By installing a fluidization component at the bottom of the polypropylene production unit and transporting fluidizing air, the problem of polypropylene material adhesion is solved and the normal operation of the unit is ensured.

CN221789310UActive Publication Date: 2024-10-01XUZHOU HAITIAN PETROCHEM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323500247.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-10-01
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

During the use of existing polypropylene production equipment, the prepared polypropylene materials tend to adhere to the bottom of the production equipment, causing formation of layers over time and affecting the use of the equipment.

Method used

Multiple installation cylinders are installed on the bottom side wall of the production device, and fluidization components are installed in them. Fluidization air is transported to the bottom of the production device through the fluidization component to ensure the fluidity of the polypropylene material and prevent it from adhering to the bottom.

Benefits of technology

Through the action of fluidizing air, polypropylene materials can continue to flow, avoiding adhesion and layering at the bottom of the production device, and extending the service life of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221789310U_ABST
    Figure CN221789310U_ABST
Patent Text Reader

Abstract

The utility model discloses a polypropylene production device which comprises a production device body, a plurality of installation cylinders are installed on the side wall of the bottom of the production device body, fluidization assemblies are installed in the installation cylinders, the fluidization assemblies are provided with installation rods, one ends of the installation rods are arranged in the production device body, and the other ends of the installation rods are arranged in the production device body. One end of the mounting rod is arranged in the production device body, the other end of the mounting rod is arranged outside the production device body, a semi-hollow ball is arranged at one end, arranged in the production device body, of the mounting rod, a plurality of first nozzles are arranged on the semi-hollow ball, and a plurality of second nozzles are arranged on the side wall, arranged in the production device body, of the mounting rod. According to the utility model, the plurality of fluidization assemblies are mounted at the bottom, and fluidization air is conveyed to the bottom of the production device through the fluidization assemblies, so that polypropylene materials at the bottom of the production device can continuously flow through the fluidization air, and the polypropylene materials are prevented from being attached to the bottom of the production device; therefore, the influence on use of the device caused by layering of polypropylene materials at the bottom of the production device is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of polypropylene production, and in particular relates to a polypropylene production device. Background Art

[0002] Polypropylene is a polymer formed by the addition polymerization of propylene. It is a white waxy material with a transparent and light appearance. Polypropylene is widely used in the production of clothing, blankets and other fiber products, medical equipment, automobiles, bicycles, parts, pipelines and chemical containers, and is also used in food and drug packaging.

[0003] After the polypropylene is prepared in the production device, it needs to be discharged from the production device through the discharge port. However, when the existing production device is used, it is found that the prepared polypropylene will adhere to the bottom of the production device. Over time, it will accumulate into a layer at the bottom of the production device, affecting the use of the production device.

[0004] Therefore, in view of the above technical problems, it is necessary to provide a polypropylene production device. Utility Model Content

[0005] The purpose of the utility model is to provide a polypropylene production device to solve the above problems.

[0006] In order to achieve the above purpose, the technical solution provided by an embodiment of the present utility model is as follows:

[0007] A polypropylene production device comprises a production device body, a plurality of installation cylinders are installed on the bottom side wall of the production device body, a fluidization assembly is installed in each of the plurality of installation cylinders, the fluidization assembly is provided with a installation rod, one end of the installation rod is placed in the production device body, and the other end of the installation rod is placed outside the production device body, a semi-hollow ball is installed on the end of the installation rod placed in the production device body, a plurality of first nozzles are arranged on the semi-hollow ball, a plurality of second nozzles are opened on the side wall of the installation rod placed in the production device body, a connecting rod is installed on the side wall of the installation rod, the connecting rod is threadedly connected to the installation cylinder, an annular tube is provided at the bottom of the production device body, and the fluidization assembly is connected to the annular tube.

[0008] As a further improvement of the present invention, a limiting ring is integrally formed at one end of the installation cylinder close to the inner side of the production device body, and a sealing ring is installed on the inner side wall of the limiting ring.

[0009] As a further improvement of the present invention, a sealing gasket is provided at one end of the connecting rod close to the inner side of the production device body, and the mounting rod abuts against the sealing gasket.

[0010] As a further improvement of the present invention, one end of the connecting rod close to the outer side of the production device body is fixedly connected with a hexagonal rotating part, and the hexagonal rotating part is sleeved on the mounting rod.

[0011] As a further improvement of the utility model, a support rod is fixedly connected to the semi-hollow ball, and a protective cap is fixedly connected to the support rod.

[0012] As a further improvement of the utility model, a plurality of connecting parts are installed on the annular tube, a hose is installed on each of the plurality of connecting parts, and one end of the hose away from the connecting part is installed on the mounting rod.

[0013] As a further improvement of the utility model, an air supply pipe is installed at the lower end of the annular pipe, and a fluidizing fan is installed at one end of the air supply pipe away from the annular pipe.

[0014] As a further improvement of the utility model, a discharge port is provided at the bottom of the production device body, and a switch valve is installed on the discharge port.

[0015] Compared with the prior art, the utility model has the following advantages:

[0016] The utility model has a plurality of fluidizing components installed at the bottom, and fluidizing air is delivered to the bottom of the production device through the fluidizing components. The fluidizing air can make the polypropylene material at the bottom of the production device flow continuously, and prevent the polypropylene material from adhering to the bottom of the production device, thereby preventing the polypropylene material from stratifying at the bottom of the production device and affecting the use of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a front view of a polypropylene production device in one embodiment of the utility model;

[0019] Figure 2 It is a three-dimensional diagram of a polypropylene production device in one embodiment of the utility model;

[0020] Figure 3 A half-section view of a polypropylene production device in one embodiment of the utility model;

[0021] Figure 4 This is a cross-sectional view of a polypropylene production device in one embodiment of the utility model;

[0022] Figure 5 This is an embodiment of the utility model Figure 4 The enlarged view of point A in the middle;

[0023] Figure 6 It is an exploded view of the installation cylinder and the fluidization assembly in one embodiment of the utility model.

[0024] In the figure: 1. Production device body, 2. Mounting cylinder, 21. Limiting ring, 22. Sealing ring, 3. Fluidizing assembly, 31. Mounting rod, 32. Semi-hollow ball, 33. First nozzle, 34. Second nozzle, 35. Connecting rod, 36. Sealing pad, 37. Support rod, 38. Protective cap, 39. Hexagonal rotating part, 4. Ring pipe, 5. Connecting part, 6. Hose, 7. Air pipe, 8. Fluidizing fan, 9. Discharge port, 10. Switch valve. DETAILED DESCRIPTION

[0025] The present invention will be described in detail below in conjunction with the various embodiments shown in the accompanying drawings. However, these embodiments do not limit the present invention, and any structural, methodological, or functional changes made by a person skilled in the art based on these embodiments are all within the scope of protection of the present invention.

[0026] The utility model discloses a polypropylene production device, Figure 1 to Figure 4 As shown, it includes a production device body 1. Polypropylene is usually prepared from propylene. During the preparation, the generation of polypropylene is promoted by stirring with a stirring device. The production device body 1 is used to produce polypropylene.

[0027] Example 1

[0028] Ginseng Figure 1 to Figure 4 As shown, a plurality of mounting barrels 2 are installed on the bottom side wall of the production device body 1, and a fluidizing assembly 3 is installed in each of the plurality of mounting barrels 2. When polypropylene is produced in the production device body 1, the generated polypropylene material needs to be discharged from the production device body 1. During the production process, it is found that the polypropylene material will have the problem of adhering to the bottom of the production device body 1. After a long time, it will form a layer at the bottom of the production device body 1, thereby affecting the use of the production device body 1. It is necessary to clean the polypropylene attached to the bottom of the production device body 1, which makes the device inconvenient to use. Therefore, in order to avoid the polypropylene material from adhering to the bottom of the production device body 1, a plurality of mounting barrels 2 are installed on the bottom side wall of the production device body 1. By installing the fluidizing assembly 3 in the plurality of mounting barrels 2, the fluidizing air is transported to the bottom of the production device body 1 through the fluidizing assembly 3, so that the polypropylene material at the bottom of the production device body 1 has better fluidity, thereby avoiding the polypropylene material from adhering to the side wall of the production device body 1.

[0029] Ginseng Figure 5 and Figure 6 As shown, the fluidizing assembly 3 is provided with a mounting rod 31, one end of the mounting rod 31 is placed in the production device body 1, and the other end of the mounting rod 31 is placed outside the production device body 1, a semi-hollow ball 32 is installed on the end of the mounting rod 31 placed in the production device body 1, and a plurality of first nozzles 33 are arranged on the semi-hollow ball 32, and a plurality of second nozzles 34 are opened on the side wall of the mounting rod 31 placed in the production device body 1.

[0030] Specifically, the fluidization assembly 3 is provided with a mounting rod 31, which is used for installing the fluidization assembly 3 and conveying fluidizing air. During installation, one end of the mounting rod 31 is placed inside the production device body 1, and the other end is placed outside the production device body 1. A semi-hollow ball 32 is integrally formed at the end of the mounting rod 31 placed inside the production device body 1. A plurality of first nozzles 33 are provided on the semi-hollow ball 32, so that the fluidizing air conveyed by the mounting rod 31 and the semi-hollow ball 32 is ejected through the semi-hollow ball 32, thereby fluidizing the polypropylene material in the production device body 1. Figure 5 It can be seen that the semi-hollow ball 32 is tilted so that the fluidizing air ejected is tilted, so that the polypropylene material slightly away from the bottom of the production device body 1 can be fluidized, so that the polypropylene material away from the bottom of the production device body 1 has better fluidity, which is convenient for the polypropylene material to be discharged. A plurality of second nozzles 34 are provided on the side wall of the mounting rod 31 placed inside the production device body 1, and part of the fluidizing air delivered by the mounting rod 31 can be ejected through the second nozzles 34, while the Figure 5 It can be seen that the second nozzle 34 is arranged near the bottom of the production device body 1, so that the polypropylene material at the bottom of the production device body 1 is fluidized by the second nozzle 34, so that the material at the bottom of the production device body 1 has better fluidity, thereby preventing the polypropylene material from adhering to the bottom side wall of the production device body 1.

[0031] Preferably, through the cooperation of the first nozzle 33 and the second nozzle 34, the first nozzle 33 fluidizes the polypropylene material slightly away from the bottom of the production device body 1, so that the material has better fluidity, and the second nozzle 34 fluidizes the polypropylene material at the bottom of the production device body 1, so that the material at the bottom of the production device body 1 has better fluidity. And with the assistance of the first nozzle 33, the second nozzle 34 will have a better fluidization effect on the polypropylene material at the bottom of the production device body 1, so that the polypropylene material at the bottom of the production device body 1 has better fluidity, thereby ensuring that the polypropylene material will not adhere to the bottom of the production device body 1.

[0032] Example 2

[0033] Ginseng Figure 5 and Figure 6As shown, a connecting rod 35 is installed on the side wall of the mounting rod 31, and the connecting rod 35 is threadedly connected to the mounting cylinder 2. In order to facilitate the installation of the fluidization assembly 3 in the mounting cylinder 2, a connecting rod 35 is installed on the side wall of the mounting rod 31, and the connecting rod 35 and the mounting rod 31 can be connected by a fixed connection method such as integral molding and welding, so that when the connecting rod 35 is threadedly connected to the mounting cylinder 2, the installation of the fluidization assembly 3 can be completed.

[0034] Ginseng Figure 5 and Figure 6 As shown, a limiting ring 21 is integrally formed at one end of the installation tube 2 close to the inner side of the production device body 1, and a sealing ring 22 is installed on the inner side wall of the limiting ring 21. A sealing gasket 36 is provided at one end of the connecting rod 35 close to the inner side of the production device body 1, and the installation rod 31 abuts on the sealing gasket 36. By providing the limiting ring 21 on the inner side wall of the installation tube 2, when the connecting rod 35 is installed in the installation tube 2, the position of the connecting rod 35 is limited by the limiting ring 21. At the same time, in order to ensure the sealing performance of the connecting rod 35 when it is installed in the installation tube 2, a sealing ring 22 is provided on the inner side wall of the limiting ring 21, and a sealing gasket 36 is provided at the front end of the connecting rod 35. When the connecting rod 35 is tightened in the installation tube 2, the connecting rod 35 and the sealing gasket 36 are tightly abutted together, so that the connecting rod 35 has good sealing performance with the installation tube 2 after installation.

[0035] Ginseng Figure 5 and Figure 6 As shown, a hexagonal rotating portion 39 is fixedly connected to one end of the connecting rod 35 close to the outer side of the production device body 1, and the hexagonal rotating portion 39 is sleeved on the mounting rod 31. Since the connecting rod 35 needs to be tightened when it is threadedly connected to the mounting cylinder 2, in order to facilitate the tightening of the connecting rod 35, a hexagonal rotating portion 39 is fixedly connected to the outer side wall of the connecting rod 35, and the connecting rod 35 can be tightened and disassembled through the hexagonal rotating portion 39, so that the installation and disassembly of the fluidizing assembly 3 are convenient.

[0036] Ginseng Figure 5 and Figure 6 As shown, a support rod 37 is fixedly connected to the semi-hollow ball 32, and a protective cap 38 is fixedly connected to the support rod 37. By arranging the protective cap 38 on the semi-hollow ball 32, the protective cap 38 can shield the material to a certain extent, thereby preventing the material from entering the first nozzle 33 during use.

[0037] Preferably, since the fluidizing component 3 needs to be maintained and replaced during use, it is necessary to facilitate the disassembly and assembly of the fluidizing component 3. During disassembly and assembly, the semi-hollow ball 32 and the protective cap 38 need to be pulled out from the production device body 1. Therefore, the inner diameter of the limit ring 21 is larger than the outer diameter of the semi-hollow ball 32 and the protective cap 38 during setting, so that the semi-hollow ball 32 and the protective cap 38 can pass through the limit ring 21, so that the fluidizing component 3 can be pulled out of the mounting tube 2 and installed.

[0038] Example 3

[0039] Ginseng Figure 1 to Figure 4 As shown, an annular tube 4 is provided at the bottom of the production device body 1, and the fluidization assembly 3 is connected to the annular tube 4. A plurality of connection parts 5 are installed on the annular tube 4, and a hose 6 is installed on each of the plurality of connection parts 5, and one end of the hose 6 away from the connection part 5 is installed on the mounting rod 31. An air supply pipe 7 is installed at the lower end of the annular tube 4, and a fluidizing fan 8 is installed at one end of the air supply pipe 7 away from the annular tube 4. When the fluidization assembly 3 fluidizes the polypropylene material in the production device body 1, it is fluidized by fluidizing wind, so it is necessary to provide fluidizing wind to the fluidization assembly 3. Therefore, a fluidizing fan 8 is installed, and the fluidizing wind provided by the fluidizing fan 8 is transported to the annular tube 4 through the air supply pipe 7, and the fluidizing wind in the annular tube 4 is transported to the hose 6 through the connection part 5, and then transported to the fluidization assembly 3 through the hose 6, and finally sprayed into the production device body 1 through the first nozzle 33 and the second nozzle 34 to fluidize the polypropylene material.

[0040] Ginseng Figure 1 and Figure 4 As shown, a discharge port 9 is provided at the bottom of the production device body 1, and a switch valve 10 is installed on the discharge port 9. By providing the discharge port 9 at the bottom of the production device body 1, the polypropylene material produced in the production device body 1 is discharged from the production device body 1 through the discharge port 9, and the switch valve 10 is provided to control the opening and closing of the discharge port 9.

[0041] It should be noted that, in order to ensure that the first nozzle 33 and the second nozzle 34 will not be blocked during use, so as to ensure that the fluidizing air can be continuously delivered to the bottom of the production device body 1, thereby preventing the polypropylene material from adhering to the bottom of the production device body 1, before the polypropylene material in the production device body 1 is emptied, it is necessary to ensure that the fluidizing fan 8 is continuously operated so that the first nozzle 33 and the second nozzle 34 continuously spray fluidizing air into the production device body 1. This ensures that the first nozzle 33 and the second nozzle 34 will not be blocked by the polypropylene material, and prevents the polypropylene material from adhering to the bottom of the production device body 1.

[0042] When in use, when producing polypropylene in the production device body 1, the fluidizing fan 8 is first started, and the pressurized fluidizing air of the fluidizing fan 8 can be transported to the annular tube 4 through the air supply pipe 7, and then transported to the hose 6 through the connecting part 5 installed on the annular tube 4. The fluidizing air is transported to the fluidizing assembly 3 through the hose 6, and the fluidizing air is finally ejected through the first nozzle 33 and the second nozzle 34, thereby fluidizing the polypropylene material at the bottom of the production device body 1, thereby preventing the polypropylene material from adhering to the bottom of the production device body 1.

[0043] It can be seen from the above technical solutions that the utility model has the following beneficial effects:

[0044] The utility model has a plurality of fluidizing components installed at the bottom, and fluidizing air is delivered to the bottom of the production device through the fluidizing components. The fluidizing air can make the polypropylene material at the bottom of the production device flow continuously, and prevent the polypropylene material from adhering to the bottom of the production device, thereby preventing the polypropylene material from stratifying at the bottom of the production device and affecting the use of the device.

[0045] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0046] In addition, it should be understood that although the present specification is described according to embodiments, not every embodiment contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation methods that those skilled in the art can understand.

Claims

1. A polypropylene production device, comprising a production device body, characterized in that: A plurality of mounting cylinders are installed on the bottom side wall of the production device body, and a fluidizing assembly is installed in each of the plurality of mounting cylinders. The fluidizing assembly is provided with a mounting rod, one end of the mounting rod is placed in the production device body, and the other end of the mounting rod is placed outside the production device body. A semi-hollow ball is installed on the end of the mounting rod placed in the production device body, and a plurality of first nozzles are provided on the semi-hollow ball. A plurality of second nozzles are provided on the side wall of the mounting rod placed in the production device body. A connecting rod is installed on the side wall of the mounting rod, and the connecting rod is threadedly connected to the mounting cylinder. An annular pipe is provided at the bottom of the production device body, and the fluidizing assembly is connected to the annular pipe.

2. A polypropylene production device according to claim 1, characterized in that: A limiting ring is integrally formed at one end of the installation cylinder close to the inner side of the production device body, and a sealing ring is installed on the inner side wall of the limiting ring.

3. A polypropylene production device according to claim 2, characterized in that: A sealing pad is arranged at one end of the connecting rod close to the inner side of the production device body, and the mounting rod abuts against the sealing pad.

4. A polypropylene production device according to claim 1, characterized in that: One end of the connecting rod close to the outer side of the production device body is fixedly connected with a hexagonal rotating part, and the hexagonal rotating part is sleeved on the mounting rod.

5. A polypropylene production device according to claim 1, characterized in that: A support rod is fixedly connected to the semi-hollow ball, and a protective cap is fixedly connected to the support rod.

6. A polypropylene production device according to claim 1, characterized in that: A plurality of connecting parts are installed on the annular tube, and a hose is installed on each of the connecting parts. One end of the hose away from the connecting part is installed on the installation rod.

7. A polypropylene production device according to claim 6, characterized in that: An air delivery pipe is installed at the lower end of the annular pipe, and a fluidizing fan is installed at one end of the air delivery pipe away from the annular pipe.

8. A polypropylene production device according to claim 1, characterized in that: A discharge port is arranged at the bottom of the production device body, and a switch valve is installed on the discharge port.