Split type salvage ship
By designing the semi-submersible hull structure and underwater propulsion system of the split salvage vessel, deep-water salvage without the support of divers is achieved, which solves the problem of complexity and risk of salvaging large-tonnage sunken ships in deep water, breaks through the water depth limit, and achieves greater success. Deep salvage capabilities.
Patent Information
- Application Number
- CN202420623727.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-03-28
AI Technical Summary
The overall salvage process of a deep-water large-tonnage sunken ship is complex and greatly affected by weather. It requires the support of a large number of high-risk saturation divers. It is difficult to salvage more than 300 meters of water depth with existing technology.
A split-type salvage vessel is designed, which adopts a semi-submersible hull structure and a split-connected surface operation body and underwater operation sub-body. By lifting and adjusting the structure, it can achieve greater depth salvage without the support of divers. It uses the underwater propulsion system and Salvage structures carry out seabed salvage and carry salvaged objects.
It achieves greater depth salvage without the support of divers, reduces the risk of salvage operations, simplifies the salvage process, and breaks through the water depth limitations of existing technology.
Smart Images

Figure CN221809815U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rescue and salvage engineering, in particular to a split type salvage ship. Background Art
[0002] At present, the overall salvage of a large-tonnage shipwreck in deep water requires the cooperation of various lifting equipment, ships, divers, and salvage devices. The operation process is complicated, and many salvage equipment are greatly affected by sea conditions. The salvage process is often interrupted by weather conditions. The salvage cycle is very long and the risk of salvage operations is extremely high.
[0003] In addition, when salvaging a deep-water shipwreck, high requirements are placed on divers, and a large number of divers with saturation diving capabilities are needed. On the one hand, divers with saturation diving capabilities are scarce, and on the other hand, saturation diving is extremely harmful to divers' bodies and should not be carried out unless necessary. In addition, the current saturation diving technology in the world is mainly at a depth of 300 meters, and saturation diving technology exceeding 300 meters is still in the research and development stage. Therefore, after exceeding a depth of 200-300 meters, current technical divers are basically unable to reach the shipwreck to cooperate in salvage. According to existing technology, many deep-water large-tonnage shipwrecks in sea areas with relatively harsh sea conditions cannot be salvaged.
[0004] Therefore, it is urgent to propose a split salvage ship to solve the above problems. Utility Model Content
[0005] The utility model aims to provide a split salvage vessel, which has a semi-submersible hull structure and good hydrodynamic performance. The salvage process does not require the support of auxiliary divers, and can achieve salvage work at a greater depth. At the same time, the operational risks brought by diving are avoided.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] A split salvage vessel comprises a surface operation mother body and an underwater operation daughter body; the underwater operation daughter body is connected to the surface operation mother body in a split manner, the underwater operation daughter body comprises a lifting adjustment structure, a daughter body hull and a salvage structure arranged on the daughter body hull, the lifting adjustment structure is used to adjust the relationship between the buoyancy of the underwater operation daughter body and its own gravity so that the underwater operation daughter body can dive or float, and the salvage structure is used to salvage and carry the salvaged objects.
[0008] Optionally, the lifting and adjusting structure is a ballast water tank and / or an airbag tank.
[0009] Optionally, the underwater operation sub-body and the surface operation mother body are connected by a lifting cable, and the lifting cable is used to provide traction for the underwater operation sub-body.
[0010] Optionally, the underwater operating sub-body also includes an underwater propulsion system, which includes a vertical propeller and a horizontal propeller. The vertical propeller is used to propel the underwater operating sub-body to move in a vertical direction, and the horizontal propeller is used to propel the underwater operating sub-body or the split salvage vessel to sail in a horizontal direction.
[0011] Optionally, a docking transition cabin is provided inside the split salvage vessel, and the docking transition cabin includes a mother cabin located at the bottom of the surface operation mother body and a daughter cabin located at the top of the underwater operation daughter body, and the mother cabin and the daughter cabin can be docked.
[0012] Optionally, a locking device is provided in the docking transition compartment, and the locking device is used to lock the surface operation mother body and the underwater operation child body.
[0013] Optionally, support sheets are provided on both sides of the sub-hull in the length direction, and the salvage structure is located between the two support sheets.
[0014] Optionally, the salvage structure comprises a support plate, wherein the support plate is partially located in the support sheet body and can pass through the soil layer at the bottom of the salvaged object in a horizontal direction to carry the salvaged object.
[0015] Optionally, the salvage structure further comprises a plurality of vertical earth-blocking plates, which can penetrate into the soil layer in a vertical direction, and are provided with escape openings for allowing the support plates to pass through, and the vertical earth-blocking plates and the support plates form a bearing structure for supporting the salvaged objects.
[0016] Optionally, the salvage structure further comprises a transverse earth-blocking plate, wherein the support plate portion is located within the support plate body, the transverse earth-blocking plate can penetrate into the soil layer in a horizontal direction, the transverse earth-blocking plate is located at the bottom of the vertical earth-blocking plate, and forms a closed cabin enclosing the salvaged object together with the vertical earth-blocking plate.
[0017] Beneficial effects:
[0018] After the split salvage ship provided by the utility model sails to the designated position, the underwater operation sub-body and the surface operation mother body are separated, and the buoyancy of the underwater operation sub-body is made smaller than its own weight by controlling the lifting and adjusting structure, so as to control the underwater operation sub-body to dive, and when the underwater operation sub-body dives to the predetermined position, the salvage structure implements salvage, and then, by controlling the lifting and adjusting structure to adjust the relationship between the buoyancy of the underwater operation sub-body and its own weight, the upward force on the underwater operation sub-body and the salvaged object as a whole is greater than the gravity, so that the underwater operation sub-body rises, and the underwater operation sub-body carries the salvaged object back and merges with the surface operation mother body. The split salvage ship has a semi-submersible hull structure, has good hydrodynamic performance during surface navigation, and uses the underwater operation sub-body to dive to the seabed to salvage the salvaged object during the salvage process, and the salvage process does not require the support of auxiliary divers, thereby breaking through the limitation that the salvage operation requires saturation divers to operate in deep water, and can achieve salvage work at a greater depth, while avoiding the operational risks brought by diving. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the contents of the embodiments of the present invention and these drawings without paying any creative work.
[0020] Figure 1 It is a schematic diagram of the structure of the split salvage boat provided by the utility model when sailing on the water surface;
[0021] Figure 2 It is a schematic diagram of the structure of the underwater operation sub-body provided by the utility model when it sails above the salvaged object;
[0022] Figure 3 It is a structural schematic diagram of the underwater operation sub-body provided by the utility model when salvaging the salvaged object;
[0023] Figure 4 This is a schematic diagram of the structure of the underwater working sub-body provided by the utility model when returning to the surface working main body;
[0024] Figure 5 It is a schematic diagram of the structure of the split salvage boat provided by the utility model when it returns to the dock;
[0025] Figure 6 The utility model is a schematic structural diagram of the salvaged objects after dry storage in a dock.
[0026] In the figure:
[0027] 10. Docking transition cabin; 11. Mother cabin; 12. Daughter cabin; 20. Lifting cable; 30. Umbilical cable;
[0028] 100. Surface operation mother body; 110. Mother hull; 200. Underwater operation daughter body; 210. Daughter hull; 221. Ballast water tank; 222. Air bag compartment; 230. Salvage structure; 231. Support plate; 232. Vertical earth partition; 233. Horizontal earth partition; 240. Support sheet; 250. Pile leg; 260. Underwater propulsion system; 1000. Salvaged object; 2000. Dock; 2100. Support pier. DETAILED DESCRIPTION
[0029] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] In the description of the present utility model, it should be noted that the orientation or positional relationship indicated by the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. Among them, the terms "first position" and "second position" are two different positions, and the first feature "above", "above" and "above" the second feature include the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. The first feature "below", "below" and "below" the second feature include the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a split connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0033] See also Figures 1 to 4 The present embodiment provides a split salvage vessel, including a surface operation mother body 100 and an underwater operation daughter body 200. The underwater operation daughter body 200 includes a lifting adjustment structure, a daughter body 210, and a salvage structure 230 disposed on the daughter body 210. The lifting adjustment structure is used to adjust the relationship between the buoyancy and the gravity of the underwater operation daughter body 200, so as to control the underwater operation daughter body 200 to dive or float. The salvage structure 230 is used to salvage and carry the salvaged object 1000. The surface operation mother body 100 and the underwater operation daughter body 200 are signal connected.
[0034] After the above-mentioned split salvage ship sails to the designated position, the underwater operation sub-body 200 is separated from the surface operation mother body 100, and the buoyancy of the underwater operation sub-body 200 is made smaller than its own weight by controlling the lifting and adjusting structure, thereby controlling the underwater operation sub-body 200 to dive. When the underwater operation sub-body 200 dives to the predetermined position, the salvage structure 230 implements salvage. Subsequently, the relationship between the buoyancy and its own weight of the underwater operation sub-body 200 is adjusted by controlling the lifting and adjusting structure so that the upward force on the underwater operation sub-body 200 and the salvaged object 1000 as a whole is greater than the gravity, thereby causing the underwater operation sub-body 200 to rise, and the underwater operation sub-body 200 returns with the salvaged object 1000 and merges with the surface operation mother body 100. The split salvage vessel has a semi-submersible hull structure and has good hydrodynamic performance during surface navigation. During the salvage process, the underwater operating sub-body 200 is used to dive to the seabed to salvage the salvaged object 1000. The salvage process does not require the support of auxiliary divers, thus breaking through the limitation that salvage operations require saturation divers to operate in deep water, and can achieve salvage work at a greater depth, while avoiding the operational risks brought by diving.
[0035] Furthermore, the lifting and adjusting structure may be a ballast water tank 221 and / or an airbag tank 222 .
[0036] Exemplarily, in one embodiment, the lifting and lowering adjustment structure is a ballast water tank 221. Optionally, the ballast water tank 221 is located below the sub-hull 210. When the underwater operation sub-body 200 needs to dive, the ballast water tank 221 is controlled to be filled with water, so that the underwater operation sub-body 200's own weight increases, and the underwater operation sub-body 200 dives after the buoyancy of the underwater operation sub-body 200 is less than its own weight; when the underwater operation sub-body 200 needs to rise, the ballast water tank 221 is controlled to be drained, so that the underwater operation sub-body 200's own weight decreases, and the underwater operation sub-body 200 rises when the upward force on the underwater operation sub-body 200 and the salvaged object 1000 as a whole is greater than the gravity.
[0037] In another embodiment, the lifting and adjusting structure is an airbag compartment 222. Optionally, a watertight compartment, a water-permeable mesh box, an airbag, an inflation pipe, a high-pressure inflation unit and a power connector are provided in the airbag compartment 222. The airbag is fixed in the water-permeable mesh box, the high-pressure inflation unit is located in the watertight compartment of the airbag compartment 222, the inflation pipe connects the airbag and the high-pressure inflation unit, and the inflation and exhaust of the airbag are realized through the inflation pipe. After inflation, the airbag fills the entire water-permeable mesh box, so that the water-permeable mesh box forms a drainage space. The airbag compartment 222 is arranged in the middle of the sub-body hull 210. During the salvage process, the airbag compartment 222 changes the drainage volume by inflating and exhausting the airbag, thereby changing the buoyancy. During navigation, it is a water-permeable compartment to reduce navigation resistance. Optionally, the airbag compartment 222 is located at the top of the sub-body hull 210. When the underwater working sub-body 200 needs to dive, the airbag compartment 222 is controlled to exhaust air, and the airbag drainage volume is reduced, thereby reducing the buoyancy of the underwater working sub-body 200. When the buoyancy of the underwater working sub-body 200 is less than its own weight, the underwater working sub-body 200 dives; when the underwater working sub-body 200 needs to rise, the airbag compartment 222 is controlled to intake air, and the airbag drainage volume is increased, thereby increasing the buoyancy of the underwater working sub-body 200. When the upward force on the underwater working sub-body 200 and the salvaged object 1000 as a whole is greater than the gravity, the underwater working sub-body 200 rises.
[0038] In other embodiments, the ballast water tank 221 and the air bag tank 222 can be provided at the same time, and the descent and ascent of the underwater operation sub-body 200 can be adjusted by controlling the ballast water tank 221 and the air bag tank 222, and the two can work simultaneously or separately. It can be understood that in actual operation, the ballast water tank 221 and the air bag tank 222 are controlled according to the specific stress conditions of the salvaged object 1000 and the underwater operation sub-body 200, and no further explanation is given here.
[0039] Further, see Figure 3The underwater operation sub-body 200 and the surface operation mother body 100 are connected by a lifting cable 20, and the lifting cable 20 is used to provide traction for the underwater operation sub-body 200. Optionally, the traction for the lifting cable 20 can be provided by draining the ballast water tank in the surface operation mother body 100, or by a hydraulic lifting device.
[0040] For example, when the weight of the salvaged object 1000 is too large and sufficient buoyancy cannot be obtained by adjusting the lifting adjustment structure to raise the underwater working sub-body 200 and the salvaged object 1000, the underwater working sub-body 200 can be pulled by the lifting cable 20 to return it to the surface working mother body 100.
[0041] Furthermore, the surface operation mother body 100 and the underwater operation daughter body 200 are connected by an umbilical cable 30 signal, so as to transmit power, data or control signals. The application of the umbilical cable 30 is a mature existing technology in this field and will not be described in detail here.
[0042] Furthermore, the underwater working sub-body 200 also includes an underwater propulsion system 260, which includes a vertical propeller and a horizontal propeller. The vertical propeller is used to propel the underwater working sub-body 200 to move in the vertical direction, and the horizontal propeller is used to propel the underwater working sub-body 200 or the split salvage ship to sail in the horizontal direction.
[0043] For example, when the underwater operation sub-body 200 descends to 30 meters from the salvaged object 1000, the vertical propeller can be started to make the underwater operation sub-body 200 slowly sail to the top of the salvaged object 1000 and hover. When the underwater operation sub-body 200 returns to the surface operation mother body 100, the vertical propeller is used to provide vertical propulsion. It can be understood that when the underwater operation sub-body 200 and the surface operation mother body 100 are separated, the horizontal propeller can control the underwater operation sub-body 200 to sail in the horizontal direction; when the underwater operation sub-body 200 and the surface operation mother body 100 are combined, the horizontal propeller is used to propel the split-type salvage ship to sail as a whole.
[0044] Furthermore, a docking transition chamber 10 is provided inside the split salvage vessel, and the docking transition chamber 10 includes a mother chamber 11 located at the bottom of the surface operation mother body 100 and a daughter chamber 12 located at the top of the underwater operation daughter body 200, and the mother chamber 11 and the daughter chamber 12 can be docked.
[0045] Exemplarily, the mother cabin 11 is provided with a plug-in coaming at the hatch, and the daughter cabin 12 is provided with a slot at the hatch. When docking, the plug-in coaming is inserted into the slot. Preferably, a sealing strip is arranged in the slot to increase the watertightness of the docking point. By setting up the docking transition cabin 10, the transportation of personnel and materials between the mother cabin 11 and the daughter cabin 12 can be realized. Before the underwater operation sub-body 200 dives, the personnel enter the daughter cabin 12 from the mother cabin 11; when the underwater operation sub-body 200 and the surface operation mother cabin 100 are merged, the personnel return to the mother cabin 11 from the daughter cabin 12.
[0046] Furthermore, a locking device is provided in the docking transition compartment 10, and the locking device is used to lock the surface operation mother body 100 and the underwater operation child body 200.
[0047] Before the underwater operation sub-body 200 dives, the locking device needs to be loosened; when the underwater operation sub-body 200 returns to the surface operation mother body 100, the surface operation mother body 100 and the underwater operation sub-body 200 are locked by the locking device. In one embodiment, the locking device includes a retractable guide rail located in the underwater operation sub-body 200, and a lock hole and a latch located in the surface operation mother body 100, and the guide rail has multiple layers of latch holes. When locking is required, the guide rail is extended and inserted into the lock hole, and the latch of the lock hole passes through the guide rail under power drive and is fixed at both ends of the lock hole. In another embodiment, the surface operation mother body 100 is provided with a convex flange, and a plurality of threaded lock holes are provided on the convex flange, and the underwater operation sub-body 200 is provided with a concave flange, and a plurality of screws are provided on the concave flange. When it is necessary to lock the surface operation mother body 100 and the underwater operation sub-body 200, the convex flange of the surface operation mother body 100 is docked with the concave flange of the underwater operation sub-body 200, the screw on the concave flange is inserted into the threaded locking hole in the convex flange, and the control system controls the screw to turn and lock.
[0048] Furthermore, support sheets 240 are provided on both sides of the sub-hull 210 in the length direction, and the salvage structure 230 is located between the two support sheets 240 .
[0049] It can be understood that the support sheet 240 has a certain height for supporting the sub-hull 210, and the arrangement of the support sheet 240 provides space for the arrangement of the underwater propulsion system 260. Optionally, the vertical propeller is located in the cavity of the support sheet 240, and the horizontal propeller is located above the support sheet 240. Figure 3After the underwater working sub-body 200 falls to the seabed, the supporting sheet 240 is located on both sides of the salvaged object 1000, and the salvage structure 230 faces the salvaged object 1000. Optionally, a pile leg 250 is provided at the bottom of the supporting sheet 240, and the pile leg 250 can be inserted into the seabed to fix the underwater working sub-body 200, thereby increasing the stability of the fixation and preventing the underwater working sub-body 200 from shaking or vibrating too much during the seabed operation. Optionally, the ballast tank 221 and the underwater propulsion system 260 are both provided on the supporting sheet 240.
[0050] Further, see Figure 3 and Figure 4 In one embodiment, the salvage structure 230 includes a support plate 231 , which is partially located in the support sheet 240 and can pass through the soil layer at the bottom of the salvaged object 1000 in a horizontal direction to support the salvaged object 1000 .
[0051] After the support plate 231 penetrates the soil layer and reaches the designated position, the salvaged object 1000 is located on the support plate 231. At this time, the support plate 231 and the support sheet body 240 are fixedly connected. When the underwater operation sub-body 200 rises, the support plate 231 rises with the salvaged object 1000. Optionally, the support plate 231 and the support sheet body 240 can be fixed by welding or bolting.
[0052] Furthermore, in another embodiment, the salvage structure 230 also includes a plurality of vertical earth-partitioning boards 232, which can penetrate into the soil layer in the vertical direction, and are provided with escape openings allowing the support plates 231 to pass through, and the vertical earth-partitioning boards 232 and the transverse earth-partitioning boards 233 form a bearing structure that supports the salvaged object 1000.
[0053] During salvage, the vertical earth-blocking plate 232 is first driven into the soil layer, and then the support plate 231 is driven into the soil layer, and the support plate 231 passes through the avoidance opening on the vertical support plate 231, thereby forming a bearing structure. Optionally, vertical earth-blocking plates 232 are provided in the front, back, left, and right directions of the salvaged object 1000. By adopting this structural form, the strength of the salvage structure 230 is increased, so that the salvage ship can be widely used in the salvage of large-tonnage sunken ships in deep waters.
[0054] Furthermore, the salvage structure 230 also includes at least one transverse earth-blocking plate 233. The support plate 231 is partially located inside the support plate body 240. The transverse earth-blocking plate 233 can penetrate into the soil layer in a horizontal direction. The transverse earth-blocking plate 233 is located at the bottom of the vertical earth-blocking plate 232, and forms a closed cabin surrounding the salvaged object 1000 together with the vertical earth-blocking plate 232.
[0055] It is understandable that after the transverse earth-blocking plate 233 penetrates the soil layer, it is fixedly connected to the support plate 240. Optionally, the transverse earth-blocking plate 233 and the support plate 240 can be fixed by welding or bolting. Optionally, an underwater welding robot is used to seal the gaps between the support plate 231, the vertical earth-blocking plate 232 and the transverse earth-blocking plate 233. The provision of the transverse earth-blocking plate 233 further enhances the overall strength of the salvage structure 230 and shares the forces acting on the support plate 231 and the vertical earth-blocking plate 232. In addition, the closed load-bearing cabin can effectively reduce the probability of secondary leakage of the salvaged object 1000 and contamination of the ocean during the salvage process.
[0056] Optionally, the support plate 231, the vertical earth-blocking plate 232 and the transverse earth-blocking plate 233 can be driven into the soil layer by impact, shield or high-jet water cutting.
[0057] Exemplarily, the support plate 231, the vertical earth-blocking plate 232 and the transverse earth-blocking plate 233 are all flat box-shaped structures, and a retractable blade is set at the insertion end of the plate. When working, the blade is extended, and the jack extrusion plate located in the underwater working sub-body 200 causes the blade to cut the soil layer to form an incision, and then the plate penetrates into the soil layer through the incision. After penetrating into place, the blade retracts. Optionally, the support plate 231, the vertical earth-blocking plate 232 and the transverse earth-blocking plate 233 are all stored vertically. During the construction process, the support plate 231 and the transverse earth-blocking plate 233 are taken out piece by piece and laid down, and extended from the support sheet body 240; if the size of the support plate 231, the vertical earth-blocking plate 232 and the transverse earth-blocking plate 233 does not meet the requirements, the length can be extended by welding or bolting until the size is sufficient to enclose the salvaged object 1000.
[0058] Furthermore, a detection system and a monitoring and command system are provided on the underwater operation sub-body 200. The detection system is used to locate the salvaged object 1000, detect the buried depth, and detect the water flow, and feed back the detection information to the monitoring and command system. The monitoring and command system is used to monitor the state of the salvage process and command and control the entire salvage process. Exemplarily, the detection system includes a data processing system, a current meter, an underwater optical measuring instrument, and a static penetration instrument. The data processing system is located in the control room inside the support sheet 240 of the underwater operation sub-body 200. The current meter is externally placed at the front end of the support sheet 240 of the underwater operation sub-body 200. The underwater optical measuring instrument is located at the bottom of the sub-body hull 210 of the underwater operation sub-body 200. The static penetration instrument is located in the support sheet 240 of the underwater operation sub-body 200. When measurement is required, the support sheet 240 opens the measurement hole and extends the static penetration probe into the soil layer. The monitoring and command system includes an underwater camera, an ultra-short baseline, a displacement sensor, a motion sensor, a monitoring display system and a command system. The monitoring and command system can control and transmit instructions to various positions and equipment of the underwater operation sub-body 200 and start related operations.
[0059] Furthermore, the surface operation mother body 100 includes a mother hull 110, on which a positioning device, a lifting device, a lifting system for controlling the lifting cable 20, and an operating system for controlling the navigation of the hull are arranged. Exemplarily, the positioning method of the positioning device can be anchor positioning or dynamic positioning; the lifting device can be a crane, an elevator, etc. The settings of the positioning device, the lifting device, the lifting system, and the operating system are all mature existing technologies in the field, and no further explanation is given here.
[0060] See also Figures 1 to 6 , taking a split salvage ship in a certain embodiment as an example, the salvage process is described:
[0061] S100: The split salvage ship sails to the shipwreck site, and the underwater operation sub-body 200 sinks to hover above the salvaged object 1000:
[0062] (1) Navigate the split salvage vessel to the shipwreck site and use the positioning system to locate the ship;
[0063] (2) After arriving at the sinking site, personnel and materials enter the underwater operation sub-body 200 from the surface operation mother body 100 through the docking transition cabin 10, unlock the locking device that locks the underwater operation sub-body 200 and the surface operation mother body 100, loosen the lifting cable 20 and the umbilical cable 30, and start the detection system, monitoring and command system;
[0064] (3) Control the water inflow of the ballast tank 221 so that the underwater operation sub-body 200 slowly leaves the surface operation main body 100;
[0065] (4) When the monitoring and command system detects that the underwater operation sub-body 200 has reached 30 meters above the salvaged object 1000, the ballast water tank 221 stops taking in water;
[0066] (5) Start the underwater propulsion system 260, adjust the underwater working sub-body 200 to align with the salvaged object 1000 through the horizontal propeller, and propel the underwater working sub-body 200 down to hover above the salvaged object 1000 through the vertical propeller.
[0067] S200, fixing the underwater operation sub-body 200 on the seabed:
[0068] (1) Detect the burial depth and soil conditions of the salvaged objects by using the detection system;
[0069] (2) The underwater propulsion system 260 pushes the underwater working sub-body 200 toward the salvaged object 1000 until the pile leg 250 is 5 meters close to the seabed soil layer;
[0070] (3) The vertical propeller is turned off, and water is introduced into the ballast tank 221, so that the underwater working sub-body 200 can sink vertically until the pile legs 250 are close to the soil layer;
[0071] (4) The ballast water tank 221 continues to take in water, maintaining the balance of the underwater working sub-body 200 and allowing the pile legs 250 to slowly insert into the mud.
[0072] S300, build salvage structure 230, salvage salvaged objects 1000:
[0073] (1) Based on the detection results of the detection system, the monitoring and command system controls a plurality of vertical earth-blocking plates 232 to be inserted into the soil layer around the salvaged object 1000 to surround the salvaged object 1000; then the vertical earth-blocking plates 232 and the sub-hull 210 are fixedly connected;
[0074] (2) The monitoring and command system commands the support plate 231 to pass through the avoidance opening of the vertical soil partition plate 232 to penetrate the soil layer at the bottom of the salvaged object 1000, and realizes the fixed connection between the support plate 231 and the support sheet 240, so as to realize the support of the salvaged object;
[0075] (3) The monitoring and command system directs the transverse earth-blocking plate 233 to be driven into the soil layer around the salvaged object 1000 along the bottom of the vertical earth-blocking plate 232 , and realizes the fixed connection between the transverse earth-blocking plate 233 and the supporting plate 240 .
[0076] S400, the underwater operation sub-body 200 leaves the seabed and returns to the surface operation main body 100 with the salvaged object 1000:
[0077] (1) According to the gravity G1 of the salvaged object 1000, the gravity G2 of the underwater working sub-body 200 and the resistance D of the pile leg 250, the lifting adjustment structure and the lifting cable 20 are controlled to make the underwater working sub-body 200 rise. For example:
[0078] Case 1: Control the ballast tank 221 to drain water. When "ballast tank reserve buoyancy F1> weight G1 of salvaged object 1000+ weight G2 of underwater operation sub-body 200+ resistance D of pile leg 250", pile leg 250 is pulled up, underwater operation sub-body 200 floats with salvaged object 1000, and then, start underwater propulsion system 260 to push underwater operation sub-body 200 back to surface operation mother body 100;
[0079] Case 2: After the ballast water tank 221 is drained, if "ballast tank reserve buoyancy F1 < weight G1 of salvaged object 1000 + weight G2 of underwater operation sub-body 200 + resistance D of pile leg 250", the airbag tank 222 is controlled to be inflated. When "ballast tank reserve buoyancy F1 + airbag tank 222 reserve buoyancy F2 > weight G1 of salvaged object 1000 + weight G2 of underwater operation sub-body 200 + resistance D of pile leg 250", the pile leg 250 is pulled up, and the underwater operation sub-body 200 floats with the salvaged object 1000. Subsequently, the underwater propulsion system 260 is started to push the underwater operation sub-body 200 back to the surface operation mother body 100.
[0080] Case three: after the ballast water tank 221 is drained and the airbag tank 222 is inflated, if "ballast tank reserve buoyancy F1 + airbag tank 222 reserve buoyancy F2 < weight G1 of salvaged object 1000 + weight G2 of underwater operation sub-body 200 + resistance D of pile leg 250", the lifting system of the surface operation mother body 100 is started, and the lifting cable 20 is tightened. When "ballast tank reserve buoyancy F1 + airbag tank 222 reserve buoyancy F2 + lifting force F3 of surface operation mother body 100 > weight G1 of salvaged object 1000 + weight G2 of underwater operation sub-body 200 + resistance D of pile leg 250", the pile leg 250 is pulled up, and the underwater operation sub-body 200 floats with the salvaged object 1000, and then the underwater propulsion system 260 is started to push the underwater operation sub-body 200 back to the surface operation mother body 100.
[0081] Case 4: After the ballast water tank 221 is drained, the airbag tank 222 is inflated, and the lifting cable 20 is tightened, if "ballast tank reserve buoyancy F1 + airbag tank 222 reserve buoyancy F2 + surface operation mother body 100 lifting force F3 < weight G1 of salvaged object 1000 + weight G2 of underwater operation sub-body 200 + resistance D of pile legs 250", the underwater propulsion system 260 is started, and when "ballast tank reserve buoyancy F1 + airbag tank 222 reserve buoyancy F2 + surface operation mother body 100 lifting force F3 + underwater propulsion system 260 propulsion force F4 > weight G1 of salvaged object 1000 + weight G2 of underwater operation sub-body 200 + resistance D of pile legs 250", the pile legs 250 are pulled up, and the underwater operation sub-body 200 floats with the salvaged object 1000 and pushes the underwater operation sub-body 200 back to the surface operation mother body 100.
[0082] S500, the underwater operation sub-body 200 and the surface operation main body 100 are combined:
[0083] (1) The underwater operation sub-body 200 docks with the surface operation mother body 100, and the mother body cabin 11 of the operation docking transition cabin 10 docks with the sub-body cabin 12;
[0084] (2) Locking the underwater operation sub-body 200 and the surface operation main body 100 with a locking device;
[0085] (3) Personnel of the underwater operation sub-body 200 enter the surface operation main body 100 through the transition cabin;
[0086] (4) Control the exhaust of the airbag compartment 222 and adjust the draft of the split-type salvage ship.
[0087] S600, the split salvage vessel carries the salvaged object 1000 back to the dock 2000, and unloads the salvage structure 230 and the salvaged object 1000:
[0088] (1) Starting the underwater propulsion system 260, the split salvage vessel sails to the dock 2000;
[0089] (2) The salvage structure 230 falls on the supporting pier 2100, the underwater hull and the vertical earth-blocking plate 232 are unfastened, and the supporting sheet 240 is unfastened from the supporting plate 231 and the transverse earth-blocking plate 233, so as to remove the salvage structure 230 and the salvaged object 1000;
[0090] (3) The salvaged object 1000 is left in the dock 2000, all water is drained from the dock 2000, and the salvaged object 1000 is dry-stored in the dock 2000, thus completing the salvage operation.
[0091] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A split type salvage ship, characterized in that: The invention comprises a surface operation mother body (100) and an underwater operation daughter body (200); the underwater operation daughter body (200) and the surface operation mother body (100) are connected in a split manner; the underwater operation daughter body (200) comprises a lifting adjustment structure, a daughter hull (210) and a salvage structure (230) arranged on the daughter hull (210); the lifting adjustment structure is used to adjust the relationship between the buoyancy and self-weight of the underwater operation daughter body (200) so as to make the underwater operation daughter body (200) dive or float; the salvage structure (230) is used to salvage and carry the salvaged object (1000).
2. The split salvage ship according to claim 1, characterized in that: The lifting and lowering adjustment structure is a ballast water tank (221) and / or an air bag tank (222).
3. The split type salvage ship according to claim 1, characterized in that: The underwater operation sub-body (200) and the surface operation mother body (100) are connected via a lifting cable (20), and the lifting cable (20) is used to provide traction force for the underwater operation sub-body (200).
4. The split type salvage ship according to claim 1, characterized in that: The underwater operation sub-body (200) further comprises an underwater propulsion system (260), wherein the underwater propulsion system (260) comprises a vertical propeller and a horizontal propeller, wherein the vertical propeller is used to propel the underwater operation sub-body (200) to move in a vertical direction, and the horizontal propeller is used to propel the underwater operation sub-body (200) or the split-type salvage vessel to sail in a horizontal direction.
5. The split salvage ship according to any one of claims 1 to 4, characterized in that: A docking transition chamber (10) is arranged inside the split-type salvage vessel, and the docking transition chamber (10) comprises a mother chamber (11) located at the bottom of the surface operation mother body (100) and a daughter chamber (12) located at the top of the underwater operation daughter body (200), and the mother chamber (11) and the daughter chamber (12) are capable of docking.
6. The split type salvage ship according to claim 5, characterized in that: A locking device is provided in the docking transition compartment (10), and the locking device is used to lock the surface operation mother body (100) and the underwater operation child body (200).
7. The split salvage ship according to any one of claims 1 to 4, characterized in that: Support sheets (240) are provided on both sides of the sub-hull (210) in the length direction, and the salvage structure (230) is located between the two support sheets (240).
8. The split type salvage ship according to claim 7, characterized in that: The salvage structure (230) comprises at least one support plate (231), wherein the support plate (231) is partially located within the support sheet (240) and is capable of passing through the soil layer at the bottom of the salvaged object (1000) in a horizontal direction to support the salvaged object (1000).
9. The split salvage ship according to claim 8, characterized in that: The salvage structure (230) further comprises a plurality of vertical earth-blocking plates (232), wherein the vertical earth-blocking plates (232) are capable of penetrating into the soil layer in a vertical direction, and wherein the vertical earth-blocking plates (232) are provided with escape openings for allowing the support plates (231) to pass through, and the vertical earth-blocking plates (232) and the support plates (231) form a bearing structure for supporting the salvaged object (1000).
10. The split type salvage ship according to claim 9, characterized in that: The salvage structure (230) further comprises at least one transverse earth-blocking plate (233), the support plate (231) being partially located within the support plate body (240), the transverse earth-blocking plate (233) being capable of penetrating into the soil layer in a horizontal direction, the transverse earth-blocking plate (233) being located at the bottom of the vertical earth-blocking plate (232), and forming a closed cabin enclosing the salvaged object (1000) together with the vertical earth-blocking plate (232).