Gantry crane girder hoisting system
The inward intersection of the wind cables is connected to the track ground anchor, which solves the problem of contact and collision between the main beam of the gantry crane and the lifting frame when lifting, and improves the lifting efficiency.
Patent Information
- Application Number
- CN202420497847.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The main beam of the existing gantry crane is prone to contact and collision with the lifting frame during lifting, which affects the hoisting efficiency.
Wind cable A, wind cable B, wind cable C and wind cable D are used to converge and connect to the ground anchors on both sides and in the middle of the track to ensure that the main beam will not come into contact with the cables when lifting. Through the design of the legs and track Avoid collisions.
It effectively avoids the contact interference between the main beam and the cable, and improves the lifting efficiency.
Smart Images

Figure CN221836614U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a main beam hoisting system for a gantry crane and belongs to the technical field of gantry crane installation and construction. Background Art
[0002] During construction, a gantry crane (also called a crane) is required to lift prefabricated components. The gantry crane itself is large in size, and after the production of the entire equipment is completed, the main beam and other components need to be lifted at the construction site.
[0003] The main beam installation technology of the existing crane is shown in Chinese patent publication number CN102146660A. The disclosed technology is: a lifting frame is installed at the side of the outrigger at the construction site, a crane is installed on the top of the lifting frame, and the main beam is connected to the outrigger through a cable, and then the main beam is lifted and installed on the outrigger by the lifting frame; although the main beam of the gantry crane can be installed on the outrigger with the help of the lifting frame as a force-bearing support body, since the lifting frame is on the inner side of the outrigger, there is a problem that the main beam of the gantry crane will contact and collide with the lifting frame during lifting, affecting the lifting efficiency. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a main beam hoisting system for a gantry crane.
[0005] The utility model is realized through the following technical solutions.
[0006] The utility model provides a gantry crane main beam hoisting system, comprising:
[0007] Legs in upright position;
[0008] Wind cables A, B, C and D, one end of each of the wind cables A and B is connected to the top of the outriggers at intervals, and the other ends of the wind cables A and B are connected inwards and intersected;
[0009] One end of the wind cable C and the wind cable D is connected to the top case of the supporting leg at intervals, and the other end of the wind cable C and the wind cable D is connected inwardly and intersectingly.
[0010] It also includes a construction ground and a track, and the legs are installed on the construction ground via the track.
[0011] There are two corresponding legs and two tracks, the two tracks are distributed on the construction ground in parallel and at intervals, and the two legs are correspondingly installed on the construction ground through the tracks.
[0012] Ground anchors are pre-buried on the construction ground. Three ground anchors are sequentially distributed in the middle and on both sides of the two tracks, and the ground anchors correspond to the middle of the track.
[0013] The other ends of the wind cables A and B are converged and connected to the ground anchor on the outer side of the track.
[0014] The other ends of the wind cables C and D are inwardly converged and connected to the ground anchor in the middle of the track.
[0015] The beneficial effects of the utility model are as follows: based on the main beam hoisting system of the gantry crane, when the main beam is lifted, the wind cables A, B, C and D are retracted and intersected on the ground anchors on both sides and the middle of the track; the main beam of the gantry crane will not easily contact and interfere with the wind cables A, B, C and D, thus solving the problem that the main beam of the gantry crane will contact and collide with the lifting frame when lifting due to the lifting frame being on the inner side of the support leg, affecting the lifting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the main view distribution of the outriggers of the utility model when they are hoisted;
[0017] Figure 2 This is a top view distribution diagram of the outriggers of the utility model when they are hoisted;
[0018] Figure 3 This is a schematic diagram of the main view distribution of the main beam of the utility model when it is hoisted;
[0019] Figure 4 This is a top view distribution diagram of the main beam of the utility model when it is hoisted;
[0020] In the figure: 1-construction ground; 2-track; 3-ground anchor; 4-crane A; 5-outrigger; 51-wind cable A; 52-wind cable B; 53-wind cable C; 54-wind cable D; 6-main beam; 61-crane B; 62-crane C. DETAILED DESCRIPTION
[0021] The technical solution of the utility model is further described below, but the scope of protection required is not limited to the description.
[0022] like Figures 1 to 4 shown.
[0023] A gantry crane main beam hoisting construction method of the present application comprises:
[0024] Step 1: Install the track 2 on the construction ground 1 made of concrete and steel bars, where the track 2 is distributed in two parallel intervals; pre-embed ground anchors 3 in the construction ground 1 on both sides and in the middle of the track 2, where three ground anchors 3 are distributed in sequence in the middle and on both sides of the two tracks 2, and the ground anchors 3 correspond to the middle of the track 2.
[0025] Step 2: Use a crane A4 to correspondingly install two legs 5 on two parallel and spaced tracks 2, and install a wind cable A51, a wind cable B52, a wind cable C53 and a wind cable D54 on the top of a single leg 5, one end of the wind cable A51 and the wind cable B52 are spaced and tied to the top case of the leg 5, and the other ends of the wind cables A51 and the wind cables B52 are inwardly intersected and tied to the anchor 3 on the outer side of the track 2; one end of the wind cable C53 and the wind cable D54 are spaced and tied to the top case of the leg 5, and the other ends of the wind cables C53 and the wind cables D54 are inwardly intersected and tied to the anchor 3 in the middle of the track 2. At this time, the leg 5 is stably connected to the anchor 23 through the wind cables A51, the wind cables B52, the wind cables C53 and the wind cables D54, and is in a stable state.
[0026] Step 3: Assemble the main beam 6 of the gantry crane on the construction ground 1 on the sides of the two outriggers 5, connect the two ends of the main beam 6 on the sides of the outriggers 5 through cranes B61 and C62, and then cranes B61 and C62 synchronously lift the main beam 6 to form a main beam lifting system for the gantry crane, and then use cranes B61 and C62 to lift it onto the two outriggers 5 for installation. The rotating arc path of cranes B61, C62 and A4 during lifting is the dotted line in the top view.
[0027] Based on the constructed gantry crane main beam hoisting system, when the main beam 6 is lifted, the wind cables A51, B52, C53 and D54 converge inwardly on the ground anchors 3 on both sides and in the middle of the track 2; the main beam 6 of the gantry crane will not easily contact and interfere with the wind cables A51, B52, C53 and D54, thereby solving the problem that the main beam of the gantry crane will contact and collide with the lifting frame when lifting due to the lifting frame being on the inner side of the support leg, affecting the lifting efficiency.
Claims
1. A gantry crane main beam hoisting system, characterized in that: include: Legs (5) in an upright position; It also includes a wind cable A (51), a wind cable B (52), a wind cable C (53) and a wind cable D (54), wherein one end of the wind cable A (51) and the wind cable B (52) are spaced apart and fastened to the top case of the supporting leg (5), and the other ends of the wind cable A (51) and the wind cable B (52) are inwardly intersected and fastened; One end of the wind cable C (53) and the wind cable D (54) is connected to the top case of the supporting leg (5) at intervals, and the other end of the wind cable C (53) and the wind cable D (54) is connected inwardly and intersectingly.
2. The main beam hoisting system for a gantry crane according to claim 1, characterized in that: It also comprises a construction ground (1) and a track (2), wherein the supporting legs (5) are installed on the construction ground (1) via the track (2).
3. The main beam hoisting system for a gantry crane according to claim 2, characterized in that: The number of the supporting legs (5) and the number of the tracks (2) is two, the two tracks (2) are distributed in parallel and at intervals on the construction ground (1), and the two supporting legs (5) are installed on the construction ground (1) via the tracks (2).
4. The main beam hoisting system for a gantry crane according to claim 3, characterized in that: Ground anchors (3) are pre-buried on the construction ground (1). Three ground anchors (3) are sequentially distributed in the middle and on both sides of the two tracks (2). The ground anchors (3) correspond to the middle of the track (2).
5. The main beam hoisting system for a gantry crane according to claim 1, characterized in that: The other ends of the wind cables A (51) and B (52) are inwardly converged and connected to the ground anchor (3) on the outer side of the track (2).
6. The main beam hoisting system for a gantry crane according to claim 1, characterized in that: The other ends of the wind cables C (53) and D (54) are inwardly converged and connected to the ground anchor (3) in the middle of the track (2).
Citation Information
Cited By
Gantry crane girder hoisting construction method
CN118255267A
