By designing the box beam sprinkler maintenance system and using the intelligent sprinkler maintenance control system to achieve fully automatic and intelligent sprinkler maintenance, the problems of untimely maintenance, uneven watering and low construction efficiency in the concrete maintenance of precast beams have been solved, and the maintenance efficiency has been improved. Quality and efficiency meet the requirements of energy saving, material reduction and green environmental protection.
Patent Information
- Application Number
- CN202420374882.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-28
AI Technical Summary
Precast beam concrete maintenance has problems such as untimely maintenance, uneven watering, low construction efficiency, and uncontrollable quality, especially under the requirements of ensuring high quality, speed, efficiency, economy, energy saving, material reduction, and green environmental protection.
A box girder sprinkler maintenance system is designed, including an intelligent sprinkler maintenance control system, an intelligent cloud controller using a wireless network card, a sprinkler solenoid valve, a submersible pump, a pipeline system and an automatic telescopic rotating sprinkler head. The software system realizes full Automatic and intelligent spray maintenance control can independently control the maintenance of each beam-making pedestal, and set parameters such as the start time, duration and interval of the spray to ensure fully automatic, intelligent, all-weather, and fully humid maintenance.
It achieves efficient and uniform maintenance of precast beam concrete, improves construction efficiency, ensures maintenance quality, meets the requirements of energy saving, material reduction and green environmental protection, and solves the problems of untimely maintenance and uneven watering.
Smart Images

Figure CN221793204U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of box beam watering maintenance, in particular to a box beam maintenance system. Background Art
[0002] The total length of the G206-03 Wohe Eighth Bridge is 1201m. The main beam of the main bridge adopts a separated main box large cantilever variable-section PC continuous box beam, the cross-embankment approach bridge adopts a single-box double-chamber straight web box beam, and other approach bridges adopt 30m span prefabricated composite small box beams (a total of 276 pieces). At present, the maintenance of prefabricated beam concrete has the current status of untimely maintenance, uneven watering, low construction efficiency, and uncontrollable quality. How to ensure high quality, fast, efficient, economical, and meet the requirements of energy saving, material reduction, and green environmental protection while maintaining the prefabricated box beam maintenance process is one of the key points of bridge construction. In order to better maintain the prefabricated beam concrete, a box beam watering maintenance system is needed to improve the above problems. Utility Model Content
[0003] In order to solve the current situation of untimely maintenance, uneven watering, low construction efficiency and uncontrollable quality during the maintenance of precast beam concrete, the utility model provides a box beam watering maintenance system to solve the above problems.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A box beam watering maintenance system comprises a mounting base, a water collecting ditch is provided on the base surface of the mounting base, a sedimentation tank is provided on one side of the water collecting ditch and located on the base surface of the mounting base, a water storage tank is provided on one side of the sedimentation tank and located on the base surface of the mounting base, an overflow trough is provided on the outer wall of the water storage tank, a beam body is provided on one side of the water collecting ditch and located on the base surface of the mounting base, a spray assembly is provided on the base surface of the mounting base, and a water collecting assembly is provided on one side of the spray assembly and located on the base surface of the mounting base;
[0006] The spray assembly includes a water storage tank, which is mounted on the base surface of the mounting base, a controller is mounted on the outer wall of the water storage tank, a main water pipe is mounted on the outer wall of the water storage tank, a spray solenoid valve is mounted on one end of the main water pipe, a branch water pipe is mounted on one end of the spray solenoid valve, a manual control valve is mounted on one end of the branch water pipe, a spray water pipe is mounted on one end of the manual control valve, a spray nozzle is embedded on the outer wall of the spray water pipe, a water inlet pipe is mounted on the outer wall of the water storage tank, a check valve is mounted on one end of the water inlet pipe, an exhaust valve is mounted on the outer wall of the check valve through a connecting pipe, a first submersible pump is mounted on one end of the connecting pipe, and an electric-controlled hydraulic gauge is mounted on the outer wall of the water storage tank;
[0007] The water collecting assembly includes a well hole, which is opened on the base surface of the mounting base, a second submersible pump is installed on the inner wall of the well hole, a drain pipe is installed at the water outlet of the second submersible pump, a constant pressure valve is installed on the outer wall of the drain pipe, a conduit is installed at one end of the constant pressure valve, a manual valve is installed on the outer wall of the conduit, a supplementary water pipe is installed at one end of the manual valve, and a liquid level sensor is installed on one side of the supplementary water pipe and on the inner wall of the water storage tank.
[0008] As a preferred solution of the utility model, the overflow trough is connected to a water collecting ditch and the connection is a connecting structure, one end of the water collecting ditch is connected to a sedimentation tank and the connection is a connecting structure, the water collecting ditch is a frame structure and the water collecting ditch is located on one side of the spray assembly.
[0009] As a preferred solution of the utility model, the controller is respectively connected to the spray solenoid valve, the first submersible pump, the second submersible pump, the electronically controlled hydraulic gauge, the constant pressure valve and the liquid level sensor through wires, and the connection method is electrical connection.
[0010] As a preferred solution of the utility model, the sedimentation tank is provided with two groups and is respectively located on the base surface of the mounting base, the port of the sedimentation tank is connected to the water storage tank and the connection is a connecting structure, and the beam body is provided with two groups and is respectively located on the base surface of the mounting base.
[0011] As a preferred solution of the utility model, the manual control valves are provided in multiple groups and are respectively located on the outer walls of the branch water pipes, and the spray water pipes are provided in multiple groups and are respectively located on the outer walls of the manual control valves.
[0012] As a preferred solution of the utility model, the spray water pipes are respectively located on the left and right sides and the top of the beam body, the spray nozzles are provided in multiple groups and are respectively located on the outer wall of the spray water pipes, and the exhaust valve is located on one side of the check valve.
[0013] As a preferred solution of the utility model, the first submersible pump is located in the inner cavity of the water reservoir, the well hole is located on one side of the water reservoir, the conduit is a T-shaped structure, and the manual valve is located on one side of the constant pressure valve.
[0014] Compared with the prior art, the utility model sets an intelligent spray curing control system in the box girder sprinkler curing system. The main components include an intelligent cloud controller with a wireless network card, a spray solenoid valve, a first submersible pump, a second submersible pump, a pipeline system, and an automatic telescopic rotating spray nozzle. Through information means such as software systems and control equipment, the beam body is fully automatic and intelligently controlled by spraying curing. The curing of the beam body of each beam-making pedestal is independently controlled. Spraying does not affect the prefabrication work of the adjacent pedestals. The start time, duration, interval time, curing cycle and other parameters of the spraying are set through the mobile phone APP software system to realize automatic remote release of control instructions, and realize fully automatic, intelligent, all-weather, full-wetting, and no-omission standard curing control, thereby solving the current problems of prefabricated beam concrete curing such as untimely curing, uneven watering, low construction efficiency, and uncontrollable quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 It is a schematic diagram of the top view structure of the utility model;
[0017] Figure 3 This is a structural schematic diagram of a constant pressure valve of the utility model;
[0018] Figure 4 This is a schematic diagram of the water storage tank structure of the utility model;
[0019] Figure 5 It is a schematic diagram of the structure of the maintenance system of the present utility model.
[0020] In the figure: 1. installation base; 2. water collecting ditch; 3. sedimentation tank; 4. water storage tank; 5. overflow trough; 6. beam body; 7. spray assembly; 701. water storage tank; 702. controller; 703. main water pipe; 704. spray solenoid valve; 705. branch water pipe; 706. manual control valve; 707. spray water pipe; 708. spray nozzle; 709. water inlet pipe; 710. check valve; 711. connecting pipe; 712. exhaust valve; 713. first submersible pump; 714. electronically controlled hydraulic gauge; 8. water collecting assembly; 801. well hole; 802. second submersible pump; 803. drain pipe; 804. constant pressure valve; 805. conduit; 806. manual valve; 807. make-up water pipeline; 808. liquid level sensor. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0022] Example: See Figure 1-5 A box beam watering maintenance system shown in the figure comprises a mounting base 1, a water collecting ditch 2 is provided on the base surface of the mounting base 1, a sedimentation tank 3 is provided on one side of the water collecting ditch 2 and located on the base surface of the mounting base 1, a water storage tank 4 is provided on one side of the sedimentation tank 3 and located on the base surface of the mounting base 1, an overflow trough 5 is provided on the outer wall of the water storage tank 4, a beam body 6 is provided on one side of the water collecting ditch 2 and located on the base surface of the mounting base 1, a spray assembly 7 is provided on the base surface of the mounting base 1, and a water collecting assembly 8 is provided on one side of the spray assembly 7 and located on the base surface of the mounting base 1;
[0023] In this embodiment, specific reference Figure 1 , Figure 2 and Figure 4 The spray assembly 7 includes a water tank 701, which is mounted on the base surface of the mounting base 1. A controller 702 is mounted on the outer wall of the water tank 701. A main water pipe 703 is mounted on the outer wall of the water tank 701. A spray solenoid valve 704 is mounted on one end of the main water pipe 703. A branch water pipe 705 is mounted on one end of the spray solenoid valve 704. A manual control valve 706 is mounted on one end of the branch water pipe 705. The manual control valve 706 is provided with multiple groups and is respectively located on the outer wall of the branch water pipe 705. A spray water pipe 707 is mounted on one end of the manual control valve 706. The spray water pipe 707 is provided with multiple groups and is respectively located on the outer wall of the manual control valve 706. The spray water pipe 707 is respectively located on the left and right sides and the top of the beam body 6. A spray nozzle 708 is embedded on the outer wall of the spray water pipe 707. The spray nozzle 708 is provided in multiple groups and is respectively located on the outer wall of the spray water pipe 707. An inlet pipe 709 is installed on the outer wall of the water storage tank 701. A check valve 710 is installed at one end of the inlet pipe 709. An exhaust valve 712 is installed on the outer wall of the check valve 710 through a connecting pipe 711. The exhaust valve 712 is located on one side of the check valve 710. A first submersible pump 713 is installed at one end of the connecting pipe 711. The first submersible pump 713 is located in the inner cavity of the water storage tank 4. An electric-controlled hydraulic gauge 714 is installed on the outer wall of the water storage tank 701.
[0024] Among them, the overflow trough 5 is connected to the water collecting ditch 2 and the connection is a connecting structure, one end of the water collecting ditch 2 is connected to the sedimentation tank 3 and the connection is a connecting structure, the water collecting ditch 2 is a frame structure and the water collecting ditch 2 is located on one side of the spray assembly 7, the controller 702 is connected to the spray solenoid valve 704, the first submersible pump 713, the second submersible pump 802, the electric control hydraulic gauge 714, the constant pressure valve 804 and the liquid level sensor 808 through wires, and the connection method is that the device is powered on under the action of electrical connection, and the controller 702 has a wireless network card structure, two groups of sedimentation tanks 3 are provided and are respectively located on the base surface of the mounting base 1, the port of the sedimentation tank 3 is connected to the water storage tank 4 and the connection is a connecting structure, and two groups of beams 6 are provided and are respectively located on the base surface of the mounting base 1, which can be maintained or prefabricated separately, and are more practical.
[0025] In this embodiment, specific reference Figure 1 and Figure 3 The water collecting component 8 includes a well hole 801, which is opened on the base surface of the mounting base 1 and is located on one side of the water storage tank 4. A second submersible pump 802 is installed on the inner wall of the well hole 801, and a drain pipe 803 is installed at the water outlet of the second submersible pump 802. A constant pressure valve 804 is installed on the outer wall of the drain pipe 803. A conduit 805 is installed at one end of the constant pressure valve 804. The conduit 805 is a T-shaped structure. A manual valve 806 is installed on the outer wall of the conduit 805. The manual valve 806 is located on one side of the constant pressure valve 804. A supplementary water pipe 807 is installed at one end of the manual valve 806. A liquid level sensor 808 is installed on one side of the supplementary water pipe 807 and located on the inner wall of the water storage tank 4.
[0026] Among them, a conduit 805 is installed at one end of the constant pressure valve 804. Under the action of the T-shaped structure of the conduit 805, one end of the conduit 805 can be connected to an external water source. If the water source in the inner cavity of the wellbore 801 is exhausted, water can also be replenished by an external water source. The water source comes from a variety of ways, so that the water storage capacity of the water storage tank 4 remains stable, and the operation stability of the sprinkler maintenance system is better.
[0027] When the box girder watering maintenance system of this scheme is working, a three-stage sedimentation tank 3 is set on one side of the beam body 6 through the water collecting ditch 2 opened on the base surface of the installation base 1, a sedimentation tank 3 is opened on one side of the water collecting ditch 2 and located on the base surface of the installation base 1, and a water storage tank 4 is opened on one side of the sedimentation tank 3 and located on the base surface of the installation base 1. The maintenance water of the beam making area of the installation base 1 and the rainwater are collected to the sedimentation tank 3 through the water collecting ditch 2 in the beam making area. The clean water after sedimentation in the sedimentation tank 3 is pressurized by the first submersible pump 713, so that the clean water enters the inner cavity of the water storage tank 701, and then is diverted by the main water pipe 703 to each branch water pipe 705, and each branch water pipe 705 is provided with a spray solenoid valve 704 to switch the water. , and connected to the spray water pipe 707 in the beam-making pedestal. When the spray solenoid valve 704 is turned on and the water pressure reaches a certain level, the spray nozzle 708 will extend from the bottom of the pedestal and rotate 180 degrees back and forth to spray water every 30 seconds. There are multiple groups of spray water pipes 707 and they are respectively located on the outer wall of the manual control valve 706. The spray water pipes 707 are respectively located on the left and right sides and the top of the beam body 6. The spray nozzles 708 are respectively located on the outer wall of the spray water pipes 707. Under the action of these, the beam body 6 can be sprayed and maintained in all directions. Longitudinal water pipes are arranged on the top plate, side plate, box room, etc. of the prefabricated beam. Spray nozzles 708 with atomizing structure are installed on the water pipes at a certain interval to ensure that the surface of the beam body 6 can be sprayed and maintained in place after the water is sprayed out.
[0028] By setting the parameters such as the start time, duration, interval time, and curing cycle of the spraying in the software system of the controller 702, automatic remote release of control instructions is realized. The intelligent control device of the controller 702 receives the control instructions through the wireless network, and intelligently manages the spray solenoid valve 704 on the main water pipe 703. The spray nozzle 708 installed in the pedestal automatically retracts and contracts under the action of water pressure, and rotates 180 degrees back and forth to spray. The side walls of the beam body 6, the bottom of the top plate, and the box chamber can be fully covered and sprayed without dead ends. At the same time, the spray water pipe 707 above the beam body 6 is also spraying water to realize spraying maintenance of the top plate of the beam body 6, thereby solving the current problems of precast beam concrete maintenance such as untimely maintenance, uneven watering, low construction efficiency, and uncontrollable quality.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A box girder watering maintenance system, comprising a mounting base (1), Features: A water collecting ditch (2) is provided on the base surface of the mounting base (1); a sedimentation tank (3) is provided on one side of the water collecting ditch (2) and located on the base surface of the mounting base (1); a water storage tank (4) is provided on one side of the sedimentation tank (3) and located on the base surface of the mounting base (1); an overflow trough (5) is installed on the outer wall of the water storage tank (4); a beam body (6) is installed on one side of the water collecting ditch (2) and located on the base surface of the mounting base (1); a spray assembly (7) is installed on the base surface of the mounting base (1); and a water collecting assembly (8) is installed on one side of the spray assembly (7) and located on the base surface of the mounting base (1); The spray assembly (7) comprises a water storage tank (701), the water storage tank (701) being mounted on a base surface of a mounting base (1), a controller (702) being mounted on an outer wall of the water storage tank (701), a main water pipe (703) being mounted on an outer wall of the water storage tank (701), a spray solenoid valve (704) being mounted on one end of the main water pipe (703), a branch water pipe (705) being mounted on one end of the spray solenoid valve (704), a manual control valve (706) being mounted on one end of the branch water pipe (705), and the manual control valve (706) being mounted on one end of the branch water pipe (705). 6) is installed at one end thereof with a spray water pipe (707), a spray nozzle (708) is embedded in the outer wall of the spray water pipe (707), a water inlet pipe (709) is installed on the outer wall of the water storage tank (701), a check valve (710) is installed at one end of the water inlet pipe (709), an exhaust valve (712) is installed on the outer wall of the check valve (710) via a connecting pipe (711), a first submersible pump (713) is installed at one end of the connecting pipe (711), and an electric-controlled hydraulic gauge (714) is installed on the outer wall of the water storage tank (701); The water collecting assembly (8) comprises a well hole (801), the well hole (801) being opened on the base surface of the mounting base (1), a second submersible pump (802) being installed on the inner wall of the well hole (801), a drainage pipe (803) being installed at the water outlet of the second submersible pump (802), a constant pressure valve (804) being installed on the outer wall of the drainage pipe (803), a conduit (805) being installed at one end of the constant pressure valve (804), a manual valve (806) being installed on the outer wall of the conduit (805), a supplementary water pipeline (807) being installed at one end of the manual valve (806), and a liquid level sensor (808) being installed on one side of the supplementary water pipeline (807) and located on the inner wall of the water storage tank (4).
2. A box girder watering maintenance system according to claim 1, Features: The overflow trough (5) is connected to a water collecting ditch (2) and the connection is a communicating structure; one end of the water collecting ditch (2) is connected to a sedimentation tank (3) and the connection is a communicating structure; the water collecting ditch (2) is a frame structure and the water collecting ditch (2) is located on one side of the spray assembly (7).
3. A box girder watering maintenance system according to claim 1, Features: The controller (702) is respectively connected to the spray solenoid valve (704), the first submersible pump (713), the second submersible pump (802), the electronically controlled hydraulic gauge (714), the constant pressure valve (804) and the liquid level sensor (808) via wires, and the connection method is electrical connection.
4. A box girder watering maintenance system according to claim 1, Features: The sedimentation tanks (3) are provided in two groups and are respectively located on the base surface of the mounting base (1); the ports of the sedimentation tanks (3) are connected to the water storage tank (4) and the connection is a communicating structure; the beam bodies (6) are provided in two groups and are respectively located on the base surface of the mounting base (1).
5. A box girder watering maintenance system according to claim 1, Features: The manual control valves (706) are provided in multiple groups and are respectively located on the outer wall of the branch water pipe (705); the spray water pipes (707) are provided in multiple groups and are respectively located on the outer wall of the manual control valves (706).
6. A box girder watering maintenance system according to claim 1, Features: The spray water pipe (707) is respectively located on the left and right sides and the top of the beam body (6); the spray nozzles (708) are provided in multiple groups and are respectively located on the outer wall of the spray water pipe (707); and the exhaust valve (712) is located on one side of the check valve (710).
7. A box girder watering maintenance system according to claim 1, Features: The first submersible pump (713) is located in the inner cavity of the water storage tank (4), the well hole (801) is located on one side of the water storage tank (4), the conduit (805) is a T-shaped structure, and the manual valve (806) is located on one side of the constant pressure valve (804).