Large-span flexible pipeline suspension protection device

By using large-span flexible pipeline suspension protection devices in the construction of deep foundation pits for urban rail transit, the problem of mismatch between pipeline relocation progress and construction progress is solved, material and labor consumption are reduced, construction technology is simplified, and construction progress is improved. and structural quality, ensuring the safety and service life of the pipeline.

CN221800857UActive Publication Date: 2024-10-01中铁隧道集团一处有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420874495.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-10-01
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

In the construction of deep foundation pits for urban rail transit, the progress of pipeline relocation does not match the construction progress. The existing pipeline protection measures consume a lot of materials and are costly, and the temporary support installation and replacement process is cumbersome, which affects the construction progress and raises lifting safety issues. Hidden danger.

Method used

A large-span flexible pipeline suspension protection device is used. By setting fixed brackets and pulling steel ropes on both sides of the foundation pit, the pipeline is suspended between the brackets and steel ropes, and combined with insulating plates and rubber tubes for protection, reducing materials and labor. consumption and simplify the construction process.

Benefits of technology

It reduces the cost of pipeline protection, simplifies the construction process, improves the construction progress and structural quality, reduces the impact of support, and ensures the safety and service life of the pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221800857U_ABST
    Figure CN221800857U_ABST
Patent Text Reader

Abstract

The utility model provides a large-span flexible pipeline suspension protection device which comprises a foundation pit and a to-be-protected pipeline suspended on the foundation pit, fixing structures are arranged on concrete on the two sides of the foundation pit, each fixing structure comprises two fixing supports arranged in a spaced mode, opposite-pulling steel ropes are arranged at the top ends of the fixing supports, and the opposite-pulling steel ropes are connected with the foundation pit. The two ends of the opposite-pulling steel rope are anchored to concrete on the two sides of a foundation pit correspondingly, a fixing steel rope is arranged below the pipeline to be protected, and a protection structure is arranged between the opposite-pulling steel rope and the fixing steel rope. The to-be-protected pipeline is suspended between the opposite-pulling steel rope and the fixed steel rope, the pulling force needed by pipeline protection is met, the support and the steel rope are easy to obtain, a large number of materials, manpower and equipment can be saved, and the pipeline protection cost is reduced; the construction process of the protection device is simple, the temporary support and support replacement process steps are few, convenient working conditions are provided for lower construction, and the construction progress can be guaranteed; and in later construction, the supporting influence is reduced, the structural quality can be guaranteed, and the construction progress is accelerated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to civil engineering construction, in particular to a large-span flexible pipeline suspension protection device. Background Art

[0002] Pipeline protection and relocation have always been the focus and difficulty in municipal engineering construction. In the current deep foundation pit construction of urban rail transit in my country, affected by the overall urban planning and operating lines, a large number of intricate pipelines are inevitably distributed within the scope of the foundation pit. The pipelines involve many property units, and the coordination of pipeline relocation is difficult, complex, and has a long period. The progress of on-site pipeline relocation and protection cannot meet the needs of on-site construction. Therefore, special protection is required for pipelines that cannot be relocated within the construction scope. To this end, it is necessary not only to ensure the safe and smooth progress of the project, but also to properly solve the problem of the normal operation of nearby industries caused by complex pipelines. Improper pipeline protection methods will increase construction risks, easily cause engineering accidents, cause negative social public opinion, and have adverse effects on enterprises.

[0003] In order to solve the problem of mismatch between pipeline relocation progress and construction progress, the country generally adopts measures such as overhead or rigid suspension protection for pipelines. In view of the heavy weight of pipelines and high requirements for settlement and deformation, the foundation pit's own retaining structure is combined with existing resources, and overhead support protection measures are generally adopted; for flexible pipelines with low settlement and deformation requirements, support protection or rigid suspension protection measures are generally adopted in combination with the foundation pit's own retaining structure and existing resources; that is, according to the proven pipeline layout, the lower part of the pipeline is excavated, and temporary support or rigid suspension protection is adopted to protect the excavated pipeline, and excavation is carried out in sections and layers in turn until the excavation is completed, and permanent support protection or rigid suspension protection is adopted.

[0004] The pipeline protection measures taken above require a large number of temporary supports for deep and large foundation pits. The processing process consumes a lot of materials and labor, is costly, and the installation and replacement of temporary protection are cumbersome. During the installation and replacement of temporary supports, construction cannot be carried out synchronously from top to bottom, affecting the normal construction progress within the limited site. Large lifting equipment is used in the support installation process, which poses a major safety hazard for lifting and hoisting. Utility Model Content

[0005] The utility model aims to provide a large-span flexible pipeline suspension protection device to achieve pipeline protection during excavation, thereby solving the problems of unstable force and obstruction of construction in pipeline protection.

[0006] To this end, the technical solution adopted by the utility model is: a large-span flexible pipeline suspension protection device, including a foundation pit and a pipeline to be protected suspended on the foundation pit, and fixed structures for fixing the pipeline to be protected are arranged on the concrete on both sides of the foundation pit, and the fixed structure includes two fixed brackets arranged at intervals, and tensioning steel ropes are arranged on the top of the fixed brackets, and the two ends of the tensioning steel ropes are respectively anchored on the concrete on both sides of the foundation pit, and a fixed steel rope is arranged below the pipeline to be protected, and a protection structure for suspending the pipeline to be protected is arranged between the tensioning steel rope and the fixed steel rope.

[0007] Further preferably, the protection structure includes fixed steel bars arranged at intervals on the tensioning steel ropes, hooks are arranged at both ends of the fixed steel bars facing the same side and are respectively hung on the tensioning steel ropes and the fixed steel ropes, supporting steel pipes are arranged at intervals laterally on the fixed steel ropes, and the pipelines to be protected are arranged on the supporting steel pipes.

[0008] More preferably, an insulating plate for insulating the pipeline to be protected is laid on the supporting steel pipe, and the pipeline to be protected is arranged on the insulating plate. The insulating plate is arranged to protect the pipeline to be protected.

[0009] More preferably, a rubber tube is sleeved on the support steel tube. The rubber tube is arranged to cover the support steel tube to prevent the support steel tube from conducting electricity.

[0010] More preferably, the pipeline to be protected is covered with a rainproof cloth to prevent the pipeline from being exposed to the sun and rain for a long time, which accelerates aging and affects the service life of the pipeline and causes safety risks.

[0011] Further preferably, the fixing bracket is an I-beam, the upper crossbeam of the I-beam is provided with a mounting hole for installing the tensioning steel rope, and the lower crossbeam is provided with a mounting hole for installing the fixing steel rope.

[0012] The beneficial effects of the utility model are as follows: by arranging tensioning steel ropes and fixed steel ropes on the fixed bracket, the pipeline to be protected is suspended between the tensioning steel ropes and the fixed steel ropes, the tension required for pipeline protection is met, and the pipeline to be protected is protected by the protection structure; the bracket and the steel rope are easy to obtain, which can save a lot of materials, labor and equipment, and reduce the cost of pipeline protection; the construction process of the protection device is simple, and the temporary support and support replacement process steps are few, which provides convenient working conditions for the lower construction and can ensure the construction progress; in the later construction, the support impact is reduced, the structural quality can be guaranteed, and the construction progress is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a construction plan diagram of the pipeline suspension protection device.

[0014] Figure 2 yes Figure 1Schematic diagram of the protection structure at AA in the middle. DETAILED DESCRIPTION

[0015] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0016] like Figure 1-2 As shown, a large-span flexible pipeline suspension protection device includes a foundation pit 1 and a pipeline 2 to be protected suspended on the foundation pit 1. A fixing structure for fixing the pipeline 2 to be protected is provided on the concrete 5 on both sides of the foundation pit 1. The fixing structure includes two fixed brackets 3 arranged at intervals. A tensioning steel rope 4 is provided on the top of the fixed bracket 3. The two ends of the tensioning steel rope 4 are respectively anchored on the concrete 5 on both sides of the foundation pit 1. A fixing steel rope 6 is provided below the pipeline 2 to be protected. A protection structure for suspending the pipeline 2 to be protected is provided between the tensioning steel rope 4 and the fixing steel rope 6. The fixing bracket 3 is an I-beam. The upper crossbeam of the I-beam is reserved with a mounting hole for installing the tensioning steel rope 4, and the lower crossbeam is reserved with a mounting hole for installing the fixing steel rope 6.

[0017] The protective structure includes fixed steel bars 7 arranged at intervals on the tensioning steel rope 4. Hooks are arranged at both ends of the fixed steel bars 7 facing the same side and are respectively hung on the tensioning steel rope 4 and the fixed steel rope 6. Support steel pipes 8 are arranged horizontally at intervals on the fixed steel rope 6, and the pipeline 2 to be protected is set on the support steel pipes 8.

[0018] An insulating plate 9 for insulating the pipeline 2 to be protected is laid on the supporting steel pipe 8, and the pipeline 2 to be protected is arranged on the insulating plate 9. The insulating plate 9 is arranged to protect the pipeline 2 to be protected. A rubber tube 10 is sleeved on the supporting steel pipe 8. The rubber tube 10 is arranged to cover the supporting steel pipe 8 to prevent the supporting steel pipe 8 from conducting electricity.

[0019] The pipeline 2 to be protected is covered with a rainproof cloth 11. The rainproof cloth 11 is provided to prevent the pipeline from being exposed to the sun for a long time and being exposed to the rain, thereby accelerating aging, affecting the service life of the pipeline and causing safety risks.

[0020] By arranging the tensioning steel rope 4 and the fixed steel rope 6 on the fixed bracket 3, the pipeline 2 to be protected is suspended between the tensioning steel rope 4 and the fixed steel rope 6, so as to meet the tension force required for pipeline protection, and the pipeline 2 to be protected is protected by the protection structure. The bracket and the steel rope are easy to obtain, which can save a lot of materials, labor and equipment, and reduce the cost of pipeline protection; the construction process of the protection device is simple, and the temporary support and support replacement process steps are few, which provides convenient working conditions for the lower construction and can ensure the construction progress; in the later construction, the support impact is reduced, the structural quality can be guaranteed, and the construction progress is improved.

[0021] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A long-span flexible pipeline suspension protection device, comprising a foundation pit (1) and a pipeline to be protected (2) suspended on the foundation pit (1), characterized in that: A fixing structure for fixing the pipeline (2) to be protected is arranged on the concrete (5) on both sides of the foundation pit (1), and the fixing structure includes two fixing brackets (3) arranged at intervals, and a tensioning steel rope (4) is arranged on the top of the fixing bracket (3), and the two ends of the tensioning steel rope (4) are respectively anchored on the concrete (5) on both sides of the foundation pit (1), and a fixing steel rope (6) is arranged below the pipeline (2) to be protected, and a protection structure for suspending the pipeline (2) to be protected is arranged between the tensioning steel rope (4) and the fixing steel rope (6).

2. A large-span flexible pipeline suspension protection device according to claim 1, characterized in that: The protective structure comprises fixed steel bars (7) arranged at intervals on the tensioning steel rope (4), hooks are arranged at both ends of the fixed steel bars (7) facing the same side and are respectively hung on the tensioning steel rope (4) and the fixed steel rope (6), supporting steel pipes (8) are arranged at intervals laterally on the fixed steel rope (6), and the pipeline (2) to be protected is arranged on the supporting steel pipes (8).

3. A large-span flexible pipeline suspension protection device according to claim 2, characterized in that: An insulating plate (9) for insulating the pipeline to be protected (2) is laid on the supporting steel pipe (8), and the pipeline to be protected (2) is arranged on the insulating plate (9).

4. A large-span flexible pipeline suspension protection device according to claim 3, characterized in that: The supporting steel pipe (8) is sleeved with a rubber pipe (10).

5. The large-span flexible pipeline suspension protection device according to claim 1 is characterized in that: The pipeline to be protected (2) is covered with a rainproof cloth (11).

6. A large-span flexible pipeline suspension protection device according to claim 1, characterized in that: The fixing bracket (3) is an I-beam, the upper crossbeam of the I-beam is reserved with a mounting hole for installing a tensioning steel rope (4), and the lower crossbeam is reserved with a mounting hole for installing a fixing steel rope (6).