A Pre-screening Method for Energy Storage Access Location Based on Dynamic Impedance Equivalent and PV Curve

By constructing a static energy storage model using dynamic impedance equivalence and PV curves, and combining it with electromagnetic transient verification, the computational efficiency and accuracy issues of energy storage access location pre-screening in existing technologies are resolved, enabling rapid screening and accurate sorting of energy storage access locations.

CN123121718APending Publication Date: 2026-11-17SOUTH CHINA UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611225321.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-13
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing methods for pre-screening energy storage access locations struggle to balance the efficiency of static analysis calculations with the voltage support characteristics of energy storage converters. This results in a significant deviation between the static P-V curves in the low-voltage operating region and the actual operating voltage, affecting the comparison and ranking of candidate access locations. Furthermore, electromagnetic transient simulation calculations are costly and difficult to use for rapid screening over a wide range.

Method used

A static energy storage model is constructed using a method based on dynamic impedance equivalence and PV curves. The P-V curve calculation of the target load node is embedded, and the static model error is checked by combining the local voltage safety margin evaluation index and the comprehensive ranking method with the electromagnetic transient operation point, thereby narrowing down the candidate node range for subsequent detailed electromagnetic transient analysis.

Benefits of technology

This technology enables rapid comparison of voltage support effects at different energy storage candidate access locations while maintaining computational efficiency, thus narrowing down the range of candidate nodes for subsequent detailed analysis and improving the accuracy and efficiency of access location selection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121718A_ABST
    Figure CN123121718A_ABST
Patent Text Reader

Abstract

This invention discloses a method for pre-screening energy storage access locations based on dynamic impedance equivalence and P-V curves, comprising: performing load growth P-V scanning on load nodes of the power system to obtain the corresponding total active power load level of the system; sorting load nodes based on the total active power load level of the system, selecting load nodes with weak initial voltage and candidate energy storage access nodes; constructing corresponding static equivalent models of energy storage and connecting them to each candidate node respectively, and constructing an improvement matrix based on the load level changes before and after energy storage access; calculating comprehensive evaluation indicators based on the improvement results of each candidate node and determining priority candidate access nodes; comparing the error between the voltage calculated by different static equivalent models of energy storage and the voltage at the electromagnetic transient steady-state operating point based on electromagnetic transient simulation, verifying the ranking trend of priority candidate access nodes, and obtaining the final set of energy storage access nodes. This invention can achieve rapid screening of a wide range of candidate access locations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of energy storage access technology, and specifically to a method for pre-screening energy storage access locations based on dynamic impedance equivalence and PV curves. Background Technology

[0002] The energy storage access location selection method based on P-V curves and static voltage stability indices has advantages such as fast calculation speed and suitability for multi-node comparison. However, existing methods typically represent energy storage as a power injection node or a voltage amplitude-controlled node, and mainly use the physical connection impedances of transformers, lines, and filter branches to establish a static model of energy storage. While this type of model can reflect the steady-state power injection and physical connection relationship of energy storage, it is difficult to reflect the impact of the energy storage converter control mode, reactive current response, and port dynamic characteristics on the external voltage support capability. This can lead to a large deviation between the static P-V curve in the low-voltage operating region and the actual operating point voltage, thus affecting the comparison and ranking of different energy storage candidate access locations. Electromagnetic transient simulation can reflect the control loop, reactive current response, current limitation, and port voltage changes of the energy storage converter in detail. However, when there are many candidate access nodes, evaluation load nodes, and load operating points, a large amount of time-domain simulation and data processing is required, resulting in high computational costs and making it difficult to directly use for rapid selection of a large range of candidate access locations during the planning stage.

[0003] Therefore, there is an urgent need for a pre-screening technology for energy storage access locations that can balance the efficiency of static analysis calculations with the ability to characterize the voltage support characteristics of energy storage converters. This technology can quickly compare the voltage support effects of different energy storage candidate access locations and narrow down the range of candidate nodes for subsequent detailed electromagnetic transient analysis and engineering scheme evaluation. Summary of the Invention

[0004] To overcome the shortcomings and deficiencies of existing technologies, this invention provides a pre-screening method for energy storage access locations based on dynamic impedance equivalence and PV curves. This invention introduces the dynamic impedance equivalence results of the energy storage port into the energy storage static model and embeds the P-V curve calculation of the target load node. At the same time, it constructs a unified local voltage safety margin evaluation index and comprehensive ranking method for multiple voltage-weak load nodes to quickly compare the voltage support effect of different energy storage candidate access locations. Furthermore, it uses electromagnetic transient operating points to verify the static model error and the ranking trend of priority candidate nodes, thereby narrowing down the range of candidate nodes for subsequent detailed electromagnetic transient analysis and engineering scheme evaluation.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] This invention provides a method for pre-screening energy storage access locations based on dynamic impedance equivalence and PV curves, comprising the following steps:

[0007] Perform load growth P-V scans on the load nodes of the power system to obtain the corresponding total active load level of the system;

[0008] The load nodes are sorted based on the total active power load level of the system, and load nodes with weak initial voltage and candidate energy storage access nodes are selected.

[0009] Obtain the dynamic impedance parameters of the energy storage converter port, convert the physical connection branch impedance, scalar dynamic impedance and complex dynamic impedance into equivalent series reactance respectively, and construct the corresponding energy storage static equivalent model.

[0010] Each energy storage static equivalent model is connected to each candidate node, and a local P-V scan of the target node is performed. A multi-node voltage safety margin improvement matrix is ​​constructed based on the load level changes before and after energy storage connection.

[0011] Calculate comprehensive evaluation indicators based on the improvement results of each candidate node and determine the priority candidate access node;

[0012] Based on electromagnetic transient simulation, the error between the voltage calculated by different energy storage static equivalent models and the voltage at the electromagnetic transient steady-state operating point is compared. The corresponding load boundary is obtained by interpolation of the electromagnetic transient operating point. The ranking trend of the priority candidate access nodes is checked to obtain the final set of energy storage access nodes.

[0013] As a preferred technical solution, load growth P-V scanning is performed on the load nodes of the power system to obtain the corresponding total active power load level of the system, specifically including:

[0014] Obtain network topology, line parameters, generator output and node load data of the power system, increase the active and reactive loads of each load node in the same proportion, and keep the original power factor of each load node unchanged.

[0015] Power flow calculations are performed for different load levels to obtain the PV curves of voltage at each load node as a function of the total active power load of the system.

[0016] As a preferred technical solution, candidate access nodes for energy storage are selected, specifically including:

[0017] Select formal evaluation load nodes from the initial voltage weak load nodes, and use the formal evaluation load nodes and their adjacent nodes as candidate access nodes for energy storage.

[0018] As a preferred technical solution, the dynamic impedance parameters of the energy storage converter port are obtained, specifically including:

[0019] A small voltage amplitude disturbance with frequency f is applied to the grid connection port of the energy storage device, and the port voltage amplitude disturbance is tested and obtained. and its corresponding reactive current response The dynamic admittance of the energy storage port is expressed as:

[0020] ;

[0021] When expressed in scalar form, the dynamic admittance and dynamic impedance are respectively represented as:

[0022] ;

[0023] ;

[0024] When using complex form, the dynamic admittance and dynamic impedance are expressed as follows:

[0025] ;

[0026] ;

[0027] in, and These are the phase angles of the voltage amplitude disturbance and the reactive current response, respectively. and These are the complex phasors for voltage amplitude disturbance and reactive current response, respectively.

[0028] As a preferred technical solution, the physical connection branch impedance, scalar dynamic impedance, and complex dynamic impedance are respectively converted into equivalent series reactance, expressed as:

[0029] ;

[0030] Where j represents the load node, The physical impedance of the energy storage transformer and its connecting branches. , and These are the physical connection branch impedance model, the scalar dynamic impedance equivalent model, and the complex dynamic impedance equivalent model, respectively.

[0031] The equivalent nodes inside the energy storage are connected to the candidate access nodes through equivalent series impedance. The equivalent structure is represented as follows:

[0032] ;

[0033] in, This is the equivalent voltage node inside the energy storage system. These are candidate access nodes.

[0034] As a preferred technical solution, a local P-V scan of the target node is performed, and a multi-node voltage safety margin improvement matrix is ​​constructed based on the load level changes before and after energy storage access. Specifically, this includes:

[0035] Calculate the active load level when the voltage of each node reaches the preset low voltage boundary, and arrange the active load levels to form a multi-node voltage safety margin improvement matrix.

[0036] As a preferred technical solution, a comprehensive evaluation index is calculated based on the improvement results of each candidate node to determine the priority candidate access node, specifically including:

[0037] The baseline load level of the node is obtained by following the same local load growth path;

[0038] The absolute improvement and relative improvement rate after energy storage is connected are calculated based on the difference between the active load level and the baseline load level.

[0039] The total absolute improvement, average relative improvement, and minimum improvement for the most unfavorable load node are calculated based on the absolute improvement and relative improvement rate, thus obtaining the corresponding total absolute improvement index, average relative improvement index, and most unfavorable node improvement index.

[0040] Priority candidate access nodes are determined based on the total absolute improvement index, the average relative improvement index, and the most unfavorable node improvement index.

[0041] As a preferred technical solution, the error between the voltage calculated by different energy storage static equivalent models and the voltage at the electromagnetic transient steady-state operating point is compared based on electromagnetic transient simulation, specifically including:

[0042] The voltage deviation, mean absolute error, root mean square error, and maximum absolute error of the energy storage static equivalent model are calculated and expressed as follows:

[0043] ;

[0044] ;

[0045] ;

[0046] ;

[0047] in, , , , Let represent the voltage deviation, mean absolute error, root mean square error, and maximum absolute error of the energy storage static equivalent model M, respectively, and N be the total number of electromagnetic transient operating points participating in the error statistics. The steady-state voltage obtained from electromagnetic transient simulation at the kth load operating point corresponding to the energy storage static equivalent model M is given by the energy storage static equivalent model M. The voltage is calculated for the energy storage static equivalent model M under the same load level.

[0048] As a preferred technical solution, the corresponding load boundary is obtained by interpolating the electromagnetic transient operating point, specifically including:

[0049] Select adjacent load operating points P whose target node voltages are located on either side of the low voltage comparison boundary. a and P b The corresponding electromagnetic transient and steady-state voltages are respectively and The load level on the electromagnetic transient side is obtained by linear interpolation and is expressed as:

[0050] ;

[0051] in, This indicates the load level on the electromagnetic transient side.

[0052] The present invention also provides a pre-screening system for energy storage access locations based on dynamic impedance equivalence and PV curves, used to implement the above-mentioned pre-screening method for energy storage access locations based on dynamic impedance equivalence and PV curves, including: a total active load level acquisition module, a sorting and screening module, an energy storage static equivalent model construction module, an improvement matrix construction module, a priority candidate access node selection module, a voltage error calculation module, and a verification module;

[0053] The total active load level acquisition module is used to perform load growth PV scanning on the load nodes of the power system to obtain the corresponding total active load level of the system.

[0054] The sorting and filtering module is used to sort load nodes based on the total active power load level of the system, and select load nodes with weak initial voltage and candidate energy storage access nodes.

[0055] The energy storage static equivalent model construction module is used to obtain the dynamic impedance parameters of the energy storage converter port, convert the physical connection branch impedance, scalar dynamic impedance and complex dynamic impedance into equivalent series reactance respectively, and construct the corresponding energy storage static equivalent model.

[0056] The improvement matrix construction module is used to construct a multi-node voltage safety margin improvement matrix, connect each energy storage static equivalent model to each candidate node, perform local P-V scanning of the target node, and construct the multi-node voltage safety margin improvement matrix based on the load level changes before and after energy storage access.

[0057] The priority candidate access node selection module is used to calculate a comprehensive evaluation index based on the improvement results of each candidate node and determine the priority candidate access node.

[0058] The voltage error calculation module is used to compare the error between the voltage calculated by different energy storage static equivalent models and the voltage at the electromagnetic transient steady-state operating point based on electromagnetic transient simulation.

[0059] The verification module is used to obtain the corresponding load boundary by interpolating the electromagnetic transient operating point, verify the ranking trend of the priority candidate access nodes, and obtain the final set of energy storage access nodes.

[0060] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0061] (1) In view of the problem that the evaluation results of existing single load nodes are difficult to fully reflect the comprehensive support capability of energy storage access locations, the present invention first conducts P-V scanning of system load growth under the condition of no new energy storage, identifies the voltage weak load nodes according to the total system load level when each load node reaches the preset low voltage boundary, and generates energy storage candidate access nodes in combination with network topology.

[0062] Based on this, the dynamic impedance parameters of the energy storage port obtained by the existing dynamic impedance equivalence method are converted into equivalent series reactance, and embedded into the static model of the equivalent voltage node, equivalent series impedance, and candidate access node inside the energy storage. Local load growth paths are constructed for each voltage-weak load node, with the P corresponding to the target node voltage reaching the preset low voltage boundary. 0.85 Characterize the local voltage safety margin, calculate the absolute improvement and relative improvement rate before and after energy storage integration, and form a P-value for multiple evaluated load nodes. 0.85 Improvement matrix.

[0063] (2) Based on P 0.85 The improvement matrix of this invention constructs a total absolute improvement index, an average relative improvement index, and a worst-case node improvement index to comprehensively evaluate the overall support effect, average relative improvement degree, and worst-case node support capability of different energy storage candidate access nodes, thereby realizing the ranking and range reduction of candidate access nodes.

[0064] Furthermore, in static P 0.85 Multiple load operating points are set near the boundary. Electromagnetic transient simulation is used to evaluate the voltage approximation error of different static equivalent models, and the corresponding values ​​are obtained by interpolation of the electromagnetic transient operating points. The ranking trend of the priority candidate nodes obtained from the static pre-screening is verified to provide a candidate range for subsequent electromagnetic transient analysis and engineering scheme evaluation. Attached Figure Description

[0065] Figure 1 This is a flowchart illustrating the energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves of the present invention.

[0066] Figure 2 This is a topology diagram of the IEEE standard 39-node system;

[0067] Figure 3For P at different energy storage access locations under the complex form dynamic impedance equivalent model 0.85 Absolutely improves the calorimetric diagram;

[0068] Figure 4(a) is a comparison of the static P-V curve and the electromagnetic transient steady-state operating point voltage of the load node 4 when the energy storage access node 7 is connected.

[0069] Figure 4(b) is a comparison of the static P-V curve and the electromagnetic transient steady-state operating point voltage of the corresponding load node 7 when the energy storage is connected to node 7.

[0070] Figure 4(c) is a comparison of the static P-V curve and the electromagnetic transient steady-state operating point voltage of the corresponding load node 8 when the energy storage access node 7 is connected.

[0071] Figure 5(a) is a comparison of the static P-V curve and the electromagnetic transient steady-state operating point voltage of the corresponding load node 5 when the energy storage access node 8 is used.

[0072] Figure 5(b) is a comparison of the static P-V curve and the electromagnetic transient steady-state operating point voltage of the corresponding load node 7 when the energy storage access node 8 is connected.

[0073] Figure 5(c) is a comparison of the static P-V curve and the electromagnetic transient steady-state operating point voltage of the corresponding load node 8 when the energy storage is connected to node 8.

[0074] Figure 6 A comparison chart of static comprehensive evaluation index and electromagnetic transient interpolation comprehensive evaluation index;

[0075] Figure 7 P calculated for the static model 0.85 Interpolated with the electromagnetic transient operating point Comparison chart. Detailed Implementation

[0076] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0077] Example 1

[0078] like Figure 1 As shown, this embodiment provides a method for pre-screening energy storage access locations based on dynamic impedance equivalence and PV curves, including the following steps:

[0079] S1: Under the baseline operation mode without adding energy storage, perform a P-V scan on the system load nodes. Based on the total system load level corresponding to each load node reaching a preset low voltage threshold, identify the voltage-weak load nodes. Combining node load characteristics, P-V curve validity, network topology, and energy storage access feasibility, determine the formal evaluation load node set and the energy storage candidate access node set, specifically including:

[0080] S11: Perform a load-increment P-V scan on the baseline system;

[0081] Acquire network topology, line parameters, generator output, and node load data for the power system. Under the baseline operating mode without adding energy storage, increase the active and reactive loads of each load node proportionally, while keeping the original power factor of each load node constant. Perform power flow calculations for different load levels and record the PV curves of voltage at each load node as a function of the total active load of the system. When the voltage at load node j drops to 0.85 pu, record the corresponding total active load level of the system. The smaller the value, the earlier node j reaches the low voltage boundary along the system load growth path. 0.85pu is the low voltage comparison boundary used in the pre-screening during the planning stage and is not used as a universal static voltage stability limit or protection action setting.

[0082] S12: Identify voltage-weak load nodes and candidate energy storage access nodes;

[0083] According to the total active power load level of the system The system load nodes are sorted from smallest to largest, and the top K load nodes are selected to form the initial voltage weak load node set:

[0084] ;

[0085] In the formula, Let K be the set of system load nodes; K is the number of initially weak voltage load nodes to be retained. Based on node type, node load size, P-V curve representativeness, and subsequent verification requirements, formal evaluation load nodes are determined from the initially weak voltage load nodes. Then, considering network topology and energy storage access feasibility, the formal evaluation load nodes and their adjacent nodes are selected as candidate energy storage access nodes.

[0086] S2: Obtain the equivalent dynamic impedance parameters of the energy storage port, convert the physical connection branch impedance, scalar dynamic impedance parameters, and complex dynamic impedance parameters into equivalent series impedances for static power flow calculations, and establish static equivalent models of energy storage internal equivalent voltage nodes, equivalent series impedances, and candidate access nodes, specifically including:

[0087] S21: The dynamic impedance equivalent parameters of the energy storage port can be obtained by using existing dynamic impedance equivalent methods;

[0088] A small voltage amplitude disturbance with frequency f is applied to the grid connection port of the energy storage device, and the port voltage amplitude disturbance is tested and obtained. and its corresponding reactive current response The dynamic admittance of the energy storage port is expressed as:

[0089] ;

[0090] When expressed in scalar form, the dynamic admittance and dynamic impedance are respectively represented as:

[0091] ;

[0092] ;

[0093] When using complex form, the dynamic admittance and dynamic impedance are expressed as follows:

[0094] ;

[0095] ;

[0096] in, and These are the phase angles of the voltage amplitude disturbance and the reactive current response, respectively. and These are the complex phasors for voltage amplitude disturbance and reactive current response, respectively.

[0097] S22: Establish a static equivalent model for energy storage that takes into account the dynamic impedance equivalent results.

[0098] The equivalent node inside the energy storage is set as an active power-voltage amplitude controlled node, and connected to the candidate access node through an equivalent series impedance. Its equivalent structure is represented as follows:

[0099] ;

[0100] For the energy storage voltage support channel, the physical connection branch impedance, scalar dynamic impedance, and complex dynamic impedance are respectively converted into equivalent series reactance:

[0101] ;

[0102] in, This is the equivalent voltage node inside the energy storage system. Candidate access node i; The physical impedance of the energy storage transformer and its connecting branches; , and These are the physical connection branch impedance model, the scalar dynamic impedance equivalent model, and the complex dynamic impedance equivalent model. All three static models use the same internal equivalent nodes, power settings, and network connection structure; only the value of the equivalent series impedance differs.

[0103] Preferably, a complex-form dynamic impedance equivalent model is adopted. The calculation of the main pre-screening results shows that the model retains the amplitude and phase relationship between the port voltage amplitude disturbance and the reactive current response during the dynamic impedance parameter acquisition stage. The obtained complex-form dynamic impedance is then converted into an equivalent series reactance and embedded into the energy storage static equivalent model, along with the physical connection branch impedance model. Equivalent model of dynamic impedance in scalar form Used to compare the effects of different static equivalent methods on node voltage and local P. 0.85 The impact of boundary and candidate node sorting results;

[0104] S3: Connect the energy storage static equivalent model to each candidate node, construct a local load growth path for each formally evaluated load node, calculate the local P-V curve of the target node and its load level when it reaches the preset low voltage threshold, construct a multi-node voltage safety margin improvement matrix based on the load level changes before and after energy storage connection, and comprehensively rank the candidate connection nodes using the total absolute improvement index, average relative improvement index, and most unfavorable node improvement index to determine the priority candidate connection node set. Specific steps include:

[0105] S31: Calculate the local P for each candidate access scheme. 0.85 ;

[0106] For any formally evaluated load node j, keep other load nodes at the baseline load level, increase only the active load of node j, and adjust the reactive load synchronously according to its original power factor:

[0107] ;

[0108] ;

[0109] in, and These are the baseline active load and baseline reactive load for formally evaluating load node j, respectively. For the active load increment of node j; and These are the active load and reactive load after the load increase, respectively.

[0110] The energy storage static equivalent model established in step S2 is connected to each candidate node, and a local P-V scan of the target node is performed. When the voltage of node j drops to 0.85 pu, the corresponding active load level satisfies:

[0111] ;

[0112] In the formula, This indicates the active load level corresponding to the formal evaluation load node j reaching 0.85 pu when using the static equivalent model M of energy storage and the candidate node i for energy storage access.

[0113] S32: Construct P 0.85 Improvement matrix;

[0114] A partial PV scan was performed on all candidate access nodes and officially evaluated load nodes, and the results were... Arrangement forms P under model M 0.85 matrix:

[0115] ;

[0116] Where n represents the number of candidate access nodes and m represents the number of officially evaluated load nodes. Under the condition of no new energy storage, the baseline load level of node j is obtained by following the same local load growth path. The absolute improvement and relative improvement rate after energy storage integration are as follows:

[0117] ;

[0118] ;

[0119] S33: Calculate the comprehensive evaluation index and determine the priority candidate nodes;

[0120] Based on the improvement results of each candidate access node on all formally evaluated load nodes, the total absolute improvement index, the average relative improvement index, and the improvement index of the most unfavorable node are calculated respectively:

[0121] ;

[0122] ;

[0123] ;

[0124] in, For the formal evaluation of the load node set; , and Let represent the total absolute improvement, average relative improvement, and minimum improvement for the most unfavorable load node i, respectively, according to... Sort the candidate access nodes from largest to smallest, and then... and As a supplementary indicator;

[0125] S4: Select detailed verification nodes from the candidate access nodes that have completed the comprehensive evaluation, set multiple load operation points near the preset low voltage threshold, and conduct electromagnetic transient simulations; compare the errors between the voltage calculated by different energy storage static equivalent models and the voltage at the electromagnetic transient steady-state operation point, and use the electromagnetic transient operation point interpolation to obtain the corresponding load boundary, and verify the ranking trend of the priority candidate nodes obtained from the static pre-screening, specifically including:

[0126] S41: Verify the voltage approximation error of the static model using electromagnetic transient operating points;

[0127] From the energy storage candidate access nodes that have completed the comprehensive evaluation, select detailed verification nodes, and obtain P in step S3. 0.85 Multiple load operating points were set up nearby, and electromagnetic transient simulations were conducted to obtain the steady-state voltage of the formally evaluated load node at each operating point. For candidate access node i, formally evaluated load node j, and load operating point k, the voltage deviation, mean absolute error, root mean square error, and maximum absolute error of the energy storage static equivalent model M are as follows:

[0128] ;

[0129] ;

[0130] ;

[0131] ;

[0132] Energy storage static equivalent model M relative to physical connection branch impedance model M phy The average absolute error reduction rate is expressed as:

[0133] ;

[0134] In the formula, The steady-state voltage obtained from electromagnetic transient simulation at the kth load operating point corresponding to the energy storage static equivalent model M is given by the energy storage static equivalent model M. The voltage is calculated by the energy storage static equivalent model M under the same load level; N is the total number of electromagnetic transient operating points participating in the error statistics;

[0135] S42: Interpolation calculation of electromagnetic transient side P 0.85 And verify the pre-screening results;

[0136] For the same candidate access node and the officially evaluated load node, select adjacent load operating points P on both sides of the target node voltage located at 0.85 pu. a and P b The corresponding electromagnetic transient and steady-state voltages are respectively and P on the electromagnetic transient side is obtained by linear interpolation. 0.85 :

[0137] ;

[0138] according to The improvement amount and comprehensive evaluation index of the candidate access nodes are calculated according to step S3, and compared with the static pre-screening results to determine the set of priority candidate access nodes verified by electromagnetic transient operation points; for candidate nodes with different rankings, they are retained for subsequent detailed time domain analysis and engineering scheme evaluation.

[0139] Example 2

[0140] This embodiment provides a pre-screening system for energy storage access locations based on dynamic impedance equivalence and PV curves, used to implement the pre-screening method for energy storage access locations based on dynamic impedance equivalence and PV curves in Embodiment 1 above. It includes: a total active load level acquisition module, a sorting and screening module, an energy storage static equivalent model construction module, an improvement matrix construction module, a priority candidate access node selection module, a voltage error calculation module, and a verification module.

[0141] In this embodiment, the total active load level acquisition module is used to perform load growth PV scanning on the load nodes of the power system to obtain the corresponding total active load level of the system.

[0142] In this embodiment, the sorting and filtering module is used to sort the load nodes based on the total active power load level of the system and select load nodes with weak initial voltage and energy storage candidate access nodes.

[0143] In this embodiment, the energy storage static equivalent model construction module is used to obtain the dynamic impedance parameters of the energy storage converter port, convert the physical connection branch impedance, scalar dynamic impedance and complex dynamic impedance into equivalent series reactance respectively, and construct the corresponding energy storage static equivalent model.

[0144] In this embodiment, the improvement matrix construction module is used to construct a multi-node voltage safety margin improvement matrix, connect each energy storage static equivalent model to each candidate node, perform local P-V scanning of the target node, and construct the multi-node voltage safety margin improvement matrix based on the load level changes before and after energy storage access.

[0145] In this embodiment, the priority candidate access node selection module is used to calculate the comprehensive evaluation index based on the improvement results of each candidate node and determine the priority candidate access node;

[0146] In this embodiment, the voltage error calculation module is used to compare the error between the voltage calculated by different energy storage static equivalent models based on electromagnetic transient simulation and the voltage at the electromagnetic transient steady-state operating point.

[0147] In this embodiment, the verification module is used to obtain the corresponding load boundary by interpolating the electromagnetic transient operating point, and to verify the ranking trend of the priority candidate access nodes to obtain the final set of energy storage access nodes.

[0148] Example 3

[0149] like Figure 2 As shown, this embodiment is based on the IEEE standard 39-bus system and provides a more detailed description of the energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves in Embodiment 1. The power reference of the IEEE standard 39-bus system is 100 MVA, and the implementation steps include:

[0150] S1. Identify voltage-weak load nodes and determine candidate access nodes for energy storage;

[0151] (1) Under the baseline operation mode without adding new energy storage, increase the active and reactive loads of each load node in the system by the same proportion, while keeping the original power factor of each load node unchanged. Perform power flow calculations at each load level, record the voltage changes of each load node and the total active load level of the system corresponding to the node voltage dropping to 0.85 pu. In this embodiment, K=3 is taken as follows: The results of identifying voltage-weak load nodes, sorted from smallest to largest, are shown in Table 1.

[0152] Table 1. Identification results of weak load nodes in the reference system voltage

[0153]

[0154] As shown in Table 1, the total active power load levels of the system corresponding to nodes 8, 7, and 4 when they reach 0.85 pu along the system load growth path rank among the top three. Therefore, in this embodiment, nodes 4, 7, and 8 are identified as the nodes for formal load evaluation.

[0155] (2) The nodes that meet the energy storage access conditions among the formally evaluated load nodes and their first-order topology adjacent nodes are included in the energy storage candidate access node set. The results are shown in Table 2:

[0156] Table 2. Generation Results of Energy Storage Candidate Access Nodes

[0157]

[0158] Therefore, the officially evaluated load nodes are nodes 4, 7, and 8, and the candidate access nodes for energy storage are nodes 3, 4, 5, 6, 7, 8, and 9.

[0159] S2. Establish a static energy storage model that takes into account the equivalent results of dynamic impedance;

[0160] (1) Apply a small voltage amplitude disturbance to the grid-connected port of the energy storage device, test the voltage amplitude disturbance at the port and its corresponding reactive current response, and obtain the scalar dynamic impedance and complex dynamic impedance according to the aforementioned dynamic impedance calculation method; further convert the obtained dynamic impedance into the equivalent series reactance for static power flow calculation. The dynamic impedance test parameters and energy storage static equivalent model parameters used in this embodiment are shown in Table 3:

[0161] Table 3. Dynamic impedance test and static equivalent model parameters of energy storage

[0162]

[0163] (2) Connect the equivalent voltage nodes inside the energy storage to the candidate nodes determined in step S1 through equivalent series impedance. Establish the physical connection branch impedance model using the physical connection branch equivalent reactance, scalar dynamic impedance equivalent reactance, and complex dynamic impedance equivalent reactance in Table 3, respectively. Scalar form dynamic impedance equivalent model Equivalent model of dynamic impedance in complex form .

[0164] The three models use the same energy storage active power setting, internal node voltage setting, and network connection method, differing only in the equivalent series impedance value. This embodiment uses a complex-form dynamic impedance equivalent model. The main pre-screening results were calculated, and the results of the three models were used to compare the effects of different static equivalent methods on the local PV curve and P. 0.85 The impact of boundary calculation results.

[0165] S3, Calculate local P 0.85 Improve the quantity and identify priority candidate access nodes;

[0166] (1) Connect the complex form dynamic impedance equivalent model to candidate nodes 3, 4, 5, 6, 7, 8 and 9 respectively, and use nodes 4, 7 and 8 as evaluation load nodes. According to the aforementioned local load growth method, increase the load of each evaluation load node in turn, while maintaining its original power factor, and calculate the local PV curves under different energy storage access schemes.

[0167] Record the P value corresponding to the voltage drop of each evaluated load node to 0.85 pu. 0.85 And compared with the baseline value under the condition of no new energy storage, the P values ​​of each candidate access node relative to nodes 4, 7 and 8 were obtained. 0.85 The absolute improvement amounts and the main improvement results for each evaluation load node are shown in Table 4:

[0168] Table 4. Main Energy Storage Connection Results for Each Evaluation Load Node

[0169]

[0170] As shown in Table 4, when energy storage is connected to the load node for evaluation, it typically has a large P value. 0.85 In addition to improving the quantity, the connection of adjacent nodes can also provide support for the evaluated load nodes. Therefore, the location of energy storage connection cannot be determined solely based on the optimal result of a single evaluated load node, but also needs to be compared with its comprehensive support effect on multiple voltage-deficient load nodes.

[0171] (2) Arrange the absolute improvement of each candidate access node to nodes 4, 7 and 8 to form an improvement matrix, the result of which is as follows: Figure 3 As shown, the union of the optimal and second-optimal energy storage access nodes corresponding to each evaluated load node is obtained as nodes 4, 5, 7, and 8, which are then used as key candidate access nodes for subsequent comprehensive evaluation and electromagnetic transient verification. Nodes 4, 7, and 8 represent local access schemes for voltage-deficient load nodes, while node 5 represents access schemes for adjacent areas with multiple voltage-deficient loads.

[0172] (3) Based on the calculation methods of the total absolute improvement index, average relative improvement index, and most unfavorable node improvement index mentioned above, a comprehensive evaluation was conducted on nodes 4, 5, 7, and 8. The results are shown in Table 5.

[0173] Table 5. Comprehensive Evaluation Results of Candidate Energy Storage Access Nodes

[0174]

[0175] Based primarily on the average relative improvement index, the comprehensive ranking of candidate access nodes is as follows:

[0176] Node 7 > Node 8 > Node 4 > Node 5

[0177] Nodes 7 and 8 have higher average relative improvement indices than nodes 4 and 5, and can be considered as first-tier candidate access nodes. Node 5 has a lower average relative improvement index, but its worst-case node improvement index is the largest, indicating that different comprehensive indices reflect different support focuses, and further verification using electromagnetic transient operating points is needed.

[0178] S4. Verify the static model and candidate node ranking using electromagnetic transient operating points;

[0179] (1) Select nodes 4, 5, 7 and 8 in step S3 as electromagnetic transient verification nodes, and use nodes 4, 7 and 8 as evaluation load nodes to establish energy storage access schemes respectively. The energy storage adopts grid-connected control, the active power is set to 100 MW, the voltage reference value is set to 1.05 pu, and the rated parameters of the interface transformer are 33 / 230 kV and 100 MVA;

[0180] P obtained from the dynamic impedance equivalent model in complex form 0.85 Centered on the load, seven load operating points with offsets of -100 MW, -50 MW, -25 MW, 0 MW, 25 MW, 50 MW, and 100 MW were set, forming a total of 84 electromagnetic transient operating points. After the system reached steady state, the load node voltages were extracted and compared with the calculated voltages of three static models under the same load level. Some comparison results are shown in Figures 4(a) to 4(c) and Figures 5(a) to 5(c). The voltage error statistics of the three static models are shown in Table 6.

[0181] Table 6. Statistical results of voltage error for the three static models

[0182]

[0183] As shown in Table 6, after adopting the scalar and complex forms of dynamic impedance equivalence, the average absolute error of the static model is reduced by approximately 57.7% and 59.1%, respectively; among them, the complex form dynamic impedance equivalent model... The mean absolute error is the smallest.

[0184] (2) Using the linear interpolation method for electromagnetic transient operating points, calculate the corresponding values ​​for each combination of energy storage access node and evaluation load node. The comprehensive evaluation index is calculated using the same method as in step S3. The static comprehensive ranking obtained from the complex form dynamic impedance equivalent model is as follows:

[0185] Node 7 > Node 8 > Node 4 > Node 5;

[0186] The overall ranking obtained by interpolating the electromagnetic transient operating points is as follows:

[0187] Node 7 > Node 8 > Node 5 > Node 4;

[0188] Both results list nodes 7 and 8 as the first two, indicating that the first-tier candidate nodes obtained from the static pre-screening are supported by the electromagnetic transient operating point results. The order of nodes 4 and 5 changes, suggesting that the detailed order of non-first-tier candidate nodes still needs further judgment based on subsequent electromagnetic transient analysis. Comparison between static comprehensive evaluation indicators and electromagnetic transient interpolation comprehensive evaluation indicators. Figure 6 As shown, static P0.85 and For example Figure 7 As shown.

[0189] This invention targets voltage-weak load nodes, using the load level P corresponding to a node voltage drop to 0.85 pu. 0.85 Characterize the local voltage safety margin, and further construct P for multiple voltage-weak load nodes. 0.85 Improvement Matrix. By using the total absolute improvement index, the average relative improvement index, and the most unfavorable node improvement index, the overall improvement degree, normalized improvement degree, and the support effect of the most unfavorable node for different energy storage access locations can be evaluated, thereby improving the comprehensiveness of the evaluation of candidate access locations.

[0190] This invention introduces existing dynamic impedance equivalent results into the static equivalent model of energy storage. Based on the equivalent structure of internal voltage nodes, equivalent impedance, and grid connection nodes of the energy storage, it embeds the physical connection branch impedance and the equivalent series reactance obtained from dynamic impedance parameters in scalar and complex forms into the PV curve calculation. Therefore, while maintaining the efficiency of static analysis calculations, it can systematically compare the local P values ​​of different static equivalent models. 0.85 The impact of boundary and energy storage access location ranking results.

[0191] This invention utilizes electromagnetic transient operating points to verify the static pre-screening results, quantitatively calculates the node voltage approximation error of different energy storage static equivalent models, and obtains the corresponding P through electromagnetic transient operating point interpolation near the selected voltage safety boundary. 0.85 As a result, based on the electromagnetic transient interpolation results, the ranking trend of the priority candidate access nodes obtained from the static pre-screening was compared and verified, thereby improving the credibility of the pre-screening results and providing a basis for subsequent electromagnetic transient analysis and engineering scheme comparison.

[0192] The above embodiments are preferred embodiments of the present invention, but the embodiments of the present invention are not limited to the above embodiments. Any changes, modifications, substitutions, combinations, or simplifications made without departing from the spirit and principle of the present invention shall be considered equivalent substitutions and shall be included within the protection scope of the present invention.

Claims

1. A method for pre-screening energy storage access locations based on dynamic impedance equivalence and PV curves, characterized in that, Includes the following steps: Perform load growth P-V scans on the load nodes of the power system to obtain the corresponding total active load level of the system; The load nodes are sorted based on the total active power load level of the system, and load nodes with weak initial voltage and candidate energy storage access nodes are selected. Obtain the dynamic impedance parameters of the energy storage converter port, convert the physical connection branch impedance, scalar dynamic impedance and complex dynamic impedance into equivalent series reactance respectively, and construct the corresponding energy storage static equivalent model. Each energy storage static equivalent model is connected to each candidate node, and a local P-V scan of the target node is performed. A multi-node voltage safety margin improvement matrix is ​​constructed based on the load level changes before and after energy storage connection. Calculate comprehensive evaluation indicators based on the improvement results of each candidate node and determine the priority candidate access node; Based on electromagnetic transient simulation, the error between the voltage calculated by different energy storage static equivalent models and the voltage at the electromagnetic transient steady-state operating point is compared. The corresponding load boundary is obtained by interpolation of the electromagnetic transient operating point. The ranking trend of the priority candidate access nodes is checked to obtain the final set of energy storage access nodes.

2. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, Perform load growth P-V scans on the load nodes of the power system to obtain the corresponding total active power load level of the system, specifically including: Obtain network topology, line parameters, generator output and node load data of the power system, increase the active and reactive loads of each load node in the same proportion, and keep the original power factor of each load node unchanged. Power flow calculations are performed for different load levels to obtain the PV curves of voltage at each load node as a function of the total active power load of the system.

3. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, The selection of candidate access nodes for energy storage specifically includes: Select formal evaluation load nodes from the initial voltage weak load nodes, and use the formal evaluation load nodes and their adjacent nodes as candidate access nodes for energy storage.

4. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, Obtain the dynamic impedance parameters of the energy storage converter port, specifically including: A small voltage amplitude disturbance with frequency f is applied to the grid connection port of the energy storage device, and the port voltage amplitude disturbance is tested and obtained. and its corresponding reactive current response The dynamic admittance of the energy storage port is expressed as: ; When expressed in scalar form, the dynamic admittance and dynamic impedance are respectively represented as: ; ; When using complex form, the dynamic admittance and dynamic impedance are expressed as follows: ; ; in, and These are the phase angles of the voltage amplitude disturbance and the reactive current response, respectively. and These are the complex phasors for voltage amplitude disturbance and reactive current response, respectively.

5. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, The physical connection branch impedance, scalar dynamic impedance, and complex dynamic impedance are converted into equivalent series reactances, expressed as follows: ; Where j represents the load node, The physical impedance of the energy storage transformer and its connecting branches. , and These are the physical connection branch impedance model, the scalar dynamic impedance equivalent model, and the complex dynamic impedance equivalent model, respectively. The equivalent nodes inside the energy storage are connected to the candidate access nodes through equivalent series impedance. The equivalent structure is represented as follows: ; in, This is the equivalent voltage node inside the energy storage system. These are candidate access nodes.

6. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, Perform a local P-V scan of the target node and construct a multi-node voltage safety margin improvement matrix based on the load level changes before and after energy storage integration. Specifically, this includes: Calculate the active load level when the voltage of each node reaches the preset low voltage boundary, and arrange the active load levels to form a multi-node voltage safety margin improvement matrix.

7. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 6, characterized in that, Based on the improvement results of each candidate node, a comprehensive evaluation index is calculated and priority candidate access nodes are determined, specifically including: The baseline load level of the node is obtained by following the same local load growth path; The absolute improvement and relative improvement rate after energy storage is connected are calculated based on the difference between the active load level and the baseline load level. The total absolute improvement, average relative improvement, and minimum improvement for the most unfavorable load node are calculated based on the absolute improvement and relative improvement rate, thus obtaining the corresponding total absolute improvement index, average relative improvement index, and most unfavorable node improvement index. Priority candidate access nodes are determined based on the total absolute improvement index, the average relative improvement index, and the most unfavorable node improvement index.

8. The method for pre-screening energy storage access locations based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, The error between the voltage calculated by different static equivalent models of energy storage and the voltage at the electromagnetic transient steady-state operating point is compared based on electromagnetic transient simulation, specifically including: The voltage deviation, mean absolute error, root mean square error, and maximum absolute error of the energy storage static equivalent model are calculated and expressed as follows: ; ; ; ; in, , , , Let represent the voltage deviation, mean absolute error, root mean square error, and maximum absolute error of the energy storage static equivalent model M, respectively, and N be the total number of electromagnetic transient operating points participating in the error statistics. The steady-state voltage obtained from electromagnetic transient simulation at the kth load operating point corresponding to the energy storage static equivalent model M is given by the energy storage static equivalent model M. The voltage is calculated for the energy storage static equivalent model M under the same load level.

9. The energy storage access location pre-screening method based on dynamic impedance equivalence and PV curves according to claim 1, characterized in that, The corresponding load boundary is obtained by interpolating the electromagnetic transient operating point, specifically including: Select adjacent load operating points P whose target node voltages are located on either side of the low voltage comparison boundary. a and P b The corresponding electromagnetic transient and steady-state voltages are respectively and The load level on the electromagnetic transient side is obtained by linear interpolation and is expressed as: ; in, This indicates the load level on the electromagnetic transient side.

10. A pre-screening system for energy storage access locations based on dynamic impedance equivalence and PV curves, characterized in that, The method for pre-screening energy storage access locations based on dynamic impedance equivalence and PV curves as described in any one of claims 1-9 includes: a total active load level acquisition module, a sorting and screening module, an energy storage static equivalent model construction module, an improvement matrix construction module, a priority candidate access node selection module, a voltage error calculation module, and a verification module. The total active load level acquisition module is used to perform load growth PV scanning on the load nodes of the power system to obtain the corresponding total active load level of the system. The sorting and filtering module is used to sort load nodes based on the total active power load level of the system, and select load nodes with weak initial voltage and candidate energy storage access nodes. The energy storage static equivalent model construction module is used to obtain the dynamic impedance parameters of the energy storage converter port, convert the physical connection branch impedance, scalar dynamic impedance and complex dynamic impedance into equivalent series reactance respectively, and construct the corresponding energy storage static equivalent model. The improvement matrix construction module is used to construct a multi-node voltage safety margin improvement matrix, connect each energy storage static equivalent model to each candidate node, perform local P-V scanning of the target node, and construct the multi-node voltage safety margin improvement matrix based on the load level changes before and after energy storage access. The priority candidate access node selection module is used to calculate a comprehensive evaluation index based on the improvement results of each candidate node and determine the priority candidate access node. The voltage error calculation module is used to compare the error between the voltage calculated by different energy storage static equivalent models and the voltage at the electromagnetic transient steady-state operating point based on electromagnetic transient simulation. The verification module is used to obtain the corresponding load boundary by interpolating the electromagnetic transient operating point, verify the ranking trend of the priority candidate access nodes, and obtain the final set of energy storage access nodes.