Pulping and grouting integrated filling equipment for rock mass blasting

By designing integrated grouting and grouting filling equipment in rock mass blasting technology, separately producing and combining A and B materials, and combining with pneumatic grouting pumps and elastic check components, the problem of early condensation of blocking slurry is solved and realized Efficient filling effect and safe blasting operation are achieved.

CN221840276UActive Publication Date: 2024-10-15MAANSHAN INST OF MINING RES BLASTING ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420505176.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-10-15
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

In the existing rock mass blasting technology, the sealing slurry is easy to solidify in advance before reaching the filling point, causing problems such as blockage of the delivery pipe, cold isolation, and pores. It reduces the solidity after solidification, affects the smooth progress of the blasting work, and poses safety hazards. .

Method used

Design an integrated grouting and grouting filling equipment for rock mass blasting. Material A and material B are produced separately, transported by a pneumatic grouting pump, and merged in the grouting channel to form a new filling and quick-setting material to avoid premature condensation. At the same time, elastic check components and air hole sheets are used to prevent backflow and excessive material spillage.

Benefits of technology

It effectively avoids premature condensation, ensures grouting quality and solidification solidity, ensures the sealing effect of explosive points, ensures the smooth progress of blasting work, saves materials, and reduces waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221840276U_ABST
    Figure CN221840276U_ABST
Patent Text Reader

Abstract

The utility model discloses pulping and grouting integrated filling equipment for rock mass blasting, which comprises a plugging pipe, a grouting channel and a slurry return channel are arranged in the plugging pipe, the slurry return channel is positioned right above the grouting channel, an elastic non-return component is arranged in one end, used for being inserted into blasting surrounding rock, of the grouting channel, and the other end of the grouting channel is connected with the plugging pipe. A three-way mixing pipe used for gathering the material A and the material B is arranged at the end, away from the blasting surrounding rock, of the grouting channel. According to the device, the material A pulping barrel and the material B pulping barrel are used for separately manufacturing the components of the synthetic quick-setting material, the material A and the material B can be respectively kept in a liquid state for a long time, and the material A and the material B are separately conveyed by the first conveying pipe and the second conveying pipe; the material A and the material B are intersected and mixed in the three-way mixing pipe to form a quick-setting material, and the quick-setting material enters the filling part through the grouting pipeline to be quickly coagulated, so that the condition of coagulation in advance is effectively avoided, the grouting quality and the coagulation firmness are ensured, the plugging effect on explosive points is ensured, and the blasting work is smoothly carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of rock mass blasting, in particular to a grouting and grouting integrated filling device for rock mass blasting. Background Art

[0002] The mining of deep-earth mineral resources and the development and utilization of space are inseparable from the excavation of rock engineering. Drilling and blasting is currently one of the main means of rock blasting and excavation. Usually, a blasthole is dug out in the rock layer to be blasted, and the blasting explosive is placed in the deepest position of the hole. After placement, the hole is filled with sealing slurry. After the sealing slurry solidifies, the blasting explosive is detonated to exert the maximum blasting force of the explosive.

[0003] However, in the current technical means, the plugging slurry used to fill the blasthole channel is easy to solidify in advance before reaching the predetermined filling position, which greatly reduces the fluidity of the plugging slurry, which not only causes the transmission pipe to be blocked, but also easily produces cold shuts, air holes and other conditions, reduces the firmness of the plugging slurry after solidification, and makes the plugging effect unable to achieve the best, which is easy to affect the smooth progress of the blasting work and even cause safety hazards. To this end, we propose an integrated grouting and grouting filling device for rock blasting. Utility Model Content

[0004] The utility model aims to provide an integrated grouting and grouting filling device for rock blasting, in which the components constituting the coagulating material are separately produced and transported, and the two groups of coagulating materials can remain in a liquid state for a long time before merging, so as to avoid premature coagulation of the materials during the transportation process, and they are melted together before entering the grouting channel to form a new type of filling quick-setting material, so as to quickly seal the blastholes in the blasting surrounding rock, thereby solving the problems in the prior art.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A grouting and grouting integrated plugging device for rock blasting, comprising a plugging pipe, wherein a grouting channel and a return grouting channel are arranged inside the plugging pipe, the return grouting channel is located directly above the grouting channel, an elastic non-return component is arranged inside the end of the grouting channel for inserting into the blasting surrounding rock, and a three-way mixing tube for gathering material A and material B is arranged at the end of the grouting channel away from the blasting surrounding rock, one of the input ports of the three-way mixing tube is connected to the inside of the material A slurry barrel through a first conveying pipe, and the other input port of the three-way mixing tube is connected to the inside of the material B slurry barrel through a second conveying pipe.

[0007] Preferably, the middle sections of the first delivery pipe and the second delivery pipe are connected with a pneumatic grouting pump for delivering material A and material B.

[0008] Preferably, a grouting pipe is provided at one end of the grouting channel away from the blasting surrounding rock.

[0009] Preferably, the elastic check assembly includes a connecting ring and an elastic sheet, the outer peripheral surface of the connecting ring is welded to the inner wall of the grouting channel, the elastic sheet is arranged on the side of the connecting ring facing the blasting surrounding rock, a fixing strip is provided on the axis of the side of the elastic sheet facing the connecting ring, and the elastic sheet is connected to the connecting ring through the fixing strip.

[0010] Preferably, the elastic sheet is provided with hard edge portions on both sides of the fixing strip, and the hard edge portions abut against a side of the connecting ring facing the blasting surrounding rock.

[0011] Preferably, one end of the return slurry channel for inserting into the blasting surrounding rock is provided with a pore sheet.

[0012] Preferably, the caliber of the return grouting channel is smaller than the caliber of the grouting channel.

[0013] Preferably, a sealing cushion is fixedly connected to the outer wall of one end of the plugging pipe for inserting into the blasting surrounding rock, and the sealing cushion is made of elastic material.

[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0015] 1. The utility model is provided with a slurry barrel for material A and a slurry barrel for material B to separately prepare the components of the synthetic quick-setting material. Material A and material B can each keep a liquid state for a long time. A first conveying pipe and a second conveying pipe are provided to separately convey material A and material B. Material A and material B are intersected and mixed in a three-way mixing pipe to form quick-setting materials, which enter the filling part through a grouting pipe and are quickly solidified, thereby effectively avoiding the occurrence of premature solidification, ensuring the grouting quality and solidification firmness, ensuring the blocking effect on the explosive point, and allowing the blasting work to proceed smoothly.

[0016] 2. The utility model is provided with an elastic sheet to prevent the slurry from flowing back through the grouting channel, and an air hole sheet is provided to provide pre-resistance for the filling slurry, restricting the quick-setting material from flowing into the return slurry channel, thereby ensuring the grouting density of the filling part and saving materials, and avoiding excessive outflow of quick-setting materials and causing waste. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 This is a position relationship diagram of the plugging pipe and the blasting surrounding rock of the utility model;

[0019] Figure 3 This is an axonometric view of the plugging pipe of the utility model;

[0020] Figure 4 This is a cross-sectional view of the plugging pipe of the utility model;

[0021] Figure 5This is a cross-sectional view of the plugging pipe of the utility model;

[0022] Figure 6 This is a diagram of the first state of the elastic sheet of the utility model;

[0023] Figure 7 This is a diagram of the second state of the elastic sheet of the utility model.

[0024] In the figure: 1. Sealing pipe; 10. Blasting surrounding rock; 101. Explosive point; 102. Filling part; 11. Grouting channel; 12. Return grouting channel; 2. Elastic check assembly; 21. Connecting ring; 22. Elastic sheet; 23. Fixing strip; 24. Hard edge; 3. Three-way mixing pipe; 4. A material slurry barrel; 41. First conveying pipe; 5. B material slurry barrel; 51. Second conveying pipe; 6. Pneumatic grouting pump; 7. Return grouting pipe; 8. Air hole sheet; 9. Sealing cushion. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] In order to solve the problems in the prior art that the plugging slurry is easy to solidify before reaching the filling point, which is easy to block the conveying pipeline, and the firmness of the slurry after solidification is reduced, which cannot meet the blasting requirements, the following technical solution is provided. Please refer to Figure 1-7 ;

[0027] A grouting and grouting integrated filling device for rock blasting comprises a plugging pipe 1, a grouting channel 11 and a return grouting channel 12 are arranged inside the plugging pipe 1, the return grouting channel 12 is located directly above the grouting channel 11, an elastic check assembly 2 is arranged inside the end of the grouting channel 11 for inserting into the blasting surrounding rock 10, a three-way mixing tube 3 for gathering material A and material B is arranged at the end of the grouting channel 11 away from the blasting surrounding rock 10; one of the input ports of the three-way mixing tube 3 is connected to the inside of the material A slurry barrel 4 through a first conveying pipe 41, and the other input port of the three-way mixing tube 3 is connected to the inside of the material B slurry barrel 5 through a second conveying pipe 51; a pneumatic grouting pump 6 for conveying material A and material B is connected to the middle section of the first conveying pipe 41 and the second conveying pipe 51; a return grouting tube 7 is arranged at the end of the return grouting channel 12 away from the blasting surrounding rock 10.

[0028] Specifically, when material A and material B are slurried separately, they can remain in a liquid state for a long time. Once material A and material B are mixed, they can solidify quickly. The pneumatic grouting pump 6 pumps material A and material B out of the material A slurry barrel 4 and the material B slurry barrel 5 respectively. Material A and material B are transported through the first delivery pipe 41 and the second delivery pipe 51 respectively. The terminals of the first delivery pipe 41 and the second delivery pipe 51 are connected to the three-way mixing pipe 3. Material A and material B are combined in the three-way mixing pipe 3 to form a new type of filling quick-setting material, and are injected into the grouting channel 11.

[0029] Specifically, the plugging tube 1 needs to be inserted into the blasting surrounding rock 10 when in use, and the new filling quick-setting material is transported along the grouting channel 11 to the front of the explosive point 101 in the blasting surrounding rock 10, and flows out in the filling part 102. The air in the filling part 102 is discharged through the return grouting channel 12. After the filling part 102 is filled, the excess quick-setting material overflows through the return grouting channel 12 and the return grouting tube 7. After the overflow, the plugging tube 1 can be slowly pulled out to complete the filling operation.

[0030] The elastic check assembly 2 includes a connecting ring 21 and an elastic sheet 22. The outer peripheral surface of the connecting ring 21 is welded to the inner wall of the grouting channel 11. The elastic sheet 22 is arranged on the side of the connecting ring 21 facing the blasting surrounding rock 10. A fixing strip 23 is provided on the axis of the side of the elastic sheet 22 facing the connecting ring 21. The elastic sheet 22 is connected to the connecting ring 21 through the fixing strip 23. The fixing strip 23 can increase the connection surface between the elastic sheet 22 and the connecting ring 21, so that the elastic sheet 22 is more stably fixed on the connecting ring 21.

[0031] Specifically, the elastic sheet 22 abuts against the connecting ring 21 when it is stationary. When the quick-setting material is injected into the filling part 102, the elastic sheet 22 on both sides of the fixed strip 23 is opened, and the elastic sheet 22 elastically deforms along the injection direction to open the injection channel. When the injection direction changes, that is, backflow occurs, the elastic sheet 22 can restore to its initial state and abut against one side of the connecting ring 21, thereby sealing the grouting channel 11 and preventing backflow.

[0032] The elastic sheet 22 is located on both sides of the fixing bar 23 and is provided with hard edge portions 24. The hard edge portions 24 abut against the side of the connecting ring 21 facing the blasting surrounding rock 10. The hard edge portions 24 ensure that the edge of the elastic sheet 22 will not be deformed under the pressure of the reflux material, and can always be fully fitted with the connecting ring 21, effectively blocking the grouting channel 11 when reflux occurs.

[0033] The return grouting channel 12 is used to insert a porous sheet 8 at one end of the blasting surrounding rock 10. When the quick-setting material is injected, the air in the filling part 102 can pass through the pores on the porous sheet 8 and be discharged from the return grouting channel 12. At the same time, the porous sheet 8 prevents the quick-setting material from overflowing to a certain extent, and provides a pre-resistance to make the quick-setting material densely filled in the filling part 102, which not only ensures the density of the injected material, but also effectively reduces the waste of materials.

[0034] The caliber of the return grout channel 12 is smaller than the caliber of the grouting channel 11 .

[0035] The plugging pipe 1 is used to be inserted into the blasting surrounding rock 10. One end of the outer wall is fixedly connected with a sealing gasket 9. The sealing gasket 9 is made of elastic material and is used to fill the gap between the plugging pipe 1 and the blasting surrounding rock 10 to prevent the quick-setting material from leaking from the gap.

[0036] Working principle: when material A and material B are slurried separately, they can remain in liquid state for a long time. The pneumatic grouting pump 6 pumps out material A and material B, and material A and material B are combined in the three-way mixing tube 3 to form a new type of filling quick-setting material, which is injected into the grouting channel 11. The new type of filling quick-setting material is transported along the grouting channel 11 to the front of the explosive point 101 in the blasting surrounding rock 10, and flows out in the filling part 102. After the filling part 102 is filled, the excess quick-setting material overflows through the return grouting channel 12 and the return grouting tube 7. After overflowing, the sealing tube 1 can be slowly drawn out to complete the filling operation.

[0037] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integrated grouting and grouting filling device for rock blasting, comprising a plugging pipe (1), characterized in that: The plugging pipe (1) is provided with a grouting channel (11) and a return grouting channel (12) inside. The return grouting channel (12) is located directly above the grouting channel (11). An elastic check assembly (2) is provided inside one end of the grouting channel (11) for inserting into the blasting surrounding rock (10). An end of the grouting channel (11) away from the blasting surrounding rock (10) is provided with a three-way mixing pipe (3) for merging material A and material B together. One input port of the three-way mixing pipe (3) is connected to the inside of the material A slurry barrel (4) through a first conveying pipe (41), and the other input port of the three-way mixing pipe (3) is connected to the inside of the material B slurry barrel (5) through a second conveying pipe (51).

2. The grouting and grouting integrated filling equipment for rock blasting according to claim 1 is characterized in that: The middle sections of the first conveying pipe (41) and the second conveying pipe (51) are connected to a pneumatic grouting pump (6) for conveying material A and material B.

3. The grouting and grouting integrated filling equipment for rock blasting according to claim 2 is characterized in that: A return grout pipe (7) is provided at one end of the return grout channel (12) away from the blasting surrounding rock (10).

4. The grouting and grouting integrated filling equipment for rock blasting according to claim 3 is characterized in that: The elastic check assembly (2) comprises a connecting ring (21) and an elastic sheet (22); the outer peripheral surface of the connecting ring (21) is welded to the inner wall of the grouting channel (11); the elastic sheet (22) is arranged on a side of the connecting ring (21) facing the blasting surrounding rock (10); a fixing strip (23) is arranged on the axis of the side of the elastic sheet (22) facing the connecting ring (21); and the elastic sheet (22) is connected to the connecting ring (21) via the fixing strip (23).

5. The grouting and grouting integrated filling equipment for rock blasting according to claim 4, characterized in that: The elastic sheet (22) is provided with hard edge portions (24) on both sides of the fixing strip (23), and the hard edge portions (24) are in contact with the side of the connecting ring (21) facing the blasting surrounding rock (10).

6. The grouting and grouting integrated filling equipment for rock blasting according to claim 5, characterized in that: One end of the return slurry channel (12) for inserting into the blasting surrounding rock (10) is provided with a pore sheet (8).

7. The grouting and grouting integrated filling equipment for rock blasting according to claim 6, characterized in that: The caliber of the return grout channel (12) is smaller than the caliber of the grouting channel (11).

8. The grouting and grouting integrated filling equipment for rock blasting according to claim 7, characterized in that: The plugging pipe (1) is used to be inserted into the blasting surrounding rock (10), and a sealing cushion (9) is fixedly connected to the outer wall of one end thereof. The sealing cushion (9) is made of elastic material.