A photovoltaic inverter field efficiency analyzer and analysis method

By using wire-type current sensors and a unified time reference to align data on the DC harness of photovoltaic inverters and eliminating non-steady-state samples, the accuracy problem of on-site conversion efficiency measurement of photovoltaic inverters is solved, and efficient measurement without power interruption is achieved.

CN123112554APending Publication Date: 2026-11-17QUANTITATIVE ENERGY (NANJING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611584667.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies make it difficult to accurately measure conversion efficiency on-site at photovoltaic inverters, resulting in measurement results that fail to reflect actual operating performance, especially when DC input power is unstable.

Method used

A wire-type current sensor is used to measure the DC harness of the photovoltaic inverter. Combined with a DC power acquisition unit and an AC parameter measurement module, the data is aligned using a unified time reference, and samples of non-steady-state or unreliable operating conditions are eliminated to calculate the conversion efficiency.

Benefits of technology

This technology enables the measurement of conversion efficiency without power interruption during normal operation of the photovoltaic inverter, improving the accuracy and efficiency of the measurement and avoiding power generation losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123112554A_ABST
    Figure CN123112554A_ABST
Patent Text Reader

Abstract

The application relates to the technical field of inverter efficiency analysis, and provides a photovoltaic inverter field efficiency analyzer and an analysis method.The analyzer comprises the following: a DC wire harness on the input side of each maximum power point tracking, which penetrates through a corresponding penetrating current sensor; a DC power acquisition unit connected with the penetrating current sensor, which is used for acquiring DC voltage and DC current on the input side of the maximum power point tracking to obtain DC power; an alternating-current parameter measurement module, which is used for acquiring alternating-current power on the output side of the alternating current; a processing unit, which is used for aligning the acquired DC power and alternating-current power to corresponding time intervals with a unified time reference; for each time interval sample, when the sample indicates a target working condition, the sample is marked as an invalid sample for elimination, and conversion efficiency is calculated based on the DC power and the alternating-current power in the valid sample.The conversion efficiency of the photovoltaic inverter under the field working condition can be accurately and truly reflected, so that the operation performance can be accurately reflected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of inverter efficiency analysis technology, and in particular to a photovoltaic inverter field efficiency analyzer and analysis method. Background Technology

[0002] Photovoltaic inverters convert the direct current (DC) output from photovoltaic (PV) modules into alternating current (AC) that meets grid connection requirements. Their conversion efficiency directly impacts the power generation and operating revenue of the PV power generation system. As the number of maximum power point tracking (MPPT) inputs configured in string PV inverters continues to increase, and as the conversion efficiency of PV inverters gradually improves, deviations introduced by sampling errors, time asynchrony, and fluctuations in operating conditions during on-site efficiency measurements may approach or exceed the difference in the measured efficiency itself. Therefore, it is necessary to ensure that the DC input power and AC output power are compared at the same physical moment or within the same time interval.

[0003] In related technologies, a photovoltaic array simulator can be used in a laboratory or production line to provide a DC input with a known set power to the photovoltaic inverter under test, and the conversion efficiency of the photovoltaic inverter can be analyzed based on the set power and AC output power.

[0004] However, the DC input power at a photovoltaic power plant site is determined by real-time irradiance, module temperature, string status, and maximum power point tracking status; there is no stable and known DC setpoint power. If the photovoltaic inverter is taken out of actual operation for the purpose of measuring efficiency, the measurement results will be difficult to accurately reflect the operating performance of the photovoltaic inverter under actual field conditions. Summary of the Invention

[0005] Therefore, it is necessary to provide a photovoltaic inverter field efficiency analyzer and analysis method to address the above-mentioned technical problems, which can accurately reflect the conversion efficiency of photovoltaic inverters under field operating conditions, thereby accurately reflecting their operating performance.

[0006] In a first aspect, this application provides a photovoltaic inverter field efficiency analyzer, which is used for analyzing the conversion efficiency of a photovoltaic inverter. The photovoltaic inverter includes multiple maximum power point tracking inputs and one AC output. The photovoltaic inverter field efficiency analyzer includes: A wire-type current sensor, wherein the DC harness on the maximum power point tracking input side of each channel passes through the corresponding wire-type current sensor; A DC power acquisition unit is connected to the output terminal of the wire-type current sensor and is used to acquire the DC voltage and DC current on the maximum power point tracking input side to obtain the DC power on the maximum power point tracking input side. An AC power parameter measurement module is used to collect the AC power on the AC output side; The processing unit is used to align the collected DC power and AC power to the corresponding time intervals with a unified time reference; for each time interval, when the sample indicates the target operating condition, the sample is marked as an invalid sample and discarded; and the conversion efficiency is calculated based on the DC power and AC power in the valid samples; the target operating condition is a set non-steady-state or unreliable operating condition.

[0007] In one embodiment, the set unsteady or unreliable operating conditions include at least one of the following: irradiance is below a first threshold, irradiance fluctuation rate within a set sliding time window is above a second threshold, the inverter is in a start-up, shutdown, or power-limiting condition, or instantaneous efficiency exceeds a preset reasonable range; wherein, the irradiance fluctuation rate is the ratio of the range to the mean of irradiance within the set sliding time window, or the ratio of the standard deviation to the mean; the start-up or shutdown condition is determined based on the AC power gradient of adjacent time intervals exceeding a set threshold; the power-limiting condition is determined based on AC power being clamped, and the difference between the DC available power calculated from irradiance and the measured AC power exceeding a set proportion of the measured AC power, and continuously exceeding a set number of time intervals.

[0008] In one embodiment, the wire-type current sensor includes a first wire-type current sensor and a second wire-type current sensor; the DC power acquisition unit includes a first DC power acquisition unit and a second DC power acquisition unit; and the processing unit includes a first acquisition gateway and a second acquisition gateway. The photovoltaic inverter field efficiency analyzer includes a main unit and an expansion unit, which are connected by a communication link. The first wire-type current sensor, the first DC power acquisition unit, and the first acquisition gateway are located inside the main unit. The second wire-type current sensor, the second DC power acquisition unit, and the second acquisition gateway are located inside the expansion unit. The first acquisition gateway and the second acquisition gateway respectively align the DC power acquired by the first DC power acquisition unit and the second DC power acquisition unit to the corresponding time interval locally for the first time with a unified time reference, and then upload them. After uploading, they are aligned a second time with the unified time reference.

[0009] In one embodiment, the wire-type current sensor is any one of an open-type Hall current sensor, a shunt, a Rogowski coil, and a fluxgate current sensor.

[0010] In one embodiment, the DC power acquisition unit is a dual-channel DC energy meter, and each dual-channel DC energy meter acquires the DC voltage and DC current of the two maximum power point tracking input sides.

[0011] In one embodiment, the photovoltaic inverter field efficiency analyzer further includes: Irradiance acquisition interface, used to acquire the planar irradiance of photovoltaic modules.

[0012] In one embodiment, the photovoltaic inverter field efficiency analyzer further includes: Temperature acquisition interface, used to acquire the temperature of the photovoltaic inverter field efficiency analyzer components; The processing unit calculates the available DC power based on the irradiance according to the temperature, and / or performs temperature-based conversion on the conversion efficiency.

[0013] Secondly, this application also provides a method for analyzing the field efficiency of a photovoltaic inverter, applied to the photovoltaic inverter field efficiency analyzer as described in the first aspect, comprising: After the DC harness on the maximum power point tracking input side of each channel passes through the corresponding wire-type current sensor, the DC voltage and DC current on the maximum power point tracking input side of each channel are measured using the wire-type current sensor. The DC power of the maximum power point tracking input side is obtained based on the DC voltage and DC current of the maximum power point tracking input side; Collect the AC power on the AC output side; The collected DC power and AC power are aligned to the corresponding time intervals using a unified time reference; for each time interval, samples are marked as invalid samples and discarded when the samples indicate the target operating condition; the conversion efficiency is calculated based on the DC power and AC power in the valid samples; the target operating condition is a set non-steady-state or unreliable operating condition.

[0014] In one embodiment, the photovoltaic inverter field efficiency analyzer includes a main unit and an expansion unit, which are connected via a communication link; aligning the collected DC power and AC power to the corresponding time intervals using a unified time base includes: The DC power collected by the first DC power acquisition unit in the main unit and the second DC power acquisition unit in the expansion box is first aligned to the corresponding time interval locally using a unified time reference, and then uploaded. After uploading, it is aligned a second time using the unified time reference.

[0015] Thirdly, this application also provides a computer-readable storage medium. The computer-readable storage medium stores a computer program thereon, which, when executed by a processor, performs the following steps: After the DC harness on the maximum power point tracking input side of each channel passes through the corresponding wire-type current sensor, the DC voltage and DC current on the maximum power point tracking input side of each channel are measured using the wire-type current sensor. The DC power of the maximum power point tracking input side is obtained based on the DC voltage and DC current of the maximum power point tracking input side; Collect the AC power on the AC output side; The collected DC power and AC power are aligned to the corresponding time intervals using a unified time reference; for each time interval, samples are marked as invalid samples and discarded when the samples indicate the target operating condition; the conversion efficiency is calculated based on the DC power and AC power in the valid samples; the target operating condition is a set non-steady-state or unreliable operating condition.

[0016] This application employs the aforementioned photovoltaic inverter field efficiency analyzer and analysis method, which has the following beneficial effects: 1. The DC harnesses on the input side of each Maximum Power Point Tracking (MPPT) circuit pass through wire-type current sensors. The output of these sensors is connected to the current input terminal of the corresponding DC power acquisition unit. Simultaneously, the voltage input terminal of the DC power acquisition unit is connected across the positive and negative DC terminals of that MPPT circuit, thereby acquiring the DC voltage and current of that MPPT circuit. In this application, the DC power of each circuit is obtained from the actual operating MPPT input power measured by the wire-type current sensors. This eliminates the need to provide the inverter with a DC analog source with a known set power Pset, accurately reflecting the conversion efficiency of the photovoltaic inverter under field operating conditions and thus accurately reflecting its operational performance.

[0017] 2. Because it adopts a wire-type current sensor, it can be clamped onto the DC harness of the inverter in operation without disconnecting the DC harness. During on-site measurement, the installation can be completed without disconnecting the inverter DC harness, thus enabling on-site measurement to be completed under normal inverter operation, improving on-site testing efficiency, and avoiding power generation loss caused by power outages or shutdowns.

[0018] 3. Through the above-mentioned local stamping-upload-secondary alignment-excess tolerance removal link, the data of the acquisition unit accessed through the communication link and the data on the host chassis side correspond to the same physical moment in the same time interval, and the alignment tolerance does not exceed 200ms, thereby ensuring that the aforementioned tolerance of no more than 200ms has feasible technical support. Attached Figure Description

[0019] Figure 1 This is a system structure diagram of a photovoltaic inverter field efficiency analyzer in one embodiment; Figure 2 This is a schematic diagram illustrating the practical application of a photovoltaic inverter field efficiency analyzer in one embodiment. Figure 3 This is a flowchart of time alignment in one embodiment; Figure 4 This is a schematic diagram illustrating the communication topology and number of acquisition channels in one embodiment.

[0020] Reference numerals: 100, Main unit; 110, Main control unit; 120, Touch display unit; 130, Processing unit; 131, First acquisition gateway; 132, Second acquisition gateway; 140, DC power acquisition unit; 141, First DC power acquisition unit; 142, Second DC power acquisition unit; 150, AC parameter measurement module; 160, Irradiance acquisition interface; 170, Temperature acquisition interface; 180, Portable self-powered unit; 200, Expansion box; 300, Wire-type current sensor; 310, First wire-type current sensor; 320, Second wire-type current sensor. Detailed Implementation

[0021] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0022] In this embodiment, the photovoltaic inverter can be a string photovoltaic inverter or other types of inverters with multiple independent DC input channels. The maximum power point tracking input side can be simply referred to as the MPPT input side, and each MPPT input side can be connected to one or more photovoltaic strings. One AC output side can be a three-phase AC output side or a single-phase AC output side. Unless otherwise stated, the DC power mentioned below refers to the input power of the corresponding MPPT input side under actual operating conditions, and the AC power refers to the active power of the photovoltaic inverter's AC output side.

[0023] It should be noted that the planar irradiance of the photovoltaic inverter field efficiency analyzer module refers to the irradiance on the plane where the photovoltaic module connected to the photovoltaic inverter under test is located; the temperature of the photovoltaic inverter field efficiency analyzer module refers to the temperature of the photovoltaic module connected to the photovoltaic inverter under test. The irradiance acquisition interface 160 and the temperature acquisition interface 170 can be connected to the irradiance sensor and temperature sensor respectively located near the photovoltaic module.

[0024] It should also be noted that the processing unit 130 can be a centralized processing unit 130 or a distributed processing unit 130 composed of multiple processing nodes with data acquisition, time stamping, data alignment, and efficiency calculation functions. When the processing unit 130 includes a first acquisition gateway 131 and a second acquisition gateway 132, the processing unit 130 may also include a main control unit 110; the first acquisition gateway 131 and the second acquisition gateway 132 are used for local acquisition control, timestamp calibration, and initial alignment, while the main control unit 110 is used for secondary alignment, validity determination, and conversion efficiency calculation after data aggregation. Therefore, the processing unit 130 is not limited to a single physical processor.

[0025] Firstly, referring to Figure 1 This application provides a photovoltaic inverter field efficiency analyzer, which is used for analyzing the conversion efficiency of a photovoltaic inverter, which includes multiple maximum power point tracking (MPPT) inputs and one AC output. The photovoltaic inverter field efficiency analyzer is used to analyze the conversion efficiency of a photovoltaic inverter with multiple MPPT inputs and one AC output. The photovoltaic inverter field efficiency analyzer includes: a wire-type current sensor 300, a DC power acquisition unit 140, an AC parameter measurement module 150, and a processing unit 130. Wherein: The DC harness of each maximum power point tracking (MPPT) input side passes through the corresponding wire-type current sensor 300. A DC power acquisition unit 140 is connected to the output of the wire-type current sensor 300 and is used to acquire the DC voltage and DC current of the MPPT input side to obtain the DC power of the MPPT input side. An AC parameter measurement module 150 is used to acquire the AC power of the AC output side. A processing unit 130 is used to align the acquired DC power and AC power to the corresponding time intervals using a unified time reference; for samples in each time interval, samples indicating a target operating condition are marked as invalid and discarded; the conversion efficiency is calculated based on the DC power and AC power in the valid samples; the target operating condition is a set non-steady-state or unreliable operating condition.

[0026] The DC harnesses on the input side of each maximum power point tracking (MPPT) circuit pass through a wire-type current sensor 300. The output of the wire-type current sensor 300 is connected to the current input terminal of the corresponding DC power acquisition unit 140. Simultaneously, the voltage input terminal of the DC power acquisition unit 140 is connected across the positive and negative DC terminals of that MPPT circuit, thereby acquiring the DC voltage and DC current of that MPPT circuit. In this application, the DC power of each circuit is obtained from the actual operating MPPT input power measured by the wire-type current sensor 300, eliminating the need to provide the inverter with a known set power P. set DC analog source.

[0027] Because it uses a wire-type current sensor 300, it can be clamped onto the DC harness of the inverter in operation without disconnecting the DC harness. Installation can be completed without disconnecting the inverter DC harness during on-site measurement, thus enabling on-site measurement to be completed under normal inverter operation, improving on-site testing efficiency, and avoiding power generation loss caused by power outages or shutdowns.

[0028] The DC power acquisition unit 140 is connected to the wire-type current sensor 300 and is used to calculate the DC power of the corresponding branch based on the DC voltage and DC current at the input side of each maximum power point tracking circuit. The DC power at the input side of the i-th maximum power point tracking circuit can be expressed as: P dc,i = U dc,i × I dc,i Among them, P dc,i U represents the DC power on the input side of the i-th MPPT. dc,i I represents the DC voltage on the input side of the i-th MPPT. dc,i This represents the DC current on the input side of the i-th MPPT.

[0029] For a photovoltaic inverter with n MPPT inputs, the total DC power can be expressed as:

[0030] Among them, P dc,total This represents the total DC power within the same time interval, and n represents the number of MPPT input sides participating in the conversion efficiency analysis. Since the DC power of each path is obtained based on the DC voltage and DC current of the photovoltaic inverter during actual operation in the field, it is not necessary to supply power to the photovoltaic inverter from a DC analog source with a known set power.

[0031] The AC parameter measurement module 150 can be directly connected to the AC output side, or it can be connected to the AC output side through a voltage transformer and a current transformer. The AC parameter measurement module 150 can also collect at least one parameter selected from AC voltage, AC current, power factor, frequency, and AC power. For the three-phase AC output side, the AC power can be the sum of the three-phase active power.

[0032] The processing unit 130 is used to align the collected DC power and AC power to the corresponding time intervals using a unified time reference, and to determine the validity of samples in each time interval. The unified time reference can be established by the real-time clock of the main control unit 110, or by a satellite time synchronization module, a network time server, or other clock sources. The time intervals can be continuous and equal-length time buckets, for example, the length of each time bucket can be 0.5 seconds, 1 second, 2 seconds, or other durations.

[0033] In one implementation mode, each DC power acquisition unit 140 and AC parameter measurement module 150 synchronously samples according to the same hardware trigger signal, and the processing unit 130 groups the DC power and AC power within the same trigger cycle into the same time interval. In another implementation mode, each acquisition channel outputs timestamped data according to its own sampling period, and the processing unit 130 groups the data into the nearest fixed time bucket according to the timestamp. In yet another implementation mode, the processing unit 130 interpolates based on adjacent sampling points to obtain the DC power and AC power at the center of the time interval. The above-mentioned hardware synchronous acquisition, fixed time bucket alignment, and interpolation alignment can be used individually or in combination.

[0034] In one embodiment, the set unsteady or unreliable operating conditions include at least one of the following: irradiance is below a first threshold, irradiance fluctuation rate within a set sliding time window is above a second threshold, the inverter is in a start-up, shutdown, or power-limiting condition, or instantaneous efficiency exceeds a preset reasonable range; wherein, the irradiance fluctuation rate is the ratio of the range to the mean of irradiance within the set sliding time window, or the ratio of the standard deviation to the mean; the start-up or shutdown condition is determined based on the AC power gradient of adjacent time intervals exceeding a set threshold; the power-limiting condition is determined based on AC power being clamped, and the difference between the DC available power calculated from irradiance and the measured AC power exceeding a set proportion of the measured AC power, and continuously exceeding a set number of time intervals.

[0035] For operating conditions where the irradiance is below a first threshold, the processing unit 130 can compare the component planar irradiance G with the first threshold G. min Compare. When G < G min At this time, it is assumed that the DC input power is low, the power measurement error is amplified in the efficiency ratio, or the photovoltaic inverter may be in a standby or start-up boundary state, thus marking the corresponding sample as invalid. The first threshold can be determined based on the rated power, minimum grid-connected power, and measurement accuracy of the photovoltaic inverter under test.

[0036] For situations where the irradiance fluctuation rate within a set time window exceeds a second threshold, the processing unit can calculate the irradiance fluctuation rate within a sliding time window that includes the current time interval. The irradiance fluctuation rate can be expressed as the ratio R of the range to the mean. G,range express: R G,range =(G max G min ) / G mean Alternatively, the irradiance volatility can be expressed as the ratio R of the standard deviation to the mean. G,std express: R G,std =σ G / G mean Among them, G max G min G mean and σ G These represent the maximum, minimum, mean, and standard deviation of the planar irradiance of the photovoltaic module within the sliding time window. When the irradiance fluctuation rate exceeds the second threshold, it indicates that the photovoltaic module may be rapidly shaded by cloud shadows, causing the DC input power to change rapidly within the time interval. Even after time alignment, the dynamic response and maximum power point tracking process of the photovoltaic inverter itself may cause transient differences between the DC input and AC output, thus marking the corresponding sample as invalid. For example, the sliding time window can be 10 seconds, and the second threshold can be 5%.

[0037] For startup or shutdown conditions, the processing unit can calculate the AC power gradient K between adjacent time intervals. P,k Specifically, it can be expressed as: K P,k =|P ac,k P ac,k 1| / Δt Among them, P ac,k P represents the AC power in the k-th time interval. ac,k 1 represents the AC power in the (k-1)th time interval, and Δt represents the time difference between the centers of adjacent time intervals. When the AC power gradient exceeds a set threshold, the photovoltaic inverter can be considered to be in a startup, shutdown, or rapid power switching process. Optionally, the startup and shutdown conditions can be distinguished by combining information on the direction of AC power continuously rising from zero or low values ​​to normal values, or continuously decreasing from normal values ​​to zero values.

[0038] For power-limited operating conditions, the processing unit can calculate the available DC power based on the module's planar irradiance and module temperature. For example, the available DC power can be expressed as: P dc,avail =(G / G ref )×P dc,rated ×[1+γ×(T mod T ref )]×η sys Among them, P dc,avail G represents the available DC power, and G represents the planar irradiance of the module. ref P represents the reference irradiance. dc,rated The DC capacity of the photovoltaic module connected to the photovoltaic inverter under test is represented by γ, and the power temperature coefficient of the module is represented by T. mod Indicates component temperature, T ref Indicates the reference temperature, ηsys This represents the system efficiency coefficient used to reflect DC line loss and string mismatch.

[0039] The processing unit 130 can obtain the theoretical available AC power under the current irradiance and temperature conditions based on the available DC power and the reference conversion efficiency, and calculate the percentage difference between the theoretical available AC power and the measured AC power. When the measured AC power remains at an approximately constant clamping value for multiple consecutive time intervals, and the difference between the theoretical available AC power and the measured AC power exceeds a set percentage of the measured AC power, and continues to exceed the set number of time intervals, the photovoltaic inverter is determined to be in a power-limiting condition. By simultaneously setting the power clamping characteristics, the percentage difference, and the duration conditions, the probability of short-term irradiance prediction errors being misjudged as power-limiting conditions can be reduced.

[0040] For abnormal instantaneous efficiency conditions, the processing unit 130 can adjust the instantaneous efficiency η k The sample is compared with a preset reasonable range. The lower limit of the preset reasonable range can be used to exclude samples that are started / stopped, faulty, severely limited, or have abnormal collection characteristics. The upper limit of the preset reasonable range can be set to 100% or slightly higher than 100% based on the measurement error. For example, the preset reasonable range can be 80% to 100.5%. When the instantaneous efficiency exceeds the preset reasonable range, it indicates that the corresponding sample may have timing misalignment, communication abnormality, wiring error, or measurement abnormality, and thus the corresponding sample is marked as invalid.

[0041] Furthermore, the processing unit 130 can also classify situations such as missing acquisition channels, failed data frame verification, timestamp jumps, communication delays exceeding a set threshold, and DC voltage or DC current exceeding the measurement range as other unreliable operating conditions. Samples marked as invalid may not participate in the conversion efficiency calculation, but can still be stored along with the invalidity reason category for subsequent differentiation of cloud shadow occlusion, limited transmission, start / stop, time alignment anomalies, and communication anomalies.

[0042] In one embodiment, refer to Figure 2The wire-type current sensor 300 includes a first wire-type current sensor 310 and a second wire-type current sensor 320; the DC power acquisition unit 140 includes a first DC power acquisition unit 141 and a second DC power acquisition unit 142; the processing unit 130 includes a first acquisition gateway 131 and a second acquisition gateway 132; the photovoltaic inverter field efficiency analyzer includes a main unit 100 and an expansion unit 200, which are connected by a communication link; the first wire-type current sensor 310, the first DC power acquisition unit 141, and the first acquisition gateway 131 are disposed inside the main unit 100; the second wire-type current sensor 320, the second DC power acquisition unit 142, and the second acquisition gateway 132 are disposed inside the expansion unit 200; the first acquisition gateway 131 and the second acquisition gateway 132 respectively align the DC power acquired by the first DC power acquisition unit 141 and the second DC power acquisition unit 142 to the corresponding time interval locally for the first time, and then upload them, and perform a second alignment by the unified time reference after uploading.

[0043] In one embodiment, the wire-type current sensor 300 is any one of an open-type Hall current sensor, a shunt, a Rogowski coil, and a fluxgate current sensor.

[0044] In one embodiment, the DC power acquisition unit 140 is a dual-channel DC energy meter, and each dual-channel DC energy meter acquires the DC voltage and DC current of two maximum power point tracking input sides.

[0045] The dual-channel DC energy meter can directly calculate the DC power of the two channels internally, or it can upload the DC voltage and DC current to the processing unit 130, which will then calculate the corresponding DC power. Optionally, the dual-channel DC energy meter can have different slave addresses so that multiple dual-channel DC energy meters can be connected to the same communication bus.

[0046] In one embodiment, the photovoltaic inverter field efficiency analyzer further includes: an irradiance acquisition interface 160 for acquiring the planar irradiance of the photovoltaic module.

[0047] Specifically, the irradiance sensor can have the same or similar tilt angle and azimuth angle as the photovoltaic module. The irradiance acquisition interface 160 receives the analog or digital signal output by the irradiance sensor and uploads the planar irradiance of the module to the processing unit 130.

[0048] In one embodiment, the photovoltaic inverter field efficiency analyzer further includes: a temperature acquisition interface 170 for acquiring the temperature of the photovoltaic inverter field efficiency analyzer components; the processing unit 130 calculates the DC available power based on the irradiance according to the temperature, and / or performs temperature-based conversion on the conversion efficiency.

[0049] Specifically, after the temperature acquisition interface 170 acquires the module temperature, the processing unit 130 corrects the theoretical module output power corresponding to the irradiance based on the module temperature, thereby obtaining the DC usable power. Since the output power of photovoltaic modules usually decreases as the module temperature increases, incorporating the module temperature into the DC usable power calculation can reduce the deviation caused by calculation based solely on irradiance and improve the accuracy of determining the power curtailment condition.

[0050] Furthermore, the processing unit 130 can also perform temperature-based conversion of the conversion efficiency. For example, it can convert the on-site measured conversion efficiency to the reference temperature based on the difference between the component temperature or the inverter's internal temperature and a reference temperature, as well as a pre-calibrated efficiency temperature coefficient. The temperature conversion can be expressed as: η ref =η meas / [1+k η ×(T T ref )] Where, η ref η represents the conversion efficiency after conversion to a reference temperature. meas k represents the conversion efficiency measured on-site. η This represents the pre-calibrated efficiency temperature coefficient, where T represents the temperature used for calculation. ref The reference temperature is indicated. The above formula is only one possible conversion method; conversion can also be performed based on a pre-established correction curve between temperature and efficiency.

[0051] The temperature acquisition interface 170 can be connected to a temperature sensor installed on the backsheet of the photovoltaic module to acquire the module temperature. The module planar irradiance and module temperature can be stored together with the DC power and AC power within the corresponding time interval.

[0052] In a complete embodiment, the photovoltaic inverter field efficiency analyzer may include a main unit 100 and an expansion unit 200 connected to the main unit 100 via a communication link. The main unit 100 may house a main control unit 110, a touch display unit 120, a first data acquisition gateway 131, at least one DC power acquisition unit 140, an AC parameter measurement module 150, an irradiance acquisition interface 160, a temperature acquisition interface 170, and a portable self-powered unit 180. The expansion unit 200 may house a second data acquisition gateway 132 and at least one DC power acquisition unit 140.

[0053] When the main unit 100 and the expansion unit 200 are connected via a communication link, the first acquisition gateway 131 and the second acquisition gateway 132 can each perform the first alignment locally. Specifically, each acquisition gateway uses a unified time base or a local clock with an established deviation relationship to the unified time base to classify the data obtained by each locally connected DC power acquisition unit 140 within the same sampling period into the corresponding local time interval, and generates a timestamp or time bucket number for each local time interval. Each acquisition gateway can package and upload the gateway identifier, channel identifier, timestamp, time bucket number, DC voltage, DC current, DC power, and data quality flag.

[0054] After data upload, the main control unit 110 performs secondary alignment based on a unified time reference. The main control unit 110 first converts the local timestamp to a timestamp under the unified time reference based on the clock deviation of each acquisition gateway, and then groups the data uploaded by the first acquisition gateway 131 and the second acquisition gateway 132 into the same time interval based on the unified timestamp. For samples whose deviation between the timestamp and the center of the time interval is less than or equal to the preset alignment tolerance, a nearest-neighbor binning method can be used; for continuous variables with sampling points before and after the center of the time interval, linear interpolation or other interpolation methods can be used to obtain the value at the center of the time interval.

[0055] Specifically, after receiving the timestamped data packet transmitted via the communication link, the main control unit 110 merges it into the corresponding time interval according to a unified time reference, and processes it according to one of the following rules: (1) Nearest bucket: The sample timestamp is assigned to the nearest time interval (time bucket) it falls into, with the time bucket as the alignment unit; (2) Interpolation to the center of the interval: For physical quantities that change continuously with time (in this embodiment, DC voltage, DC current and the DC power obtained from them, as well as AC active power, etc.), the values ​​are interpolated to the corresponding time at the center of the time interval using linear interpolation with two adjacent sampling points as nodes; for slow variables such as irradiance, zero-order hold (taking the most recent valid sampling value) can also be used. The interpolation type and applicable physical quantity are selected by the main control unit 110 according to the change characteristics of the quantity. In this embodiment, linear interpolation is used for DC voltage, DC current and AC power, and zero-order hold is used for irradiance.

[0056] The processing rules for samples with excessive tolerance are as follows: When the difference between a sample timestamp and the center of the time interval to which it belongs exceeds the preset alignment tolerance (200ms in this embodiment), the sample will not participate in the efficiency calculation of the interval. That is, the sample will be set as invalid and removed, or delayed and merged into the adjacent interval to which its timestamp actually belongs.

[0057] Through the aforementioned link of local stamping—uploading—secondary alignment—excess tolerance removal, the data from the acquisition unit accessed via the communication link and the data from the host chassis 100 correspond to the same physical moment within the same time interval, and the alignment tolerance does not exceed 200ms, thereby ensuring that the aforementioned tolerance of no more than 200ms has feasible technical support.

[0058] For example, interpolation to the center of the interval specifically means: the center of the time interval is t. c , in t c The two adjacent sampling points before and after are respectively (t) a ,x a ) and (t b ,x b If the interpolation result at the center of the time interval is: x(t c )=x a +(x b x a )×(t c t a ) / (t b t a ) Where x represents a physical quantity that changes continuously with time (in this embodiment, this includes DC voltage, DC current, and the DC power derived from them, as well as AC active power, etc.). For parameters that change relatively slowly, such as irradiance and component temperature, linear interpolation or the most recent value can be used. If the deviation between the sample timestamp and the center of the time interval exceeds the preset alignment tolerance, the sample can be marked as time-aligned invalid and will not participate in the conversion efficiency calculation of the corresponding time interval. The preset alignment tolerance can be set according to the sampling period and communication conditions, for example, it can be set to 200 milliseconds, but this embodiment does not limit it.

[0059] The local clocks of the first acquisition gateway 131 and the second acquisition gateway 132 can be synchronized with a unified time reference through network time protocol, precision time protocol, or periodic master-slave time synchronization. In the absence of independent time synchronization capability, the main control unit 110 can also record the request sending time and response receiving time, and estimate the one-way communication delay based on the round-trip time, thereby correcting the timestamp uploaded by the acquisition gateways. In other words, the first alignment is used to reduce the time difference between acquisition channels within the same enclosure, and the second alignment is used to eliminate time deviations between different enclosures, different acquisition gateways, and communication links.

[0060] For each time interval, the processing unit can calculate the instantaneous efficiency within that time interval, which can be specifically expressed as: η k =Pac,k / P dc,total,k Where, η k P represents the instantaneous efficiency corresponding to the k-th time interval. ac,k P represents the AC power corresponding to the k-th time interval. dc,total,k This represents the total DC power corresponding to the k-th time interval. The processing unit 130 does not directly use all instantaneous efficiencies for the final conversion efficiency calculation; instead, it first determines whether the sample in the corresponding time interval indicates the target operating condition. The target operating condition is a set non-steady-state or unreliable operating condition; if a sample indicates the target operating condition, the sample is marked as invalid and discarded.

[0061] Regarding the establishment of a unified time base and the calibration of timestamps for each acquisition unit, this embodiment refers to... Figure 3 A unified time reference is established and maintained by the main control unit 110, which uses its real-time clock as the global reference. For the acquisition units in the main chassis 100 that are directly collected by the first acquisition gateway 131, the deviation between their sampling time and the main control clock is negligible, and they are directly assigned to the corresponding time interval based on the packet reception time. For the acquisition units on the expansion box 200 side connected via a communication link (such as Ethernet), the second acquisition gateway 132 timestamps each frame of sampled data locally. Specifically, the sampling timestamp can be obtained in any of the following ways: (a) the local real-time clock (RTC) of the second acquisition gateway 132 stamps the data at the moment a sampling is completed; (b) the second acquisition gateway 132 synchronizes with the unified time reference of the main control unit 110 via network time synchronization (such as NTP / SNTP or PTP) and then stamps the data using the local synchronized clock; (c) the main control unit 110 initiates a request-response cycle, records the request sending time t1 and the response receiving time t2, estimates the one-way communication delay with half of the round-trip delay, and then uses the packet reception time to deduce the sampling time. The second acquisition gateway 132 packages the timestamped sampled data and uploads it via the communication link. The communication delay is defined as the difference between the sampling timestamps of each slave station and a unified time base, which allows for the quantification and monitoring of the communication delay of each acquisition unit.

[0062] Refer to 2 and Figure 4 , Figure 4 The communication topology and acquisition channel expansion method involved in the embodiments of this application are shown. Figure 4 (The DC power meters are referred to as DC meters for short). For example, three dual-channel DC power meters can be installed in the main unit 100, collecting MPPT1 to MPPT6 respectively; four dual-channel DC power meters can be installed in the expansion box 200, collecting MPPT7 to MPPT14 respectively. Thus, the main unit 100 and the expansion box 200 together form a DC power acquisition structure with fourteen MPPT input sides.

[0063] Each dual-channel DC energy meter can have a different slave address and is connected to the corresponding acquisition gateway via an RS485 bus. The first acquisition gateway 131 and the second acquisition gateway 132 read the DC voltage and DC current corresponding to each slave address according to a preset polling cycle, and set a timestamp for the reading results locally. The second acquisition gateway 132 can communicate with the main control unit 110 via Ethernet, and the first acquisition gateway 131 can communicate with the main control unit 110 via internal Ethernet, serial bus, or board-level communication interface. The communication link is not limited to Ethernet; it can also include an RS485 bus, CAN bus, or wireless communication link.

[0064] When adapting to sixteen MPPT input channels is required, a multiplexed dual-channel DC energy meter with another slave address can be added to the same RS485 bus of the second acquisition gateway 132 to acquire MPPT15 and MPPT16. The main control unit 110 can load the mapping relationship between slave addresses and channels according to the MPPT channel number mode selected by the user, and synchronously update the channel set participating in the DC total power calculation and validity determination. Thus, the number of acquisition channels can be expanded without increasing the physical ports of the acquisition gateway.

[0065] In one optional implementation, the main control unit 110 can store configuration files corresponding to six, twelve, fourteen, sixteen, and custom channel numbers. The configuration file includes information such as slave station address, measurement channel, measurement range, sensor ratio, associated enclosure, and whether it participates in efficiency calculations. After the wiring is completed on-site, the processing unit 130 can check whether each expected channel returns data according to the configuration file and output wiring prompts when a channel is missing or there is a mapping conflict.

[0066] The portable self-powered unit 180 may include an energy storage battery, a first DC-DC converter circuit, an intermediate bus, and a second DC-DC converter circuit. For example, the energy storage battery outputs 24V DC power; the first DC-DC converter circuit converts the 24V DC power to 12V DC power to supply power to the wire-type current sensor 300, the AC parameter measurement module 150, and the data acquisition gateway; the second DC-DC converter circuit converts the 12V DC power to 5V DC power to supply power to the main control unit 110 and the touch display unit 120. Electrical isolation can be provided between the high-voltage DC sampling terminal and the low-voltage communication terminal to improve the safety of on-site measurements.

[0067] The AC parameter measurement module 150 can use a meter with a single rated voltage input and select either a first accessory package or a second accessory package based on the voltage range of the AC output side being measured. The processing unit 130 converts the secondary side measurement value output by the meter according to the voltage transformer ratio and current transformer ratio corresponding to the selected accessory package. Optionally, it can also compare the values ​​at multiple secondary voltage points using a reference standard meter to obtain a correction coefficient or correction curve corresponding to the secondary voltage deviation, and use the correction coefficient to compensate for the AC power or power factor.

[0068] Secondly, this application also provides a method for analyzing the on-site efficiency of a photovoltaic inverter, including: After the DC harness on the maximum power point tracking input side of each channel passes through the corresponding wire-type current sensor, the DC voltage and DC current on the maximum power point tracking input side of each channel are measured using the wire-type current sensor. The DC power of the maximum power point tracking input side is obtained based on the DC voltage and DC current of the maximum power point tracking input side; Collect the AC power on the AC output side; The collected DC power and AC power are aligned to the corresponding time intervals using a unified time reference; for each time interval, samples are marked as invalid samples and discarded when the samples indicate the target operating condition; the conversion efficiency is calculated based on the DC power and AC power in the valid samples; the target operating condition is a set non-steady-state or unreliable operating condition.

[0069] In one embodiment, the photovoltaic inverter field efficiency analyzer includes a main unit 100 and an expansion unit 200, which are connected via a communication link; aligning the collected DC power and AC power to the corresponding time intervals using a unified time base includes: The DC power collected by the first DC power acquisition unit in the main unit and the second DC power acquisition unit in the expansion box is first aligned to the corresponding time interval locally using a unified time reference, and then uploaded. After uploading, it is aligned a second time using the unified time reference.

[0070] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon, which, when executed by a processor, implements the steps in the above method embodiments.

[0071] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0072] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. A photovoltaic inverter field efficiency analyzer for conversion efficiency analysis of a photovoltaic inverter comprising multiple maximum power point tracking input sides and one alternating current output side, characterized in that, The photovoltaic inverter field efficiency analyzer includes: A wire-type current sensor, wherein the DC harness on the maximum power point tracking input side of each channel passes through the corresponding wire-type current sensor; A DC power acquisition unit is connected to the output terminal of the wire-type current sensor and is used to acquire the DC voltage and DC current on the maximum power point tracking input side to obtain the DC power on the maximum power point tracking input side. An AC power parameter measurement module is used to collect the AC power on the AC output side; The processing unit is used to align the collected DC power and AC power to the corresponding time intervals with a unified time reference; for each time interval, when the sample indicates the target operating condition, the sample is marked as an invalid sample and discarded; and the conversion efficiency is calculated based on the DC power and AC power in the valid samples; the target operating condition is a set non-steady-state or unreliable operating condition.

2. The photovoltaic inverter field efficiency analyzer of claim 1, wherein, The set unsteady or unreliable operating conditions include at least one of the following: irradiance is below a first threshold, irradiance fluctuation rate within the set sliding time window is above a second threshold, the inverter is in start-up, shutdown, or power-limiting condition, or instantaneous efficiency exceeds a preset reasonable range; wherein, the irradiance fluctuation rate is the ratio of the range to the mean of irradiance within the set sliding time window, or the ratio of the standard deviation to the mean; the start-up or shutdown condition is determined by the AC power gradient of adjacent time intervals exceeding a set threshold; the power-limiting condition is determined by the AC power being clamped, and the difference between the DC available power calculated from the irradiance and the measured AC power exceeding a set proportion of the measured AC power, and continuously exceeding a set number of time intervals.

3. The photovoltaic inverter field efficiency analyzer according to claim 1, characterized in that, The wire-type current sensor includes a first wire-type current sensor and a second wire-type current sensor; the DC power acquisition unit includes a first DC power acquisition unit and a second DC power acquisition unit; the processing unit includes a first acquisition gateway and a second acquisition gateway. The photovoltaic inverter field efficiency analyzer includes a main unit and an expansion unit, which are connected by a communication link. The first wire-type current sensor, the first DC power acquisition unit, and the first acquisition gateway are located inside the main unit. The second wire-type current sensor, the second DC power acquisition unit, and the second acquisition gateway are located inside the expansion unit. The first acquisition gateway and the second acquisition gateway respectively align the DC power acquired by the first DC power acquisition unit and the second DC power acquisition unit to the corresponding time interval locally for the first time with a unified time reference, and then upload them. After uploading, they are aligned a second time with the unified time reference.

4. The photovoltaic inverter field efficiency analyzer according to claim 1, characterized in that, The wire-type current sensor is any one of an open-type Hall current sensor, a shunt, a Rogowski coil, and a fluxgate current sensor.

5. The photovoltaic inverter field efficiency analyzer according to claim 1, characterized in that, The DC power acquisition unit is a dual-channel DC energy meter, and each dual-channel DC energy meter acquires the DC voltage and DC current of the two maximum power point tracking input sides.

6. The photovoltaic inverter field efficiency analyzer according to claim 1, characterized in that, The photovoltaic inverter field efficiency analyzer also includes: Irradiance acquisition interface, used to acquire the planar irradiance of photovoltaic modules.

7. The photovoltaic inverter field efficiency analyzer according to claim 2, characterized in that, The photovoltaic inverter field efficiency analyzer also includes: Temperature acquisition interface, used to acquire the temperature of the photovoltaic inverter field efficiency analyzer components; The processing unit calculates the available DC power based on the irradiance according to the temperature, and / or performs temperature-based conversion on the conversion efficiency.

8. A method for analyzing the field efficiency of a photovoltaic inverter, applied to the photovoltaic inverter field efficiency analyzer as described in any one of claims 1 to 7, characterized in that, include: After the DC harness on the maximum power point tracking input side of each channel passes through the corresponding wire-type current sensor, the DC voltage and DC current on the maximum power point tracking input side of each channel are measured using the wire-type current sensor. The DC power of the maximum power point tracking input side is obtained based on the DC voltage and DC current of the maximum power point tracking input side; Collect the AC power on the AC output side; The collected DC and AC power are aligned to the corresponding time intervals using a unified time base; For each time interval, samples are marked as invalid and discarded when they indicate the target operating condition. The conversion efficiency is calculated based on the DC power and AC power in the valid samples. The target operating condition is a set unsteady or unreliable operating condition.

9. The method for on-site efficiency analysis of photovoltaic inverters according to claim 8, characterized in that, The photovoltaic inverter field efficiency analyzer includes a main unit and an expansion unit, which are connected by a communication link. Aligning the collected DC and AC power to the corresponding time intervals using a unified time base, including: The DC power collected by the first DC power acquisition unit in the main unit and the second DC power acquisition unit in the expansion box is first aligned to the corresponding time interval locally using a unified time reference, and then uploaded. After uploading, it is aligned a second time using the unified time reference.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 8 to 9.