 mm / km × 10.2 km = 13.2 mm, thus triggering a dynamic update of the baseline. The dynamic update of the baseline uses the relative incremental method to update the elevation results of each control point to: H new(Point) =H init(Point) +Δh acc(Point) H init(Point) The initial elevation value Δh is determined when the network is constructed at this point. acc(Point) This represents the cumulative settlement of the measured normal elevation at this point relative to the initial normal elevation at the beginning of the network construction. Subsidence is negative, and rise is positive.

[0049] The relative incremental method has the technical advantage of directly obtaining the cumulative settlement of each point relative to the initial benchmark through leveling measurements. This accurately eliminates the influence of non-uniform settlement at each point and avoids the error propagation that may be introduced by the overall adjustment. Based on this updated elevation value, the new elevation anomaly rate α on both sides of the river is recalibrated using the two-step solution method described above: "ground calibration - cross-river application". ’ And recalculate the normal elevation difference across the river.

[0050] After the benchmark dynamic update, the closure error of the cross-river closed loop was recalculated to verify that the system error had been effectively eliminated after the update. To verify the superiority of the dynamic maintenance mechanism of this invention, two schemes were compared in parallel after the third phase of remeasurement: the comparison scheme simulated the existing static method without dynamic updates, only using the initial α value to estimate the cross-river elevation difference. By the seventh phase, due to the failure to compensate for the actual settlement of the control points, the calculation error of the cross-river elevation difference increased to 13.2 mm, exceeding the limit requirement of the second-order leveling. However, after adopting the dynamic update scheme of this invention, the closure error of the cross-river leveling loop in each phase was consistently controlled within 12.21 mm, far better than the limit requirement of 19 mm. At the same time, the closure error of the leveling loop of the dual survey lines and the closure accuracy of the connecting route of the national first and second-order leveling points both met the specifications.

[0051] The above results show that this invention proposes for the first time a dynamic maintenance closed-loop mechanism for differential settlement of control points, which successfully eliminates the systematic error caused by construction settlement, extends the effective life of the elevation control network from the conventional 3-6 months to long-term observation covering 3-5 years, and completely solves the fundamental defect that existing static methods cannot cope with differential settlement of control points during the construction period.

[0052] The parts of this invention not described in detail are prior art. It will be apparent to those skilled in the art that this invention is not limited to the details of the above exemplary embodiments, and that the invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be regarded as exemplary and non-limiting in all respects, and are intended to encompass all changes falling within the meaning and scope of equivalents within this invention.

Claims

1. A method for constructing a cross-river elevation control network with dynamic maintenance capabilities, characterized in that, Includes the following steps: Step S1: In the areas selected through geological surveys on both sides of the river where the impact of construction disturbance is relatively small, at least two pairs of core cross-river static observation points are symmetrically arranged along the cross-river direction. Several pairs of non-cross-river auxiliary points are then arranged outward along each survey line to form two independent survey lines with an angle of less than 3° between their extension directions, thus forming a two-way closed verification network. The location of the non-cross-river auxiliary points must meet the following requirement: their vertical distance d from the direction of their survey line is not greater than 1 / 50 of the total cross-river distance D of the survey line, i.e., d / D≤1 / 50. Step S2: Conduct multi-time-segment long-distance static GNSS observations simultaneously with multiple receivers, and simultaneously perform leveling measurements on the land section across both banks of the river; Step S3: A two-step solution is used to calculate the normal elevation difference across the river based on a linear extrapolation model. Accuracy is verified by using the elevation closure loop of independent results from the two survey lines and the threshold difference between the elevation anomaly change rates on the same bank and the opposite bank. Specifically, the maximum difference in the elevation anomaly change rate α between each survey section on the same bank must be less than 13 mm / km, and the average elevation anomaly change rate α calibrated on the opposite bank must be... The maximum mutual difference is less than 18 mm / km; if the mutual difference on the same bank or on opposite banks exceeds the limit, the measurement period is increased, the measurement points are optimized, or gross errors are eliminated and the measurement is recalibrated until the limit requirement is met. Step S4: Perform multiple remeasurements within a predetermined period, with an interval of 4 to 6 months between each remeasurement. When the cumulative differential settlement Δδ between the core control points on both sides of the river exceeds a preset threshold, perform a dynamic update of the benchmark. The preset threshold is 3mm + 1mm / km × D, where D is the distance across the river in km. Based on this updated elevation value, recalibrate the new elevation anomaly rate α on both sides of the river according to the method in Step S3. ’ And recalculate the normal elevation difference across the river.

2. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, In step S1, all points are constructed as forced centrifugal observation piers that penetrate deep into the stable bearing layer.

3. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, In step S1, the entire network forms at least two independent elevation closed loops.

4. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, In step S2, the number of receivers for synchronous observation shall not be less than 12; the requirements for geodetic control network observation include: a continuous observation duration of not less than 23 hours in a single time period, a number of observation time periods of not less than 3, a sampling interval of 15 seconds, a satellite cutoff elevation angle of 15°, and baseline calculation and network adjustment using IGS precise ephemeris.

5. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, In step S2, forward and backward measurements are performed in a symmetrical observation sequence of "back-forward-forward-back"; the line-of-sight length is controlled to be ≤30m, the difference between foresight and backsight distances is ≤0.5m, the cumulative difference between foresight and backsight distances is ≤1.5m, and the minimum height of the line of sight above the ground is ≥0.5m; the difference in elevation between forward and backward measurements of the measurement segment meets the tolerance requirement of ±1.8√K mm, where K is the length of the measurement segment in km; the loop closure error meets the tolerance requirement of ±2√F mm, where F is the length of the loop in km.

6. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, The two-step solution includes: S3.1 Ground Calibration: The geodetic height of each point is calculated from GNSS observation data. Combined with the normal height measured by first-order leveling, the elevation anomaly rate α of each land section across the river is calculated using the formula α=(ΔH-Δh) / S, where ΔH is the difference in geodetic height between the two points, Δh is the difference in the normal height measured by leveling, and S is the horizontal distance between the two points. The average value of α is obtained by taking the average value of multiple sections and multiple time periods on the same bank. ; S3.2 Cross-river application: This involves marking the two banks of the river. Extrapolating the value, according to the formula Δh_crossing_the_river = ΔH_crossing_the_river ×S crosses the river to calculate the normal elevation difference of the cross-river section, where ΔH crosses the river is the elevation difference between the two points across the river, and S crosses the river is the distance across the river.

7. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, In step S4, the benchmark dynamic update includes: using the relative incremental method, updating the elevation results of each control point to: H new(Point) =H init(Point) +Δh acc(Point) H init(Point) The initial elevation value Δh is determined when the network is constructed at this point. acc(Point) This represents the cumulative settlement of the measured normal elevation at this point relative to the initial normal elevation at the beginning of the network construction. Subsidence is negative, and rise is positive.

8. The method for constructing a cross-river elevation control network with dynamic maintenance capability as described in claim 1, characterized in that, In step S4, after performing the benchmark dynamic update, the closure error of the cross-river closed loop is recalculated to verify that the updated system error has been eliminated.