A survey data asset evaluation method and system based on a classification time factor
By synergistically correcting the classification timeliness factor and the comprehensive adjustment coefficient, the problem of value commingling in the valuation of surveying and mapping data assets is solved, enabling accurate valuation of different types of assets, reflecting the impact of quality, circulation, proprietaryness and risk, and improving the accuracy and comprehensiveness of the valuation.
Patent Information
- Application Number
- CN202611094158.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-22
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies are insufficient to effectively reflect the actual value of different types of surveying and mapping data assets in the assessment of surveying and mapping data assets. Furthermore, the comprehensive assessment results are prone to being confused with the laws of time decay and cannot accurately reflect the impact of quality, circulation, proprietaryness, and risk.
By collecting asset identification, service life, cost amount data, and classification and timeliness configuration data, an asset timeliness category is generated. Replacement cost is generated using cost amount data. Standard evaluation processing is performed, and evaluation data is corrected using weight coefficients. A comprehensive adjustment coefficient is generated by combining asset timeliness category and service life, and finally, a comprehensive assessment value is generated.
It enables accurate reflection of the actual value status of surveying and mapping data assets based on changes in asset type and service life, reduces the confusion and correction of time-related decay caused by uniform linear depreciation rate, and improves the accuracy and comprehensiveness of the assessment results.
Smart Images

Figure CN123118261A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of data processing technology, specifically to a method and system for evaluating surveying and mapping data assets based on classification timeliness factors. Background Technology
[0002] Surveying and mapping data asset valuation typically serves business operations such as asset registration, asset transfer, results management, and value accounting. The valuation objects include not only surveying and mapping data results, but also geographic information service platforms, database management applications, and archival results. Common valuation methods are usually based on cost collection and combined with evaluation factors such as quality, circulation, proprietary degree, and risk to adjust the asset value. This can provide a quantitative basis for the book recognition and management of surveying and mapping data assets.
[0003] Currently, in the process of assessing surveying and mapping data assets, the sources of value for regulatory business assets, basic platform assets, thematic results assets, comprehensive database assets, and archival assets differ significantly. Value changes are also affected by management cycles, technological advancements, results updates, the dual structure of software and data, and long-term retention requirements. If all assets are uniformly depreciated according to linear years, the time decay patterns of different types of surveying and mapping data assets are easily confused.
[0004] Secondly, the valuation of surveying and mapping data assets not only depends on cost input, but is also affected by quantitative data on quality evaluation, circulation evaluation, proprietary evaluation, and risk evaluation. When there is a lack of consistent calculation connection between cost amount, evaluation results, and time reduction results, the comprehensive evaluation result may only reflect a single cost or a single evaluation score, making it difficult to correspond to the actual value status of surveying and mapping data assets within their service life. Summary of the Invention
[0005] To address the aforementioned technical problems, this invention provides a method and system for evaluating surveying and mapping data assets based on classification timeliness factors.
[0006] A method for assessing surveying and mapping data assets based on classification timeliness factors, comprising: Collect asset identification, service life, cost amount data, evaluation quantification data and classification timeliness configuration data. Based on the asset identification, match the value source mark and time-driven mark from the classification timeliness configuration data to generate asset timeliness category; Replacement cost is generated by collecting cost amount data, and standard evaluation data is generated by standard evaluation processing of the quantitative evaluation data. Weighting coefficients are generated based on the discrete distribution of standard evaluation data. The standard evaluation data are then corrected using these weighting coefficients, and the positive and negative ideal distances are calculated to generate a comprehensive adjustment coefficient. The classification timeliness factor is generated by using asset timeliness category, service life and classification timeliness configuration data. Based on replacement cost, comprehensive adjustment coefficient and classification timeliness factor, a comprehensive assessment value is generated.
[0007] Furthermore, the present invention also includes a surveying and mapping data asset assessment system based on classification timeliness factors, used to execute the surveying and mapping data asset assessment method based on classification timeliness factors, the system comprising: Timeliness Classification Module: Used to collect asset identification, service life, cost amount data, evaluation quantification data and classification timeliness configuration data. Based on the asset identification, it matches the value source mark and time-driven mark from the classification timeliness configuration data to generate asset timeliness categories. Cost evaluation module: used to generate replacement cost by aggregating cost amount data, perform standard evaluation processing on the evaluation quantitative data, and generate standard evaluation data; Weighting adjustment module: Used to generate weighting coefficients based on the discrete distribution of standard evaluation data, correct the standard evaluation data using the weighting coefficients, calculate the positive and negative ideal distances, and generate a comprehensive adjustment coefficient; Value assessment module: Used to generate classification timeliness factors by asset timeliness category, service life and classification timeliness configuration data, and generate comprehensive assessment value based on replacement cost, comprehensive adjustment coefficient and classification timeliness factors.
[0008] Compared with the prior art, the beneficial effects of the present invention are as follows: This invention constrains the value source marker and time-driven marker by configuring asset identification, service life, and classification timeliness data, so that the asset timeliness category can correspond to policy cycle, technology iteration, data update replacement, software data dual-layer structure and long-term archival preservation attributes, thereby making the classification timeliness factor change with asset type and service life, reducing the confusion correction of the timeliness decay of different surveying and mapping data assets by the uniform linear depreciation rate. Furthermore, this invention also uses cost amount data, evaluation quantification data, standard evaluation data, weighting coefficients, and positive and negative ideal distances to make the comprehensive adjustment coefficient work together with replacement cost and classification timeliness factors to comprehensively evaluate value, maintaining the participation of quality, circulation, proprietaryness, and risk in value correction, thereby improving the correspondence between the comprehensive evaluation value and the actual value status of surveying and mapping data assets. This invention uses a combination of classification timeliness factors and comprehensive adjustment coefficients to adjust the overall assessment value in accordance with changes in asset type, service life, and evaluation status. Attached Figure Description
[0009] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this invention. For those skilled in the art, other drawings can be obtained based on these drawings.
[0010] Figure 1 A flowchart of a surveying and mapping data asset evaluation method based on classification timeliness factors provided in Embodiment 1 of the present invention; Figure 2 This is a module diagram of a surveying and mapping data asset evaluation system based on classification timeliness factors, provided in Embodiment 2 of the present invention. Detailed Implementation
[0011] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0012] Example 1 Please see Figure 1 As shown in the figure, this embodiment discloses a method for assessing surveying and mapping data assets based on classification timeliness factors. The method includes: S11: Collect asset identification, service life, cost amount data, evaluation quantification data and classification timeliness configuration data, and match value source markers and time-driven markers from the classification timeliness configuration data based on asset identification to generate asset timeliness categories; In one specific embodiment, the asset identifier is the asset name or asset code of the surveying and mapping data asset to be evaluated in the evaluation system. The asset identifier includes one of the following: Internet map supervision system, surveying and mapping geographic information double random sampling system, government map mobile terminal, geographic information public service platform, natural resource remote sensing image integrated application service platform, satellite navigation and positioning benchmark service system, image control point data editing and result management system, basic geographic information database management system, real scene 3D database management application system, surveying and mapping archive management information system, surveying and mapping result archive management information system, water storage data, and land change survey data.
[0013] The useful life is the difference in years between the valuation date and the date the asset was built or the date the asset was created. The useful life is expressed as follows: ; in, For service life, To assess the year corresponding to the base date, The year corresponding to the date of asset construction or the date of achievement. The evaluation base date is obtained from the evaluation system. It is obtained from asset ledgers, project acceptance documents, or results-based documents.
[0014] Cost data includes direct costs, indirect costs, related taxes and fees, preliminary expenses, and opportunity costs. Direct costs include data acquisition, data processing and production, and other direct costs. Indirect costs include management and daily operations, network maintenance, and storage. Related taxes and fees are collected based on actual tax and fee amounts incurred. Preliminary expenses include project approval and data planning consulting costs. Opportunity costs are collected based on the cost of capital tied up as of the valuation date.
[0015] The evaluation quantitative data includes quality evaluation quantitative data, circulation evaluation quantitative data, proprietary evaluation quantitative data, and risk evaluation quantitative data. Quality evaluation quantitative data includes quantitative values corresponding to content accuracy, precision accuracy, record duplication rate, dirty data occurrence rate, element assignment consistency rate, element filling rate, record filling rate, data item filling rate, value range compliance rate, metadata compliance rate, format compliance rate, security compliance rate, periodicity timeliness, real-time timeliness, and accessibility. Circulation evaluation quantitative data includes quantitative values corresponding to open data dissemination volume, public data dissemination volume, and shared data dissemination volume. Proprietary evaluation quantitative data includes quantitative values corresponding to the industry share of data volume and the regional usage rate of data volume. Risk evaluation quantitative data includes quantitative values corresponding to equipment failure, inappropriate data description, system incompatibility, solution impact, application requirements, data development level, data leakage, and data corruption.
[0016] The classification and timeliness configuration data includes value source comparison content, time-driven comparison content, category priority, category verification code, timeliness function, and timeliness calculation parameters. The value source comparison content stores the corresponding content of asset identifiers and value source tags. Value source tags include business supervision tags, basic platform tags, special achievement tags, comprehensive library tags, and archive retention tags. The time-driven comparison content stores the corresponding content of asset identifiers and time-driven tags. Time-driven tags include scheme cycle tags, technology replacement tags, achievement update tags, dual-layer composition tags, and long-term retention tags. Category priority stores the reading order when multiple candidate categories appear simultaneously. The category verification code is the verification code between the asset timeliness category and the timeliness function. The timeliness function includes scheme cycle function, technology replacement function, achievement update function, dual-layer composition function, and archive retention function. The timeliness calculation parameters include scheme node years, stage retention ratio, platform lifespan years, content retention ratio, achievement update cycle, historical retention ratio, software layer weight, data content layer weight, software layer lifespan years, data update cycle, platform layer weight, archive layer weight, platform layer lifespan years, and archive retention ratio.
[0017] The value source comparison content is stored in three columns: asset identifier, value source mark, and source verification code. The time-driven comparison content is stored in three columns: asset identifier, time-driven mark, and driving verification code. The category priority is stored in two columns: asset timeliness category and sort number. The category verification code is stored in two columns: asset timeliness category and category code. The timeliness function is stored in two columns: asset timeliness category and function name. The timeliness calculation parameters are stored in three columns: asset timeliness category, calculation object, and calculation value.
[0018] The steps to generate asset expiration categories are as follows: S111: Based on the comparison of asset identification and value source, filter the value source markers corresponding to the asset identification; Using the asset identifier as the search key, the asset name or asset code is matched in the value source comparison content. When the asset name or asset code in the value source comparison content matches the asset identifier, the value source mark in the same row is read. For example, if the asset identifier is an Internet map supervision system, the business supervision mark is read; if the asset identifier is a basic geographic information database management system, the comprehensive database mark is read; and if the asset identifier is a surveying and mapping results archive management information system, the archive retention mark is read.
[0019] S112: Filter time-driven markers corresponding to asset identifiers by comparing asset identifiers and time-driven comparison content; Using the asset identifier as the retrieval key, the asset name or asset code is matched in the time-driven comparison content. When the asset name or asset code in the time-driven comparison content matches the asset identifier, the time-driven marker in the same row is read. For example, the scheme cycle marker corresponds to the Internet map supervision system, the technology replacement marker corresponds to the geographic information public service platform, the result update marker corresponds to the land change survey data, the two-layer composition marker corresponds to the real scene 3D database management application system, and the long-term retention marker corresponds to the surveying and mapping archive management information system.
[0020] S113: Based on the value source marker and the time-driven marker, filter candidate categories that match both the value source marker and the time-driven marker; The asset timeliness categories include scheme cycle type, technology replacement type, result update type, two-layer structure type and archive retention type. The classification timeliness configuration data stores the corresponding content of value source mark, time-driven mark and asset timeliness category. When the same asset timeliness category corresponds to both the value source mark and the time-driven mark, the asset timeliness category is written into the candidate category.
[0021] The corresponding contents of the value source marker, time-driven marker and asset timeliness category are as follows: business supervision marker and solution cycle marker correspond to solution cycle type category; basic platform marker and technology replacement marker correspond to technology replacement type category; special achievement marker and achievement update marker correspond to achievement update type category; comprehensive repository marker and two-layer composition marker correspond to two-layer composition type category; and archive retention marker and long-term retention marker correspond to archive retention type category.
[0022] S114: Based on category priority, read the first-ranked category from the candidate categories and generate the asset expiration category.
[0023] When a candidate category contains only one category, the candidate category is used as the asset timeliness category. When a candidate category contains two or more categories, the category priority is read, and the category ranked first in the candidate category is read according to the category priority to generate the asset timeliness category. The category priority is set in the order of archive retention type category, two-layer composition type category, result update type category, technology replacement type category, and solution cycle type category.
[0024] It should be noted that the category priority is set according to the surveying and mapping data asset assessment and management rules and is stored in the classification timeliness configuration data.
[0025] S12: Generate replacement cost by aggregating cost amount data, perform standard evaluation processing on the evaluation quantitative data, and generate standard evaluation data; In one specific implementation, the amounts of direct costs, indirect costs, related taxes and fees, upfront expenses, and opportunity costs are read, and the five types of cost amounts are summed to generate the replacement cost. , represented as: ; in, To replace the cost, This represents the amount of direct costs. This refers to the amount of indirect costs. This refers to the amount of relevant taxes and fees. This refers to the amount of upfront costs. The amount of opportunity cost, , , , and All of these were obtained from cost amount data.
[0026] Direct cost amount Represented as: ; in, The amount to be obtained through data collection. For the amount of data processed and produced, Other direct costs, , and All of these are obtained from the direct cost amount.
[0027] Indirect cost amount Represented as: ; in, To manage daily operating costs, For network operation and maintenance costs, To safeguard the amount, , and All of these are derived from the amount of indirect costs.
[0028] Opportunity cost Represented as: ; in, The amount of opportunity cost, To assess the risk-free annualized interest rate corresponding to the benchmark date, For the period of capital occupation, Obtained from publicly available interest rate data or unit financial parameters as of the valuation benchmark date. It is derived from the difference in years between the project payment date and the valuation date.
[0029] It should be noted that the cost amount data comes from at least one of the following: project final settlement report, equipment purchase list, travel expense reimbursement documents, field survey log, image acquisition voucher, software purchase voucher, entrusted business voucher, and operation and maintenance storage voucher. The cost amount data is entered in RMB, and missing cost amounts are entered as zero, and missing information is retained in the evaluation system log.
[0030] The steps to generate standard evaluation data are as follows: S121: Based on quantitative data of quality evaluation, quantitative data of circulation evaluation, quantitative data of proprietary evaluation, and quantitative data of risk evaluation, positive evaluation data and negative evaluation data are divided into positive evaluation data and negative evaluation data. The quantitative data for quality evaluation, circulation evaluation, proprietary evaluation, and risk evaluation are categorized by evaluation direction. Positive evaluation data includes: content accuracy, precision accuracy, element assignment consistency rate, element filling rate, record filling rate, data item filling rate, value range compliance rate, metadata compliance rate, format compliance rate, security compliance rate, cycle timeliness, real-time timeliness, accessibility, open data dissemination volume, public data dissemination volume, shared data dissemination volume, data volume industry share, and data volume regional usage rate. Negative evaluation data includes: record duplication rate, dirty data occurrence rate, equipment failure, inappropriate data description, system incompatibility, solution impact, application requirements, data development level, data leakage, and data corruption.
[0031] It should be noted that the larger the value of the positive evaluation data, the closer the evaluation result is to the positive ideal evaluation value, and the larger the value of the negative evaluation data, the closer the evaluation result is to the negative ideal evaluation value.
[0032] S122: Input the reverse evaluation data into the direction conversion function, and obtain the turning evaluation data based on the value boundaries of the reverse evaluation data; The direction conversion function is a function for converting the values of reverse evaluation data. The inputs to the direction conversion function are the reverse evaluation value, the upper bound of the reverse evaluation item's value, and the lower bound of the reverse evaluation item's value. The output of the direction conversion function is the turning evaluation value. For each reverse evaluation item, the upper bound and lower bound of the values of different surveying and mapping data assets under the same reverse evaluation item are read, and the value of the first reverse evaluation item is converted. The reverse evaluation value of a mapping data asset is denoted as The turning evaluation value is denoted as The direction conversion function is expressed as: ; in, For the first The first mapping data asset in the first The turning point evaluation value under the reverse evaluation item For the first The first mapping data asset in the first The reverse evaluation values under each reverse evaluation item For the first The upper bound of the values for each reverse evaluation item For the first The lower bound of the values for each reverse evaluation item and It is obtained by reading the reverse evaluation values of all surveying and mapping data assets under the same reverse evaluation project.
[0033] If the following conditions are met: ; but: ; After all reverse evaluation items have completed the direction reversal, the turning evaluation data is obtained.
[0034] S123: By correcting the evaluation values corresponding to the repeated values of the positive evaluation data and the directional evaluation data, discrete evaluation data is obtained. The positive evaluation data and the negative evaluation data are arranged according to asset identification and evaluation item to obtain the evaluation table to be corrected. Duplicate values are retrieved for the same evaluation item in the table. When duplicate values exist for the same evaluation item, a small perturbation is applied according to the row number order of the duplicate value in the evaluation table to be corrected. The perturbation amplitude does not exceed the original data measurement unit. .
[0035] Let the first The first evaluation item The evaluation value to be corrected for each mapping data asset is: The order of repeated values in the row number is as follows The disturbance strength is The corrected evaluation value is , represented as: ; in, For the first The first mapping data asset in the first The corrected evaluation values for each evaluation item. For the first The first mapping data asset in the first The evaluation values to be corrected under each evaluation item. To determine the row number order of repeated values in the evaluation table to be corrected, For the first The disturbance intensity of each evaluation item, the disturbance intensity By the Units of measurement for raw data of each evaluation item get.
[0036] Evaluation values that do not contain duplicate values remain unchanged. After correcting for duplicate values, discrete evaluation data is obtained.
[0037] It should be noted that the duplicate value correction only changes the ranking difference of duplicate values within the same evaluation item, and does not change the original evaluation direction of the evaluation item.
[0038] S124: Input the discrete evaluation data into the standard evaluation function, perform non-zero shifting according to the unified value range, and generate standard evaluation data.
[0039] The standard evaluation function is an interval transformation function for discrete evaluation data. The inputs to the standard evaluation function are discrete evaluation values, an upper bound for the discrete evaluation values, a lower bound for the discrete evaluation values, and a non-zero translation constant. The output of the standard evaluation function is the standard evaluation value. It performs interval transformation on each evaluation item in the discrete evaluation data. Let the i-th evaluation item be an example of this transformation. The first evaluation item The discrete evaluation value of each mapping data asset is The standard evaluation value is The standard evaluation function is expressed as: ; in, For the first The first mapping data asset in the first The standard evaluation values for each evaluation item. For the first The first mapping data asset in the first Discrete evaluation values under each evaluation item For the first Upper bound of discrete evaluation values for each evaluation item For the first Lower bound of discrete evaluation values for each evaluation item It is a non-zero translation constant. and It is obtained by reading discrete evaluation values of all surveying and mapping data assets under the same evaluation project. Pick .
[0040] If the following conditions are met: ; but: ; Arrange all standard evaluation values according to asset identification and evaluation items to generate standard evaluation data.
[0041] It should be noted that all evaluation values in the standard evaluation data are greater than zero, and the direction of the evaluation values is positive. The larger the evaluation value, the closer the corresponding evaluation item is to the ideal evaluation value.
[0042] S13: Generate weighting coefficients based on the discrete distribution of standard evaluation data, correct the standard evaluation data using the weighting coefficients, calculate the positive and negative ideal distances, and generate a comprehensive adjustment coefficient; In one specific embodiment, the standard evaluation data is arranged according to asset identification and evaluation items, and the number of surveying and mapping data assets involved in the calculation is [number missing]. The number of evaluation items is , No. The first mapping data asset in the first The standard evaluation value for each evaluation item is: ,in , Standard evaluation value The standard evaluation data generated in step S124 is read.
[0043] The steps for generating the comprehensive adjustment coefficient are as follows: S131: Arrange the evaluation items according to the standard evaluation data, calculate the value ratio of each evaluation item, and obtain the evaluation ratio data; For the The evaluation project reads all surveying and mapping data assets in the first... Calculate the standard evaluation value under the evaluation item, and then calculate the first evaluation item. The first mapping data asset in the first The percentage of values under each evaluation item , represented as: ; in, For the first The first mapping data asset in the first The percentage of values for each evaluation item For the first The first mapping data asset in the first The standard evaluation values for each evaluation item. For the first The sum of the standard evaluation values of all surveying and mapping data assets under each evaluation project, after non-zero shifting, satisfies... .
[0044] Traverse according to the above calculation method Each evaluation item, and the proportion of all values. The evaluation percentage data is obtained by arranging the assets according to their identification and evaluation items.
[0045] S132: Calculate the information utility value of each evaluation item by assessing the dispersion of each evaluation item's proportion in the evaluation proportion data; For the Each evaluation item calculates its entropy value based on information entropy. , represented as: ; in, For the first The entropy value of each evaluation item For the first The first mapping data asset in the first The percentage of values for each evaluation item For the quantity of surveying and mapping data assets, For the number of surveying and mapping data assets The natural logarithm, when At that time, according to deal with.
[0046] No. Information utility value of each evaluation item Represented as: ; in, For the first The information utility value of each evaluation item. For the first Entropy value and information utility value of each evaluation item By the Entropy of each evaluation item Calculated.
[0047] S133: Based on the information utility value of each evaluation item, complete the weight normalization mapping and generate weight coefficients; Read the information utility values of all evaluation items and calculate the first one. Weighting coefficients of each evaluation item , represented as: ; in, For the first The weighting coefficients of each evaluation item For the first The information utility value of each evaluation item. It is the sum of the information utility values of all evaluated items.
[0048] When the following conditions are met: ; but: ; in, To evaluate the number of items, weighting coefficients are used. The range of values is The sum of the weight coefficients of all evaluation items is The weight coefficients of all evaluation items are written in the order of the evaluation items to generate the weight coefficients.
[0049] S134: Write the weighting coefficients into the evaluation items corresponding to the standard evaluation data, and generate the positive and negative ideal distances according to the deviation between the weighted standard evaluation data and the positive and negative ideal evaluation values; The steps to generate positive and negative ideal distances are as follows: S134.1: Weighted evaluation data is obtained by multiplying the weight coefficients by the values of the corresponding evaluation items in the standard evaluation data; For the The first mapping data asset and the first Each evaluation item reads the standard evaluation value. and weighting coefficients Calculate the weighted evaluation value , represented as: ; in, For the first The first mapping data asset in the first The weighted evaluation values under each evaluation item For the first The weighting coefficients of each evaluation item For the first The first mapping data asset in the first The standard evaluation values under each evaluation item are used to arrange all weighted evaluation values according to asset identification and evaluation item to obtain weighted evaluation data.
[0050] S134.2: Based on the value boundaries of the weighted evaluation data under each evaluation item, filter the positive ideal evaluation values and negative ideal evaluation values; For the The evaluation project reads all surveying and mapping data assets in the first... The weighted evaluation values under each evaluation item are used, and the upper bound of the weighted evaluation values is taken as the positive ideal evaluation value. The lower bound of the weighted evaluation value is taken as the negative ideal evaluation value. , represented as: ; ; in, For the first The ideal evaluation value for each evaluation item. For the first The negative ideal evaluation value for each evaluation item. For all surveying and mapping data assets in the first The weighted evaluation values under each evaluation item.
[0051] S134.3: The positive ideal distance is obtained based on the deviation between the weighted evaluation data and the positive ideal evaluation value, and the negative ideal distance is obtained based on the deviation between the weighted evaluation data and the negative ideal evaluation value.
[0052] For the Each surveying data asset is used to calculate the ideal distance. and negative ideal distance , represented as: ; ; in, For the first The ideal distance of a mapping data asset For the first The negative ideal distance of a mapping data asset For the first The first mapping data asset in the first The weighted evaluation values under each evaluation item For the first The ideal evaluation value for each evaluation item. For the first The negative ideal evaluation value and positive ideal distance for each evaluation item and negative ideal distance Together they constitute the positive and negative ideal distances.
[0053] S135: Generate a comprehensive adjustment coefficient based on the proportion of negative ideal distance in the positive and negative ideal distances.
[0054] For the Individual surveying and mapping data assets, comprehensive adjustment coefficient Represented as: ; in, For the first The comprehensive adjustment coefficient for each surveying and mapping data asset. For the first The ideal distance of a mapping data asset For the first The negative ideal distance of a mapping data asset, when At that time, Set as .
[0055] S14: Generate classification timeliness factors by using asset timeliness category, service life and classification timeliness configuration data, and generate comprehensive assessment value based on replacement cost, comprehensive adjustment coefficient and classification timeliness factors.
[0056] In a specific embodiment, the classification timeliness factor is a time adjustment amount constrained by both the asset timeliness category and the useful life, and is expressed as follows: Replacement cost is expressed as The comprehensive adjustment coefficient is expressed as The comprehensive assessment value is expressed as Replacement cost Generated from step S12, comprehensive adjustment coefficient It is generated by step S13.
[0057] The steps for generating classification timeliness factors are as follows: S141: Based on the asset timeliness category, select the category calculation parameters corresponding to the asset timeliness category from the timeliness calculation parameters; When the asset timeliness category is the scheme cycle type, the scheme node years are read from the timeliness calculation parameters. , , and stage retention ratio , , , When the asset's timeliness category is technology replacement, the platform's lifespan is read from the timeliness calculation parameters. and content retention ratio When the asset timeliness category is the result update type, the result update cycle is read from the timeliness calculation parameters. and the proportion of historical preservation When the asset timeliness category is a two-tiered structured category, the software layer weight is read from the timeliness calculation parameters. Data content layer weight Software layer lifespan Data update cycle and content retention ratio When the asset timeliness category is the archive retention category, the platform layer weight is read from the timeliness calculation parameters. Archives layer weight Platform layer lifespan and the proportion of archives retained .
[0058] It should be noted that, , , , , , , and All values are for years. , , , , , , , , , , and All are normalized proportions, and their values range from [value range missing]. The normalization ratio is calculated by dividing the percentage of classification timeliness configuration data read by 1 / 2. get.
[0059] S142: Select the category-specific timeliness function that corresponds to the asset timeliness category from the timeliness functions, based on the asset timeliness category; When the asset timeliness category is a scheme cycle type, the scheme cycle function is selected as the category timeliness function; when the asset timeliness category is a technology replacement type, the technology replacement function is selected as the category timeliness function; when the asset timeliness category is an outcome update type, the outcome update function is selected as the category timeliness function; when the asset timeliness category is a two-layer composition type, the two-layer composition function is selected as the category timeliness function; and when the asset timeliness category is an archive retention type, the archive retention function is selected as the category timeliness function.
[0060] The periodic function of the scheme is expressed as: ; in, The scheme is a periodic function. For service life, , and The project's node lifespan, and it meets the following requirements: , , , and For the stage retention ratio, the scheme periodic function The output is a single-layer candidate time factor.
[0061] The technology replacement function is expressed as: ; ; in, For technology replacement functions, For service life, For the platform's lifespan, To preserve the proportion of content, Technology replacement attenuation rate, technology replacement attenuation rate Platform lifespan The calculated technology replacement function The output is a single-layer candidate time factor.
[0062] The result update function is expressed as: ; ; in, Update the function for the results. For service life, For the results update cycle, To preserve the proportions for history, The number of years within the period, the number of years within the period Based on service life and results update cycle The calculated result update function The output is a single-layer candidate time-efficiency factor. This is the floor symbol.
[0063] The two-layer construct function is represented as: ; ; ; in, It is a two-layer construct function. For service life, For software layer weights, For the weight of the data content layer, This refers to the lifespan of the software layer. For the data update cycle, To preserve the proportion of content, Software layer attenuation rate, For data content layer timeliness factor, software layer decay rate Software layer lifespan The calculated two-layer composition function The output is the hierarchical candidate timeliness factor.
[0064] The function for storing archives is expressed as follows: ; ; in, For archive retention functions, For service life, For platform layer weight, As the weight of the archive level, This refers to the platform layer's lifespan. For the percentage of archives to be retained, The plateau layer attenuation rate, the plateau layer attenuation rate Platform layer lifespan The calculated archive retention function The output is the hierarchical candidate timeliness factor.
[0065] S143: Input the calculation parameters of the years and categories into the category timeliness function to generate candidate timeliness factors; The steps for generating candidate timeliness factors are as follows: S143.1: When the asset timeliness category is a scheme cycle type, technology replacement type, or achievement update type, the calculation parameters of the years and category will be input into the scheme cycle function, technology replacement function, or achievement update function to obtain a single-layer candidate timeliness factor; When the asset's lifespan category is the plan cycle type, the usage period will be... Plan milestones and timeframes , , and stage retention ratio , , , Input scheme periodic function Single-layer candidate time factor is obtained , represented as: ; When the asset's lifespan category is technology replacement, the useful life will be... Platform lifespan and content retention ratio Input technology replacement function Single-layer candidate time factor is obtained , represented as: ; When the asset's timeliness category is the results update category, the usage period will be... Results update cycle and the proportion of historical preservation Input result update function Single-layer candidate time factor is obtained , represented as: ; S143.2: When the asset timeliness category is a two-level composition type category or an archive retention type category, the years and category calculation parameters will be input into the two-level composition function or the archive retention function to obtain the hierarchical candidate timeliness factors; The steps to obtain the candidate timeliness factors at the hierarchical level are as follows: S143.2.1: When the asset timeliness category is a two-layer composition type, the two-layer superimposed timeliness factor is obtained by using the years, software layer weight, data content layer weight, software layer lifespan and data update cycle. When the asset's timeliness category is a two-tiered structure, the useful life will be... Software layer weights Data content layer weight Software layer lifespan Data update cycle and content retention ratio Input two-level construct function The double-layer superimposed time factor was obtained. , represented as: ; in, The time factor is a double-layer superposition, and the double-layer constitutes a function. As given in step S142, the double-layer superimposed time factor As a hierarchical candidate time factor under the two-layer composition type category.
[0066] S143.2.2: When the asset timeliness category is the archive retention category, a double bottom-line timeliness factor is obtained based on the service life, platform layer weight, archive layer weight, platform layer lifespan, and archive retention ratio. When the asset's validity period category is archival retention, the usage period will be... Platform layer weight Archives layer weight Platform layer lifespan and the proportion of archives retained Input file retention function The double bottom line timeliness factor is obtained. , represented as: ; in, As a double bottom-line timeliness factor, the archive retention function As given in step S142, the double bottom line time factor As a candidate timeliness factor under the category of archival retention.
[0067] S143.2.3: Based on the asset timeliness category, select the hierarchical candidate timeliness factors corresponding to the asset timeliness category from the double-layer superimposed timeliness factors and the double bottom-line timeliness factors; When the asset timeliness category is a two-tiered composition category, the timeliness factor will be superimposed on both tiers. As a tiered candidate timeliness factor, when the asset timeliness category is the archival retention category, the double bottom-line timeliness factor will be applied. As a candidate timeliness factor at the hierarchical level.
[0068] S143.3: Based on the asset timeliness category, select candidate timeliness factors corresponding to the asset timeliness category from single-level candidate timeliness factors and hierarchical candidate timeliness factors; When the asset timeliness category is a scheme cycle type, technology replacement type, or achievement update type, a single-layer candidate timeliness factor will be used. When the asset timeliness category is a two-tiered structured category or an archive retention category, the hierarchical candidate timeliness factor will be used as the candidate timeliness factor.
[0069] S144: Verify the asset timeliness category corresponding to the candidate timeliness factor based on the category verification code, and generate the classification timeliness factor.
[0070] Read the asset timeliness category and category verification code corresponding to the candidate timeliness factor. When the asset timeliness category corresponding to the category verification code matches the asset timeliness category corresponding to the candidate timeliness factor, use the candidate timeliness factor as the classification timeliness factor. When the asset validity category corresponding to the category verification code is inconsistent with the asset validity category corresponding to the candidate validity factor, steps S141 to S143 are re-executed until the asset validity category corresponding to the category verification code is consistent with the asset validity category corresponding to the candidate validity factor.
[0071] The steps to generate a comprehensive assessment value are as follows: Read reset cost Comprehensive adjustment coefficient and classification timeliness factor Generate a comprehensive evaluation value , represented as: ; in, In order to comprehensively assess the value, To replace the cost, To adjust the overall coefficient, This is a classification timeliness factor.
[0072] Example 2 Please see Figure 2 As shown, based on a unified inventive concept, this embodiment discloses a surveying and mapping data asset assessment system based on classification timeliness factors. The system includes: Timeliness Classification Module S21: Used to collect asset identification, service life, cost amount data, evaluation quantification data and classification timeliness configuration data. Based on the asset identification, it matches the value source mark and time-driven mark from the classification timeliness configuration data to generate asset timeliness category; Cost evaluation module S22: used to generate replacement cost by collecting cost amount data, perform standard evaluation processing on the evaluation quantitative data, and generate standard evaluation data; Weight adjustment module S23: Used to generate weight coefficients based on the discrete distribution of standard evaluation data, correct the standard evaluation data through the weight coefficients and calculate the positive and negative ideal distances to generate a comprehensive adjustment coefficient; Value assessment module S24: Used to generate classification timeliness factors through asset timeliness category, service life and classification timeliness configuration data, and generate comprehensive assessment value based on replacement cost, comprehensive adjustment coefficient and classification timeliness factors.
[0073] The above embodiments are only used to illustrate the technical methods of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical methods of the present invention without departing from the spirit and scope of the technical methods of the present invention.
Claims
1. A method for mapping data asset valuation based on classification time factor, characterized in that, The method includes: Collect asset identification, service life, cost amount data, evaluation quantification data and classification timeliness configuration data. Based on the asset identification, match the value source mark and time-driven mark from the classification timeliness configuration data to generate asset timeliness category; Replacement cost is generated by collecting cost amount data, and standard evaluation data is generated by standard evaluation processing of the quantitative evaluation data. Weighting coefficients are generated based on the discrete distribution of standard evaluation data. The standard evaluation data are then corrected using these weighting coefficients, and the positive and negative ideal distances are calculated to generate a comprehensive adjustment coefficient. A classification timeliness factor is generated by using asset timeliness category, service life, and classification timeliness configuration data. Based on replacement cost, comprehensive adjustment coefficient, and classification timeliness factor, a comprehensive assessment value is generated.
2. The method for evaluating mapping data assets based on classification time factor according to claim 1, characterized in that, The cost data includes direct cost, indirect cost, related taxes and fees, preliminary expenses, and opportunity cost. The evaluation quantification data includes quality evaluation quantification data, circulation evaluation quantification data, proprietary evaluation quantification data, and risk evaluation quantification data. The classification timeliness configuration data includes value source comparison content, time-driven comparison content, category priority, category verification code, timeliness function, and timeliness calculation parameters. The timeliness function includes scheme cycle function, technology replacement function, achievement update function, two-layer composition function, and archive retention function.
3. The method of claim 2, wherein, The steps to generate asset expiration categories are as follows: Based on the comparison of asset identification and value source, filter the value source markers corresponding to the asset identification; By comparing asset identifiers with time-driven content, filter time-driven tags that correspond to the asset identifiers; Based on value source tags and time-driven tags, filter candidate categories that match both value source tags and time-driven tags; Based on category priority, the top-ranked category is read from the candidate categories to generate the asset expiration category.
4. The method of claim 3, wherein, The steps to generate standard evaluation data are as follows: Based on quantitative data of quality evaluation, quantitative data of circulation evaluation, quantitative data of proprietary evaluation, and quantitative data of risk evaluation, positive evaluation data and negative evaluation data are divided. The reverse evaluation data is input into the direction conversion function, and the turning evaluation data is obtained based on the value boundaries of the reverse evaluation data. By correcting the evaluation values corresponding to the repeated values in the positive evaluation data and the directional evaluation data, discrete evaluation data is obtained. The discrete evaluation data is input into the standard evaluation function, and a non-zero shift is performed according to a unified value range to generate standard evaluation data.
5. The method for evaluating mapping data assets based on classification time factor according to claim 4, characterized in that, The steps to generate the comprehensive adjustment coefficient are as follows: Arrange the evaluation items according to the standard evaluation data, calculate the value percentage of each evaluation item, and obtain the evaluation percentage data. The information utility value of each evaluation item is calculated by assessing the dispersion of the proportion of each evaluation item in the evaluation proportion data. Based on the information utility value of each evaluation item, a weight normalization mapping is completed to generate weight coefficients; The weighting coefficients are written into the evaluation items corresponding to the standard evaluation data, and the positive and negative ideal distances are generated according to the deviation between the weighted standard evaluation data and the positive and negative ideal evaluation values. A comprehensive adjustment coefficient is generated based on the proportion of negative ideal distance in the positive and negative ideal distances.
6. The method for evaluating mapping data assets based on classification time factor according to claim 5, characterized in that, The steps to generate positive and negative ideal distances are as follows: The weighted evaluation data is obtained by multiplying the weight coefficients by the values of the corresponding evaluation items in the standard evaluation data; Based on the value boundaries of the weighted evaluation data under each evaluation item, positive ideal evaluation values and negative ideal evaluation values are selected; The positive ideal distance is obtained based on the deviation between the weighted evaluation data and the positive ideal evaluation value, and the negative ideal distance is obtained based on the deviation between the weighted evaluation data and the negative ideal evaluation value.
7. The method for evaluating mapping data assets based on classification time factor according to claim 6, characterized in that, The steps for generating classification timeliness factors are as follows: Based on the asset timeliness category, select the category calculation parameters corresponding to the asset timeliness category from the timeliness calculation parameters; Select the category-specific timeliness function corresponding to the asset timeliness category from the timeliness functions based on the asset timeliness category; The parameters for calculating the years and categories are input into the category timeliness function to generate candidate timeliness factors; The asset timeliness category corresponding to the candidate timeliness factor is verified based on the category verification code, and a classification timeliness factor is generated.
8. The method for evaluating mapping data assets based on classification time factor according to claim 7, characterized in that, The steps for generating candidate timeliness factors are as follows: When the asset timeliness category is a scheme cycle type, technology replacement type, or achievement update type, the calculation parameters of the years and category will be input into the scheme cycle function, technology replacement function, or achievement update function to obtain the single-layer candidate timeliness factor. When the asset timeliness category is a two-level composition type or an archive retention type, the years and category calculation parameters will be input into the two-level composition function or the archive retention function to obtain the hierarchical candidate timeliness factors. Based on the asset timeliness category, candidate timeliness factors corresponding to the asset timeliness category are selected from single-level candidate timeliness factors and hierarchical candidate timeliness factors.
9. The method for assessing surveying and mapping data assets based on classification timeliness factors according to claim 8, characterized in that, The steps to obtain the candidate timeliness factors at the hierarchical level are as follows: When the asset timeliness category is a two-layer composition category, the two-layer superimposed timeliness factor is obtained by using the years, software layer weight, data content layer weight, software layer lifespan and data update cycle. When the asset timeliness category is the archive retention category, a double bottom-line timeliness factor is obtained based on the usage period, platform layer weight, archive layer weight, platform layer lifespan, and archive retention ratio. Based on the asset timeliness category, candidate timeliness factors corresponding to the asset timeliness category are selected from the double-layer superimposed timeliness factors and the double bottom-line timeliness factors.
10. A surveying and mapping data asset assessment system based on classification timeliness factors, used to execute the surveying and mapping data asset assessment method based on classification timeliness factors as described in any one of claims 1-9, characterized in that, Timeliness Classification Module: Used to collect asset identification, service life, cost amount data, evaluation quantification data and classification timeliness configuration data. Based on the asset identification, it matches the value source mark and time-driven mark from the classification timeliness configuration data to generate asset timeliness categories. Cost evaluation module: used to generate replacement cost by aggregating cost amount data, perform standard evaluation processing on the evaluation quantitative data, and generate standard evaluation data; Weighting adjustment module: Used to generate weighting coefficients based on the discrete distribution of standard evaluation data, correct the standard evaluation data using the weighting coefficients, calculate the positive and negative ideal distances, and generate a comprehensive adjustment coefficient; Value assessment module: Used to generate classification timeliness factors by asset timeliness category, service life and classification timeliness configuration data, and generate comprehensive assessment value based on replacement cost, comprehensive adjustment coefficient and classification timeliness factors.
